diff --git a/Snakefile b/Snakefile index b6402cae..187f62be 100644 --- a/Snakefile +++ b/Snakefile @@ -11,7 +11,7 @@ configfile: "config.yaml" rule compile_cost_assumptions: input: - inflation_rate="inputs/prc_hicp_aind__custom_9928419_spreadsheet.xlsx", + inflation_rate="inputs/Eurostat_inflation_rates.xlsx", pypsa_costs="inputs/costs_PyPSA.csv", fraunhofer_costs="inputs/Fraunhofer_ISE_costs.csv", fraunhofer_energy_prices="inputs/Fraunhofer_ISE_energy_prices.csv", @@ -49,7 +49,7 @@ rule compile_cost_assumptions_usa: year=config["nrel_atb"]["nrel_atb_input_years"], ), nrel_atb_manual_input_usa="inputs/US/manual_input_usa.csv", - eur_inflation_rate="inputs/prc_hicp_aind__custom_9928419_spreadsheet.xlsx", + inflation_rate="inputs/Eurostat_inflation_rates.xlsx", nrel_atb_input_discount_rate="inputs/US/discount_rates_usa.csv", nrel_atb_input_fuel_costs="inputs/US/fuel_costs_usa.csv", output: diff --git a/docs/release_notes.rst b/docs/release_notes.rst index ba9d9238..3748069d 100644 --- a/docs/release_notes.rst +++ b/docs/release_notes.rst @@ -40,6 +40,8 @@ Upcoming Release * Switch to `python-calamine` as engine for reading Excel files in `pandas`, greatly improving performance (https://github.com/PyPSA/technology-data/pull/188) +* Inflation rates input file `inputs/prc_hicp_aind__custom_9928419_spreadsheet.xlsx` reporting inflation rates for Europe and US and dating back to Jan 2024 substituted by 'Eurostat_inflation_rates.xlsx` dating back to Feb 2025 + Convert EUR data in `manual_input_usa.csv` in USD + Include inflation adjustments for USD (https://github.com/PyPSA/technology-data/pull/193) + * Update scenarios for US-specific eletrolyzer investment cost (https://github.com/PyPSA/technology-data/pull/194) `v0.11.0 `__ (24th January 2025) diff --git a/docs/structure.rst b/docs/structure.rst index 5a6f959c..5e16a84f 100644 --- a/docs/structure.rst +++ b/docs/structure.rst @@ -39,7 +39,7 @@ This repository has the following structure: .. literalinclude:: ../config.yaml :language: yaml - :lines: 4-40 + :lines: 4-41 The following parameters can be set in the ``config.yaml`` diff --git a/inputs/Eurostat_inflation_rates.xlsx b/inputs/Eurostat_inflation_rates.xlsx new file mode 100644 index 00000000..bf24b8e1 Binary files /dev/null and b/inputs/Eurostat_inflation_rates.xlsx differ diff --git a/inputs/US/manual_input_usa.csv b/inputs/US/manual_input_usa.csv index bbc75eb4..8bfc94ed 100644 --- a/inputs/US/manual_input_usa.csv +++ b/inputs/US/manual_input_usa.csv @@ -30,23 +30,23 @@ direct air capture,investment,2020,19180739.93,USD/t_CO2/h,2022,ICCT IRA e-fuels direct air capture,investment,2020,7103597.31,USD/t_CO2/h,2022,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,Market,Advanced direct air capture,electricity-input,2020,0.24,MWh_el/t_CO2,,ICCT IRA e-fuels assumptions ,,, direct air capture,heat-input,2020,1.17,MWh_th/t_CO2,,ICCT IRA e-fuels assumptions ,,, -Coal-IGCC,lifetime,2020,40,years,-,"JRC, 01_JRC-EU-TIMES Full model ",,, -Coal-IGCC-90%-CCS,lifetime,2030,40,years,-,"JRC, 01_JRC-EU-TIMES Full model ",,, -Coal-95%-CCS,lifetime,2030,40,years,-,"JRC, 01_JRC-EU-TIMES Full model ",,, -Coal-99%-CCS,lifetime,2030,40,years,-,"JRC, 01_JRC-EU-TIMES Full model ",,, -NG 2-on-1 Combined Cycle (F-Frame),lifetime,2030,30,years,-,"JRC, 01_JRC-EU-TIMES Full model ",,, -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,lifetime,2030,30,years,-,"JRC, 01_JRC-EU-TIMES Full model ",,, -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,lifetime,2030,30,years,-,"JRC, 01_JRC-EU-TIMES Full model ",,, +Coal-IGCC,lifetime,2020,40,years,-,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Coal-IGCC-90%-CCS,lifetime,2030,40,years,-,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Coal-95%-CCS,lifetime,2030,40,years,-,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Coal-99%-CCS,lifetime,2030,40,years,-,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +NG 2-on-1 Combined Cycle (F-Frame),lifetime,2030,30,years,-,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,lifetime,2030,30,years,-,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,lifetime,2030,30,years,-,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, Coal-95%-CCS,capture_rate,2030,0.95,per unit,-,"NREL, NREL ATB 2024",,, Coal-99%-CCS,capture_rate,2030,0.99,per unit,-,"NREL, NREL ATB 2024",,, Coal-IGCC-90%-CCS,capture_rate,2030,0.9,per unit,-,"NREL, NREL ATB 2024",,, NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,capture_rate,2030,0.95,per unit,-,"NREL, NREL ATB 2024",,, NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,capture_rate,2030,0.97,per unit,-,"NREL, NREL ATB 2024",,, -Coal-IGCC,efficiency,2020,0.5,p.u.,-,"JRC, 01_JRC-EU-TIMES Full model ",,, -Coal-IGCC-90%-CCS,efficiency,2030,0.403,p.u.,,"JRC, 01_JRC-EU-TIMES Full model ",,, +Coal-IGCC,efficiency,2020,0.5,p.u.,-,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Coal-IGCC-90%-CCS,efficiency,2030,0.403,p.u.,,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, NG 2-on-1 Combined Cycle (F-Frame),efficiency,2020,0.573,p.u.,-,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,, -Coal-95%-CCS,efficiency,2030,0.403,p.u.,-,"JRC, 01_JRC-EU-TIMES Full model ",,, -Coal-99%-CCS,efficiency,2030,0.403,p.u.,-,"JRC, 01_JRC-EU-TIMES Full model ",,, +Coal-95%-CCS,efficiency,2030,0.403,p.u.,-,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Coal-99%-CCS,efficiency,2030,0.403,p.u.,-,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, NG 2-on-1 Combined Cycle (F-Frame),efficiency,2030,0.573,p.u.,-,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,, NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,efficiency,2030,0.527,p.u.,-,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,, NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,efficiency,2030,0.525,p.u.,-,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,, @@ -58,50 +58,50 @@ Coal integrated retrofit 90%-CCS,efficiency,2030,0.386,p.u.,-,"NREL, “Cost and Coal integrated retrofit 95%-CCS,efficiency,2030,0.386,p.u.,-,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,, NG Combined Cycle F-Class integrated retrofit 90%-CCS,efficiency,2030,0.536,p.u.,-,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,, NG Combined Cycle F-Class integrated retrofit 95%-CCS,efficiency,2030,0.536,p.u.,-,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,, -Natural gas steam reforming,lifetime,2020,20,years,-,"JRC, 01_JRC-EU-TIMES Full model ",,, -Coal gasification,lifetime,2020,20,years,-,"JRC, 01_JRC-EU-TIMES Full model ",,, -Heavy oil partial oxidation,lifetime,2020,20,years,-,"JRC, 01_JRC-EU-TIMES Full model ",,, -Solid biomass steam reforming,lifetime,2020,20,years,-,"JRC, 01_JRC-EU-TIMES Full model ",,, -Biomass gasification,lifetime,2020,20,years,-,"JRC, 01_JRC-EU-TIMES Full model ",,, -Natural gas steam reforming CC,lifetime,2020,20,years,-,"JRC, 01_JRC-EU-TIMES Full model ",,, -Coal gasification CC,lifetime,2020,20,years,-,"JRC, 01_JRC-EU-TIMES Full model ",,, -Biomass gasification CC,lifetime,2020,20,years,-,"JRC, 01_JRC-EU-TIMES Full model ",,, -Natural gas steam reforming,efficiency,2020,0.75,p.u.,-,"JRC, 01_JRC-EU-TIMES Full model ",,, -Natural gas steam reforming,efficiency,2050,0.787,p.u.,-,"JRC, 01_JRC-EU-TIMES Full model ",,, -Coal gasification,efficiency,2020,0.56,p.u.,-,"JRC, 01_JRC-EU-TIMES Full model ",,, -Coal gasification,efficiency,2050,0.787,p.u.,-,"JRC, 01_JRC-EU-TIMES Full model ",,, -Heavy oil partial oxidation,efficiency,2020,0.734,p.u.,-,"JRC, 01_JRC-EU-TIMES Full model ",,, -Solid biomass steam reforming,FOM,2020,0.04,%/year,2010,"JRC, 01_JRC-EU-TIMES Full model ",,, -Solid biomass steam reforming,FOM,2020,0.05,%/year,2010,"JRC, 01_JRC-EU-TIMES Full model ",,, -Natural gas steam reforming CC,FOM,2030,0.05,%/year,2010,"JRC, 01_JRC-EU-TIMES Full model ",,, -Natural gas steam reforming CC,FOM,2050,0.05,%/year,2010,"JRC, 01_JRC-EU-TIMES Full model ",,, -Coal gasification CC,FOM,2030,0.07,%/year,2010,"JRC, 01_JRC-EU-TIMES Full model ",,, -Biomass gasification CC,FOM,2030,0.02,%/year,2010,"JRC, 01_JRC-EU-TIMES Full model ",,, -Solid biomass steam reforming,investment,2020,519.4,EUR/kW,2010,"JRC, 01_JRC-EU-TIMES Full model ",,, -Biomass gasification,investment,2020,1290.45,EUR/kW,2010,"JRC, 01_JRC-EU-TIMES Full model ",,, -Natural gas steam reforming CC,investment,2030,284.77,EUR/kW,2010,"JRC, 01_JRC-EU-TIMES Full model ",,, -Natural gas steam reforming CC,investment,2030,284.77,EUR/kW,2010,"JRC, 01_JRC-EU-TIMES Full model ",,, -Coal gasification CC,investment,2030,571.12,EUR/kW,2010,"JRC, 01_JRC-EU-TIMES Full model ",,, -Biomass gasification CC,investment,2030,2651.23,EUR/kW,2010,"JRC, 01_JRC-EU-TIMES Full model ",,, -Natural gas steam reforming,FOM,2020,0.05,%/year,2010,"JRC, 01_JRC-EU-TIMES Full model ",,, -Natural gas steam reforming,FOM,2030,0.05,%/year,2010,"JRC, 01_JRC-EU-TIMES Full model ",,, -Coal gasification,FOM,2020,0.06,%/year,2010,"JRC, 01_JRC-EU-TIMES Full model ",,, -Coal gasification,FOM,2030,0.06,%/year,2010,"JRC, 01_JRC-EU-TIMES Full model ",,, -Heavy oil partial oxidation,FOM,2020,0.05,%/year,2010,"JRC, 01_JRC-EU-TIMES Full model ",,, -Solid biomass steam reforming,efficiency,2020,0.712,p.u.,-,"JRC, 01_JRC-EU-TIMES Full model ",,, -Biomass gasification,efficiency,2020,0.35,p.u.,-,"JRC, 01_JRC-EU-TIMES Full model ",,, -Biomass gasification,efficiency,2050,0.525,p.u.,-,"JRC, 01_JRC-EU-TIMES Full model ",,, -Natural gas steam reforming CC,efficiency,2030,0.637,p.u.,-,"JRC, 01_JRC-EU-TIMES Full model ",,, -Natural gas steam reforming CC,efficiency,2050,0.695,p.u.,-,"JRC, 01_JRC-EU-TIMES Full model ",,, -Coal gasification CC,efficiency,2030,0.532,p.u.,-,"JRC, 01_JRC-EU-TIMES Full model ",,, -Coal gasification CC,efficiency,2030,0.609,p.u.,-,"JRC, 01_JRC-EU-TIMES Full model ",,, -Biomass gasification CC,efficiency,2030,0.328,p.u.,-,"JRC, 01_JRC-EU-TIMES Full model ",,, -Biomass gasification CC,efficiency,2040,0.514,p.u.,-,"JRC, 01_JRC-EU-TIMES Full model ",,, -Natural gas steam reforming,investment,2020,186.9,EUR/kW,2010,"JRC, 01_JRC-EU-TIMES Full model ",,, -Natural gas steam reforming,investment,2030,158.31,EUR/kW,2010,"JRC, 01_JRC-EU-TIMES Full model ",,, -Coal gasification,investment,2020,425.42,EUR/kW,2010,"JRC, 01_JRC-EU-TIMES Full model ",,, -Coal gasification,investment,2030,351,EUR/kW,2010,"JRC, 01_JRC-EU-TIMES Full model ",,, -Heavy oil partial oxidation,investment,2020,431.73,EUR/kW,2010,"JRC, 01_JRC-EU-TIMES Full model ",,, +Natural gas steam reforming,lifetime,2020,20,years,-,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Coal gasification,lifetime,2020,20,years,-,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Heavy oil partial oxidation,lifetime,2020,20,years,-,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Solid biomass steam reforming,lifetime,2020,20,years,-,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Biomass gasification,lifetime,2020,20,years,-,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Natural gas steam reforming CC,lifetime,2020,20,years,-,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Coal gasification CC,lifetime,2020,20,years,-,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Biomass gasification CC,lifetime,2020,20,years,-,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Natural gas steam reforming,efficiency,2020,0.75,p.u.,-,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Natural gas steam reforming,efficiency,2050,0.787,p.u.,-,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Coal gasification,efficiency,2020,0.56,p.u.,-,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Coal gasification,efficiency,2050,0.787,p.u.,-,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Heavy oil partial oxidation,efficiency,2020,0.734,p.u.,-,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Solid biomass steam reforming,FOM,2020,0.04,%/year,2010,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Solid biomass steam reforming,FOM,2020,0.05,%/year,2010,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Natural gas steam reforming CC,FOM,2030,0.05,%/year,2010,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Natural gas steam reforming CC,FOM,2050,0.05,%/year,2010,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Coal gasification CC,FOM,2030,0.07,%/year,2010,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Biomass gasification CC,FOM,2030,0.02,%/year,2010,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Solid biomass steam reforming,investment,2020,690.8,USD/kW,2010,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Biomass gasification,investment,2020,1716.3,USD/kW,2010,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Natural gas steam reforming CC,investment,2030,378.74,USD/kW,2010,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Natural gas steam reforming CC,investment,2030,378.74,USD/kW,2010,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Coal gasification CC,investment,2030,759.59,USD/kW,2010,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Biomass gasification CC,investment,2030,3526.14,USD/kW,2010,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Natural gas steam reforming,FOM,2020,0.05,%/year,2010,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Natural gas steam reforming,FOM,2030,0.05,%/year,2010,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Coal gasification,FOM,2020,0.06,%/year,2010,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Coal gasification,FOM,2030,0.06,%/year,2010,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Heavy oil partial oxidation,FOM,2020,0.05,%/year,2010,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Solid biomass steam reforming,efficiency,2020,0.712,p.u.,-,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Biomass gasification,efficiency,2020,0.35,p.u.,-,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Biomass gasification,efficiency,2050,0.525,p.u.,-,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Natural gas steam reforming CC,efficiency,2030,0.637,p.u.,-,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Natural gas steam reforming CC,efficiency,2050,0.695,p.u.,-,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Coal gasification CC,efficiency,2030,0.532,p.u.,-,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Coal gasification CC,efficiency,2030,0.609,p.u.,-,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Biomass gasification CC,efficiency,2030,0.328,p.u.,-,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Biomass gasification CC,efficiency,2040,0.514,p.u.,-,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Natural gas steam reforming,investment,2020,248.58,USD/kW,2010,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Natural gas steam reforming,investment,2030,210.55,USD/kW,2010,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Coal gasification,investment,2020,565.81,USD/kW,2010,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Coal gasification,investment,2030,466.83,USD/kW,2010,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, +Heavy oil partial oxidation,investment,2020,574.2,USD/kW,2010,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx`",,, Alkaline electrolyzer,lifetime,2020,30,years,-,ICCT IRA e-fuels assumptions ,,, PEM electrolyzer,lifetime,2020,30,years,-,ICCT IRA e-fuels assumptions ,,, SOEC,lifetime,2020,30,years,-,ICCT IRA e-fuels assumptions ,,, diff --git a/inputs/prc_hicp_aind__custom_9928419_spreadsheet.xlsx b/inputs/prc_hicp_aind__custom_9928419_spreadsheet.xlsx deleted file mode 100644 index d36f70d8..00000000 Binary files a/inputs/prc_hicp_aind__custom_9928419_spreadsheet.xlsx and /dev/null differ diff --git a/outputs/US/costs_2020.csv b/outputs/US/costs_2020.csv index 61f59613..48f4d857 100644 --- a/outputs/US/costs_2020.csv +++ b/outputs/US/costs_2020.csv @@ -6,12 +6,12 @@ Alkaline electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of s Alkaline electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Alkaline electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Alkaline electrolyzer,efficiency,0.65,p.u.,ICCT IRA e-fuels assumptions ,,,, -Alkaline electrolyzer,investment,1471.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Alkaline electrolyzer,investment,1471.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Alkaline electrolyzer,investment,1471.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Alkaline electrolyzer,investment,1471.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Alkaline electrolyzer,investment,662.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Alkaline electrolyzer,investment,662.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Alkaline electrolyzer,investment,1285.152772426615,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Alkaline electrolyzer,investment,1285.152772426615,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Alkaline electrolyzer,investment,1285.152772426615,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Alkaline electrolyzer,investment,1285.152772426615,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Alkaline electrolyzer,investment,578.3624305550096,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Alkaline electrolyzer,investment,578.3624305550096,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Alkaline electrolyzer,lifetime,30.0,years,ICCT IRA e-fuels assumptions ,,,, Ammonia cracker,FOM,4.3,%/year,"Ishimoto et al. (2020): 10.1016/j.ijhydene.2020.09.017 , table 7.","Estimated based on Labour cost rate, Maintenance cost rate, Insurance rate, Admin. cost rate and Chemical & other consumables cost rate.",2015.0,, Ammonia cracker,ammonia-input,1.46,MWh_NH3/MWh_H2,"ENGIE et al (2020): Ammonia to Green Hydrogen Feasibility Study (https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/880826/HS420_-_Ecuity_-_Ammonia_to_Green_Hydrogen.pdf), Fig. 10.",Assuming a integrated 200t/d cracking and purification facility. Electricity demand (316 MWh per 2186 MWh_LHV H2 output) is assumed to also be ammonia LHV input which seems a fair assumption as the facility has options for a higher degree of integration according to the report).,,, @@ -65,11 +65,11 @@ BioSNG,efficiency,0.6,per unit,"Danish Energy Agency, inputs/data_sheets_for_ren BioSNG,investment,2658.5,EUR/kW_th,"Danish Energy Agency, inputs/data_sheets_for_renewable_fuels.xlsx","84 Gasif. CFB, Bio-SNG: Specific investment",2020.0,, BioSNG,lifetime,25.0,years,TODO,"84 Gasif. CFB, Bio-SNG: Technical lifetime",2020.0,, Biomass gasification,efficiency,0.35,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Biomass gasification,investment,1467.7693,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Biomass gasification,investment,1978.8508861995015,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Biomass gasification,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Biomass gasification CC,FOM,0.02,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Biomass gasification CC,efficiency,0.328,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Biomass gasification CC,investment,3015.5325,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Biomass gasification CC,investment,4065.5510481055235,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Biomass gasification CC,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, BtL,C in fuel,0.2455,per unit,"Stoichiometric calculation, doi:10.1016/j.apenergy.2022.120016",,,, BtL,C stored,0.7545,per unit,"Stoichiometric calculation, doi:10.1016/j.apenergy.2022.120016",,,, @@ -225,11 +225,11 @@ Coal - IGCC,investment,5327.264195357951,USD/kW,NREL/ATB-https://data.openei.org Coal - IGCC,investment,5327.264195357951,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2020.0,R&D,Moderate Coal gasification,FOM,0.06,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Coal gasification,efficiency,0.56,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Coal gasification,investment,483.8765,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Coal gasification,investment,652.364749706077,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Coal gasification,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Coal gasification CC,FOM,0.07,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Coal gasification CC,efficiency,0.532,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Coal gasification CC,investment,649.5969,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Coal gasification CC,investment,875.7882332041481,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Coal gasification CC,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Coal integrated retrofit 90%-CCS,capture_rate,0.9,per unit,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, Coal integrated retrofit 90%-CCS,efficiency,0.386,p.u.,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, @@ -833,7 +833,7 @@ Fischer-Tropsch,carbondioxide-input,0.32,t_CO2/MWh_FT,ICCT IRA e-fuels assumptio Fischer-Tropsch,efficiency,0.7,per unit,ICCT IRA e-fuels assumptions ,,,, Fischer-Tropsch,electricity-input,0.04,MWh_el/MWh_FT,ICCT IRA e-fuels assumptions ,"0.005 MWh_el input per FT output, output increasing from 2020 to 2050 (0.65, 0.7, 0.73, 0.75 MWh liquid FT output).",,, Fischer-Tropsch,hydrogen-input,1.43,MWh_H2/MWh_FT,ICCT IRA e-fuels assumptions ,"0.995 MWh_H2 per output, output increasing from 2020 to 2050 (0.65, 0.7, 0.73, 0.75 MWh liquid FT output).",,, -Fischer-Tropsch,investment,1696429.0,USD/MW_FT,ICCT IRA e-fuels assumptions ,,2022.0,, +Fischer-Tropsch,investment,1482100.9058972877,USD/MW_FT,ICCT IRA e-fuels assumptions ,,2022.0,, Fischer-Tropsch,lifetime,20.0,years,ICCT IRA e-fuels assumptions ,,,, Gasnetz,FOM,2.5,%,"WEGE ZU EINEM KLIMANEUTRALEN ENERGIESYSEM, Anhang zur Studie, Fraunhofer-Institut für Solare Energiesysteme ISE, Freiburg",Gasnetz,2020.0,, Gasnetz,investment,28.0,EUR/kWGas,"WEGE ZU EINEM KLIMANEUTRALEN ENERGIESYSEM, Anhang zur Studie, Fraunhofer-Institut für Solare Energiesysteme ISE, Freiburg",Gasnetz,2020.0,, @@ -1015,7 +1015,7 @@ Haber-Bosch,lifetime,30.0,years,"Danish Energy Agency, inputs/data_sheets_for_re Haber-Bosch,nitrogen-input,0.1597,t_N2/MWh_NH3,"DECHEMA 2017: DECHEMA: Low carbon energy and feedstock for the European chemical industry (https://dechema.de/dechema_media/Downloads/Positionspapiere/Technology_study_Low_carbon_energy_and_feedstock_for_the_European_chemical_industry.pdf), pg. 57.",".33 MWh electricity are required for ASU per t_NH3, considering 0.4 MWh are required per t_N2 and LHV of NH3 of 5.1666 Mwh.",,, Heavy oil partial oxidation,FOM,0.05,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Heavy oil partial oxidation,efficiency,0.734,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Heavy oil partial oxidation,investment,491.0535,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Heavy oil partial oxidation,investment,662.0382094364353,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Heavy oil partial oxidation,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, HighT-Molten-Salt-charger,FOM,1.075,%/year,"Viswanathan_2022, NULL","{'carrier': ['elec', 'salthight'], 'technology_type': ['charger'], 'type': ['thermal'], 'note': ['Guesstimate, 50% on charger']}",2020.0,, HighT-Molten-Salt-charger,efficiency,0.99,per unit,"Viswanathan_2022, p.107 (p.129)","{'carrier': ['elec', 'salthight'], 'technology_type': ['charger'], 'type': ['thermal'], 'note': ['RTE assume 99% for charge and other for discharge']}",2020.0,, @@ -1961,11 +1961,11 @@ NH3 (l) transport ship,investment,81164200.0,EUR,"Cihlar et al 2020 based on IEA NH3 (l) transport ship,lifetime,20.0,years,"Guess estimated based on H2 (l) tanker, but more mature technology",,2019.0,, Natural gas steam reforming,FOM,0.05,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Natural gas steam reforming,efficiency,0.75,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Natural gas steam reforming,investment,212.5817,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Natural gas steam reforming,investment,286.6065101039866,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Natural gas steam reforming,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Natural gas steam reforming CC,FOM,0.05,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Natural gas steam reforming CC,efficiency,0.637,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Natural gas steam reforming CC,investment,323.8999,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Natural gas steam reforming CC,investment,436.6777280424164,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Natural gas steam reforming CC,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Ni-Zn-bicharger,FOM,2.0701,%/year,"Viswanathan_2022, p.51-52 in section 4.4.2","{'carrier': ['elec', 'nizn', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['Guesstimate 30% assumed of power components every 10 years ']}",2020.0,, Ni-Zn-bicharger,efficiency,0.9,per unit,"Viswanathan_2022, p.59 (p.81)","{'carrier': ['elec', 'nizn', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['((0.75-0.87)/2)^0.5 mean value of range efficiency is not RTE but single way AC-store conversion']}",2020.0,, @@ -2230,12 +2230,12 @@ PEM electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenar PEM electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PEM electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PEM electrolyzer,efficiency,0.63,p.u.,ICCT IRA e-fuels assumptions ,,,, -PEM electrolyzer,investment,2399.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PEM electrolyzer,investment,2399.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PEM electrolyzer,investment,2399.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PEM electrolyzer,investment,2399.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PEM electrolyzer,investment,447.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PEM electrolyzer,investment,447.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PEM electrolyzer,investment,2095.908566316417,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PEM electrolyzer,investment,2095.908566316417,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PEM electrolyzer,investment,2095.908566316417,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PEM electrolyzer,investment,2095.908566316417,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PEM electrolyzer,investment,390.52568951373,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PEM electrolyzer,investment,390.52568951373,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PEM electrolyzer,lifetime,30.0,years,ICCT IRA e-fuels assumptions ,,,, PHS,FOM,0.89,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2020.0,Market,Advanced PHS,FOM,0.89,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2020.0,Market,Conservative @@ -3125,12 +3125,12 @@ SOEC,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and finan SOEC,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced SOEC,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced SOEC,efficiency,0.82,p.u.,ICCT IRA e-fuels assumptions ,,,, -SOEC,investment,2651.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -SOEC,investment,2651.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -SOEC,investment,2651.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -SOEC,investment,2651.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -SOEC,investment,785.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -SOEC,investment,785.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +SOEC,investment,2316.0707000020097,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +SOEC,investment,2316.0707000020097,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +SOEC,investment,2316.0707000020097,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +SOEC,investment,2316.0707000020097,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +SOEC,investment,685.8225196158346,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +SOEC,investment,685.8225196158346,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced SOEC,lifetime,30.0,years,ICCT IRA e-fuels assumptions ,,,, Sand-charger,FOM,1.075,%/year,"Viswanathan_2022, NULL","{'carrier': ['elec', 'sand'], 'technology_type': ['charger'], 'type': ['thermal'], 'note': ['Guesstimate, 50% on charger']}",2020.0,, Sand-charger,efficiency,0.99,per unit,"Viswanathan_2022, p.107 (p.129)","{'carrier': ['elec', 'sand'], 'technology_type': ['charger'], 'type': ['thermal'], 'note': ['RTE assume 99% for charge and other for discharge']}",2020.0,, @@ -3145,7 +3145,7 @@ Sand-store,investment,8014.7441,EUR/MWh,"Viswanathan_2022, p.100 (p.122)","{'car Sand-store,lifetime,35.0,years,"Viswanathan_2022, p.107 (p.129)","{'carrier': ['sand'], 'technology_type': ['store'], 'type': ['thermal'], 'note': ['NULL']}",2020.0,, Solid biomass steam reforming,FOM,0.05,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Solid biomass steam reforming,efficiency,0.712,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Solid biomass steam reforming,investment,590.7702,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Solid biomass steam reforming,investment,796.4750872147151,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Solid biomass steam reforming,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Steam methane reforming,FOM,3.0,%/year,"International Energy Agency (2015): Technology Roadmap Hydrogen and Fuel Cells , table 15.",Large scale SMR facility (150-300 MW).,2015.0,, Steam methane reforming,investment,497454.611,EUR/MW_H2,"International Energy Agency (2015): Technology Roadmap Hydrogen and Fuel Cells , table 15.",Large scale SMR facility (150-300 MW). Currency conversion 1.17 USD = 1 EUR.,2015.0,, @@ -3695,7 +3695,7 @@ coal,discount rate,0.0394356097560977,per unit,"NREL, NREL ATB 2022",Meaning of coal,discount rate,0.0394356097560977,per unit,"NREL, NREL ATB 2022",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2018.0,R&D,Conservative coal,discount rate,0.0394356097560977,per unit,"NREL, NREL ATB 2022",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2018.0,R&D,Moderate coal,efficiency,0.356,p.u.,"Lazard's levelized cost of energy analysis - version 16.0 (2023): https://www.lazard.com/media/typdgxmm/lazards-lcoeplus-april-2023.pdf , pg. 49 (Levelized Cost of Energy - Key Assumptions), accessed: 2023-12-14.","Calculated based on average of listed range, i.e. 1 / ((8.75+12) MMbtu/MWh_th /2 / (3.4095 MMbtu/MWh_th)), rounded up.",2023.0,, -coal,fuel,6.25,USD/MWh_th,"EIA, https://www.eia.gov/coal/annual/",36.14 USD/short ton of bituminous coal with energy content = 19.73 million BTU/short ton,2023.0,, +coal,fuel,5.301330465152392,USD/MWh_th,"EIA, https://www.eia.gov/coal/annual/",36.14 USD/short ton of bituminous coal with energy content = 19.73 million BTU/short ton,2023.0,, coal,investment,3074.941437104792,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2020.0,Market,Conservative coal,investment,3074.941437104792,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2020.0,R&D,Conservative coal,investment,3074.941437104792,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2020.0,Market,Moderate @@ -3796,12 +3796,12 @@ direct air capture,compression-heat-output,0.2,MWh/tCO2,"Danish Energy Agency, i direct air capture,electricity-input,0.24,MWh_el/t_CO2,ICCT IRA e-fuels assumptions ,,,, direct air capture,heat-input,1.17,MWh_th/t_CO2,ICCT IRA e-fuels assumptions ,,,, direct air capture,heat-output,1.25,MWh/tCO2,"Danish Energy Agency, inputs/technology_data_for_carbon_capture_transport_storage.xlsx",403.a Direct air capture,2020.0,, -direct air capture,investment,12398844.91,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -direct air capture,investment,12398844.91,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -direct air capture,investment,19180739.93,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -direct air capture,investment,19180739.93,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -direct air capture,investment,7103597.31,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -direct air capture,investment,7103597.31,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +direct air capture,investment,10832365.677072823,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +direct air capture,investment,10832365.677072823,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +direct air capture,investment,16757431.066100188,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +direct air capture,investment,16757431.066100188,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +direct air capture,investment,6206123.573860465,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +direct air capture,investment,6206123.573860465,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced direct air capture,lifetime,20.0,years,"Danish Energy Agency, inputs/technology_data_for_carbon_capture_transport_storage.xlsx",403.a Direct air capture,2020.0,, direct air capture,years,30.0,years,ICCT IRA e-fuels assumptions ,,,, direct firing gas,FOM,1.2121,%/year,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",312.a Direct firing Natural Gas: Fixed O&M,2019.0,, @@ -3882,7 +3882,7 @@ fuel cell,investment,1375.6881,EUR/kW_e,"Danish Energy Agency, inputs/technology fuel cell,lifetime,10.0,years,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",12 LT-PEMFC CHP: Technical lifetime,2015.0,, fuelwood,fuel,15.9997,EUR/MWhth,"JRC ENSPRESO ca avg for MINBIOWOO (FuelwoodRW), ENS_BaU_GFTM",,2010.0,, gas,CO2 intensity,0.198,tCO2/MWh_th,Stoichiometric calculation with 50 GJ/t CH4,,,, -gas,fuel,7.65,USD/MWh_th,World Bank https://www.worldbank.org/en/research/commodity-markets,,2010.0,, +gas,fuel,8.820258276190751,USD/MWh_th,World Bank https://www.worldbank.org/en/research/commodity-markets,,2010.0,, gas boiler steam,FOM,3.6667,%/year,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",311.1c Steam boiler Gas: Fixed O&M,2019.0,, gas boiler steam,VOM,1.1077,EUR/MWh,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",311.1c Steam boiler Gas: Variable O&M,2019.0,, gas boiler steam,efficiency,0.92,per unit,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx","311.1c Steam boiler Gas: Total efficiency, net, annual average",2019.0,, @@ -3959,10 +3959,10 @@ hydro,investment,2574.060290445133,USD/kW,NREL/ATB-https://data.openei.org/s3_vi hydro,lifetime,80.0,years,IEA2010, from old pypsa cost assumptions,2015.0,, hydrogen storage compressor,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,,2022.0,, hydrogen storage compressor,compression-electricity-input,0.05,MWh_el/MWh_H2,"Based on Stöckl et al (2021): https://doi.org/10.48550/arXiv.2005.03464, table SI.4.",1.707 kWh/kg.,,, -hydrogen storage compressor,investment,2.28,USD/kWh_H2,ICCT IRA e-fuels assumptions ,,2022.0,, +hydrogen storage compressor,investment,1.9919431142982202,USD/kWh_H2,ICCT IRA e-fuels assumptions ,,2022.0,, hydrogen storage compressor,lifetime,30.0,years,ICCT IRA e-fuels assumptions ,,,, hydrogen storage tank type 1,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,,2022.0,, -hydrogen storage tank type 1,investment,16.87,USD/kWh_H2,ICCT IRA e-fuels assumptions ,,2022.0,, +hydrogen storage tank type 1,investment,14.738631727285517,USD/kWh_H2,ICCT IRA e-fuels assumptions ,,2022.0,, hydrogen storage tank type 1,lifetime,30.0,years,ICCT IRA e-fuels assumptions ,,,, hydrogen storage tank type 1,min_fill_level,6.0,%,"Based on Stöckl et al (2021): https://doi.org/10.48550/arXiv.2005.03464, table SI.9.",,,, hydrogen storage tank type 1 including compressor,FOM,1.0526,%/year,"Danish Energy Agency, inputs/technology_data_catalogue_for_energy_storage.xlsx",151a Hydrogen Storage - Tanks: Fixed O&M,2015.0,, @@ -4090,7 +4090,7 @@ oil,CO2 intensity,0.2571,tCO2/MWh_th,Stoichiometric calculation with 44 GJ/t die oil,FOM,2.5656,%/year,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",50 Diesel engine farm: Fixed O&M,2015.0,, oil,VOM,6.3493,EUR/MWh,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",50 Diesel engine farm: Variable O&M,2015.0,, oil,efficiency,0.35,per unit,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","50 Diesel engine farm: Electricity efficiency, annual average",2015.0,, -oil,fuel,25.98,USD/MWh_th,World Bank https://www.worldbank.org/en/research/commodity-markets,,2010.0,, +oil,fuel,29.954288890906632,USD/MWh_th,World Bank https://www.worldbank.org/en/research/commodity-markets,,2010.0,, oil,investment,362.97,EUR/kW,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",50 Diesel engine farm: Specific investment,2015.0,, oil,lifetime,25.0,years,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",50 Diesel engine farm: Technical lifetime,2015.0,, onwind,CF,0.437,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2020.0,Market,Advanced diff --git a/outputs/US/costs_2025.csv b/outputs/US/costs_2025.csv index e19bc6c0..3221869e 100644 --- a/outputs/US/costs_2025.csv +++ b/outputs/US/costs_2025.csv @@ -5,13 +5,13 @@ Alkaline electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of s Alkaline electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Alkaline electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Alkaline electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Alkaline electrolyzer,efficiency,0.67,p.u.,ICCT IRA e-fuels assumptions ,,,, -Alkaline electrolyzer,investment,1336.5,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Alkaline electrolyzer,investment,1336.5,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Alkaline electrolyzer,investment,1306.5,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Alkaline electrolyzer,investment,1306.5,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Alkaline electrolyzer,investment,646.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Alkaline electrolyzer,investment,646.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Alkaline electrolyzer,efficiency,0.6699999999999999,p.u.,ICCT IRA e-fuels assumptions ,,,, +Alkaline electrolyzer,investment,1167.6456018682331,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Alkaline electrolyzer,investment,1167.6456018682331,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Alkaline electrolyzer,investment,1141.4358240485196,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Alkaline electrolyzer,investment,1141.4358240485196,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Alkaline electrolyzer,investment,564.3838823844958,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Alkaline electrolyzer,investment,564.3838823844958,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Alkaline electrolyzer,lifetime,30.0,years,ICCT IRA e-fuels assumptions ,,,, Ammonia cracker,FOM,4.3,%/year,"Ishimoto et al. (2020): 10.1016/j.ijhydene.2020.09.017 , table 7.","Estimated based on Labour cost rate, Maintenance cost rate, Insurance rate, Admin. cost rate and Chemical & other consumables cost rate.",2015.0,, Ammonia cracker,ammonia-input,1.46,MWh_NH3/MWh_H2,"ENGIE et al (2020): Ammonia to Green Hydrogen Feasibility Study (https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/880826/HS420_-_Ecuity_-_Ammonia_to_Green_Hydrogen.pdf), Fig. 10.",Assuming a integrated 200t/d cracking and purification facility. Electricity demand (316 MWh per 2186 MWh_LHV H2 output) is assumed to also be ammonia LHV input which seems a fair assumption as the facility has options for a higher degree of integration according to the report).,,, @@ -64,12 +64,12 @@ BioSNG,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015 BioSNG,efficiency,0.615,per unit,"Danish Energy Agency, inputs/data_sheets_for_renewable_fuels.xlsx","84 Gasif. CFB, Bio-SNG: Bio SNG Output",2020.0,, BioSNG,investment,2179.97,EUR/kW_th,"Danish Energy Agency, inputs/data_sheets_for_renewable_fuels.xlsx","84 Gasif. CFB, Bio-SNG: Specific investment",2020.0,, BioSNG,lifetime,25.0,years,TODO,"84 Gasif. CFB, Bio-SNG: Technical lifetime",2020.0,, -Biomass gasification,efficiency,0.3792,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Biomass gasification,investment,1467.7693,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Biomass gasification,efficiency,0.37916666666666665,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, +Biomass gasification,investment,1978.8508861995015,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Biomass gasification,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Biomass gasification CC,FOM,0.02,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Biomass gasification CC,efficiency,0.328,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Biomass gasification CC,investment,3015.5325,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Biomass gasification CC,investment,4065.5510481055235,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Biomass gasification CC,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, BtL,C in fuel,0.2571,per unit,"Stoichiometric calculation, doi:10.1016/j.apenergy.2022.120016",,,, BtL,C stored,0.7429,per unit,"Stoichiometric calculation, doi:10.1016/j.apenergy.2022.120016",,,, @@ -86,12 +86,12 @@ CCGT,FOM,1.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data CCGT,FOM,1.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced CCGT,FOM,1.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate CCGT,FOM,1.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -CCGT,VOM,6.94,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -CCGT,VOM,6.94,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -CCGT,VOM,6.94,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -CCGT,VOM,6.94,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -CCGT,VOM,6.94,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -CCGT,VOM,6.94,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +CCGT,VOM,6.0631952689603725,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +CCGT,VOM,6.0631952689603725,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +CCGT,VOM,6.0631952689603725,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +CCGT,VOM,6.0631952689603725,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +CCGT,VOM,6.0631952689603725,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +CCGT,VOM,6.0631952689603725,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative CCGT,c_b,1.9,50oC/100oC,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","05 Gas turb. CC, steam extract.: Cb coefficient",2015.0,, CCGT,c_v,0.15,50oC/100oC,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","05 Gas turb. CC, steam extract.: Cv coefficient",2015.0,, CCGT,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced @@ -101,12 +101,12 @@ CCGT,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of CCGT,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate CCGT,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative CCGT,efficiency,0.57,per unit,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","05 Gas turb. CC, steam extract.: Electricity efficiency, annual average",2015.0,, -CCGT,investment,1319.3961678558885,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -CCGT,investment,1319.3961678558885,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -CCGT,investment,1319.3961678558885,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -CCGT,investment,1319.3961678558885,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -CCGT,investment,1319.3961678558885,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -CCGT,investment,1319.3961678558885,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +CCGT,investment,1152.7026805228054,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +CCGT,investment,1152.7026805228054,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +CCGT,investment,1152.7026805228054,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +CCGT,investment,1152.7026805228054,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +CCGT,investment,1152.7026805228054,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +CCGT,investment,1152.7026805228054,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative CCGT,lifetime,25.0,years,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","05 Gas turb. CC, steam extract.: Technical lifetime",2015.0,, CH4 (g) fill compressor station,FOM,1.7,%/year,Assume same as for H2 (g) fill compressor station.,-,2020.0,, CH4 (g) fill compressor station,investment,1654.96,EUR/MW_CH4,"Guesstimate, based on H2 (g) pipeline and fill compressor station cost.","Assume same ratio as between H2 (g) pipeline and fill compressor station, i.e. 1:19 , due to a lack of reliable numbers.",2020.0,, @@ -157,18 +157,18 @@ CSP - Class 3,FOM,0.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket= CSP - Class 3,FOM,0.98,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced CSP - Class 3,FOM,0.98,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate CSP - Class 3,FOM,0.