Skip to content

Merge pull request #2235 from softlayer/dependabot/pip/sphinx-9.1.0 #1694

Merge pull request #2235 from softlayer/dependabot/pip/sphinx-9.1.0

Merge pull request #2235 from softlayer/dependabot/pip/sphinx-9.1.0 #1694

Triggered via push February 27, 2026 21:30
Status Failure
Total duration 1m 28s
Artifacts

tests.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

7 errors
test (3.11)
Process completed with exit code 1.
test (3.10)
The strategy configuration was canceled because "test._3_11" failed
test (3.12)
The strategy configuration was canceled because "test._3_11" failed
test (3.8)
The strategy configuration was canceled because "test._3_11" failed
test (3.8)
The operation was canceled.
coverage
Process completed with exit code 1.
analysis
Process completed with exit code 16.