Implementation of MFT rails inside Cage#14278
Conversation
|
REQUEST FOR PRODUCTION RELEASES: This will add The following labels are available |
shahor02
left a comment
There was a problem hiding this comment.
@mario6829 thanks! Is this the only change which is expected in the geometry? I'll need to regenerate the materials LUT.
|
Hi @shahor02 what I implemented so far are the rails running all along the inner cage walls, which I believe are the main contributors to the material budget. I am currently implementing also the support blocks which are at the two ends of the rails and fix them to the cage edges; they may be less important due to their somehow more peripheral position. I plan to have them ready in 2-3 days. |
|
@mario6829 OK, thanks. We are planning to start a Pb24 apass2 next week, would be good to have all the geometry changes by that time to have the mat. LUT regenerated. |
The MFT rails inside the barrel Cage were implemented following the CAD data. Their contribution to material budget is evident from gamma conversion.