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -CSP - Class 3,VOM,3.5647875,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -CSP - Class 3,VOM,3.5985375,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -CSP - Class 3,VOM,3.95766,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -CSP - Class 3,VOM,3.5647875,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -CSP - Class 3,VOM,3.5985375,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -CSP - Class 3,VOM,3.95766,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -CSP - Class 3,investment,6506.952202460267,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -CSP - Class 3,investment,6887.476655978137,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -CSP - Class 3,investment,7912.019603207439,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -CSP - Class 3,investment,6506.952202460267,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -CSP - Class 3,investment,6887.476655978137,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -CSP - Class 3,investment,7912.019603207439,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +CSP - Class 3,VOM,3.1144096116497226,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +CSP - Class 3,VOM,3.1438956116969,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +CSP - Class 3,VOM,3.4576463095322345,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +CSP - Class 3,VOM,3.1144096116497226,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +CSP - Class 3,VOM,3.1438956116969,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +CSP - Class 3,VOM,3.4576463095322345,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +CSP - Class 3,investment,5684.859050332618,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +CSP - Class 3,investment,6017.307763054992,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +CSP - Class 3,investment,6912.409196842806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +CSP - Class 3,investment,5684.859050332618,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +CSP - Class 3,investment,6017.307763054992,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +CSP - Class 3,investment,6912.409196842806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative CSP - Class 8,CF,0.514,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced CSP - Class 8,CF,0.514,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate CSP - Class 8,CF,0.514,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -181,18 +181,18 @@ CSP - Class 8,FOM,0.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket= CSP - Class 8,FOM,0.98,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced CSP - Class 8,FOM,0.98,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate CSP - Class 8,FOM,0.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -CSP - Class 8,VOM,3.5647875,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -CSP - Class 8,VOM,3.5985375,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -CSP - Class 8,VOM,3.95766,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -CSP - Class 8,VOM,3.5647875,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -CSP - Class 8,VOM,3.5985375,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -CSP - Class 8,VOM,3.95766,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -CSP - Class 8,investment,6506.952202460267,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -CSP - Class 8,investment,6887.476655978137,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -CSP - Class 8,investment,7912.019603207439,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -CSP - Class 8,investment,6506.952202460267,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -CSP - Class 8,investment,6887.476655978137,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -CSP - Class 8,investment,7912.019603207439,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +CSP - Class 8,VOM,3.1144096116497226,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +CSP - Class 8,VOM,3.1438956116969,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +CSP - Class 8,VOM,3.4576463095322345,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +CSP - Class 8,VOM,3.1144096116497226,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +CSP - Class 8,VOM,3.1438956116969,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +CSP - Class 8,VOM,3.4576463095322345,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +CSP - Class 8,investment,5684.859050332618,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +CSP - Class 8,investment,6017.307763054992,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +CSP - Class 8,investment,6912.409196842806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +CSP - Class 8,investment,5684.859050332618,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +CSP - Class 8,investment,6017.307763054992,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +CSP - Class 8,investment,6912.409196842806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Charging infrastructure fast (purely) battery electric vehicles passenger cars,FOM,1.6,%,PATHS TO A CLIMATE-NEUTRAL ENERGY SYSTEM The German energy transformation in its social context. https://www.ise.fraunhofer.de/en/publications/studies/paths-to-a-climate-neutral-energy-system.html,Charging infrastructure fast (purely) battery electric vehicles passenger cars,2020.0,, Charging infrastructure fast (purely) battery electric vehicles passenger cars,investment,527507.0,EUR/Lades�ule,PATHS TO A CLIMATE-NEUTRAL ENERGY SYSTEM The German energy transformation in its social context. https://www.ise.fraunhofer.de/en/publications/studies/paths-to-a-climate-neutral-energy-system.html,Charging infrastructure fast (purely) battery electric vehicles passenger cars,2020.0,, Charging infrastructure fast (purely) battery electric vehicles passenger cars,lifetime,30.0,years,PATHS TO A CLIMATE-NEUTRAL ENERGY SYSTEM The German energy transformation in its social context. https://www.ise.fraunhofer.de/en/publications/studies/paths-to-a-climate-neutral-energy-system.html,Charging infrastructure fast (purely) battery electric vehicles passenger cars,2020.0,, @@ -211,25 +211,25 @@ Coal - IGCC,FOM,2.38,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oe Coal - IGCC,FOM,2.38,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Coal - IGCC,FOM,2.38,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal - IGCC,FOM,2.38,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Coal - IGCC,VOM,16.19,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal - IGCC,VOM,16.28,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal - IGCC,VOM,16.36,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal - IGCC,VOM,16.19,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal - IGCC,VOM,16.28,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal - IGCC,VOM,16.36,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Coal - IGCC,investment,6930.171665384618,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal - IGCC,investment,6967.730223248825,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal - IGCC,investment,7005.412329000742,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal - IGCC,investment,6930.171665384618,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal - IGCC,investment,6967.730223248825,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal - IGCC,investment,7005.412329000742,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal - IGCC,VOM,14.144543430038679,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal - IGCC,VOM,14.22317276349782,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal - IGCC,VOM,14.293065504350388,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal - IGCC,VOM,14.144543430038679,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal - IGCC,VOM,14.22317276349782,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal - IGCC,VOM,14.293065504350388,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal - IGCC,investment,6054.608653406807,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal - IGCC,investment,6087.422035301797,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal - IGCC,investment,6120.34335595302,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal - IGCC,investment,6054.608653406807,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal - IGCC,investment,6087.422035301797,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal - IGCC,investment,6120.34335595302,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal gasification,FOM,0.06,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, -Coal gasification,efficiency,0.5978,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Coal gasification,investment,441.5535,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Coal gasification,efficiency,0.5978333333333334,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, +Coal gasification,investment,595.3040200212821,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Coal gasification,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Coal gasification CC,FOM,0.07,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Coal gasification CC,efficiency,0.532,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Coal gasification CC,investment,649.5969,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Coal gasification CC,investment,875.7882332041481,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Coal gasification CC,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Coal integrated retrofit 90%-CCS,FOM,7.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal integrated retrofit 90%-CCS,FOM,7.37,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -237,52 +237,52 @@ Coal integrated retrofit 90%-CCS,FOM,7.23,%/year,NREL/ATB-https://data.openei.or Coal integrated retrofit 90%-CCS,FOM,7.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Coal integrated retrofit 90%-CCS,FOM,7.37,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal integrated retrofit 90%-CCS,FOM,7.23,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Coal integrated retrofit 90%-CCS,VOM,17.0,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal integrated retrofit 90%-CCS,VOM,17.26,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal integrated retrofit 90%-CCS,VOM,17.52,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal integrated retrofit 90%-CCS,VOM,17.0,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal integrated retrofit 90%-CCS,VOM,17.26,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal integrated retrofit 90%-CCS,VOM,17.52,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal integrated retrofit 90%-CCS,VOM,14.85220743117094,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal integrated retrofit 90%-CCS,VOM,15.079358838941792,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal integrated retrofit 90%-CCS,VOM,15.30651024671264,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal integrated retrofit 90%-CCS,VOM,14.85220743117094,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal integrated retrofit 90%-CCS,VOM,15.079358838941792,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal integrated retrofit 90%-CCS,VOM,15.30651024671264,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal integrated retrofit 90%-CCS,capture_rate,0.9,per unit,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, Coal integrated retrofit 90%-CCS,efficiency,0.386,p.u.,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, -Coal integrated retrofit 90%-CCS,investment,2048.8,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal integrated retrofit 90%-CCS,investment,2119.2,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal integrated retrofit 90%-CCS,investment,2189.5,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal integrated retrofit 90%-CCS,investment,2048.8,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal integrated retrofit 90%-CCS,investment,2119.2,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal integrated retrofit 90%-CCS,investment,2189.5,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal integrated retrofit 90%-CCS,investment,1789.9530932342957,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal integrated retrofit 90%-CCS,investment,1851.4587051845563,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal integrated retrofit 90%-CCS,investment,1912.8769512087515,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal integrated retrofit 90%-CCS,investment,1789.9530932342957,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal integrated retrofit 90%-CCS,investment,1851.4587051845563,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal integrated retrofit 90%-CCS,investment,1912.8769512087515,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal integrated retrofit 95%-CCS,FOM,7.35,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal integrated retrofit 95%-CCS,FOM,7.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Coal integrated retrofit 95%-CCS,FOM,7.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Coal integrated retrofit 95%-CCS,FOM,7.35,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Coal integrated retrofit 95%-CCS,FOM,7.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal integrated retrofit 95%-CCS,FOM,7.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Coal integrated retrofit 95%-CCS,VOM,17.39,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal integrated retrofit 95%-CCS,VOM,17.66,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal integrated retrofit 95%-CCS,VOM,17.93,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal integrated retrofit 95%-CCS,VOM,17.39,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal integrated retrofit 95%-CCS,VOM,17.66,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal integrated retrofit 95%-CCS,VOM,17.93,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal integrated retrofit 95%-CCS,VOM,15.192934542827217,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal integrated retrofit 95%-CCS,VOM,15.428822543204637,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal integrated retrofit 95%-CCS,VOM,15.664710543582057,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal integrated retrofit 95%-CCS,VOM,15.192934542827217,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal integrated retrofit 95%-CCS,VOM,15.428822543204637,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal integrated retrofit 95%-CCS,VOM,15.664710543582057,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal integrated retrofit 95%-CCS,capture_rate,0.95,per unit,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, Coal integrated retrofit 95%-CCS,efficiency,0.386,p.u.,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, -Coal integrated retrofit 95%-CCS,investment,2139.6,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal integrated retrofit 95%-CCS,investment,2213.9,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal integrated retrofit 95%-CCS,investment,2288.2,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal integrated retrofit 95%-CCS,investment,2139.6,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal integrated retrofit 95%-CCS,investment,2213.9,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal integrated retrofit 95%-CCS,investment,2288.2,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal integrated retrofit 95%-CCS,investment,1869.2813541019614,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal integrated retrofit 95%-CCS,investment,1934.194237168785,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal integrated retrofit 95%-CCS,investment,1999.1071202356086,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal integrated retrofit 95%-CCS,investment,1869.2813541019614,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal integrated retrofit 95%-CCS,investment,1934.194237168785,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal integrated retrofit 95%-CCS,investment,1999.1071202356086,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-95%-CCS,FOM,2.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal-95%-CCS,FOM,2.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Coal-95%-CCS,FOM,2.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Coal-95%-CCS,FOM,2.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Coal-95%-CCS,FOM,2.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal-95%-CCS,FOM,2.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Coal-95%-CCS,VOM,15.4,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal-95%-CCS,VOM,15.68,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal-95%-CCS,VOM,15.96,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal-95%-CCS,VOM,15.4,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal-95%-CCS,VOM,15.68,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal-95%-CCS,VOM,15.96,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal-95%-CCS,VOM,13.454352614119559,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal-95%-CCS,VOM,13.69897720710355,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal-95%-CCS,VOM,13.943601800087544,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal-95%-CCS,VOM,13.454352614119559,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal-95%-CCS,VOM,13.69897720710355,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal-95%-CCS,VOM,13.943601800087544,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-95%-CCS,capture_rate,0.95,per unit,"NREL, NREL ATB 2024",,,, Coal-95%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal-95%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -291,12 +291,12 @@ Coal-95%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Mea Coal-95%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal-95%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-95%-CCS,efficiency,0.403,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Coal-95%-CCS,investment,6405.093142611998,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal-95%-CCS,investment,6455.130037135035,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal-95%-CCS,investment,6505.166931658074,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal-95%-CCS,investment,6405.093142611998,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal-95%-CCS,investment,6455.130037135035,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal-95%-CCS,investment,6505.166931658074,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal-95%-CCS,investment,5595.86893941435,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal-95%-CCS,investment,5639.584135688925,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal-95%-CCS,investment,5683.299331963501,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal-95%-CCS,investment,5595.86893941435,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal-95%-CCS,investment,5639.584135688925,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal-95%-CCS,investment,5683.299331963501,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-95%-CCS,lifetime,40.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Coal-99%-CCS,FOM,2.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal-99%-CCS,FOM,2.05,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -304,12 +304,12 @@ Coal-99%-CCS,FOM,2.05,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=o Coal-99%-CCS,FOM,2.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Coal-99%-CCS,FOM,2.05,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal-99%-CCS,FOM,2.05,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Coal-99%-CCS,VOM,15.76,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal-99%-CCS,VOM,16.06,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal-99%-CCS,VOM,16.36,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal-99%-CCS,VOM,15.76,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal-99%-CCS,VOM,16.06,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal-99%-CCS,VOM,16.36,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal-99%-CCS,VOM,13.76886994795612,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal-99%-CCS,VOM,14.030967726153253,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal-99%-CCS,VOM,14.293065504350388,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal-99%-CCS,VOM,13.76886994795612,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal-99%-CCS,VOM,14.030967726153253,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal-99%-CCS,VOM,14.293065504350388,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-99%-CCS,capture_rate,0.99,per unit,"NREL, NREL ATB 2024",,,, Coal-99%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal-99%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -318,12 +318,12 @@ Coal-99%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Mea Coal-99%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal-99%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-99%-CCS,efficiency,0.403,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Coal-99%-CCS,investment,6540.1309838803445,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal-99%-CCS,investment,6596.468820676653,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal-99%-CCS,investment,6652.806657472963,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal-99%-CCS,investment,6540.1309838803445,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal-99%-CCS,investment,6596.468820676653,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal-99%-CCS,investment,6652.806657472963,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal-99%-CCS,investment,5713.845999977587,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal-99%-CCS,investment,5763.066072820071,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal-99%-CCS,investment,5812.286145662556,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal-99%-CCS,investment,5713.845999977587,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal-99%-CCS,investment,5763.066072820071,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal-99%-CCS,investment,5812.286145662556,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-99%-CCS,lifetime,40.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Coal-IGCC,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal-IGCC,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -339,12 +339,12 @@ Coal-IGCC-90%-CCS,FOM,2.37,%/year,NREL/ATB-https://data.openei.org/s3_viewer?buc Coal-IGCC-90%-CCS,FOM,2.37,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Coal-IGCC-90%-CCS,FOM,2.37,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal-IGCC-90%-CCS,FOM,2.37,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Coal-IGCC-90%-CCS,VOM,24.07,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal-IGCC-90%-CCS,VOM,24.19,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal-IGCC-90%-CCS,VOM,24.31,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal-IGCC-90%-CCS,VOM,24.07,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal-IGCC-90%-CCS,VOM,24.19,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal-IGCC-90%-CCS,VOM,24.31,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal-IGCC-90%-CCS,VOM,21.02897840401674,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal-IGCC-90%-CCS,VOM,21.133817515295593,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal-IGCC-90%-CCS,VOM,21.238656626574446,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal-IGCC-90%-CCS,VOM,21.02897840401674,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal-IGCC-90%-CCS,VOM,21.133817515295593,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal-IGCC-90%-CCS,VOM,21.238656626574446,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-IGCC-90%-CCS,capture_rate,0.9,per unit,"NREL, NREL ATB 2024",,,, Coal-IGCC-90%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal-IGCC-90%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -353,12 +353,12 @@ Coal-IGCC-90%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024 Coal-IGCC-90%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal-IGCC-90%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-IGCC-90%-CCS,efficiency,0.403,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Coal-IGCC-90%-CCS,investment,9854.426619621128,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal-IGCC-90%-CCS,investment,9907.552211336946,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal-IGCC-90%-CCS,investment,9960.677803052764,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal-IGCC-90%-CCS,investment,9854.426619621128,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal-IGCC-90%-CCS,investment,9907.552211336946,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal-IGCC-90%-CCS,investment,9960.677803052764,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal-IGCC-90%-CCS,investment,8609.41107469798,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal-IGCC-90%-CCS,investment,8655.824739878393,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal-IGCC-90%-CCS,investment,8702.238405058806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal-IGCC-90%-CCS,investment,8609.41107469798,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal-IGCC-90%-CCS,investment,8655.824739878393,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal-IGCC-90%-CCS,investment,8702.238405058806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-IGCC-90%-CCS,lifetime,40.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Commercial Battery Storage 1Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial Battery Storage 1Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -366,60 +366,60 @@ Commercial Battery Storage 1Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/ Commercial Battery Storage 1Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial Battery Storage 1Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial Battery Storage 1Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial Battery Storage 1Hr,investment,969.1872776423812,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial Battery Storage 1Hr,investment,1248.67500031219,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial Battery Storage 1Hr,investment,1548.4201067325798,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial Battery Storage 1Hr,investment,969.1872776423812,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial Battery Storage 1Hr,investment,1248.67500031219,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial Battery Storage 1Hr,investment,1548.4201067325798,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial Battery Storage 1Hr,investment,846.739440423324,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial Battery Storage 1Hr,investment,1090.9164775737697,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial Battery Storage 1Hr,investment,1352.7915656345956,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial Battery Storage 1Hr,investment,846.739440423324,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial Battery Storage 1Hr,investment,1090.9164775737697,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial Battery Storage 1Hr,investment,1352.7915656345956,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial Battery Storage 2Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial Battery Storage 2Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial Battery Storage 2Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Commercial Battery Storage 2Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial Battery Storage 2Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial Battery Storage 2Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial Battery Storage 2Hr,investment,1160.0593136115042,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial Battery Storage 2Hr,investment,1482.539952387204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial Battery Storage 2Hr,investment,1853.3664314785271,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial Battery Storage 2Hr,investment,1160.0593136115042,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial Battery Storage 2Hr,investment,1482.539952387204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial Battery Storage 2Hr,investment,1853.3664314785271,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial Battery Storage 2Hr,investment,1013.4965622482262,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial Battery Storage 2Hr,investment,1295.234758697238,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial Battery Storage 2Hr,investment,1619.210746252244,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial Battery Storage 2Hr,investment,1013.4965622482262,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial Battery Storage 2Hr,investment,1295.234758697238,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial Battery Storage 2Hr,investment,1619.210746252244,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial Battery Storage 4Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial Battery Storage 4Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial Battery Storage 4Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Commercial Battery Storage 4Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial Battery Storage 4Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial Battery Storage 4Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial Battery Storage 4Hr,investment,1541.80338554975,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial Battery Storage 4Hr,investment,1950.269856537232,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial Battery Storage 4Hr,investment,2463.259080970422,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial Battery Storage 4Hr,investment,1541.80338554975,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial Battery Storage 4Hr,investment,1950.269856537232,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial Battery Storage 4Hr,investment,2463.259080970422,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial Battery Storage 4Hr,investment,1347.0108058980302,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial Battery Storage 4Hr,investment,1703.8713209441744,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial Battery Storage 4Hr,investment,2152.0491074875413,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial Battery Storage 4Hr,investment,1347.0108058980302,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial Battery Storage 4Hr,investment,1703.8713209441744,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial Battery Storage 4Hr,investment,2152.0491074875413,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial Battery Storage 6Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial Battery Storage 6Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial Battery Storage 6Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Commercial Battery Storage 6Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial Battery Storage 6Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial Battery Storage 6Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial Battery Storage 6Hr,investment,1923.547457487996,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial Battery Storage 6Hr,investment,2417.9997606872607,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial Battery Storage 6Hr,investment,3073.151730462317,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial Battery Storage 6Hr,investment,1923.547457487996,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial Battery Storage 6Hr,investment,2417.9997606872607,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial Battery Storage 6Hr,investment,3073.151730462317,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial Battery Storage 6Hr,investment,1680.5250495478344,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial Battery Storage 6Hr,investment,2112.5078831911114,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial Battery Storage 6Hr,investment,2684.887468722839,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial Battery Storage 6Hr,investment,1680.5250495478344,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial Battery Storage 6Hr,investment,2112.5078831911114,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial Battery Storage 6Hr,investment,2684.887468722839,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial Battery Storage 8Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial Battery Storage 8Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial Battery Storage 8Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Commercial Battery Storage 8Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial Battery Storage 8Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial Battery Storage 8Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial Battery Storage 8Hr,investment,2305.291529426242,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial Battery Storage 8Hr,investment,2885.729664837289,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial Battery Storage 8Hr,investment,3683.044379954212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial Battery Storage 8Hr,investment,2305.291529426242,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial Battery Storage 8Hr,investment,2885.729664837289,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial Battery Storage 8Hr,investment,3683.044379954212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial Battery Storage 8Hr,investment,2014.0392931976387,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial Battery Storage 8Hr,investment,2521.144445438048,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial Battery Storage 8Hr,investment,3217.7258299581367,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial Battery Storage 8Hr,investment,2014.0392931976387,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial Battery Storage 8Hr,investment,2521.144445438048,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial Battery Storage 8Hr,investment,3217.7258299581367,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 1,CF,0.5055645,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 1,CF,0.5055645,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 1,CF,0.5055645,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -432,12 +432,12 @@ Commercial DW - Class 1,FOM,0.71,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 1,FOM,1.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 1,FOM,0.81,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 1,FOM,0.71,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 1,investment,3494.11669483746,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 1,investment,4776.761301931725,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 1,investment,5433.119703532603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 1,investment,3494.11669483746,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 1,investment,4776.761301931725,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 1,investment,5433.119703532603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 1,investment,3052.6674082613745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 1,investment,4173.261747381185,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 1,investment,4746.695343249893,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 1,investment,3052.6674082613745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 1,investment,4173.261747381185,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 1,investment,4746.695343249893,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 10,CF,0.1691445,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 10,CF,0.1691445,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 10,CF,0.1691445,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -450,12 +450,12 @@ Commercial DW - Class 10,FOM,0.71,%/year,NREL/ATB-https://data.openei.org/s3_vie Commercial DW - Class 10,FOM,1.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 10,FOM,0.81,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 10,FOM,0.71,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 10,investment,3494.11669483746,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 10,investment,4776.761301931725,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 10,investment,5433.119703532603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 10,investment,3494.11669483746,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 10,investment,4776.761301931725,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 10,investment,5433.119703532603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 10,investment,3052.6674082613745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 10,investment,4173.261747381185,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 10,investment,4746.695343249893,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 10,investment,3052.6674082613745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 10,investment,4173.261747381185,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 10,investment,4746.695343249893,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 2,CF,0.4677395000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 2,CF,0.4677395000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 2,CF,0.4677395000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -468,12 +468,12 @@ Commercial DW - Class 2,FOM,0.71,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 2,FOM,1.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 2,FOM,0.81,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 2,FOM,0.71,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 2,investment,3494.11669483746,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 2,investment,4776.761301931725,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 2,investment,5433.119703532603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 2,investment,3494.11669483746,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 2,investment,4776.761301931725,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 2,investment,5433.119703532603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 2,investment,3052.6674082613745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 2,investment,4173.261747381185,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 2,investment,4746.695343249893,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 2,investment,3052.6674082613745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 2,investment,4173.261747381185,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 2,investment,4746.695343249893,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 3,CF,0.4545229999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 3,CF,0.4545229999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 3,CF,0.4545229999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -486,12 +486,12 @@ Commercial DW - Class 3,FOM,0.71,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 3,FOM,1.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 3,FOM,0.81,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 3,FOM,0.71,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 3,investment,3494.11669483746,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 3,investment,4776.761301931725,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 3,investment,5433.119703532603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 3,investment,3494.11669483746,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 3,investment,4776.761301931725,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 3,investment,5433.119703532603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 3,investment,3052.6674082613745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 3,investment,4173.261747381185,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 3,investment,4746.695343249893,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 3,investment,3052.6674082613745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 3,investment,4173.261747381185,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 3,investment,4746.695343249893,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 4,CF,0.4407725,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 4,CF,0.4407725,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 4,CF,0.4407725,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -504,12 +504,12 @@ Commercial DW - Class 4,FOM,0.71,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 4,FOM,1.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 4,FOM,0.8,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 4,FOM,0.71,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 4,investment,3494.11669483746,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 4,investment,4832.772845267113,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 4,investment,5489.131246867991,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 4,investment,3494.11669483746,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 4,investment,4832.772845267113,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 4,investment,5489.131246867991,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 4,investment,3052.6674082613745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 4,investment,4222.196750919844,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 4,investment,4795.630346788552,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 4,investment,3052.6674082613745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 4,investment,4222.196750919844,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 4,investment,4795.630346788552,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 5,CF,0.4237290000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 5,CF,0.4237290000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 5,CF,0.4237290000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -522,12 +522,12 @@ Commercial DW - Class 5,FOM,0.71,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 5,FOM,1.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 5,FOM,0.81,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 5,FOM,0.71,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 5,investment,3494.11669483746,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 5,investment,4776.761301931725,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 5,investment,5433.119703532603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 5,investment,3494.11669483746,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 5,investment,4776.761301931725,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 5,investment,5433.119703532603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 5,investment,3052.6674082613745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 5,investment,4173.261747381185,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 5,investment,4746.695343249893,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 5,investment,3052.6674082613745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 5,investment,4173.261747381185,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 5,investment,4746.695343249893,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 6,CF,0.3980524999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 6,CF,0.3980524999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 6,CF,0.3980524999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -540,12 +540,12 @@ Commercial DW - Class 6,FOM,0.71,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 6,FOM,1.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 6,FOM,0.81,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 6,FOM,0.71,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 6,investment,3494.11669483746,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 6,investment,4776.761301931725,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 6,investment,5433.119703532603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 6,investment,3494.11669483746,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 6,investment,4776.761301931725,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 6,investment,5433.119703532603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 6,investment,3052.6674082613745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 6,investment,4173.261747381185,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 6,investment,4746.695343249893,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 6,investment,3052.6674082613745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 6,investment,4173.261747381185,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 6,investment,4746.695343249893,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 7,CF,0.3615179999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 7,CF,0.3615179999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 7,CF,0.3615179999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -558,12 +558,12 @@ Commercial DW - Class 7,FOM,0.71,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 7,FOM,1.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 7,FOM,0.81,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 7,FOM,0.71,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 7,investment,3494.11669483746,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 7,investment,4776.761301931725,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 7,investment,5433.119703532603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 7,investment,3494.11669483746,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 7,investment,4776.761301931725,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 7,investment,5433.119703532603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 7,investment,3052.6674082613745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 7,investment,4173.261747381185,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 7,investment,4746.695343249893,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 7,investment,3052.6674082613745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 7,investment,4173.261747381185,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 7,investment,4746.695343249893,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 8,CF,0.3166175000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 8,CF,0.3166175000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 8,CF,0.3166175000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -576,12 +576,12 @@ Commercial DW - Class 8,FOM,0.71,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 8,FOM,1.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 8,FOM,0.81,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 8,FOM,0.71,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 8,investment,3494.11669483746,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 8,investment,4776.761301931725,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 8,investment,5433.119703532603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 8,investment,3494.11669483746,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 8,investment,4776.761301931725,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 8,investment,5433.119703532603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 8,investment,3052.6674082613745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 8,investment,4173.261747381185,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 8,investment,4746.695343249893,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 8,investment,3052.6674082613745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 8,investment,4173.261747381185,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 8,investment,4746.695343249893,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 9,CF,0.2651755000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 9,CF,0.2651755000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 9,CF,0.2651755000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -594,12 +594,12 @@ Commercial DW - Class 9,FOM,0.71,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 9,FOM,1.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 9,FOM,0.81,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 9,FOM,0.71,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 9,investment,3494.11669483746,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 9,investment,4776.761301931725,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 9,investment,5433.119703532603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 9,investment,3494.11669483746,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 9,investment,4776.761301931725,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 9,investment,5433.119703532603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 9,investment,3052.6674082613745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 9,investment,4173.261747381185,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 9,investment,4746.695343249893,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 9,investment,3052.6674082613745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 9,investment,4173.261747381185,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 9,investment,4746.695343249893,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 10,CF,0.1258324676258478,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 10,CF,0.1234188523765134,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 10,CF,0.11974504956396947,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -612,12 +612,12 @@ Commercial PV - Class 10,FOM,1.02,%/year,NREL/ATB-https://data.openei.org/s3_vie Commercial PV - Class 10,FOM,1.04,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 10,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 10,FOM,1.02,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 10,investment,1692.558588782558,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 10,investment,1744.249794670278,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 10,investment,1818.212696019045,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 10,investment,1692.558588782558,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 10,investment,1744.249794670278,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 10,investment,1818.212696019045,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 10,investment,1478.7194852946182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 10,investment,1523.8799860129584,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 10,investment,1588.4983597213773,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 10,investment,1478.7194852946182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 10,investment,1523.8799860129584,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 10,investment,1588.4983597213773,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 2,CF,0.18863301241719396,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 2,CF,0.18501480859517425,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 2,CF,0.17950748203127412,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -630,12 +630,12 @@ Commercial PV - Class 2,FOM,1.02,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 2,FOM,1.04,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 2,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 2,FOM,1.02,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 2,investment,1692.558588782558,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 2,investment,1744.249794670278,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 2,investment,1818.212696019045,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 2,investment,1692.558588782558,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 2,investment,1744.249794670278,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 2,investment,1818.212696019045,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 2,investment,1478.7194852946182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 2,investment,1523.8799860129584,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 2,investment,1588.4983597213773,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 2,investment,1478.7194852946182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 2,investment,1523.8799860129584,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 2,investment,1588.4983597213773,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 3,CF,0.17856330899502698,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 3,CF,0.1751382539699322,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 3,CF,0.16992492231411763,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -648,12 +648,12 @@ Commercial PV - Class 3,FOM,1.02,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 3,FOM,1.04,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 3,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 3,FOM,1.02,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 3,investment,1692.558588782558,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 3,investment,1744.249794670278,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 3,investment,1818.212696019045,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 3,investment,1692.558588782558,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 3,investment,1744.249794670278,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 3,investment,1818.212696019045,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 3,investment,1478.7194852946182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 3,investment,1523.8799860129584,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 3,investment,1588.4983597213773,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 3,investment,1478.7194852946182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 3,investment,1523.8799860129584,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 3,investment,1588.4983597213773,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 4,CF,0.16912798055721873,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 4,CF,0.16588390626809474,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 4,CF,0.160946048317963,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -666,12 +666,12 @@ Commercial PV - Class 4,FOM,1.02,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 4,FOM,1.04,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 4,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 4,FOM,1.02,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 4,investment,1692.558588782558,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 4,investment,1744.249794670278,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 4,investment,1818.212696019045,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 4,investment,1692.558588782558,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 4,investment,1744.249794670278,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 4,investment,1818.212696019045,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 4,investment,1478.7194852946182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 4,investment,1523.8799860129584,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 4,investment,1588.4983597213773,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 4,investment,1478.7194852946182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 4,investment,1523.8799860129584,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 4,investment,1588.4983597213773,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 5,CF,0.16139555670967107,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 5,CF,0.1582997994365359,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 5,CF,0.1535876972155484,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -684,12 +684,12 @@ Commercial PV - Class 5,FOM,1.02,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 5,FOM,1.04,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 5,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 5,FOM,1.02,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 5,investment,1692.558588782558,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 5,investment,1744.249794670278,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 5,investment,1818.212696019045,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 5,investment,1692.558588782558,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 5,investment,1744.249794670278,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 5,investment,1818.212696019045,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 5,investment,1478.7194852946182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 5,investment,1523.8799860129584,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 5,investment,1588.4983597213773,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 5,investment,1478.7194852946182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 5,investment,1523.8799860129584,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 5,investment,1588.4983597213773,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 6,CF,0.15925534883029896,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 6,CF,0.15620064327038108,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 6,CF,0.15155102652611524,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -702,12 +702,12 @@ Commercial PV - Class 6,FOM,1.02,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 6,FOM,1.04,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 6,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 6,FOM,1.02,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 6,investment,1692.558588782558,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 6,investment,1744.249794670278,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 6,investment,1818.212696019045,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 6,investment,1692.558588782558,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 6,investment,1744.249794670278,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 6,investment,1818.212696019045,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 6,investment,1478.7194852946182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 6,investment,1523.8799860129584,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 6,investment,1588.4983597213773,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 6,investment,1478.7194852946182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 6,investment,1523.8799860129584,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 6,investment,1588.4983597213773,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 7,CF,0.15173850687099713,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 7,CF,0.14882798321199972,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 7,CF,0.1443978280713452,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -720,12 +720,12 @@ Commercial PV - Class 7,FOM,1.02,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 7,FOM,1.04,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 7,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 7,FOM,1.02,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 7,investment,1692.558588782558,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 7,investment,1744.249794670278,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 7,investment,1818.212696019045,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 7,investment,1692.558588782558,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 7,investment,1744.249794670278,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 7,investment,1818.212696019045,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 7,investment,1478.7194852946182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 7,investment,1523.8799860129584,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 7,investment,1588.4983597213773,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 7,investment,1478.7194852946182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 7,investment,1523.8799860129584,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 7,investment,1588.4983597213773,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 8,CF,0.14411089946832906,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 8,CF,0.14134668232219233,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 8,CF,0.13713922269135043,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -738,12 +738,12 @@ Commercial PV - Class 8,FOM,1.02,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 8,FOM,1.04,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 8,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 8,FOM,1.02,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 8,investment,1692.558588782558,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 8,investment,1744.249794670278,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 8,investment,1818.212696019045,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 8,investment,1692.558588782558,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 8,investment,1744.249794670278,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 8,investment,1818.212696019045,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 8,investment,1478.7194852946182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 8,investment,1523.8799860129584,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 8,investment,1588.4983597213773,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 8,investment,1478.7194852946182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 8,investment,1523.8799860129584,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 8,investment,1588.4983597213773,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 9,CF,0.1383306665440682,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 9,CF,0.13567732108783745,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 9,CF,0.1316386210496107,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -756,12 +756,12 @@ Commercial PV - Class 9,FOM,1.02,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 9,FOM,1.04,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 9,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 9,FOM,1.02,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 9,investment,1692.558588782558,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 9,investment,1744.249794670278,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 9,investment,1818.212696019045,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 9,investment,1692.558588782558,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 9,investment,1744.249794670278,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 9,investment,1818.212696019045,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 9,investment,1478.7194852946182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 9,investment,1523.8799860129584,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 9,investment,1588.4983597213773,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 9,investment,1478.7194852946182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 9,investment,1523.8799860129584,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 9,investment,1588.4983597213773,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Compressed-Air-Adiabatic-bicharger,FOM,0.9265,%/year,"Viswanathan_2022, p.64 (p.86) Figure 4.14","{'carrier': ['elec', 'pair', 'elec'], 'technology_type': ['bicharger'], 'type': ['mechanical'], 'note': ['NULL']}",2020.0,, Compressed-Air-Adiabatic-bicharger,efficiency,0.7211,per unit,"Viswanathan_2022, p.59 (p.81)","{'carrier': ['elec', 'pair', 'elec'], 'technology_type': ['bicharger'], 'type': ['mechanical'], 'note': ['AC-AC efficiency at transformer level 0.52^0.5']}",2020.0,, Compressed-Air-Adiabatic-bicharger,investment,946180.9426,EUR/MW,"Viswanathan_2022, p.59 (p.81)","{'carrier': ['elec', 'pair', 'elec'], 'technology_type': ['bicharger'], 'type': ['mechanical'], 'note': ['Turbine Compressor BOP EPC Management']}",2020.0,, @@ -869,7 +869,7 @@ Fischer-Tropsch,carbondioxide-input,0.32,t_CO2/MWh_FT,ICCT IRA e-fuels assumptio Fischer-Tropsch,efficiency,0.7,per unit,ICCT IRA e-fuels assumptions ,,,, Fischer-Tropsch,electricity-input,0.04,MWh_el/MWh_FT,ICCT IRA e-fuels assumptions ,"0.005 MWh_el input per FT output, output increasing from 2020 to 2050 (0.65, 0.7, 0.73, 0.75 MWh liquid FT output).",,, Fischer-Tropsch,hydrogen-input,1.43,MWh_H2/MWh_FT,ICCT IRA e-fuels assumptions ,"0.995 MWh_H2 per output, output increasing from 2020 to 2050 (0.65, 0.7, 0.73, 0.75 MWh liquid FT output).",,, -Fischer-Tropsch,investment,1696429.0,USD/MW_FT,ICCT IRA e-fuels assumptions ,,2022.0,, +Fischer-Tropsch,investment,1482100.9058972877,USD/MW_FT,ICCT IRA e-fuels assumptions ,,2022.0,, Fischer-Tropsch,lifetime,25.0,years,ICCT IRA e-fuels assumptions ,,,, Gasnetz,FOM,2.5,%,"WEGE ZU EINEM KLIMANEUTRALEN ENERGIESYSEM, Anhang zur Studie, Fraunhofer-Institut für Solare Energiesysteme ISE, Freiburg",Gasnetz,2020.0,, Gasnetz,investment,28.0,EUR/kWGas,"WEGE ZU EINEM KLIMANEUTRALEN ENERGIESYSEM, Anhang zur Studie, Fraunhofer-Institut für Solare Energiesysteme ISE, Freiburg",Gasnetz,2020.0,, @@ -892,12 +892,12 @@ Geothermal - Deep EGS / Binary,FOM,1.16,%/year,NREL/ATB-https://data.openei.org/ Geothermal - Deep EGS / Binary,FOM,1.58,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Geothermal - Deep EGS / Binary,FOM,1.36,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Geothermal - Deep EGS / Binary,FOM,1.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Geothermal - Deep EGS / Binary,investment,12718.842967932736,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Geothermal - Deep EGS / Binary,investment,15602.85175387943,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Geothermal - Deep EGS / Binary,investment,19464.687918566608,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Geothermal - Deep EGS / Binary,investment,12718.842967932736,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Geothermal - Deep EGS / Binary,investment,15602.85175387943,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Geothermal - Deep EGS / Binary,investment,19464.687918566608,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Geothermal - Deep EGS / Binary,investment,11111.934943778051,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Geothermal - Deep EGS / Binary,investment,13631.57592743686,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Geothermal - Deep EGS / Binary,investment,17005.504855856365,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Geothermal - Deep EGS / Binary,investment,11111.934943778051,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Geothermal - Deep EGS / Binary,investment,13631.57592743686,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Geothermal - Deep EGS / Binary,investment,17005.504855856365,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Geothermal - Deep EGS / Flash,CF,0.9,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Geothermal - Deep EGS / Flash,CF,0.9,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Geothermal - Deep EGS / Flash,CF,0.9,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -910,12 +910,12 @@ Geothermal - Deep EGS / Flash,FOM,1.33,%/year,NREL/ATB-https://data.openei.org/s Geothermal - Deep EGS / Flash,FOM,1.78,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Geothermal - Deep EGS / Flash,FOM,1.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Geothermal - Deep EGS / Flash,FOM,1.33,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Geothermal - Deep EGS / Flash,investment,7643.832754038631,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Geothermal - Deep EGS / Flash,investment,9412.146857349377,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Geothermal - Deep EGS / Flash,investment,11057.47992214336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Geothermal - Deep EGS / Flash,investment,7643.832754038631,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Geothermal - Deep EGS / Flash,investment,9412.146857349377,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Geothermal - Deep EGS / Flash,investment,11057.47992214336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Geothermal - Deep EGS / Flash,investment,6678.105272480023,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Geothermal - Deep EGS / Flash,investment,8223.009264588038,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Geothermal - Deep EGS / Flash,investment,9660.469733510652,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Geothermal - Deep EGS / Flash,investment,6678.105272480023,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Geothermal - Deep EGS / Flash,investment,8223.009264588038,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Geothermal - Deep EGS / Flash,investment,9660.469733510652,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Geothermal - Hydro / Binary,CF,0.8,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Geothermal - Hydro / Binary,CF,0.8,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Geothermal - Hydro / Binary,CF,0.8,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -928,12 +928,12 @@ Geothermal - Hydro / Binary,FOM,1.71,%/year,NREL/ATB-https://data.openei.org/s3_ Geothermal - Hydro / Binary,FOM,1.78,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Geothermal - Hydro / Binary,FOM,1.72,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Geothermal - Hydro / Binary,FOM,1.71,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Geothermal - Hydro / Binary,investment,8603.24454903916,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Geothermal - Hydro / Binary,investment,9006.341474974928,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Geothermal - Hydro / Binary,investment,9432.305722010287,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Geothermal - Hydro / Binary,investment,8603.24454903916,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Geothermal - Hydro / Binary,investment,9006.341474974928,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Geothermal - Hydro / Binary,investment,9432.305722010287,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Geothermal - Hydro / Binary,investment,7516.304271965901,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Geothermal - Hydro / Binary,investment,7868.473634252099,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Geothermal - Hydro / Binary,investment,8240.621243383375,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Geothermal - Hydro / Binary,investment,7516.304271965901,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Geothermal - Hydro / Binary,investment,7868.473634252099,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Geothermal - Hydro / Binary,investment,8240.621243383375,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Geothermal - NF EGS / Binary,CF,0.8,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Geothermal - NF EGS / Binary,CF,0.8,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Geothermal - NF EGS / Binary,CF,0.8,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -946,12 +946,12 @@ Geothermal - NF EGS / Binary,FOM,1.51,%/year,NREL/ATB-https://data.openei.org/s3 Geothermal - NF EGS / Binary,FOM,1.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Geothermal - NF EGS / Binary,FOM,1.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Geothermal - NF EGS / Binary,FOM,1.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Geothermal - NF EGS / Binary,investment,10331.354401059623,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Geothermal - NF EGS / Binary,investment,11985.855220543835,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Geothermal - NF EGS / Binary,investment,13216.85705073686,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Geothermal - NF EGS / Binary,investment,10331.354401059623,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Geothermal - NF EGS / Binary,investment,11985.855220543835,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Geothermal - NF EGS / Binary,investment,13216.85705073686,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Geothermal - NF EGS / Binary,investment,9026.083447616373,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Geothermal - NF EGS / Binary,investment,10471.55341032354,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Geothermal - NF EGS / Binary,investment,11547.029559157532,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Geothermal - NF EGS / Binary,investment,9026.083447616373,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Geothermal - NF EGS / Binary,investment,10471.55341032354,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Geothermal - NF EGS / Binary,investment,11547.029559157532,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Geothermal - NF EGS / Flash,CF,0.9,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Geothermal - NF EGS / Flash,CF,0.9,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Geothermal - NF EGS / Flash,CF,0.9,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -964,12 +964,12 @@ Geothermal - NF EGS / Flash,FOM,1.63,%/year,NREL/ATB-https://data.openei.org/s3_ Geothermal - NF EGS / Flash,FOM,1.91,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Geothermal - NF EGS / Flash,FOM,1.69,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Geothermal - NF EGS / Flash,FOM,1.63,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Geothermal - NF EGS / Flash,investment,7580.861151487899,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Geothermal - NF EGS / Flash,investment,8904.443398149877,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Geothermal - NF EGS / Flash,investment,9491.77226170138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Geothermal - NF EGS / Flash,investment,7580.861151487899,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Geothermal - NF EGS / Flash,investment,8904.443398149877,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Geothermal - NF EGS / Flash,investment,9491.77226170138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Geothermal - NF EGS / Flash,investment,6623.089548753158,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Geothermal - NF EGS / Flash,investment,7779.449435790743,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Geothermal - NF EGS / Flash,investment,8292.574736483733,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Geothermal - NF EGS / Flash,investment,6623.089548753158,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Geothermal - NF EGS / Flash,investment,7779.449435790743,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Geothermal - NF EGS / Flash,investment,8292.574736483733,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Gravity-Brick-bicharger,FOM,1.5,%/year,"Viswanathan_2022, p.76 (p.98) Sentence 1 in 4.7.2 Operating Costs","{'carrier': ['elec', 'gravity', 'elec'], 'technology_type': ['bicharger'], 'type': ['mechanical'], 'note': ['1.5 percent of capital cost']}",2020.0,, Gravity-Brick-bicharger,efficiency,0.9274,per unit,"Viswanathan_2022, p.77 (p.99) Table 4.36","{'carrier': ['elec', 'gravity', 'elec'], 'technology_type': ['bicharger'], 'type': ['mechanical'], 'note': ['AC-AC efficiency at transformer level 0.86^0.5']}",2020.0,, Gravity-Brick-bicharger,investment,415570.5177,EUR/MW,"Viswanathan_2022, p.71 (p.94) text at the bottom speaks about 0% cost reduction for 2030 compared to 2021","{'carrier': ['elec', 'gravity', 'elec'], 'technology_type': ['bicharger'], 'type': ['mechanical'], 'note': ['Power Equipment']}",2020.0,, @@ -1051,7 +1051,7 @@ Haber-Bosch,lifetime,30.0,years,"Danish Energy Agency, inputs/data_sheets_for_re Haber-Bosch,nitrogen-input,0.1597,t_N2/MWh_NH3,"DECHEMA 2017: DECHEMA: Low carbon energy and feedstock for the European chemical industry (https://dechema.de/dechema_media/Downloads/Positionspapiere/Technology_study_Low_carbon_energy_and_feedstock_for_the_European_chemical_industry.pdf), pg. 57.",".33 MWh electricity are required for ASU per t_NH3, considering 0.4 MWh are required per t_N2 and LHV of NH3 of 5.1666 Mwh.",,, Heavy oil partial oxidation,FOM,0.05,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Heavy oil partial oxidation,efficiency,0.734,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Heavy oil partial oxidation,investment,491.0535,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Heavy oil partial oxidation,investment,662.0382094364353,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Heavy oil partial oxidation,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, HighT-Molten-Salt-charger,FOM,1.075,%/year,"Viswanathan_2022, NULL","{'carrier': ['elec', 'salthight'], 'technology_type': ['charger'], 'type': ['thermal'], 'note': ['Guesstimate, 50% on charger']}",2020.0,, HighT-Molten-Salt-charger,efficiency,0.99,per unit,"Viswanathan_2022, p.107 (p.129)","{'carrier': ['elec', 'salthight'], 'technology_type': ['charger'], 'type': ['thermal'], 'note': ['RTE assume 99% for charge and other for discharge']}",2020.0,, @@ -1095,12 +1095,12 @@ Hydropower - NPD 2,FOM,1.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Hydropower - NPD 2,FOM,1.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NPD 2,FOM,1.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NPD 2,FOM,1.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NPD 2,investment,6357.064447883142,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NPD 2,investment,6357.064447883142,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NPD 2,investment,6357.064447883142,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NPD 2,investment,6357.064447883142,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NPD 2,investment,6357.064447883142,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NPD 2,investment,6357.064447883142,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NPD 2,investment,5553.908225487212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NPD 2,investment,5553.908225487212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NPD 2,investment,5553.908225487212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NPD 2,investment,5553.908225487212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NPD 2,investment,5553.908225487212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NPD 2,investment,5553.908225487212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NPD 3,CF,0.33,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NPD 3,CF,0.33,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NPD 3,CF,0.33,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1113,12 +1113,12 @@ Hydropower - NPD 3,FOM,1.74,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Hydropower - NPD 3,FOM,1.74,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NPD 3,FOM,1.74,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NPD 3,FOM,1.74,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NPD 3,investment,6487.995279612818,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NPD 3,investment,6487.995279612818,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NPD 3,investment,6487.995279612818,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NPD 3,investment,6487.995279612818,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NPD 3,investment,6487.995279612818,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NPD 3,investment,6487.995279612818,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NPD 3,investment,5668.297159133382,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NPD 3,investment,5668.297159133382,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NPD 3,investment,5668.297159133382,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NPD 3,investment,5668.297159133382,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NPD 3,investment,5668.297159133382,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NPD 3,investment,5668.297159133382,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NPD 4,CF,0.38,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NPD 4,CF,0.38,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NPD 4,CF,0.38,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1131,12 +1131,12 @@ Hydropower - NPD 4,FOM,1.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Hydropower - NPD 4,FOM,1.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NPD 4,FOM,1.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NPD 4,FOM,1.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NPD 4,investment,14239.526309332348,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NPD 4,investment,14239.526309332348,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NPD 4,investment,14239.526309332348,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NPD 4,investment,14239.526309332348,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NPD 4,investment,14239.526309332348,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NPD 4,investment,14239.526309332348,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NPD 4,investment,12440.494027518826,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NPD 4,investment,12440.494027518826,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NPD 4,investment,12440.494027518826,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NPD 4,investment,12440.494027518826,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NPD 4,investment,12440.494027518826,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NPD 4,investment,12440.494027518826,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NPD 5,CF,0.42,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NPD 5,CF,0.42,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NPD 5,CF,0.42,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1149,12 +1149,12 @@ Hydropower - NPD 5,FOM,0.65,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Hydropower - NPD 5,FOM,0.65,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NPD 5,FOM,0.65,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NPD 5,FOM,0.65,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NPD 5,investment,5220.201616279123,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NPD 5,investment,5220.201616279123,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NPD 5,investment,5220.201616279123,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NPD 5,investment,5220.201616279123,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NPD 5,investment,5220.201616279123,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NPD 5,investment,5220.201616279123,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NPD 5,investment,4560.677484559491,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NPD 5,investment,4560.677484559491,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NPD 5,investment,4560.677484559491,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NPD 5,investment,4560.677484559491,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NPD 5,investment,4560.677484559491,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NPD 5,investment,4560.677484559491,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NPD 6,CF,0.44,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NPD 6,CF,0.44,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NPD 6,CF,0.44,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1167,12 +1167,12 @@ Hydropower - NPD 6,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?buc Hydropower - NPD 6,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NPD 6,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NPD 6,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NPD 6,investment,7859.04333870081,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NPD 6,investment,7859.04333870081,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NPD 6,investment,7859.04333870081,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NPD 6,investment,7859.04333870081,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NPD 6,investment,7859.04333870081,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NPD 6,investment,7859.04333870081,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NPD 6,investment,6866.125992761567,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NPD 6,investment,6866.125992761567,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NPD 6,investment,6866.125992761567,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NPD 6,investment,6866.125992761567,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NPD 6,investment,6866.125992761567,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NPD 6,investment,6866.125992761567,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NPD 7,CF,0.62,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NPD 7,CF,0.62,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NPD 7,CF,0.62,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1185,12 +1185,12 @@ Hydropower - NPD 7,FOM,0.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Hydropower - NPD 7,FOM,0.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NPD 7,FOM,0.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NPD 7,FOM,0.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NPD 7,investment,15796.858072100777,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NPD 7,investment,15796.858072100777,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NPD 7,investment,15796.858072100777,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NPD 7,investment,15796.858072100777,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NPD 7,investment,15796.858072100777,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NPD 7,investment,15796.858072100777,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NPD 7,investment,13801.071343976932,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NPD 7,investment,13801.071343976932,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NPD 7,investment,13801.071343976932,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NPD 7,investment,13801.071343976932,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NPD 7,investment,13801.071343976932,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NPD 7,investment,13801.071343976932,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NPD 8,CF,0.4,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NPD 8,CF,0.4,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NPD 8,CF,0.4,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1203,12 +1203,12 @@ Hydropower - NPD 8,FOM,0.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Hydropower - NPD 8,FOM,0.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NPD 8,FOM,0.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NPD 8,FOM,0.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NPD 8,investment,21498.20388302879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NPD 8,investment,21498.20388302879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NPD 8,investment,21498.20388302879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NPD 8,investment,21498.20388302879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NPD 8,investment,21498.20388302879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NPD 8,investment,21498.20388302879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NPD 8,investment,18782.104909902835,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NPD 8,investment,18782.104909902835,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NPD 8,investment,18782.104909902835,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NPD 8,investment,18782.104909902835,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NPD 8,investment,18782.104909902835,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NPD 8,investment,18782.104909902835,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NSD 2,CF,0.66,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NSD 2,CF,0.66,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NSD 2,CF,0.66,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1221,12 +1221,12 @@ Hydropower - NSD 2,FOM,0.6,%/year,NREL/ATB-https://data.openei.org/s3_viewer?buc Hydropower - NSD 2,FOM,0.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NSD 2,FOM,0.61,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NSD 2,FOM,0.6,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NSD 2,investment,8051.713912221715,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NSD 2,investment,8256.09374711682,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NSD 2,investment,8297.608401079888,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NSD 2,investment,8051.713912221715,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NSD 2,investment,8256.09374711682,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NSD 2,investment,8297.608401079888,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NSD 2,investment,7034.454423574224,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NSD 2,investment,7213.0127590219045,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NSD 2,investment,7249.282420909714,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NSD 2,investment,7034.454423574224,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NSD 2,investment,7213.0127590219045,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NSD 2,investment,7249.282420909714,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NSD 3,CF,0.62,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NSD 3,CF,0.62,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NSD 3,CF,0.62,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1239,12 +1239,12 @@ Hydropower - NSD 3,FOM,1.78,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Hydropower - NSD 3,FOM,1.39,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NSD 3,FOM,1.79,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NSD 3,FOM,1.78,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NSD 3,investment,7888.848731289679,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NSD 3,investment,8087.906174651057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NSD 3,investment,8129.420828614125,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NSD 3,investment,7888.848731289679,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NSD 3,investment,8087.906174651057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NSD 3,investment,8129.420828614125,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NSD 3,investment,6892.165750014354,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NSD 3,investment,7066.0741288097515,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NSD 3,investment,7102.3437906975605,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NSD 3,investment,6892.165750014354,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NSD 3,investment,7066.0741288097515,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NSD 3,investment,7102.3437906975605,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NSD 4,CF,0.66,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NSD 4,CF,0.66,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NSD 4,CF,0.66,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1257,12 +1257,12 @@ Hydropower - NSD 4,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Hydropower - NSD 4,FOM,0.38,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NSD 4,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NSD 4,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NSD 4,investment,7112.844045672329,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NSD 4,investment,7292.740879512291,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NSD 4,investment,7329.997620248378,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NSD 4,investment,7112.844045672329,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NSD 4,investment,7292.740879512291,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NSD 4,investment,7329.997620248378,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NSD 4,investment,6214.202070111444,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NSD 4,investment,6371.370604958621,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NSD 4,investment,6403.920301524604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NSD 4,investment,6214.202070111444,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NSD 4,investment,6371.370604958621,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NSD 4,investment,6403.920301524604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative LNG storage tank,FOM,2.0,%/year,"Guesstimate, based on H2 (l) storage tank with comparable requirements.",Currency year and technology year assumed based on publication date.,2019.0,, LNG storage tank,investment,666.634,EUR/m^3,"Hurskainen 2019, https://cris.vtt.fi/en/publications/liquid-organic-hydrogen-carriers-lohc-concept-evaluation-and-tech pg. 46 (59).",Currency year and technology year assumed based on publication date.,2019.0,, LNG storage tank,lifetime,20.0,years,"Guesstimate, based on H2 (l) storage tank with comparable requirements.",Currency year and technology year assumed based on publication date.,2019.0,, @@ -1302,12 +1302,12 @@ Land-Based Wind - Class 1 - Technology 1,FOM,1.95,%/year,NREL/ATB-https://data.o Land-Based Wind - Class 1 - Technology 1,FOM,1.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 1 - Technology 1,FOM,1.99,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 1 - Technology 1,FOM,1.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 1 - Technology 1,investment,1544.2437353547416,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 1 - Technology 1,investment,1569.0990734589152,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 1 - Technology 1,investment,1632.638533920156,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 1 - Technology 1,investment,1544.2437353547416,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 1 - Technology 1,investment,1569.0990734589152,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 1 - Technology 1,investment,1632.638533920156,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 1 - Technology 1,investment,1349.1428401044038,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 1 - Technology 1,investment,1370.8579364158788,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 1 - Technology 1,investment,1426.3697744649985,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 1 - Technology 1,investment,1349.1428401044038,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 1 - Technology 1,investment,1370.8579364158788,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 1 - Technology 1,investment,1426.3697744649985,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 10 - Technology 4,CF,0.277685456790123,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 10 - Technology 4,CF,0.266329555555555,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 10 - Technology 4,CF,0.259807777777777,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1320,12 +1320,12 @@ Land-Based Wind - Class 10 - Technology 4,FOM,1.4,%/year,NREL/ATB-https://data.o Land-Based Wind - Class 10 - Technology 4,FOM,1.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 10 - Technology 4,FOM,1.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 10 - Technology 4,FOM,1.4,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 10 - Technology 4,investment,2097.9590776521995,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 10 - Technology 4,investment,2150.8419015733803,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 10 - Technology 4,investment,2271.6320504765526,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 10 - Technology 4,investment,2097.9590776521995,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 10 - Technology 4,investment,2150.8419015733803,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 10 - Technology 4,investment,2271.6320504765526,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 10 - Technology 4,investment,1832.9013766705018,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 10 - Technology 4,investment,1879.102945518941,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 10 - Technology 4,investment,1984.6323777043492,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 10 - Technology 4,investment,1832.9013766705018,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 10 - Technology 4,investment,1879.102945518941,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 10 - Technology 4,investment,1984.6323777043492,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 2 - Technology 1,CF,0.496182790123456,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 2 - Technology 1,CF,0.481730888888888,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 2 - Technology 1,CF,0.469934444444444,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1338,12 +1338,12 @@ Land-Based Wind - Class 2 - Technology 1,FOM,1.95,%/year,NREL/ATB-https://data.o Land-Based Wind - Class 2 - Technology 1,FOM,1.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 2 - Technology 1,FOM,1.99,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 2 - Technology 1,FOM,1.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 2 - Technology 1,investment,1544.2437353547416,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 2 - Technology 1,investment,1569.0990734589152,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 2 - Technology 1,investment,1632.638533920156,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 2 - Technology 1,investment,1544.2437353547416,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 2 - Technology 1,investment,1569.0990734589152,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 2 - Technology 1,investment,1632.638533920156,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 2 - Technology 1,investment,1349.1428401044038,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 2 - Technology 1,investment,1370.8579364158788,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 2 - Technology 1,investment,1426.3697744649985,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 2 - Technology 1,investment,1349.1428401044038,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 2 - Technology 1,investment,1370.8579364158788,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 2 - Technology 1,investment,1426.3697744649985,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 3 - Technology 1,CF,0.485173234567901,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 3 - Technology 1,CF,0.470877333333333,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 3 - Technology 1,CF,0.459346666666666,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1356,12 +1356,12 @@ Land-Based Wind - Class 3 - Technology 1,FOM,1.95,%/year,NREL/ATB-https://data.o Land-Based Wind - Class 3 - Technology 1,FOM,1.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 3 - Technology 1,FOM,1.99,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 3 - Technology 1,FOM,1.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 3 - Technology 1,investment,1544.2437353547416,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 3 - Technology 1,investment,1569.0990734589152,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 3 - Technology 1,investment,1632.638533920156,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 3 - Technology 1,investment,1544.2437353547416,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 3 - Technology 1,investment,1569.0990734589152,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 3 - Technology 1,investment,1632.638533920156,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 3 - Technology 1,investment,1349.1428401044038,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 3 - Technology 1,investment,1370.8579364158788,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 3 - Technology 1,investment,1426.3697744649985,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 3 - Technology 1,investment,1349.1428401044038,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 3 - Technology 1,investment,1370.8579364158788,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 3 - Technology 1,investment,1426.3697744649985,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 5 - Technology 1,CF,0.457225901234567,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 5 - Technology 1,CF,0.443326,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 5 - Technology 1,CF,0.43247,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1374,12 +1374,12 @@ Land-Based Wind - Class 5 - Technology 1,FOM,1.95,%/year,NREL/ATB-https://data.o Land-Based Wind - Class 5 - Technology 1,FOM,1.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 5 - Technology 1,FOM,1.99,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 5 - Technology 1,FOM,1.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 5 - Technology 1,investment,1544.2437353547416,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 5 - Technology 1,investment,1569.0990734589152,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 5 - Technology 1,investment,1632.638533920156,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 5 - Technology 1,investment,1544.2437353547416,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 5 - Technology 1,investment,1569.0990734589152,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 5 - Technology 1,investment,1632.638533920156,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 5 - Technology 1,investment,1349.1428401044038,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 5 - Technology 1,investment,1370.8579364158788,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 5 - Technology 1,investment,1426.3697744649985,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 5 - Technology 1,investment,1349.1428401044038,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 5 - Technology 1,investment,1370.8579364158788,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 5 - Technology 1,investment,1426.3697744649985,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 6 - Technology 1,CF,0.433513012345679,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 6 - Technology 1,CF,0.419949111111111,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 6 - Technology 1,CF,0.409665555555555,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1392,12 +1392,12 @@ Land-Based Wind - Class 6 - Technology 1,FOM,1.95,%/year,NREL/ATB-https://data.o Land-Based Wind - Class 6 - Technology 1,FOM,1.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 6 - Technology 1,FOM,1.99,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 6 - Technology 1,FOM,1.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 6 - Technology 1,investment,1544.2437353547416,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 6 - Technology 1,investment,1569.0990734589152,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 6 - Technology 1,investment,1632.638533920156,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 6 - Technology 1,investment,1544.2437353547416,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 6 - Technology 1,investment,1569.0990734589152,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 6 - Technology 1,investment,1632.638533920156,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 6 - Technology 1,investment,1349.1428401044038,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 6 - Technology 1,investment,1370.8579364158788,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 6 - Technology 1,investment,1426.3697744649985,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 6 - Technology 1,investment,1349.1428401044038,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 6 - Technology 1,investment,1370.8579364158788,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 6 - Technology 1,investment,1426.3697744649985,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 7 - Technology 1,CF,0.400484345679012,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 7 - Technology 1,CF,0.387388444444444,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 7 - Technology 1,CF,0.377902222222222,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1410,12 +1410,12 @@ Land-Based Wind - Class 7 - Technology 1,FOM,1.95,%/year,NREL/ATB-https://data.o Land-Based Wind - Class 7 - Technology 1,FOM,1.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 7 - Technology 1,FOM,1.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 7 - Technology 1,FOM,1.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 7 - Technology 1,investment,1544.2437353547416,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 7 - Technology 1,investment,1593.4358887096005,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 7 - Technology 1,investment,1632.638533920156,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 7 - Technology 1,investment,1544.2437353547416,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 7 - Technology 1,investment,1593.4358887096005,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 7 - Technology 1,investment,1632.638533920156,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 7 - Technology 1,investment,1349.1428401044038,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 7 - Technology 1,investment,1392.1200204345412,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 7 - Technology 1,investment,1426.3697744649985,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 7 - Technology 1,investment,1349.1428401044038,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 7 - Technology 1,investment,1392.1200204345412,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 7 - Technology 1,investment,1426.3697744649985,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 8 - Technology 2,CF,0.362374345679012,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 8 - Technology 2,CF,0.349818444444444,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 8 - Technology 2,CF,0.341252222222222,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1428,12 +1428,12 @@ Land-Based Wind - Class 8 - Technology 2,FOM,1.7,%/year,NREL/ATB-https://data.op Land-Based Wind - Class 8 - Technology 2,FOM,1.72,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 8 - Technology 2,FOM,1.7,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 8 - Technology 2,FOM,1.7,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 8 - Technology 2,investment,1646.9127697068484,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 8 - Technology 2,investment,1703.287705159342,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 8 - Technology 2,investment,1761.1297173056528,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 8 - Technology 2,investment,1646.9127697068484,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 8 - Technology 2,investment,1703.287705159342,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 8 - Technology 2,investment,1761.1297173056528,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 8 - Technology 2,investment,1438.8405927488454,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 8 - Technology 2,investment,1488.0930771758635,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 8 - Technology 2,investment,1538.6272867425291,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 8 - Technology 2,investment,1438.8405927488454,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 8 - Technology 2,investment,1488.0930771758635,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 8 - Technology 2,investment,1538.6272867425291,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 9 - Technology 3,CF,0.350517901234567,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 9 - Technology 3,CF,0.33813,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 9 - Technology 3,CF,0.32985,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1446,12 +1446,12 @@ Land-Based Wind - Class 9 - Technology 3,FOM,2.36,%/year,NREL/ATB-https://data.o Land-Based Wind - Class 9 - Technology 3,FOM,2.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 9 - Technology 3,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 9 - Technology 3,FOM,2.36,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 9 - Technology 3,investment,1648.7125673784928,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 9 - Technology 3,investment,1660.4538366714423,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 9 - Technology 3,investment,1712.191329594922,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 9 - Technology 3,investment,1648.7125673784928,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 9 - Technology 3,investment,1660.4538366714423,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 9 - Technology 3,investment,1712.191329594922,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 9 - Technology 3,investment,1440.4130026519865,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 9 - Technology 3,investment,1450.670871301641,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 9 - Technology 3,investment,1495.871811117421,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 9 - Technology 3,investment,1440.4130026519865,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 9 - Technology 3,investment,1450.670871301641,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 9 - Technology 3,investment,1495.871811117421,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 1,CF,0.5330655000000002,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 1,CF,0.5330655000000002,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 1,CF,0.5330655000000002,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1464,12 +1464,12 @@ Large DW - Class 1,FOM,1.39,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 1,FOM,2.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 1,FOM,1.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 1,FOM,1.39,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 1,investment,1749.6569647795254,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 1,investment,2309.5471935089736,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 1,investment,2790.2097968754915,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 1,investment,1749.6569647795254,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 1,investment,2309.5471935089736,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 1,investment,2790.2097968754915,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 1,investment,1528.6040102528507,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 1,investment,2017.757293533763,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 1,investment,2437.6926282164786,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 1,investment,1528.6040102528507,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 1,investment,2017.757293533763,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 1,investment,2437.6926282164786,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 10,CF,0.197669,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 10,CF,0.197669,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 10,CF,0.197669,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1482,12 +1482,12 @@ Large DW - Class 10,FOM,1.39,%/year,NREL/ATB-https://data.openei.org/s3_viewer?b Large DW - Class 10,FOM,2.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 10,FOM,1.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 10,FOM,1.39,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 10,investment,1749.6569647795254,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 10,investment,2309.5471935089736,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 10,investment,2790.2097968754915,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 10,investment,1749.6569647795254,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 10,investment,2309.5471935089736,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 10,investment,2790.2097968754915,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 10,investment,1528.6040102528507,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 10,investment,2017.757293533763,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 10,investment,2437.6926282164786,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 10,investment,1528.6040102528507,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 10,investment,2017.757293533763,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 10,investment,2437.6926282164786,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 2,CF,0.4978215,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 2,CF,0.4978215,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 2,CF,0.4978215,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1500,12 +1500,12 @@ Large DW - Class 2,FOM,1.39,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 2,FOM,2.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 2,FOM,1.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 2,FOM,1.39,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 2,investment,1749.6569647795254,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 2,investment,2309.5471935089736,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 2,investment,2790.2097968754915,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 2,investment,1749.6569647795254,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 2,investment,2309.5471935089736,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 2,investment,2790.2097968754915,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 2,investment,1528.6040102528507,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 2,investment,2017.757293533763,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 2,investment,2437.6926282164786,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 2,investment,1528.6040102528507,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 2,investment,2017.757293533763,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 2,investment,2437.6926282164786,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 3,CF,0.4851835000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 3,CF,0.4851835000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 3,CF,0.4851835000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1518,12 +1518,12 @@ Large DW - Class 3,FOM,1.39,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 3,FOM,2.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 3,FOM,1.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 3,FOM,1.39,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 3,investment,1749.6569647795254,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 3,investment,2309.5471935089736,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 3,investment,2790.2097968754915,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 3,investment,1749.6569647795254,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 3,investment,2309.5471935089736,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 3,investment,2790.2097968754915,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 3,investment,1528.6040102528507,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 3,investment,2017.757293533763,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 3,investment,2437.6926282164786,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 3,investment,1528.6040102528507,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 3,investment,2017.757293533763,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 3,investment,2437.6926282164786,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 4,CF,0.4720559999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 4,CF,0.4720559999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 4,CF,0.4720559999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1536,12 +1536,12 @@ Large DW - Class 4,FOM,1.39,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 4,FOM,2.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 4,FOM,1.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 4,FOM,1.39,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 4,investment,1749.6569647795254,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 4,investment,2309.5471935089736,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 4,investment,2790.2097968754915,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 4,investment,1749.6569647795254,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 4,investment,2309.5471935089736,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 4,investment,2790.2097968754915,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 4,investment,1528.6040102528507,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 4,investment,2017.757293533763,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 4,investment,2437.6926282164786,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 4,investment,1528.6040102528507,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 4,investment,2017.757293533763,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 4,investment,2437.6926282164786,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 5,CF,0.4556355,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 5,CF,0.4556355,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 5,CF,0.4556355,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1554,12 +1554,12 @@ Large DW - Class 5,FOM,1.39,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 5,FOM,2.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 5,FOM,1.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 5,FOM,1.39,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 5,investment,1749.6569647795254,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 5,investment,2309.5471935089736,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 5,investment,2790.2097968754915,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 5,investment,1749.6569647795254,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 5,investment,2309.5471935089736,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 5,investment,2790.2097968754915,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 5,investment,1528.6040102528507,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 5,investment,2017.757293533763,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 5,investment,2437.6926282164786,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 5,investment,1528.6040102528507,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 5,investment,2017.757293533763,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 5,investment,2437.6926282164786,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 6,CF,0.430671,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 6,CF,0.430671,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 6,CF,0.430671,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1572,12 +1572,12 @@ Large DW - Class 6,FOM,1.39,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 6,FOM,2.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 6,FOM,1.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 6,FOM,1.39,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 6,investment,1749.6569647795254,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 6,investment,2309.5471935089736,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 6,investment,2790.2097968754915,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 6,investment,1749.6569647795254,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 6,investment,2309.5471935089736,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 6,investment,2790.2097968754915,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 6,investment,1528.6040102528507,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 6,investment,2017.757293533763,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 6,investment,2437.6926282164786,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 6,investment,1528.6040102528507,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 6,investment,2017.757293533763,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 6,investment,2437.6926282164786,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 7,CF,0.3947595000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 7,CF,0.3947595000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 7,CF,0.3947595000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1590,12 +1590,12 @@ Large DW - Class 7,FOM,1.39,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 7,FOM,2.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 7,FOM,1.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 7,FOM,1.39,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 7,investment,1749.6569647795254,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 7,investment,2309.5471935089736,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 7,investment,2790.2097968754915,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 7,investment,1749.6569647795254,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 7,investment,2309.5471935089736,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 7,investment,2790.2097968754915,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 7,investment,1528.6040102528507,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 7,investment,2017.757293533763,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 7,investment,2437.6926282164786,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 7,investment,1528.6040102528507,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 7,investment,2017.757293533763,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 7,investment,2437.6926282164786,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 8,CF,0.34936950000000006,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 8,CF,0.34936950000000006,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 8,CF,0.34936950000000006,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1608,12 +1608,12 @@ Large DW - Class 8,FOM,1.39,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 8,FOM,2.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 8,FOM,1.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 8,FOM,1.39,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 8,investment,1749.6569647795254,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 8,investment,2309.5471935089736,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 8,investment,2790.2097968754915,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 8,investment,1749.6569647795254,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 8,investment,2309.5471935089736,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 8,investment,2790.2097968754915,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 8,investment,1528.6040102528507,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 8,investment,2017.757293533763,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 8,investment,2437.6926282164786,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 8,investment,1528.6040102528507,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 8,investment,2017.757293533763,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 8,investment,2437.6926282164786,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 9,CF,0.297883,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 9,CF,0.297883,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 9,CF,0.297883,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1626,12 +1626,12 @@ Large DW - Class 9,FOM,1.39,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 9,FOM,2.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 9,FOM,1.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 9,FOM,1.39,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 9,investment,1749.6569647795254,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 9,investment,2309.5471935089736,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 9,investment,2790.2097968754915,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 9,investment,1749.6569647795254,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 9,investment,2309.5471935089736,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 9,investment,2790.2097968754915,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 9,investment,1528.6040102528507,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 9,investment,2017.757293533763,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 9,investment,2437.6926282164786,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 9,investment,1528.6040102528507,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 9,investment,2017.757293533763,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 9,investment,2437.6926282164786,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Lead-Acid-bicharger,FOM,2.4245,%/year,"Viswanathan_2022, p.28 (p.50)","{'carrier': ['elec', 'lead', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['30% assumed of power components every 10 years']}",2020.0,, Lead-Acid-bicharger,efficiency,0.8832,per unit,"Viswanathan_2022, p.33 (p.55)","{'carrier': ['elec', 'lead', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['AC-AC efficiency at transformer level 0.78^0.5']}",2020.0,, Lead-Acid-bicharger,investment,139292.4203,EUR/MW,"Viswanathan_2022, p.33 (p.55)","{'carrier': ['elec', 'lead', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['Power Equipment']}",2020.0,, @@ -1703,12 +1703,12 @@ Midsize DW - Class 1,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 1,FOM,1.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 1,FOM,1.21,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 1,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 1,investment,2679.592233164946,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 1,investment,3202.31583129671,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 1,investment,3441.651041682645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 1,investment,2679.592233164946,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 1,investment,3202.31583129671,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 1,investment,3441.651041682645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 1,investment,2341.050569289432,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 1,investment,2797.7328815612555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 1,investment,3006.8303045162465,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 1,investment,2341.050569289432,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 1,investment,2797.7328815612555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 1,investment,3006.8303045162465,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 10,CF,0.16861050000000002,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 10,CF,0.16861050000000002,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 10,CF,0.16861050000000002,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1721,12 +1721,12 @@ Midsize DW - Class 10,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer Midsize DW - Class 10,FOM,1.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 10,FOM,1.21,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 10,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 10,investment,2679.592233164946,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 10,investment,3202.31583129671,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 10,investment,3441.651041682645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 10,investment,2679.592233164946,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 10,investment,3202.31583129671,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 10,investment,3441.651041682645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 10,investment,2341.050569289432,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 10,investment,2797.7328815612555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 10,investment,3006.8303045162465,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 10,investment,2341.050569289432,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 10,investment,2797.7328815612555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 10,investment,3006.8303045162465,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 2,CF,0.4577270000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 2,CF,0.4577270000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 2,CF,0.4577270000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1739,12 +1739,12 @@ Midsize DW - Class 2,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 2,FOM,1.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 2,FOM,1.21,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 2,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 2,investment,2679.592233164946,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 2,investment,3202.31583129671,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 2,investment,3441.651041682645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 2,investment,2679.592233164946,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 2,investment,3202.31583129671,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 2,investment,3441.651041682645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 2,investment,2341.050569289432,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 2,investment,2797.7328815612555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 2,investment,3006.8303045162465,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 2,investment,2341.050569289432,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 2,investment,2797.7328815612555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 2,investment,3006.8303045162465,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 3,CF,0.44477749999999994,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 3,CF,0.44477749999999994,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 3,CF,0.44477749999999994,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1757,12 +1757,12 @@ Midsize DW - Class 3,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 3,FOM,1.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 3,FOM,1.21,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 3,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 3,investment,2679.592233164946,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 3,investment,3202.31583129671,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 3,investment,3441.651041682645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 3,investment,2679.592233164946,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 3,investment,3202.31583129671,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 3,investment,3441.651041682645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 3,investment,2341.050569289432,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 3,investment,2797.7328815612555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 3,investment,3006.8303045162465,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 3,investment,2341.050569289432,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 3,investment,2797.7328815612555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 3,investment,3006.8303045162465,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 4,CF,0.4313385,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 4,CF,0.4313385,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 4,CF,0.4313385,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1775,12 +1775,12 @@ Midsize DW - Class 4,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 4,FOM,1.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 4,FOM,1.21,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 4,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 4,investment,2679.592233164946,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 4,investment,3202.31583129671,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 4,investment,3441.651041682645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 4,investment,2679.592233164946,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 4,investment,3202.31583129671,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 4,investment,3441.651041682645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 4,investment,2341.050569289432,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 4,investment,2797.7328815612555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 4,investment,3006.8303045162465,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 4,investment,2341.050569289432,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 4,investment,2797.7328815612555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 4,investment,3006.8303045162465,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 5,CF,0.4146955000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 5,CF,0.4146955000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 5,CF,0.4146955000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1793,12 +1793,12 @@ Midsize DW - Class 5,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 5,FOM,1.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 5,FOM,1.21,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 5,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 5,investment,2679.592233164946,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 5,investment,3202.31583129671,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 5,investment,3441.651041682645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 5,investment,2679.592233164946,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 5,investment,3202.31583129671,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 5,investment,3441.651041682645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 5,investment,2341.050569289432,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 5,investment,2797.7328815612555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 5,investment,3006.8303045162465,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 5,investment,2341.050569289432,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 5,investment,2797.7328815612555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 5,investment,3006.8303045162465,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 6,CF,0.389553,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 6,CF,0.389553,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 6,CF,0.389553,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1811,12 +1811,12 @@ Midsize DW - Class 6,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 6,FOM,1.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 6,FOM,1.21,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 6,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 6,investment,2679.592233164946,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 6,investment,3202.31583129671,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 6,investment,3441.651041682645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 6,investment,2679.592233164946,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 6,investment,3202.31583129671,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 6,investment,3441.651041682645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 6,investment,2341.050569289432,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 6,investment,2797.7328815612555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 6,investment,3006.8303045162465,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 6,investment,2341.050569289432,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 6,investment,2797.7328815612555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 6,investment,3006.8303045162465,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 7,CF,0.354042,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 7,CF,0.354042,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 7,CF,0.354042,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1829,12 +1829,12 @@ Midsize DW - Class 7,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 7,FOM,1.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 7,FOM,1.21,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 7,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 7,investment,2679.592233164946,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 7,investment,3202.31583129671,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 7,investment,3441.651041682645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 7,investment,2679.592233164946,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 7,investment,3202.31583129671,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 7,investment,3441.651041682645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 7,investment,2341.050569289432,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 7,investment,2797.7328815612555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 7,investment,3006.8303045162465,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 7,investment,2341.050569289432,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 7,investment,2797.7328815612555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 7,investment,3006.8303045162465,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 8,CF,0.3099424999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 8,CF,0.3099424999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 8,CF,0.3099424999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1847,12 +1847,12 @@ Midsize DW - Class 8,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 8,FOM,1.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 8,FOM,1.21,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 8,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 8,investment,2679.592233164946,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 8,investment,3202.31583129671,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 8,investment,3441.651041682645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 8,investment,2679.592233164946,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 8,investment,3202.31583129671,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 8,investment,3441.651041682645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 8,investment,2341.050569289432,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 8,investment,2797.7328815612555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 8,investment,3006.8303045162465,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 8,investment,2341.050569289432,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 8,investment,2797.7328815612555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 8,investment,3006.8303045162465,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 9,CF,0.26094799999999996,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 9,CF,0.26094799999999996,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 9,CF,0.26094799999999996,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1865,78 +1865,78 @@ Midsize DW - Class 9,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 9,FOM,1.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 9,FOM,1.21,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 9,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 9,investment,2679.592233164946,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 9,investment,3202.31583129671,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 9,investment,3441.651041682645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 9,investment,2679.592233164946,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 9,investment,3202.31583129671,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 9,investment,3441.651041682645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 9,investment,2341.050569289432,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 9,investment,2797.7328815612555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 9,investment,3006.8303045162465,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 9,investment,2341.050569289432,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 9,investment,2797.7328815612555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 9,investment,3006.8303045162465,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 1-on-1 Combined Cycle (H-Frame),FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 1-on-1 Combined Cycle (H-Frame),FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG 1-on-1 Combined Cycle (H-Frame),FOM,2.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG 1-on-1 Combined Cycle (H-Frame),FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 1-on-1 Combined Cycle (H-Frame),FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 1-on-1 Combined Cycle (H-Frame),FOM,2.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 1-on-1 Combined Cycle (H-Frame),VOM,2.48,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 1-on-1 Combined Cycle (H-Frame),VOM,2.49,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 1-on-1 Combined Cycle (H-Frame),VOM,2.5,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 1-on-1 Combined Cycle (H-Frame),VOM,2.48,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 1-on-1 Combined Cycle (H-Frame),VOM,2.49,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 1-on-1 Combined Cycle (H-Frame),VOM,2.5,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 1-on-1 Combined Cycle (H-Frame),investment,1725.021341081854,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 1-on-1 Combined Cycle (H-Frame),investment,1727.2500508248538,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 1-on-1 Combined Cycle (H-Frame),investment,1730.5931154393534,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 1-on-1 Combined Cycle (H-Frame),investment,1725.021341081854,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 1-on-1 Combined Cycle (H-Frame),investment,1727.2500508248538,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 1-on-1 Combined Cycle (H-Frame),investment,1730.5931154393534,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 1-on-1 Combined Cycle (H-Frame),VOM,2.166674966429643,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 1-on-1 Combined Cycle (H-Frame),VOM,2.1754115590362146,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 1-on-1 Combined Cycle (H-Frame),VOM,2.1841481516427854,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 1-on-1 Combined Cycle (H-Frame),VOM,2.166674966429643,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 1-on-1 Combined Cycle (H-Frame),VOM,2.1754115590362146,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 1-on-1 Combined Cycle (H-Frame),VOM,2.1841481516427854,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 1-on-1 Combined Cycle (H-Frame),investment,1507.0808694673162,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 1-on-1 Combined Cycle (H-Frame),investment,1509.0280023736047,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 1-on-1 Combined Cycle (H-Frame),investment,1511.9487017330373,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 1-on-1 Combined Cycle (H-Frame),investment,1507.0808694673162,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 1-on-1 Combined Cycle (H-Frame),investment,1509.0280023736047,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 1-on-1 Combined Cycle (H-Frame),investment,1511.9487017330373,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.29,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.29,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,5.0,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,5.1,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,5.19,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,5.0,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,5.1,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,5.19,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,3212.685094534228,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,3268.4028381092235,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,3324.1205816842185,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,3212.685094534228,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,3268.4028381092235,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,3324.1205816842185,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.368296303285571,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.455662229351282,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.534291562810423,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.368296303285571,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.455662229351282,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.534291562810423,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2806.792084414905,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2855.4704070721177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2904.1487297293306,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2806.792084414905,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2855.4704070721177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2904.1487297293306,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.28,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.28,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,5.08,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,5.18,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,5.28,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,5.08,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,5.18,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,5.28,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,3253.9162247797244,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,3311.8626780977197,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,3369.8091314157145,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,3253.9162247797244,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,3311.8626780977197,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,3369.8091314157145,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.43818904413814,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.525554970203851,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.612920896269563,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.43818904413814,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.525554970203851,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.612920896269563,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2842.814043181242,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2893.439498744744,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2944.0649543082454,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2842.814043181242,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2893.439498744744,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2944.0649543082454,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame),FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (F-Frame),FOM,2.29,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG 2-on-1 Combined Cycle (F-Frame),FOM,2.3,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG 2-on-1 Combined Cycle (F-Frame),FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 2-on-1 Combined Cycle (F-Frame),FOM,2.29,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (F-Frame),FOM,2.3,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (F-Frame),VOM,2.1,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (F-Frame),VOM,2.12,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (F-Frame),VOM,2.14,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (F-Frame),VOM,2.1,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (F-Frame),VOM,2.12,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (F-Frame),VOM,2.14,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (F-Frame),VOM,1.83468444737994,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (F-Frame),VOM,1.8521576325930822,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (F-Frame),VOM,1.8696308178062244,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (F-Frame),VOM,1.83468444737994,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (F-Frame),VOM,1.8521576325930822,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (F-Frame),VOM,1.8696308178062244,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame),discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (F-Frame),discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG 2-on-1 Combined Cycle (F-Frame),discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1944,12 +1944,12 @@ NG 2-on-1 Combined Cycle (F-Frame),discount rate,0.0535847804878049,per unit,"NR NG 2-on-1 Combined Cycle (F-Frame),discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (F-Frame),discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame),efficiency,0.573,p.u.,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, -NG 2-on-1 Combined Cycle (F-Frame),investment,1455.0131557174268,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (F-Frame),investment,1463.259381766526,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (F-Frame),investment,1471.6170433027753,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (F-Frame),investment,1455.0131557174268,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (F-Frame),investment,1463.259381766526,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (F-Frame),investment,1471.6170433027753,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (F-Frame),investment,1271.1857178704618,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (F-Frame),investment,1278.3901096237291,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (F-Frame),investment,1285.691858022311,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (F-Frame),investment,1271.1857178704618,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (F-Frame),investment,1278.3901096237291,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (F-Frame),investment,1285.691858022311,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame),lifetime,30.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,FOM,2.28,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,FOM,2.29,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -1957,12 +1957,12 @@ NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,FOM,2.3,%/year,NREL/ATB-https://data. NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,FOM,2.28,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,FOM,2.29,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,FOM,2.3,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,4.74,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,4.88,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,5.02,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,4.74,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,4.88,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,5.02,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,4.141144895514722,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,4.263457192006717,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,4.385769488498713,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,4.141144895514722,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,4.263457192006717,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,4.385769488498713,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,capture_rate,0.95,per unit,"NREL, NREL ATB 2024",,,, NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -1971,12 +1971,12 @@ NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,discount rate,0.0535847804878049,per NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,efficiency,0.527,p.u.,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,2817.869163561811,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,2902.3372628215043,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,2986.693926594047,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,2817.869163561811,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,2902.3372628215043,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,2986.693926594047,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,2461.8574900658928,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,2535.653827214228,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,2609.352807717248,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,2461.8574900658928,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,2535.653827214228,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,2609.352807717248,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,lifetime,30.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,FOM,2.28,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,FOM,2.29,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -1984,12 +1984,12 @@ NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,FOM,2.3,%/year,NREL/ATB-https://data. NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,FOM,2.28,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,FOM,2.29,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,FOM,2.3,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,4.82,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,4.97,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,5.11,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,4.82,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,4.97,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,5.11,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,4.211037636367291,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,4.342086525465858,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,4.464398821957854,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,4.211037636367291,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,4.342086525465858,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,4.464398821957854,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,capture_rate,0.97,per unit,"NREL, NREL ATB 2024",,,, NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -1998,12 +1998,12 @@ NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,discount rate,0.0535847804878049,per NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,efficiency,0.525,p.u.,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,2856.537277602858,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,2943.5683930670007,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,3030.5995085311433,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,2856.537277602858,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,2943.5683930670007,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,3030.5995085311433,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,2495.6402459899987,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,2571.6757859805657,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,2647.7113259711323,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,2495.6402459899987,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,2571.6757859805657,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,2647.7113259711323,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,lifetime,30.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, NG 2-on-1 Combined Cycle (H-Frame),FOM,2.21,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (H-Frame),FOM,2.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -2011,130 +2011,130 @@ NG 2-on-1 Combined Cycle (H-Frame),FOM,2.22,%/year,NREL/ATB-https://data.openei. NG 2-on-1 Combined Cycle (H-Frame),FOM,2.21,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 2-on-1 Combined Cycle (H-Frame),FOM,2.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (H-Frame),FOM,2.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (H-Frame),VOM,2.1,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (H-Frame),VOM,2.12,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (H-Frame),VOM,2.13,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (H-Frame),VOM,2.1,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (H-Frame),VOM,2.12,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (H-Frame),VOM,2.13,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (H-Frame),investment,1483.2063339663744,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (H-Frame),investment,1495.3528020657234,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (H-Frame),investment,1507.4992701650724,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (H-Frame),investment,1483.2063339663744,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (H-Frame),investment,1495.3528020657234,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (H-Frame),investment,1507.4992701650724,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (H-Frame),VOM,1.83468444737994,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (H-Frame),VOM,1.8521576325930822,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (H-Frame),VOM,1.8608942251996532,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (H-Frame),VOM,1.83468444737994,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (H-Frame),VOM,1.8521576325930822,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (H-Frame),VOM,1.8608942251996532,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (H-Frame),investment,1295.8169491350113,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (H-Frame),investment,1306.428823474284,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (H-Frame),investment,1317.0406978135563,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (H-Frame),investment,1295.8169491350113,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (H-Frame),investment,1306.428823474284,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (H-Frame),investment,1317.0406978135563,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.55,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.66,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.77,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.55,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.66,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.77,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2704.427837643121,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2773.852146137565,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2843.276454632009,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2704.427837643121,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2773.852146137565,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2843.276454632009,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.9751496359898693,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.071252154662152,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.167354673334434,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.9751496359898693,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.071252154662152,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.167354673334434,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2362.7484251358073,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2423.4016151666942,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2484.054805197582,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2362.7484251358073,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2423.4016151666942,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2484.054805197582,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.23,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.23,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.62,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.74,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.85,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.62,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.74,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.85,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2739.084274146768,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2810.402985922762,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2882.836052570256,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2739.084274146768,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2810.402985922762,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2882.836052570256,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.036305784235868,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.141144895514722,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.237247414187004,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.036305784235868,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.141144895514722,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.237247414187004,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2393.0263418285936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2455.3345948298265,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2518.6164142842035,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2393.0263418285936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2455.3345948298265,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2518.6164142842035,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG Combined Cycle F-Class integrated retrofit 90%-CCS,FOM,5.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG Combined Cycle F-Class integrated retrofit 90%-CCS,FOM,5.28,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG Combined Cycle F-Class integrated retrofit 90%-CCS,FOM,5.17,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG Combined Cycle F-Class integrated retrofit 90%-CCS,FOM,5.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG Combined Cycle F-Class integrated retrofit 90%-CCS,FOM,5.28,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG Combined Cycle F-Class integrated retrofit 90%-CCS,FOM,5.17,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,4.9,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,4.97,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,5.04,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,4.9,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,4.97,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,5.04,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,4.2809303772198595,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,4.342086525465858,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,4.403242673711856,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,4.2809303772198595,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,4.342086525465858,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,4.403242673711856,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG Combined Cycle F-Class integrated retrofit 90%-CCS,capture_rate,0.9,per unit,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, NG Combined Cycle F-Class integrated retrofit 90%-CCS,efficiency,0.536,p.u.,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, -NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,1261.3,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,1307.6,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,1353.9,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,1261.3,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,1307.6,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,1353.9,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,1101.946425466818,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,1142.3968492352424,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,1182.847273003667,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,1101.946425466818,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,1142.3968492352424,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,1182.847273003667,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG Combined Cycle F-Class integrated retrofit 95%-CCS,FOM,5.3,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG Combined Cycle F-Class integrated retrofit 95%-CCS,FOM,5.18,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG Combined Cycle F-Class integrated retrofit 95%-CCS,FOM,5.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG Combined Cycle F-Class integrated retrofit 95%-CCS,FOM,5.3,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG Combined Cycle F-Class integrated retrofit 95%-CCS,FOM,5.18,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG Combined Cycle F-Class integrated retrofit 95%-CCS,FOM,5.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,5.03,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,5.1,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,5.17,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,5.03,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,5.1,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,5.17,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,4.394506081105285,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,4.455662229351282,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,4.51681837759728,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,4.394506081105285,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,4.455662229351282,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,4.51681837759728,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG Combined Cycle F-Class integrated retrofit 95%-CCS,capture_rate,0.95,per unit,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, NG Combined Cycle F-Class integrated retrofit 95%-CCS,efficiency,0.536,p.u.,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, -NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,1316.5,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,1365.3,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,1414.2,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,1316.5,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,1365.3,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,1414.2,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,1150.1724166550907,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,1192.806988575158,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,1235.5289264212909,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,1150.1724166550907,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,1192.806988575158,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,1235.5289264212909,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG Combined Cycle H-Class integrated retrofit 90%-CCS,FOM,5.82,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG Combined Cycle H-Class integrated retrofit 90%-CCS,FOM,5.67,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG Combined Cycle H-Class integrated retrofit 90%-CCS,FOM,5.54,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG Combined Cycle H-Class integrated retrofit 90%-CCS,FOM,5.82,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG Combined Cycle H-Class integrated retrofit 90%-CCS,FOM,5.67,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG Combined Cycle H-Class integrated retrofit 90%-CCS,FOM,5.54,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,4.67,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,4.73,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,4.79,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,4.67,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,4.73,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,4.79,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,1097.1,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,1137.1,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,1177.2,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,1097.1,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,1137.1,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,1177.2,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,4.0799887472687235,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,4.132408302908151,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,4.184827858547577,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,4.0799887472687235,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,4.132408302908151,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,4.184827858547577,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,958.4915748669199,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,993.4379452932045,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,1028.4716816455548,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,958.4915748669199,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,993.4379452932045,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,1028.4716816455548,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG Combined Cycle H-Class integrated retrofit 95%-CCS,FOM,5.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG Combined Cycle H-Class integrated retrofit 95%-CCS,FOM,5.55,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG Combined Cycle H-Class integrated retrofit 95%-CCS,FOM,5.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG Combined Cycle H-Class integrated retrofit 95%-CCS,FOM,5.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG Combined Cycle H-Class integrated retrofit 95%-CCS,FOM,5.55,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG Combined Cycle H-Class integrated retrofit 95%-CCS,FOM,5.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,4.78,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,4.85,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,4.91,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,4.78,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,4.85,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,4.91,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,1145.3,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,1187.6,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,1229.9,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,1145.3,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,1187.6,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,1229.9,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,4.176091265941006,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,4.237247414187004,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,4.289666969826431,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,4.176091265941006,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,4.237247414187004,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,4.289666969826431,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,1000.6019512305928,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,1037.5577379563888,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,1074.5135246821849,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,1000.6019512305928,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,1037.5577379563888,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,1074.5135246821849,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NH3 (l) storage tank incl. liquefaction,FOM,2.0,%/year,"Guesstimate, based on H2 (l) storage tank.",,2010.0,, NH3 (l) storage tank incl. liquefaction,investment,166.8201,EUR/MWh_NH3,"Calculated based on Morgan E. 2013: doi:10.7275/11KT-3F59 , Fig. 55, Fig 58.","Based on estimated for a double-wall liquid ammonia tank (~ambient pressure, -33°C), inner tank from stainless steel, outer tank from concrete including installations for liquefaction/condensation, boil-off gas recovery and safety installations; the necessary installations make only a small fraction of the total cost. The total cost are driven by material and working time on the tanks. While the costs do not scale strictly linearly, we here assume they do (good approximation c.f. ref. Fig 55.) and take the costs for a 9 kt NH3 (l) tank = 8 M$2010, which is smaller 4-5x smaller than the largest deployed tanks today. @@ -2146,12 +2146,12 @@ NH3 (l) transport ship,capacity,53000.0,t_NH3,"Cihlar et al 2020 based on IEA 20 NH3 (l) transport ship,investment,81164200.0,EUR,"Cihlar et al 2020 based on IEA 2019, Table 3-B",,2019.0,, NH3 (l) transport ship,lifetime,20.0,years,"Guess estimated based on H2 (l) tanker, but more mature technology",,2019.0,, Natural gas steam reforming,FOM,0.05,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, -Natural gas steam reforming,efficiency,0.7562,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Natural gas steam reforming,investment,196.3225,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Natural gas steam reforming,efficiency,0.7561666666666667,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, +Natural gas steam reforming,investment,264.68269165669676,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Natural gas steam reforming,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Natural gas steam reforming CC,FOM,0.05,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Natural gas steam reforming CC,efficiency,0.637,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Natural gas steam reforming CC,investment,323.8999,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Natural gas steam reforming CC,investment,436.6777280424164,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Natural gas steam reforming CC,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Ni-Zn-bicharger,FOM,2.095,%/year,"Viswanathan_2022, p.51-52 in section 4.4.2","{'carrier': ['elec', 'nizn', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['Guesstimate 30% assumed of power components every 10 years ']}",2020.0,, Ni-Zn-bicharger,efficiency,0.9,per unit,"Viswanathan_2022, p.59 (p.81)","{'carrier': ['elec', 'nizn', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['((0.75-0.87)/2)^0.5 mean value of range efficiency is not RTE but single way AC-store conversion']}",2020.0,, @@ -2177,12 +2177,12 @@ Offshore Wind - Class 1,FOM,1.19,%/year,NREL/ATB-https://data.openei.org/s3_view Offshore Wind - Class 1,FOM,1.69,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 1,FOM,1.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 1,FOM,1.19,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 1,investment,4678.5633018482695,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 1,investment,5794.139724389535,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 1,investment,7490.463492926807,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 1,investment,4678.5633018482695,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 1,investment,5794.139724389535,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 1,investment,7490.463492926807,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 1,investment,4087.4701552302663,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 1,investment,5062.103827754177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 1,investment,6544.112797209539,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 1,investment,4087.4701552302663,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 1,investment,5062.103827754177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 1,investment,6544.112797209539,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 2,CF,0.4752,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 2,CF,0.4597,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 2,CF,0.4505,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2195,12 +2195,12 @@ Offshore Wind - Class 2,FOM,1.22,%/year,NREL/ATB-https://data.openei.org/s3_view Offshore Wind - Class 2,FOM,1.74,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 2,FOM,1.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 2,FOM,1.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 2,investment,4548.2634160302305,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 2,investment,5632.7705472705575,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 2,investment,7281.851054474069,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 2,investment,4548.2634160302305,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 2,investment,5632.7705472705575,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 2,investment,7281.851054474069,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 2,investment,3973.6324533227717,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 2,investment,4921.122151779564,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 2,investment,6361.856608467043,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 2,investment,3973.6324533227717,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 2,investment,4921.122151779564,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 2,investment,6361.856608467043,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 4,CF,0.4819,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 4,CF,0.4662,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 4,CF,0.4568,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2213,12 +2213,12 @@ Offshore Wind - Class 4,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_view Offshore Wind - Class 4,FOM,1.55,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 4,FOM,1.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 4,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 4,investment,5088.4018839474165,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 4,investment,6301.701862710587,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 4,investment,8146.622290176627,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 4,investment,5088.4018839474165,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 4,investment,6301.701862710587,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 4,investment,8146.622290176627,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 4,investment,4445.529427855767,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 4,investment,5505.540190257291,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 4,investment,7117.372006888479,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 4,investment,4445.529427855767,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 4,investment,5505.540190257291,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 4,investment,7117.372006888479,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 5,CF,0.47,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 5,CF,0.4547,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 5,CF,0.4456,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2231,12 +2231,12 @@ Offshore Wind - Class 5,FOM,1.05,%/year,NREL/ATB-https://data.openei.org/s3_view Offshore Wind - Class 5,FOM,1.49,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 5,FOM,1.28,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 5,FOM,1.05,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 5,investment,5352.638925159778,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 5,investment,6628.9447015285095,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 5,investment,8569.670434897653,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 5,investment,5352.638925159778,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 5,investment,6628.9447015285095,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 5,investment,8569.670434897653,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 5,investment,4676.382565919583,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 5,investment,5791.4389268742925,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 5,investment,7486.971936227814,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 5,investment,4676.382565919583,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 5,investment,5791.4389268742925,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 5,investment,7486.971936227814,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 6,CF,0.3679,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 6,CF,0.3559,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 6,CF,0.3487,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2249,12 +2249,12 @@ Offshore Wind - Class 6,FOM,1.08,%/year,NREL/ATB-https://data.openei.org/s3_view Offshore Wind - Class 6,FOM,1.53,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 6,FOM,1.31,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 6,FOM,1.08,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 6,investment,5163.811561301967,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 6,investment,6395.092559106515,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 6,investment,8267.354539434646,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 6,investment,5163.811561301967,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 6,investment,6395.092559106515,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 6,investment,8267.354539434646,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 6,investment,4511.411790819735,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 6,investment,5587.13183702281,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 6,investment,7222.85085451271,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 6,investment,4511.411790819735,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 6,investment,5587.13183702281,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 6,investment,7222.85085451271,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 7,CF,0.2815,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 7,CF,0.2723,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 7,CF,0.2669,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2267,12 +2267,12 @@ Offshore Wind - Class 7,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_view Offshore Wind - Class 7,FOM,1.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 7,FOM,1.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 7,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 7,investment,5460.29143904845,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 7,investment,6762.266313877521,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 7,investment,8742.02415061539,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 7,investment,5460.29143904845,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 7,investment,6762.266313877521,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 7,investment,8742.02415061539,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 7,investment,4770.434181611439,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 7,investment,5907.916588148743,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 7,investment,7637.550356073279,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 7,investment,4770.434181611439,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 7,investment,5907.916588148743,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 7,investment,7637.550356073279,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PEM electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PEM electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PEM electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative @@ -2280,12 +2280,12 @@ PEM electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenar PEM electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PEM electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PEM electrolyzer,efficiency,0.655,p.u.,ICCT IRA e-fuels assumptions ,,,, -PEM electrolyzer,investment,2179.5,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PEM electrolyzer,investment,2179.5,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PEM electrolyzer,investment,2130.5,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PEM electrolyzer,investment,2130.5,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PEM electrolyzer,investment,436.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PEM electrolyzer,investment,436.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PEM electrolyzer,investment,1904.1403586021804,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PEM electrolyzer,investment,1904.1403586021804,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PEM electrolyzer,investment,1861.3310548299817,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PEM electrolyzer,investment,1861.3310548299817,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PEM electrolyzer,investment,380.9154376465018,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PEM electrolyzer,investment,380.9154376465018,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PEM electrolyzer,lifetime,30.0,years,ICCT IRA e-fuels assumptions ,,,, PHS,FOM,0.64,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PHS,FOM,0.62,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -2293,12 +2293,12 @@ PHS,FOM,0.62,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data- PHS,FOM,0.64,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PHS,FOM,0.62,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PHS,FOM,0.62,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PHS,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PHS,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PHS,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PHS,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PHS,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PHS,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PHS,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PHS,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PHS,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PHS,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PHS,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PHS,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PHS,discount rate,0.0481937880466246,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PHS,discount rate,0.0481937880466246,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PHS,discount rate,0.0481937880466246,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2306,12 +2306,12 @@ PHS,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of s PHS,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PHS,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PHS,efficiency,0.75,per unit,DIW DataDoc http://hdl.handle.net/10419/80348, from old pypsa cost assumptions,2015.0,, -PHS,investment,3159.1023266368993,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PHS,investment,3224.2384570830204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PHS,investment,3224.2384570830204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PHS,investment,3159.1023266368993,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PHS,investment,3224.2384570830204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PHS,investment,3224.2384570830204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PHS,investment,2759.9790030297627,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PHS,investment,2816.8857865973864,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PHS,investment,2816.8857865973864,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PHS,investment,2759.9790030297627,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PHS,investment,2816.8857865973864,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PHS,investment,2816.8857865973864,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PHS,lifetime,80.0,years,IEA2010, from old pypsa cost assumptions,2015.0,, PV+Storage - Class 1,CF,0.33945757023873563,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 1,CF,0.33406186944532296,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -2325,12 +2325,12 @@ PV+Storage - Class 1,FOM,2.78,%/year,NREL/ATB-https://data.openei.org/s3_viewer? PV+Storage - Class 1,FOM,2.52,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 1,FOM,2.65,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 1,FOM,2.78,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 1,investment,2064.650765258823,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 1,investment,2275.4082985034393,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 1,investment,2569.4573304211267,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 1,investment,2064.650765258823,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 1,investment,2275.4082985034393,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 1,investment,2569.4573304211267,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 1,investment,1803.8012610911683,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 1,investment,1987.931531763577,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 1,investment,2244.8301915857237,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 1,investment,1803.8012610911683,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 1,investment,1987.931531763577,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 1,investment,2244.8301915857237,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 10,CF,0.22011585395871305,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 10,CF,0.21617243159266444,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 10,CF,0.2106669247149348,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2343,12 +2343,12 @@ PV+Storage - Class 10,FOM,2.78,%/year,NREL/ATB-https://data.openei.org/s3_viewer PV+Storage - Class 10,FOM,2.52,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 10,FOM,2.65,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 10,FOM,2.78,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 10,investment,2064.650765258823,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 10,investment,2275.4082985034393,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 10,investment,2569.4573304211267,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 10,investment,2064.650765258823,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 10,investment,2275.4082985034393,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 10,investment,2569.4573304211267,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 10,investment,1803.8012610911683,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 10,investment,1987.931531763577,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 10,investment,2244.8301915857237,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 10,investment,1803.8012610911683,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 10,investment,1987.931531763577,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 10,investment,2244.8301915857237,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 2,CF,0.32873255561772374,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 2,CF,0.32354298510138346,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 2,CF,0.3167726023817773,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2361,12 +2361,12 @@ PV+Storage - Class 2,FOM,2.78,%/year,NREL/ATB-https://data.openei.org/s3_viewer? PV+Storage - Class 2,FOM,2.52,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 2,FOM,2.65,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 2,FOM,2.78,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 2,investment,2064.650765258823,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 2,investment,2275.4082985034393,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 2,investment,2569.4573304211267,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 2,investment,2064.650765258823,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 2,investment,2275.4082985034393,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 2,investment,2569.4573304211267,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 2,investment,1803.8012610911683,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 2,investment,1987.931531763577,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 2,investment,2244.8301915857237,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 2,investment,1803.8012610911683,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 2,investment,1987.931531763577,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 2,investment,2244.8301915857237,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 3,CF,0.31427400487450724,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 3,CF,0.30915578596719634,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 3,CF,0.30233205125608215,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2379,12 +2379,12 @@ PV+Storage - Class 3,FOM,2.78,%/year,NREL/ATB-https://data.openei.org/s3_viewer? PV+Storage - Class 3,FOM,2.52,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 3,FOM,2.65,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 3,FOM,2.78,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 3,investment,2064.650765258823,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 3,investment,2275.4082985034393,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 3,investment,2569.4573304211267,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 3,investment,2064.650765258823,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 3,investment,2275.4082985034393,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 3,investment,2569.4573304211267,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 3,investment,1803.8012610911683,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 3,investment,1987.931531763577,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 3,investment,2244.8301915857237,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 3,investment,1803.8012610911683,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 3,investment,1987.931531763577,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 3,investment,2244.8301915857237,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 4,CF,0.30029569414166984,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 4,CF,0.2952823967470792,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 4,CF,0.28850054090664873,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2397,12 +2397,12 @@ PV+Storage - Class 4,FOM,2.78,%/year,NREL/ATB-https://data.openei.org/s3_viewer? PV+Storage - Class 4,FOM,2.52,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 4,FOM,2.65,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 4,FOM,2.78,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 4,investment,2064.650765258823,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 4,investment,2275.4082985034393,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 4,investment,2569.4573304211267,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 4,investment,2064.650765258823,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 4,investment,2275.4082985034393,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 4,investment,2569.4573304211267,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 4,investment,1803.8012610911683,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 4,investment,1987.931531763577,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 4,investment,2244.8301915857237,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 4,investment,1803.8012610911683,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 4,investment,1987.931531763577,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 4,investment,2244.8301915857237,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 5,CF,0.2862025494319227,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 5,CF,0.281331806571824,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 5,CF,0.27473305099077683,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2415,12 +2415,12 @@ PV+Storage - Class 5,FOM,2.78,%/year,NREL/ATB-https://data.openei.org/s3_viewer? PV+Storage - Class 5,FOM,2.52,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 5,FOM,2.65,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 5,FOM,2.78,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 5,investment,2064.650765258823,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 5,investment,2275.4082985034393,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 5,investment,2569.4573304211267,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 5,investment,2064.650765258823,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 5,investment,2275.4082985034393,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 5,investment,2569.4573304211267,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 5,investment,1803.8012610911683,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 5,investment,1987.931531763577,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 5,investment,2244.8301915857237,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 5,investment,1803.8012610911683,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 5,investment,1987.931531763577,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 5,investment,2244.8301915857237,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 6,CF,0.2723221522469409,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 6,CF,0.26759067590434843,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 6,CF,0.2611740397097814,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2433,12 +2433,12 @@ PV+Storage - Class 6,FOM,2.78,%/year,NREL/ATB-https://data.openei.org/s3_viewer? PV+Storage - Class 6,FOM,2.52,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 6,FOM,2.65,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 6,FOM,2.78,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 6,investment,2064.650765258823,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 6,investment,2275.4082985034393,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 6,investment,2569.4573304211267,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 6,investment,2064.650765258823,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 6,investment,2275.4082985034393,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 6,investment,2569.4573304211267,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 6,investment,1803.8012610911683,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 6,investment,1987.931531763577,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 6,investment,2244.8301915857237,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 6,investment,1803.8012610911683,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 6,investment,1987.931531763577,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 6,investment,2244.8301915857237,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 7,CF,0.25923486436275767,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 7,CF,0.2546725738351523,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 7,CF,0.2484154893661901,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2451,12 +2451,12 @@ PV+Storage - Class 7,FOM,2.78,%/year,NREL/ATB-https://data.openei.org/s3_viewer? PV+Storage - Class 7,FOM,2.52,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 7,FOM,2.65,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 7,FOM,2.78,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 7,investment,2064.650765258823,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 7,investment,2275.4082985034393,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 7,investment,2569.4573304211267,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 7,investment,2064.650765258823,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 7,investment,2275.4082985034393,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 7,investment,2569.4573304211267,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 7,investment,1803.8012610911683,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 7,investment,1987.931531763577,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 7,investment,2244.8301915857237,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 7,investment,1803.8012610911683,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 7,investment,1987.931531763577,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 7,investment,2244.8301915857237,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 8,CF,0.24978050833280915,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 8,CF,0.2454258549517022,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 8,CF,0.23937350255286224,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2469,12 +2469,12 @@ PV+Storage - Class 8,FOM,2.78,%/year,NREL/ATB-https://data.openei.org/s3_viewer? PV+Storage - Class 8,FOM,2.52,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 8,FOM,2.65,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 8,FOM,2.78,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 8,investment,2064.650765258823,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 8,investment,2275.4082985034393,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 8,investment,2569.4573304211267,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 8,investment,2064.650765258823,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 8,investment,2275.4082985034393,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 8,investment,2569.4573304211267,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 8,investment,1803.8012610911683,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 8,investment,1987.931531763577,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 8,investment,2244.8301915857237,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 8,investment,1803.8012610911683,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 8,investment,1987.931531763577,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 8,investment,2244.8301915857237,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 9,CF,0.23844656415113957,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 9,CF,0.23426980231503192,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 9,CF,0.22841716106097537,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2487,336 +2487,336 @@ PV+Storage - Class 9,FOM,2.78,%/year,NREL/ATB-https://data.openei.org/s3_viewer? PV+Storage - Class 9,FOM,2.52,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 9,FOM,2.65,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 9,FOM,2.78,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 9,investment,2064.650765258823,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 9,investment,2275.4082985034393,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 9,investment,2569.4573304211267,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 9,investment,2064.650765258823,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 9,investment,2275.4082985034393,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 9,investment,2569.4573304211267,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 9,investment,1803.8012610911683,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 9,investment,1987.931531763577,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 9,investment,2244.8301915857237,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 9,investment,1803.8012610911683,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 9,investment,1987.931531763577,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 9,investment,2244.8301915857237,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 10,FOM,0.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 10,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 10,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 10,FOM,0.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 10,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 10,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 10,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 10,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 10,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 10,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 10,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 10,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 10,investment,4415.771675741926,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 10,investment,4506.818514417017,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 10,investment,4506.818514417017,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 10,investment,4415.771675741926,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 10,investment,4506.818514417017,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 10,investment,4506.818514417017,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 10,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 10,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 10,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 10,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 10,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 10,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 10,investment,3857.879817459317,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 10,investment,3937.4237312213645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 10,investment,3937.4237312213645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 10,investment,3857.879817459317,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 10,investment,3937.4237312213645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 10,investment,3937.4237312213645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 11,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 11,FOM,0.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 11,FOM,0.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 11,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 11,FOM,0.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 11,FOM,0.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 11,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 11,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 11,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 11,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 11,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 11,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 11,investment,4481.279586458361,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 11,investment,4573.677103704925,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 11,investment,4573.677103704925,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 11,investment,4481.279586458361,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 11,investment,4573.677103704925,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 11,investment,4573.677103704925,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 11,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 11,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 11,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 11,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 11,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 11,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 11,investment,3915.1114103030304,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 11,investment,3995.835356907216,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 11,investment,3995.835356907216,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 11,investment,3915.1114103030304,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 11,investment,3995.835356907216,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 11,investment,3995.835356907216,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 12,FOM,0.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 12,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 12,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 12,FOM,0.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 12,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 12,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 12,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 12,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 12,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 12,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 12,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 12,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 12,investment,4540.132369020984,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 12,investment,4633.743345701827,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 12,investment,4633.743345701827,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 12,investment,4540.132369020984,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 12,investment,4633.743345701827,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 12,investment,4633.743345701827,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 12,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 12,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 12,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 12,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 12,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 12,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 12,investment,3966.528688804305,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 12,investment,4048.3127854806808,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 12,investment,4048.3127854806808,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 12,investment,3966.528688804305,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 12,investment,4048.3127854806808,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 12,investment,4048.3127854806808,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 13,FOM,0.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 13,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 13,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 13,FOM,0.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 13,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 13,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 13,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 13,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 13,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 13,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 13,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 13,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 13,investment,4594.229608189556,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 13,investment,4688.955991863566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 13,investment,4688.955991863566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 13,investment,4594.229608189556,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 13,investment,4688.955991863566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 13,investment,4688.955991863566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 13,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 13,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 13,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 13,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 13,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 13,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 13,investment,4013.7912427799106,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 13,investment,4096.549825105269,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 13,investment,4096.549825105269,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 13,investment,4013.7912427799106,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 13,investment,4096.549825105269,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 13,investment,4096.549825105269,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 14,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 14,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 14,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 14,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 14,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 14,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 14,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 14,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 14,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 14,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 14,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 14,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 14,investment,4645.147389221679,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 14,investment,4740.923624050991,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 14,investment,4740.923624050991,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 14,investment,4645.147389221679,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 14,investment,4740.923624050991,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 14,investment,4740.923624050991,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 14,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 14,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 14,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 14,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 14,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 14,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 14,investment,4058.2760337107366,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 14,investment,4141.951828220235,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 14,investment,4141.951828220235,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 14,investment,4058.2760337107366,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 14,investment,4141.951828220235,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 14,investment,4141.951828220235,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 15,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 15,FOM,0.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 15,FOM,0.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 15,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 15,FOM,0.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 15,FOM,0.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 15,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 15,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 15,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 15,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 15,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 15,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 15,investment,4693.975239354378,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 15,investment,4790.75823398024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 15,investment,4790.75823398024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 15,investment,4693.975239354378,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 15,investment,4790.75823398024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 15,investment,4790.75823398024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 15,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 15,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 15,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 15,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 15,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 15,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 15,investment,4100.934937157146,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 15,investment,4185.490296686159,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 15,investment,4185.490296686159,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 15,investment,4100.934937157146,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 15,investment,4185.490296686159,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 15,investment,4185.490296686159,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 2,FOM,0.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 2,FOM,0.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 2,FOM,0.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 2,FOM,0.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 2,FOM,0.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 2,FOM,0.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 2,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 2,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 2,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 2,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 2,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 2,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 2,investment,3522.478797917419,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 2,investment,3595.107226740458,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 2,investment,3595.107226740458,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 2,investment,3522.478797917419,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 2,investment,3595.107226740458,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 2,investment,3595.107226740458,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 2,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 2,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 2,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 2,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 2,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 2,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 2,investment,3077.4462222688926,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 2,investment,3140.898721697117,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 2,investment,3140.898721697117,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 2,investment,3077.4462222688926,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 2,investment,3140.898721697117,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 2,investment,3140.898721697117,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 3,FOM,0.54,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 3,FOM,0.53,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 3,FOM,0.53,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 3,FOM,0.54,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 3,FOM,0.53,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 3,FOM,0.53,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 3,investment,3717.359421270431,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 3,investment,3794.0060072760057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 3,investment,3794.0060072760057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 3,investment,3717.359421270431,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 3,investment,3794.0060072760057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 3,investment,3794.0060072760057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 3,investment,3247.7054835838826,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 3,investment,3314.668483245405,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 3,investment,3314.668483245405,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 3,investment,3247.7054835838826,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 3,investment,3314.668483245405,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 3,investment,3314.668483245405,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 4,FOM,0.52,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 4,FOM,0.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 4,FOM,0.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 4,FOM,0.52,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 4,FOM,0.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 4,FOM,0.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 4,investment,3865.900184834355,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 4,investment,3945.609466995887,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 4,investment,3945.609466995887,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 4,investment,3865.900184834355,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 4,investment,3945.609466995887,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 4,investment,3945.609466995887,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 4,investment,3377.4794972565837,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 4,investment,3447.118249777337,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 4,investment,3447.118249777337,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 4,investment,3377.4794972565837,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 4,investment,3447.118249777337,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 4,investment,3447.118249777337,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 5,FOM,0.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 5,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 5,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 5,FOM,0.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 5,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 5,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 5,investment,3984.9784984110306,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 5,investment,4067.1430035329063,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 5,investment,4067.1430035329063,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 5,investment,3984.9784984110306,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 5,investment,4067.1430035329063,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 5,investment,4067.1430035329063,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 5,investment,3481.513368656278,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 5,investment,3553.2971494533135,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 5,investment,3553.2971494533135,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 5,investment,3481.513368656278,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 5,investment,3553.2971494533135,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 5,investment,3553.2971494533135,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 6,FOM,0.49,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 6,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 6,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 6,FOM,0.49,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 6,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 6,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 6,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 6,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 6,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 6,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 6,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 6,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 6,investment,4089.712424436576,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 6,investment,4174.036391950732,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 6,investment,4174.036391950732,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 6,investment,4089.712424436576,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 6,investment,4174.036391950732,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 6,investment,4174.036391950732,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 6,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 6,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 6,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 6,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 6,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 6,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 6,investment,3573.015133033473,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 6,investment,3646.685548147565,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 6,investment,3646.685548147565,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 6,investment,3573.015133033473,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 6,investment,3646.685548147565,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 6,investment,3646.685548147565,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 7,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 7,FOM,0.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 7,FOM,0.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 7,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 7,FOM,0.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 7,FOM,0.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 7,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 7,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 7,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 7,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 7,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 7,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 7,investment,4184.0617788092895,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 7,investment,4270.331093836284,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 7,investment,4270.331093836284,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 7,investment,4184.0617788092895,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 7,investment,4270.331093836284,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 7,investment,4270.331093836284,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 7,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 7,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 7,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 7,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 7,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 7,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 7,investment,3655.4443202182138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 7,investment,3730.8143062020936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 7,investment,3730.8143062020936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 7,investment,3655.4443202182138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 7,investment,3730.8143062020936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 7,investment,3730.8143062020936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 8,FOM,0.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 8,FOM,0.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 8,FOM,0.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 8,FOM,0.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 8,FOM,0.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 8,FOM,0.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 8,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 8,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 8,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 8,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 8,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 8,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 8,investment,4269.438892728393,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 8,investment,4357.468560619698,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 8,investment,4357.468560619698,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 8,investment,4269.438892728393,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 8,investment,4357.468560619698,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 8,investment,4357.468560619698,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 8,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 8,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 8,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 8,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 8,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 8,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 8,investment,3730.0348264418158,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 8,investment,3806.942761007625,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 8,investment,3806.942761007625,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 8,investment,3730.0348264418158,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 8,investment,3806.942761007625,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 8,investment,3806.942761007625,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 9,FOM,0.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 9,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 9,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 9,FOM,0.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 9,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 9,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 9,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 9,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 9,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 9,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 9,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 9,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 9,investment,4343.859466213235,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 9,investment,4433.423578918661,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 9,investment,4433.423578918661,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 9,investment,4343.859466213235,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 9,investment,4433.423578918661,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 9,investment,4433.423578918661,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 9,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 9,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 9,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 9,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 9,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 9,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 9,investment,3795.053049650261,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 9,investment,3873.301566137895,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 9,investment,3873.301566137895,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 9,investment,3795.053049650261,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 9,investment,3873.301566137895,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 9,investment,3873.301566137895,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower One New Reservoir - National Class 1,FOM,1.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower One New Reservoir - National Class 1,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower One New Reservoir - National Class 1,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower One New Reservoir - National Class 1,FOM,1.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower One New Reservoir - National Class 1,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower One New Reservoir - National Class 1,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1803.8609795563884,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1841.0539894441488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1841.0539894441488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1803.8609795563884,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1841.0539894441488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1841.0539894441488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1575.9598497274521,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1608.4538672476056,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1608.4538672476056,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1575.9598497274521,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1608.4538672476056,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1608.4538672476056,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower One New Reservoir - National Class 3,FOM,0.89,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower One New Reservoir - National Class 3,FOM,0.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower One New Reservoir - National Class 3,FOM,0.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower One New Reservoir - National Class 3,FOM,0.89,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower One New Reservoir - National Class 3,FOM,0.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower One New Reservoir - National Class 3,FOM,0.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2276.1212067099723,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2323.0515408689403,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2323.0515408689403,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2276.1212067099723,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2323.0515408689403,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2323.0515408689403,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 3,investment,1988.554370620213,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2029.5554916639283,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2029.5554916639283,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 3,investment,1988.554370620213,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2029.5554916639283,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2029.5554916639283,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower One New Reservoir - National Class 4,FOM,0.77,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower One New Reservoir - National Class 4,FOM,0.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower One New Reservoir - National Class 4,FOM,0.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower One New Reservoir - National Class 4,FOM,0.77,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower One New Reservoir - National Class 4,FOM,0.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower One New Reservoir - National Class 4,FOM,0.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2608.473198476832,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2662.256151022745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2662.256151022745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2608.473198476832,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2662.256151022745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2662.256151022745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2278.916766025167,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2325.9047405823862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2325.9047405823862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2278.916766025167,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2325.9047405823862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2325.9047405823862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower One New Reservoir - National Class 5,FOM,0.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower One New Reservoir - National Class 5,FOM,0.58,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower One New Reservoir - National Class 5,FOM,0.58,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower One New Reservoir - National Class 5,FOM,0.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower One New Reservoir - National Class 5,FOM,0.58,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower One New Reservoir - National Class 5,FOM,0.58,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3389.158945212967,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3459.038511093646,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3459.038511093646,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3389.158945212967,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3459.038511093646,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3459.038511093646,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 5,investment,2960.9700983242055,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3022.0210281865598,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3022.0210281865598,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 5,investment,2960.9700983242055,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3022.0210281865598,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3022.0210281865598,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped-Heat-charger,FOM,0.366,%/year,"Viswanathan_2022, NULL","{'carrier': ['elec', 'phes'], 'technology_type': ['charger'], 'type': ['thermal'], 'note': ['Guesstimate, 50% on charger']}",2020.0,, Pumped-Heat-charger,efficiency,0.99,per unit,"Viswanathan_2022, NULL","{'carrier': ['elec', 'phes'], 'technology_type': ['charger'], 'type': ['thermal'], 'note': ['Charger']}",2020.0,, Pumped-Heat-charger,investment,784485.9619,EUR/MW,"Georgiou_2018, Figure 9 of reference roughly 80% of capital cost are power related 47%/80% of costs are required for liquefaction (charging)","{'carrier': ['elec', 'phes'], 'technology_type': ['charger'], 'type': ['thermal'], 'note': ['Power Equipment Charge']}",2020.0,, @@ -2841,24 +2841,24 @@ Residential Battery Storage - 5 kW - 12.5 kWh,FOM,2.41,%/year,NREL/ATB-https://d Residential Battery Storage - 5 kW - 12.5 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential Battery Storage - 5 kW - 12.5 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential Battery Storage - 5 kW - 12.5 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential Battery Storage - 5 kW - 12.5 kWh,investment,2580.012645659609,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential Battery Storage - 5 kW - 12.5 kWh,investment,3410.447071325883,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential Battery Storage - 5 kW - 12.5 kWh,investment,4121.952019305957,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential Battery Storage - 5 kW - 12.5 kWh,investment,2580.012645659609,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential Battery Storage - 5 kW - 12.5 kWh,investment,3410.447071325883,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential Battery Storage - 5 kW - 12.5 kWh,investment,4121.952019305957,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential Battery Storage - 5 kW - 12.5 kWh,investment,2254.051940492979,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential Battery Storage - 5 kW - 12.5 kWh,investment,2979.568666844791,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential Battery Storage - 5 kW - 12.5 kWh,investment,3601.181553650941,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential Battery Storage - 5 kW - 12.5 kWh,investment,2254.051940492979,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential Battery Storage - 5 kW - 12.5 kWh,investment,2979.568666844791,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential Battery Storage - 5 kW - 12.5 kWh,investment,3601.181553650941,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential Battery Storage - 5 kW - 20 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential Battery Storage - 5 kW - 20 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential Battery Storage - 5 kW - 20 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Residential Battery Storage - 5 kW - 20 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential Battery Storage - 5 kW - 20 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential Battery Storage - 5 kW - 20 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential Battery Storage - 5 kW - 20 kWh,investment,3203.663655040512,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential Battery Storage - 5 kW - 20 kWh,investment,4144.345381306451,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential Battery Storage - 5 kW - 20 kWh,investment,5118.326801338311,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential Battery Storage - 5 kW - 20 kWh,investment,3203.663655040512,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential Battery Storage - 5 kW - 20 kWh,investment,4144.345381306451,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential Battery Storage - 5 kW - 20 kWh,investment,5118.326801338311,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential Battery Storage - 5 kW - 20 kWh,investment,2798.910420256762,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential Battery Storage - 5 kW - 20 kWh,investment,3620.7457217399196,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential Battery Storage - 5 kW - 20 kWh,investment,4471.673609058721,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential Battery Storage - 5 kW - 20 kWh,investment,2798.910420256762,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential Battery Storage - 5 kW - 20 kWh,investment,3620.7457217399196,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential Battery Storage - 5 kW - 20 kWh,investment,4471.673609058721,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 1,CF,0.4404165,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 1,CF,0.4404165,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 1,CF,0.4404165,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2871,12 +2871,12 @@ Residential DW - Class 1,FOM,0.57,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential DW - Class 1,FOM,0.9,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 1,FOM,0.61,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 1,FOM,0.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 1,investment,4285.855390953619,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 1,investment,6361.316923886055,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 1,investment,6863.740231683862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 1,investment,4285.855390953619,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 1,investment,6361.316923886055,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 1,investment,6863.740231683862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 1,investment,3744.3772521438455,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 1,investment,5557.623440527878,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 1,investment,5996.570216155412,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 1,investment,3744.3772521438455,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 1,investment,5557.623440527878,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 1,investment,5996.570216155412,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 10,CF,0.190760375,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 10,CF,0.190760375,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 10,CF,0.190760375,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2889,12 +2889,12 @@ Residential DW - Class 10,FOM,0.57,%/year,NREL/ATB-https://data.openei.org/s3_vi Residential DW - Class 10,FOM,0.9,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 10,FOM,0.61,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 10,FOM,0.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 10,investment,4285.855390953619,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 10,investment,6361.316923886055,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 10,investment,6863.740231683862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 10,investment,4285.855390953619,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 10,investment,6361.316923886055,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 10,investment,6863.740231683862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 10,investment,3744.3772521438455,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 10,investment,5557.623440527878,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 10,investment,5996.570216155412,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 10,investment,3744.3772521438455,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 10,investment,5557.623440527878,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 10,investment,5996.570216155412,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 2,CF,0.40899950000000007,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 2,CF,0.40899950000000007,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 2,CF,0.40899950000000007,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2907,12 +2907,12 @@ Residential DW - Class 2,FOM,0.57,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential DW - Class 2,FOM,0.9,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 2,FOM,0.61,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 2,FOM,0.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 2,investment,4285.855390953619,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 2,investment,6361.316923886055,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 2,investment,6863.740231683862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 2,investment,4285.855390953619,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 2,investment,6361.316923886055,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 2,investment,6863.740231683862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 2,investment,3744.3772521438455,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 2,investment,5557.623440527878,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 2,investment,5996.570216155412,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 2,investment,3744.3772521438455,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 2,investment,5557.623440527878,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 2,investment,5996.570216155412,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 3,CF,0.3981581875,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 3,CF,0.3981581875,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 3,CF,0.3981581875,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2925,12 +2925,12 @@ Residential DW - Class 3,FOM,0.57,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential DW - Class 3,FOM,0.9,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 3,FOM,0.61,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 3,FOM,0.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 3,investment,4285.855390953619,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 3,investment,6361.316923886055,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 3,investment,6863.740231683862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 3,investment,4285.855390953619,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 3,investment,6361.316923886055,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 3,investment,6863.740231683862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 3,investment,3744.3772521438455,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 3,investment,5557.623440527878,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 3,investment,5996.570216155412,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 3,investment,3744.3772521438455,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 3,investment,5557.623440527878,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 3,investment,5996.570216155412,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 4,CF,0.38677175,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 4,CF,0.38677175,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 4,CF,0.38677175,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2943,12 +2943,12 @@ Residential DW - Class 4,FOM,0.57,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential DW - Class 4,FOM,0.9,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 4,FOM,0.61,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 4,FOM,0.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 4,investment,4285.855390953619,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 4,investment,6361.316923886055,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 4,investment,6863.740231683862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 4,investment,4285.855390953619,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 4,investment,6361.316923886055,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 4,investment,6863.740231683862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 4,investment,3744.3772521438455,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 4,investment,5557.623440527878,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 4,investment,5996.570216155412,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 4,investment,3744.3772521438455,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 4,investment,5557.623440527878,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 4,investment,5996.570216155412,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 5,CF,0.37244275,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 5,CF,0.37244275,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 5,CF,0.37244275,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2961,12 +2961,12 @@ Residential DW - Class 5,FOM,0.57,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential DW - Class 5,FOM,0.9,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 5,FOM,0.61,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 5,FOM,0.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 5,investment,4285.855390953619,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 5,investment,6361.316923886055,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 5,investment,6863.740231683862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 5,investment,4285.855390953619,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 5,investment,6361.316923886055,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 5,investment,6863.740231683862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 5,investment,3744.3772521438455,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 5,investment,5557.623440527878,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 5,investment,5996.570216155412,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 5,investment,3744.3772521438455,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 5,investment,5557.623440527878,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 5,investment,5996.570216155412,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 6,CF,0.35050425,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 6,CF,0.35050425,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 6,CF,0.35050425,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2979,12 +2979,12 @@ Residential DW - Class 6,FOM,0.57,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential DW - Class 6,FOM,0.9,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 6,FOM,0.61,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 6,FOM,0.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 6,investment,4285.855390953619,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 6,investment,6361.316923886055,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 6,investment,6863.740231683862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 6,investment,4285.855390953619,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 6,investment,6361.316923886055,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 6,investment,6863.740231683862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 6,investment,3744.3772521438455,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 6,investment,5557.623440527878,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 6,investment,5996.570216155412,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 6,investment,3744.3772521438455,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 6,investment,5557.623440527878,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 6,investment,5996.570216155412,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 7,CF,0.3191873749999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 7,CF,0.3191873749999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 7,CF,0.3191873749999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2997,12 +2997,12 @@ Residential DW - Class 7,FOM,0.57,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential DW - Class 7,FOM,0.9,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 7,FOM,0.61,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 7,FOM,0.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 7,investment,4285.855390953619,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 7,investment,6361.316923886055,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 7,investment,6863.740231683862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 7,investment,4285.855390953619,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 7,investment,6361.316923886055,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 7,investment,6863.740231683862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 7,investment,3744.3772521438455,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 7,investment,5557.623440527878,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 7,investment,5996.570216155412,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 7,investment,3744.3772521438455,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 7,investment,5557.623440527878,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 7,investment,5996.570216155412,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 8,CF,0.2803055000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 8,CF,0.2803055000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 8,CF,0.2803055000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3015,12 +3015,12 @@ Residential DW - Class 8,FOM,0.57,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential DW - Class 8,FOM,0.9,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 8,FOM,0.61,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 8,FOM,0.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 8,investment,4285.855390953619,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 8,investment,6361.316923886055,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 8,investment,6863.740231683862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 8,investment,4285.855390953619,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 8,investment,6361.316923886055,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 8,investment,6863.740231683862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 8,investment,3744.3772521438455,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 8,investment,5557.623440527878,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 8,investment,5996.570216155412,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 8,investment,3744.3772521438455,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 8,investment,5557.623440527878,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 8,investment,5996.570216155412,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 9,CF,0.2375855,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 9,CF,0.2375855,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 9,CF,0.2375855,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3033,12 +3033,12 @@ Residential DW - Class 9,FOM,0.57,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential DW - Class 9,FOM,0.9,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 9,FOM,0.61,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 9,FOM,0.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 9,investment,4285.855390953619,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 9,investment,6361.316923886055,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 9,investment,6863.740231683862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 9,investment,4285.855390953619,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 9,investment,6361.316923886055,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 9,investment,6863.740231683862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 9,investment,3744.3772521438455,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 9,investment,5557.623440527878,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 9,investment,5996.570216155412,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 9,investment,3744.3772521438455,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 9,investment,5557.623440527878,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 9,investment,5996.570216155412,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 1,CF,0.1876346824172311,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 1,CF,0.1858162179452293,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 1,CF,0.1846378442763413,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3051,12 +3051,12 @@ Residential PV - Class 1,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential PV - Class 1,FOM,1.14,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 1,FOM,1.14,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 1,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 1,investment,2436.4994266959334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 1,investment,2518.9680519015233,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 1,investment,2636.238356447583,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 1,investment,2436.4994266959334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 1,investment,2518.9680519015233,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 1,investment,2636.238356447583,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 1,investment,2128.6702877186517,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 1,investment,2200.719765843176,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 1,investment,2303.1740534099213,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 1,investment,2128.6702877186517,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 1,investment,2200.719765843176,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 1,investment,2303.1740534099213,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 10,CF,0.12160275599150998,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 10,CF,0.1204242409716888,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 10,CF,0.11966055760633976,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3069,12 +3069,12 @@ Residential PV - Class 10,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_vi Residential PV - Class 10,FOM,1.14,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 10,FOM,1.14,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 10,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 10,investment,2436.4994266959334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 10,investment,2518.9680519015233,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 10,investment,2636.238356447583,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 10,investment,2436.4994266959334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 10,investment,2518.9680519015233,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 10,investment,2636.238356447583,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 10,investment,2128.6702877186517,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 10,investment,2200.719765843176,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 10,investment,2303.1740534099213,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 10,investment,2128.6702877186517,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 10,investment,2200.719765843176,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 10,investment,2303.1740534099213,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 2,CF,0.184731878578959,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 2,CF,0.1829415466759529,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 2,CF,0.1817814030462288,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3087,12 +3087,12 @@ Residential PV - Class 2,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential PV - Class 2,FOM,1.14,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 2,FOM,1.14,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 2,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 2,investment,2436.4994266959334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 2,investment,2518.9680519015233,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 2,investment,2636.238356447583,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 2,investment,2436.4994266959334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 2,investment,2518.9680519015233,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 2,investment,2636.238356447583,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 2,investment,2128.6702877186517,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 2,investment,2200.719765843176,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 2,investment,2303.1740534099213,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 2,investment,2128.6702877186517,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 2,investment,2200.719765843176,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 2,investment,2303.1740534099213,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 3,CF,0.1723385721972788,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 3,CF,0.1706683502177441,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 3,CF,0.1695860383924738,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3105,12 +3105,12 @@ Residential PV - Class 3,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential PV - Class 3,FOM,1.14,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 3,FOM,1.14,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 3,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 3,investment,2436.4994266959334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 3,investment,2518.9680519015233,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 3,investment,2636.238356447583,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 3,investment,2436.4994266959334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 3,investment,2518.9680519015233,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 3,investment,2636.238356447583,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 3,investment,2128.6702877186517,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 3,investment,2200.719765843176,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 3,investment,2303.1740534099213,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 3,investment,2128.6702877186517,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 3,investment,2200.719765843176,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 3,investment,2303.1740534099213,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 4,CF,0.16285555632023396,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 4,CF,0.16127723913803022,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 4,CF,0.16025448206067328,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3123,12 +3123,12 @@ Residential PV - Class 4,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential PV - Class 4,FOM,1.14,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 4,FOM,1.14,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 4,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 4,investment,2436.4994266959334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 4,investment,2518.9680519015233,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 4,investment,2636.238356447583,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 4,investment,2436.4994266959334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 4,investment,2518.9680519015233,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 4,investment,2636.238356447583,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 4,investment,2128.6702877186517,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 4,investment,2200.719765843176,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 4,investment,2303.1740534099213,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 4,investment,2128.6702877186517,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 4,investment,2200.719765843176,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 4,investment,2303.1740534099213,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 5,CF,0.1542504654072364,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 5,CF,0.1527555445987844,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 5,CF,0.15178682877019675,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3141,12 +3141,12 @@ Residential PV - Class 5,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential PV - Class 5,FOM,1.14,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 5,FOM,1.14,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 5,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 5,investment,2436.4994266959334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 5,investment,2518.9680519015233,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 5,investment,2636.238356447583,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 5,investment,2436.4994266959334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 5,investment,2518.9680519015233,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 5,investment,2636.238356447583,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 5,investment,2128.6702877186517,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 5,investment,2200.719765843176,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 5,investment,2303.1740534099213,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 5,investment,2128.6702877186517,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 5,investment,2200.719765843176,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 5,investment,2303.1740534099213,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 6,CF,0.15233634912395794,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 6,CF,0.150859979003532,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 6,CF,0.14990328410944517,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3159,12 +3159,12 @@ Residential PV - Class 6,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential PV - Class 6,FOM,1.14,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 6,FOM,1.14,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 6,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 6,investment,2436.4994266959334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 6,investment,2518.9680519015233,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 6,investment,2636.238356447583,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 6,investment,2436.4994266959334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 6,investment,2518.9680519015233,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 6,investment,2636.238356447583,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 6,investment,2128.6702877186517,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 6,investment,2200.719765843176,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 6,investment,2303.1740534099213,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 6,investment,2128.6702877186517,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 6,investment,2200.719765843176,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 6,investment,2303.1740534099213,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 7,CF,0.1456203458946716,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 7,CF,0.14420906402503705,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 7,CF,0.14329454662854071,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3177,12 +3177,12 @@ Residential PV - Class 7,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential PV - Class 7,FOM,1.14,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 7,FOM,1.14,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 7,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 7,investment,2436.4994266959334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 7,investment,2518.9680519015233,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 7,investment,2636.238356447583,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 7,investment,2436.4994266959334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 7,investment,2518.9680519015233,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 7,investment,2636.238356447583,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 7,investment,2128.6702877186517,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 7,investment,2200.719765843176,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 7,investment,2303.1740534099213,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 7,investment,2128.6702877186517,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 7,investment,2200.719765843176,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 7,investment,2303.1740534099213,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 8,CF,0.13871816340805676,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 8,CF,0.13737377414841023,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 8,CF,0.13650260348288767,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3195,12 +3195,12 @@ Residential PV - Class 8,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential PV - Class 8,FOM,1.14,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 8,FOM,1.14,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 8,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 8,investment,2436.4994266959334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 8,investment,2518.9680519015233,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 8,investment,2636.238356447583,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 8,investment,2436.4994266959334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 8,investment,2518.9680519015233,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 8,investment,2636.238356447583,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 8,investment,2128.6702877186517,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 8,investment,2200.719765843176,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 8,investment,2303.1740534099213,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 8,investment,2128.6702877186517,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 8,investment,2200.719765843176,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 8,investment,2303.1740534099213,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 9,CF,0.13319642264157447,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 9,CF,0.13190554741930152,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 9,CF,0.1310690541057579,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3213,12 +3213,12 @@ Residential PV - Class 9,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential PV - Class 9,FOM,1.14,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 9,FOM,1.14,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 9,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 9,investment,2436.4994266959334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 9,investment,2518.9680519015233,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 9,investment,2636.238356447583,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 9,investment,2436.4994266959334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 9,investment,2518.9680519015233,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 9,investment,2636.238356447583,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 9,investment,2128.6702877186517,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 9,investment,2200.719765843176,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 9,investment,2303.1740534099213,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 9,investment,2128.6702877186517,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 9,investment,2200.719765843176,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 9,investment,2303.1740534099213,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative SMR,FOM,5.0,%/year,Danish Energy Agency,"Technology data for renewable fuels, in pdf on table 3 p.311",2015.0,, SMR,efficiency,0.76,per unit (in LHV),"IEA Global average levelised cost of hydrogen production by energy source and technology, 2019 and 2050 (2020), https://www.iea.org/data-and-statistics/charts/global-average-levelised-cost-of-hydrogen-production-by-energy-source-and-technology-2019-and-2050",,,, SMR,investment,522201.0492,EUR/MW_CH4,Danish Energy Agency,"Technology data for renewable fuels, in pdf on table 3 p.311",2015.0,, @@ -3235,12 +3235,12 @@ SOEC,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and finan SOEC,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced SOEC,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced SOEC,efficiency,0.83,p.u.,ICCT IRA e-fuels assumptions ,,,, -SOEC,investment,2408.5,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -SOEC,investment,2408.5,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -SOEC,investment,2354.5,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -SOEC,investment,2354.5,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -SOEC,investment,766.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -SOEC,investment,766.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +SOEC,investment,2104.2083292926595,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +SOEC,investment,2104.2083292926595,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +SOEC,investment,2057.0307292171756,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +SOEC,investment,2057.0307292171756,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +SOEC,investment,669.2229936633495,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +SOEC,investment,669.2229936633495,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced SOEC,lifetime,30.0,years,ICCT IRA e-fuels assumptions ,,,, Sand-charger,FOM,1.075,%/year,"Viswanathan_2022, NULL","{'carrier': ['elec', 'sand'], 'technology_type': ['charger'], 'type': ['thermal'], 'note': ['Guesstimate, 50% on charger']}",2020.0,, Sand-charger,efficiency,0.99,per unit,"Viswanathan_2022, p.107 (p.129)","{'carrier': ['elec', 'sand'], 'technology_type': ['charger'], 'type': ['thermal'], 'note': ['RTE assume 99% for charge and other for discharge']}",2020.0,, @@ -3255,7 +3255,7 @@ Sand-store,investment,7357.7979,EUR/MWh,"Viswanathan_2022, p.100 (p.122)","{'car Sand-store,lifetime,35.0,years,"Viswanathan_2022, p.107 (p.129)","{'carrier': ['sand'], 'technology_type': ['store'], 'type': ['thermal'], 'note': ['NULL']}",2020.0,, Solid biomass steam reforming,FOM,0.05,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Solid biomass steam reforming,efficiency,0.712,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Solid biomass steam reforming,investment,590.7702,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Solid biomass steam reforming,investment,796.4750872147151,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Solid biomass steam reforming,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Steam methane reforming,FOM,3.0,%/year,"International Energy Agency (2015): Technology Roadmap Hydrogen and Fuel Cells , table 15.",Large scale SMR facility (150-300 MW).,2015.0,, Steam methane reforming,investment,497454.611,EUR/MW_H2,"International Energy Agency (2015): Technology Roadmap Hydrogen and Fuel Cells , table 15.",Large scale SMR facility (150-300 MW). Currency conversion 1.17 USD = 1 EUR.,2015.0,, @@ -3282,12 +3282,12 @@ Utility PV - Class 1,FOM,1.4,%/year,NREL/ATB-https://data.openei.org/s3_viewer?b Utility PV - Class 1,FOM,1.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 1,FOM,1.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 1,FOM,1.4,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 1,investment,1456.236613013845,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 1,investment,1491.6407443350658,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 1,investment,1540.6284021118563,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 1,investment,1456.236613013845,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 1,investment,1491.6407443350658,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 1,investment,1540.6284021118563,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 1,investment,1272.2546026674959,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 1,investment,1303.185749861801,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 1,investment,1345.9842707363955,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 1,investment,1272.2546026674959,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 1,investment,1303.185749861801,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 1,investment,1345.9842707363955,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 10,CF,0.2063227505104372,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 10,CF,0.20237932814438855,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 10,CF,0.19687382126665892,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3300,12 +3300,12 @@ Utility PV - Class 10,FOM,1.4,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Utility PV - Class 10,FOM,1.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 10,FOM,1.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 10,FOM,1.4,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 10,investment,1456.236613013845,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 10,investment,1491.6407443350658,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 10,investment,1540.6284021118563,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 10,investment,1456.236613013845,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 10,investment,1491.6407443350658,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 10,investment,1540.6284021118563,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 10,investment,1272.2546026674959,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 10,investment,1303.185749861801,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 10,investment,1345.9842707363955,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 10,investment,1272.2546026674959,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 10,investment,1303.185749861801,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 10,investment,1345.9842707363955,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 2,CF,0.3149394521694479,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 2,CF,0.30974988165310763,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 2,CF,0.30297949893350146,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3318,12 +3318,12 @@ Utility PV - Class 2,FOM,1.4,%/year,NREL/ATB-https://data.openei.org/s3_viewer?b Utility PV - Class 2,FOM,1.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 2,FOM,1.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 2,FOM,1.4,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 2,investment,1456.236613013845,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 2,investment,1491.6407443350658,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 2,investment,1540.6284021118563,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 2,investment,1456.236613013845,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 2,investment,1491.6407443350658,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 2,investment,1540.6284021118563,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 2,investment,1272.2546026674959,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 2,investment,1303.185749861801,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 2,investment,1345.9842707363955,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 2,investment,1272.2546026674959,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 2,investment,1303.185749861801,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 2,investment,1345.9842707363955,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 3,CF,0.3004809014262314,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 3,CF,0.2953626825189205,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 3,CF,0.2885389478078063,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3336,12 +3336,12 @@ Utility PV - Class 3,FOM,1.4,%/year,NREL/ATB-https://data.openei.org/s3_viewer?b Utility PV - Class 3,FOM,1.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 3,FOM,1.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 3,FOM,1.4,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 3,investment,1456.236613013845,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 3,investment,1491.6407443350658,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 3,investment,1540.6284021118563,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 3,investment,1456.236613013845,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 3,investment,1491.6407443350658,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 3,investment,1540.6284021118563,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 3,investment,1272.2546026674959,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 3,investment,1303.185749861801,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 3,investment,1345.9842707363955,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 3,investment,1272.2546026674959,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 3,investment,1303.185749861801,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 3,investment,1345.9842707363955,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 4,CF,0.286502590693394,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 4,CF,0.28148929329880334,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 4,CF,0.2747074374583729,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3354,12 +3354,12 @@ Utility PV - Class 4,FOM,1.4,%/year,NREL/ATB-https://data.openei.org/s3_viewer?b Utility PV - Class 4,FOM,1.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 4,FOM,1.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 4,FOM,1.4,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 4,investment,1456.236613013845,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 4,investment,1491.6407443350658,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 4,investment,1540.6284021118563,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 4,investment,1456.236613013845,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 4,investment,1491.6407443350658,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 4,investment,1540.6284021118563,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 4,investment,1272.2546026674959,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 4,investment,1303.185749861801,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 4,investment,1345.9842707363955,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 4,investment,1272.2546026674959,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 4,investment,1303.185749861801,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 4,investment,1345.9842707363955,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 6,CF,0.25852904879866506,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 6,CF,0.2537975724560726,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 6,CF,0.24738093626150556,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3372,12 +3372,12 @@ Utility PV - Class 6,FOM,1.4,%/year,NREL/ATB-https://data.openei.org/s3_viewer?b Utility PV - Class 6,FOM,1.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 6,FOM,1.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 6,FOM,1.4,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 6,investment,1456.236613013845,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 6,investment,1491.6407443350658,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 6,investment,1540.6284021118563,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 6,investment,1456.236613013845,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 6,investment,1491.6407443350658,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 6,investment,1540.6284021118563,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 6,investment,1272.2546026674959,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 6,investment,1303.185749861801,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 6,investment,1345.9842707363955,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 6,investment,1272.2546026674959,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 6,investment,1303.185749861801,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 6,investment,1345.9842707363955,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 7,CF,0.24544176091448183,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 7,CF,0.2408794703868765,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 7,CF,0.23462238591791423,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3390,12 +3390,12 @@ Utility PV - Class 7,FOM,1.4,%/year,NREL/ATB-https://data.openei.org/s3_viewer?b Utility PV - Class 7,FOM,1.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 7,FOM,1.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 7,FOM,1.4,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 7,investment,1456.236613013845,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 7,investment,1491.6407443350658,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 7,investment,1540.6284021118563,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 7,investment,1456.236613013845,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 7,investment,1491.6407443350658,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 7,investment,1540.6284021118563,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 7,investment,1272.2546026674959,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 7,investment,1303.185749861801,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 7,investment,1345.9842707363955,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 7,investment,1272.2546026674959,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 7,investment,1303.185749861801,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 7,investment,1345.9842707363955,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 8,CF,0.2359874048845333,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 8,CF,0.23163275150342633,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 8,CF,0.2255803991045864,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3408,12 +3408,12 @@ Utility PV - Class 8,FOM,1.4,%/year,NREL/ATB-https://data.openei.org/s3_viewer?b Utility PV - Class 8,FOM,1.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 8,FOM,1.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 8,FOM,1.4,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 8,investment,1456.236613013845,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 8,investment,1491.6407443350658,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 8,investment,1540.6284021118563,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 8,investment,1456.236613013845,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 8,investment,1491.6407443350658,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 8,investment,1540.6284021118563,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 8,investment,1272.2546026674959,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 8,investment,1303.185749861801,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 8,investment,1345.9842707363955,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 8,investment,1272.2546026674959,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 8,investment,1303.185749861801,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 8,investment,1345.9842707363955,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 9,CF,0.22465346070286368,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 9,CF,0.22047669886675608,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 9,CF,0.21462405761269948,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3426,60 +3426,60 @@ Utility PV - Class 9,FOM,1.4,%/year,NREL/ATB-https://data.openei.org/s3_viewer?b Utility PV - Class 9,FOM,1.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 9,FOM,1.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 9,FOM,1.4,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 9,investment,1456.236613013845,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 9,investment,1491.6407443350658,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 9,investment,1540.6284021118563,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 9,investment,1456.236613013845,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 9,investment,1491.6407443350658,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 9,investment,1540.6284021118563,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 9,investment,1272.2546026674959,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 9,investment,1303.185749861801,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 9,investment,1345.9842707363955,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 9,investment,1272.2546026674959,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 9,investment,1303.185749861801,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 9,investment,1345.9842707363955,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility-Scale Battery Storage - 10Hr,FOM,2.33,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility-Scale Battery Storage - 10Hr,FOM,2.34,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility-Scale Battery Storage - 10Hr,FOM,2.36,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Utility-Scale Battery Storage - 10Hr,FOM,2.33,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility-Scale Battery Storage - 10Hr,FOM,2.34,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility-Scale Battery Storage - 10Hr,FOM,2.36,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility-Scale Battery Storage - 10Hr,investment,2959.012486785936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility-Scale Battery Storage - 10Hr,investment,3638.921285164085,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility-Scale Battery Storage - 10Hr,investment,4661.999232764512,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility-Scale Battery Storage - 10Hr,investment,2959.012486785936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility-Scale Battery Storage - 10Hr,investment,3638.921285164085,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility-Scale Battery Storage - 10Hr,investment,4661.999232764512,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility-Scale Battery Storage - 10Hr,investment,2585.1686614805694,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility-Scale Battery Storage - 10Hr,investment,3179.17727958589,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility-Scale Battery Storage - 10Hr,investment,4072.9988028810776,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility-Scale Battery Storage - 10Hr,investment,2585.1686614805694,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility-Scale Battery Storage - 10Hr,investment,3179.17727958589,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility-Scale Battery Storage - 10Hr,investment,4072.9988028810776,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility-Scale Battery Storage - 2Hr,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility-Scale Battery Storage - 2Hr,FOM,2.18,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility-Scale Battery Storage - 2Hr,FOM,2.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Utility-Scale Battery Storage - 2Hr,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility-Scale Battery Storage - 2Hr,FOM,2.18,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility-Scale Battery Storage - 2Hr,FOM,2.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility-Scale Battery Storage - 2Hr,investment,867.9884263021866,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility-Scale Battery Storage - 2Hr,investment,1068.896874034551,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility-Scale Battery Storage - 2Hr,investment,1325.923901597508,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility-Scale Battery Storage - 2Hr,investment,867.9884263021866,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility-Scale Battery Storage - 2Hr,investment,1068.896874034551,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility-Scale Battery Storage - 2Hr,investment,1325.923901597508,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility-Scale Battery Storage - 2Hr,investment,758.3261267821003,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility-Scale Battery Storage - 2Hr,investment,933.8516526877264,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility-Scale Battery Storage - 2Hr,investment,1158.405695557275,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility-Scale Battery Storage - 2Hr,investment,758.3261267821003,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility-Scale Battery Storage - 2Hr,investment,933.8516526877264,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility-Scale Battery Storage - 2Hr,investment,1158.405695557275,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility-Scale Battery Storage - 4Hr,FOM,2.23,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility-Scale Battery Storage - 4Hr,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility-Scale Battery Storage - 4Hr,FOM,2.3,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Utility-Scale Battery Storage - 4Hr,FOM,2.23,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility-Scale Battery Storage - 4Hr,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility-Scale Battery Storage - 4Hr,FOM,2.3,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility-Scale Battery Storage - 4Hr,investment,1390.744441423124,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility-Scale Battery Storage - 4Hr,investment,1711.4029768169346,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility-Scale Battery Storage - 4Hr,investment,2159.9427343892594,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility-Scale Battery Storage - 4Hr,investment,1390.744441423124,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility-Scale Battery Storage - 4Hr,investment,1711.4029768169346,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility-Scale Battery Storage - 4Hr,investment,2159.9427343892594,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility-Scale Battery Storage - 4Hr,investment,1215.0367604567177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility-Scale Battery Storage - 4Hr,investment,1495.1830594122673,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility-Scale Battery Storage - 4Hr,investment,1887.053972388226,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility-Scale Battery Storage - 4Hr,investment,1215.0367604567177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility-Scale Battery Storage - 4Hr,investment,1495.1830594122673,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility-Scale Battery Storage - 4Hr,investment,1887.053972388226,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility-Scale Battery Storage - 8Hr,FOM,2.31,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility-Scale Battery Storage - 8Hr,FOM,2.33,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility-Scale Battery Storage - 8Hr,FOM,2.35,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Utility-Scale Battery Storage - 8Hr,FOM,2.31,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility-Scale Battery Storage - 8Hr,FOM,2.33,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility-Scale Battery Storage - 8Hr,FOM,2.35,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility-Scale Battery Storage - 8Hr,investment,2436.256471664999,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility-Scale Battery Storage - 8Hr,investment,2996.4151823817015,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility-Scale Battery Storage - 8Hr,investment,3827.9803999727615,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility-Scale Battery Storage - 8Hr,investment,2436.256471664999,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility-Scale Battery Storage - 8Hr,investment,2996.4151823817015,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility-Scale Battery Storage - 8Hr,investment,3827.9803999727615,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility-Scale Battery Storage - 8Hr,investment,2128.4580278059525,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility-Scale Battery Storage - 8Hr,investment,2617.845872861349,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility-Scale Battery Storage - 8Hr,investment,3344.350526050127,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility-Scale Battery Storage - 8Hr,investment,2128.4580278059525,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility-Scale Battery Storage - 8Hr,investment,2617.845872861349,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility-Scale Battery Storage - 8Hr,investment,3344.350526050127,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Vanadium-Redox-Flow-bicharger,FOM,2.4212,%/year,"Viswanathan_2022, p.28 (p.50)","{'carrier': ['elec', 'vanadium', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['30% assumed of power components every 10 years']}",2020.0,, Vanadium-Redox-Flow-bicharger,efficiency,0.8062,per unit,"Viswanathan_2022, p.42 (p.64)","{'carrier': ['elec', 'vanadium', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['AC-AC efficiency at transformer level 0.65^0.5']}",2020.0,, Vanadium-Redox-Flow-bicharger,investment,139486.6307,EUR/MW,"Viswanathan_2022, p.42 (p.64)","{'carrier': ['elec', 'vanadium', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['Power Equipment']}",2020.0,, @@ -3526,12 +3526,12 @@ battery storage,FOM,2.33,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucke battery storage,FOM,2.28,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced battery storage,FOM,2.31,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate battery storage,FOM,2.33,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -battery storage,investment,1913.500456544061,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -battery storage,investment,2353.909079599318,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -battery storage,investment,2993.96156718101,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -battery storage,investment,1913.500456544061,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -battery storage,investment,2353.909079599318,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -battery storage,investment,2993.96156718101,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +battery storage,investment,1671.7473941313349,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +battery storage,investment,2056.514466136808,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +battery storage,investment,2615.7022492191763,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +battery storage,investment,1671.7473941313349,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +battery storage,investment,2056.514466136808,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +battery storage,investment,2615.7022492191763,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative battery storage,lifetime,22.5,years,"Danish Energy Agency, inputs/technology_data_catalogue_for_energy_storage.xlsx",: Technical lifetime,2015.0,, biochar pyrolysis,FOM,3.4615,%/year,"Danish Energy Agency, inputs/data_sheets_for_renewable_fuels.xlsx","105 Slow pyrolysis, Straw: Fixed O&M",2020.0,, biochar pyrolysis,VOM,823.497,EUR/MWh_biochar,"Danish Energy Agency, inputs/data_sheets_for_renewable_fuels.xlsx","105 Slow pyrolysis, Straw: Variable O&M",2020.0,, @@ -3576,12 +3576,12 @@ biomass,FOM,3.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-d biomass,FOM,3.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced biomass,FOM,3.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate biomass,FOM,3.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -biomass,VOM,5.246639999999999,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -biomass,VOM,5.246639999999999,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -biomass,VOM,5.246639999999999,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -biomass,VOM,5.246639999999999,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -biomass,VOM,5.246639999999999,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -biomass,VOM,5.246639999999999,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +biomass,VOM,4.583775623334041,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +biomass,VOM,4.583775623334041,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +biomass,VOM,4.583775623334041,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +biomass,VOM,4.583775623334041,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +biomass,VOM,4.583775623334041,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +biomass,VOM,4.583775623334041,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative biomass,discount rate,0.0535409772976367,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced biomass,discount rate,0.0535409772976367,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate biomass,discount rate,0.0535409772976367,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3589,18 +3589,18 @@ biomass,discount rate,0.0471698161746512,per unit,"NREL, NREL ATB 2024",Meaning biomass,discount rate,0.0471698161746512,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate biomass,discount rate,0.0471698161746512,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative biomass,efficiency,0.468,per unit,DIW DataDoc http://hdl.handle.net/10419/80348, from old pypsa cost assumptions,2015.0,, -biomass,fuel,73.57007249999998,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -biomass,fuel,73.57007249999998,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -biomass,fuel,73.57007249999998,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -biomass,fuel,73.57007249999998,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -biomass,fuel,73.57007249999998,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -biomass,fuel,73.57007249999998,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -biomass,investment,5005.775900702775,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -biomass,investment,5005.775900702775,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -biomass,investment,5005.775900702775,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -biomass,investment,5005.775900702775,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -biomass,investment,5005.775900702775,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -biomass,investment,5005.775900702775,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +biomass,fuel,64.27517514684027,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +biomass,fuel,64.27517514684027,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +biomass,fuel,64.27517514684027,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +biomass,fuel,64.27517514684027,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +biomass,fuel,64.27517514684027,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +biomass,fuel,64.27517514684027,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +biomass,investment,4373.342472423186,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +biomass,investment,4373.342472423186,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +biomass,investment,4373.342472423186,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +biomass,investment,4373.342472423186,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +biomass,investment,4373.342472423186,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +biomass,investment,4373.342472423186,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative biomass,lifetime,30.0,years,ECF2010 in DIW DataDoc http://hdl.handle.net/10419/80348, from old pypsa cost assumptions,2015.0,, biomass CHP,FOM,3.5955,%/year,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","09c Straw, Large, 40 degree: Fixed O&M",2015.0,, biomass CHP,VOM,2.2255,EUR/MWh_e,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","09c Straw, Large, 40 degree: Variable O&M ",2015.0,, @@ -3766,12 +3766,12 @@ coal,FOM,2.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data coal,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced coal,FOM,2.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate coal,FOM,2.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -coal,VOM,9.15,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -coal,VOM,9.18,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -coal,VOM,9.21,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -coal,VOM,9.15,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -coal,VOM,9.18,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -coal,VOM,9.21,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +coal,VOM,7.993982235012595,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +coal,VOM,8.020192012832307,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +coal,VOM,8.046401790652022,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +coal,VOM,7.993982235012595,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +coal,VOM,8.020192012832307,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +coal,VOM,8.046401790652022,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative coal,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced coal,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate coal,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3779,13 +3779,13 @@ coal,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of coal,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate coal,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative coal,efficiency,0.356,p.u.,"Lazard's levelized cost of energy analysis - version 16.0 (2023): https://www.lazard.com/media/typdgxmm/lazards-lcoeplus-april-2023.pdf , pg. 49 (Levelized Cost of Energy - Key Assumptions), accessed: 2023-12-14.","Calculated based on average of listed range, i.e. 1 / ((8.75+12) MMbtu/MWh_th /2 / (3.4095 MMbtu/MWh_th)), rounded up.",2023.0,, -coal,fuel,8.12,USD/MWh_th,"EIA, https://www.eia.gov/coal/annual/",46.97 USD/short ton of bituminous coal with energy content = 19.73 million BTU/short ton,2023.0,, -coal,investment,4044.4636521140046,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -coal,investment,4013.7002280739143,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -coal,investment,3982.936804033825,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -coal,investment,4044.4636521140046,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -coal,investment,4013.7002280739143,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -coal,investment,3982.936804033825,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +coal,fuel,6.887488540325987,USD/MWh_th,"EIA, https://www.eia.gov/coal/annual/",46.97 USD/short ton of bituminous coal with energy content = 19.73 million BTU/short ton,2023.0,, +coal,investment,3533.483124060493,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +coal,investment,3506.6063737583468,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +coal,investment,3479.729623456201,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +coal,investment,3533.483124060493,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +coal,investment,3506.6063737583468,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +coal,investment,3479.729623456201,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative coal,lifetime,40.0,years,"Lazard's levelized cost of energy analysis - version 16.0 (2023): https://www.lazard.com/media/typdgxmm/lazards-lcoeplus-april-2023.pdf , pg. 49 (Levelized Cost of Energy - Key Assumptions), accessed: 2023-12-14.",,2023.0,, csp-tower,CF,0.666,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced csp-tower,CF,0.666,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -3799,24 +3799,24 @@ csp-tower,FOM,0.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi csp-tower,FOM,0.98,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced csp-tower,FOM,0.98,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate csp-tower,FOM,0.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -csp-tower,VOM,3.5647875,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -csp-tower,VOM,3.5985375,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -csp-tower,VOM,3.95766,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -csp-tower,VOM,3.5647875,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -csp-tower,VOM,3.5985375,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -csp-tower,VOM,3.95766,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +csp-tower,VOM,3.1144096116497226,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +csp-tower,VOM,3.1438956116969,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +csp-tower,VOM,3.4576463095322345,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +csp-tower,VOM,3.1144096116497226,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +csp-tower,VOM,3.1438956116969,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +csp-tower,VOM,3.4576463095322345,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative csp-tower,discount rate,0.0525797392876843,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced csp-tower,discount rate,0.0525797392876843,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate csp-tower,discount rate,0.0525797392876843,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative csp-tower,discount rate,0.0416031281240576,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced csp-tower,discount rate,0.0416031281240576,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate csp-tower,discount rate,0.0416031281240576,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -csp-tower,investment,6506.952202460267,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -csp-tower,investment,6887.476655978137,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -csp-tower,investment,7912.019603207439,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -csp-tower,investment,6506.952202460267,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -csp-tower,investment,6887.476655978137,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -csp-tower,investment,7912.019603207439,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +csp-tower,investment,5684.859050332618,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +csp-tower,investment,6017.307763054992,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +csp-tower,investment,6912.409196842806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +csp-tower,investment,5684.859050332618,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +csp-tower,investment,6017.307763054992,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +csp-tower,investment,6912.409196842806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative csp-tower,lifetime,30.0,years,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),-,2020.0,, csp-tower TES,FOM,1.05,%/year,see solar-tower.,-,2020.0,, csp-tower TES,investment,17.975,EUR/kWh_th,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,"Based on NREL’s SAM (v2021.12.2) numbers for a CSP power plant, 2020 numbers. CAPEX degression (=learning) taken from ATB database (“moderate”) scenario. Costs include the TES incl. EPC cost for the default installation size (104 MWe plant, 2.791 MW_th TES). Total costs (69390776.7 USD) are divided by TES size to obtain EUR/kW_th. Exchange rate: 1.16 USD to 1 EUR.",2020.0,, @@ -3882,12 +3882,12 @@ direct air capture,compression-heat-output,0.2,MWh/tCO2,"Danish Energy Agency, i direct air capture,electricity-input,0.24,MWh_el/t_CO2,ICCT IRA e-fuels assumptions ,,,, direct air capture,heat-input,1.17,MWh_th/t_CO2,ICCT IRA e-fuels assumptions ,,,, direct air capture,heat-output,1.25,MWh/tCO2,"Danish Energy Agency, inputs/technology_data_for_carbon_capture_transport_storage.xlsx",403.a Direct air capture,2020.0,, -direct air capture,investment,12398844.91,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -direct air capture,investment,12398844.91,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -direct air capture,investment,19180739.93,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -direct air capture,investment,19180739.93,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -direct air capture,investment,7103597.31,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -direct air capture,investment,7103597.31,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +direct air capture,investment,10832365.677072823,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +direct air capture,investment,10832365.677072823,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +direct air capture,investment,16757431.066100188,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +direct air capture,investment,16757431.066100188,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +direct air capture,investment,6206123.573860465,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +direct air capture,investment,6206123.573860465,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced direct air capture,lifetime,20.0,years,"Danish Energy Agency, inputs/technology_data_for_carbon_capture_transport_storage.xlsx",403.a Direct air capture,2020.0,, direct air capture,years,30.0,years,ICCT IRA e-fuels assumptions ,,,, direct firing gas,FOM,1.197,%/year,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",312.a Direct firing Natural Gas: Fixed O&M,2019.0,, @@ -3968,7 +3968,7 @@ fuel cell,investment,1269.866,EUR/kW_e,"Danish Energy Agency, inputs/technology_ fuel cell,lifetime,10.0,years,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",12 LT-PEMFC CHP: Technical lifetime,2015.0,, fuelwood,fuel,15.261,EUR/MWhth,"JRC ENSPRESO ca avg for MINBIOWOO (FuelwoodRW), ENS_BaU_GFTM",,2010.0,, gas,CO2 intensity,0.198,tCO2/MWh_th,Stoichiometric calculation with 50 GJ/t CH4,,,, -gas,fuel,12.91,USD/MWh_th,World Bank https://www.worldbank.org/en/research/commodity-markets,,2010.0,, +gas,fuel,14.884906450408183,USD/MWh_th,World Bank https://www.worldbank.org/en/research/commodity-markets,,2010.0,, gas boiler steam,FOM,3.9,%/year,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",311.1c Steam boiler Gas: Fixed O&M,2019.0,, gas boiler steam,VOM,1.0574,EUR/MWh,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",311.1c Steam boiler Gas: Variable O&M,2019.0,, gas boiler steam,efficiency,0.925,per unit,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx","311.1c Steam boiler Gas: Total efficiency, net, annual average",2019.0,, @@ -4000,12 +4000,12 @@ geothermal,discount rate,0.0400999293962161,per unit,"NREL, NREL ATB 2024",Meani geothermal,discount rate,0.0400999293962161,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative geothermal,district heat surcharge,25.0,%,Frey et al. 2022: Techno-Economic Assessment of Geothermal Resources in the Variscan Basement of the Northern Upper Rhine Graben,"If capital cost of electric generation from EGS is 100%, district heating adds additional 25%. Costs incurred by piping.",2020.0,, geothermal,district heat-input,0.8,MWh_thdh/MWh_th,"Aghahosseini, Breyer 2020: From hot rock to useful energy: A global estimate of enhanced geothermal systems potential, https://www.sciencedirect.com/science/article/pii/S0306261920312551; Breede et al. 2015: Overcoming challenges in the classification of deep geothermal potential, https://eprints.gla.ac.uk/169585/","Heat-input, District Heat-output. This is an assessment of typical heat losses when heat is transmitted from the EGS plant to the DH network, This is a rough estimate, depends on local conditions",2020.0,, -geothermal,investment,6640.279542920247,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -geothermal,investment,6890.214586821563,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -geothermal,investment,7108.02581740575,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -geothermal,investment,6640.279542920247,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -geothermal,investment,6890.214586821563,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -geothermal,investment,7108.02581740575,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +geothermal,investment,5801.341716024263,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +geothermal,investment,6019.69978169139,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +geothermal,investment,6209.992580366387,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +geothermal,investment,5801.341716024263,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +geothermal,investment,6019.69978169139,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +geothermal,investment,6209.992580366387,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative geothermal,lifetime,30.0,years,"Aghahosseini, Breyer 2020: From hot rock to useful energy: A global estimate of enhanced geothermal systems potential, https://www.sciencedirect.com/science/article/pii/S0306261920312551",,2020.0,, helmeth,FOM,3.0,%/year,no source, from old pypsa cost assumptions,2015.0,, helmeth,efficiency,0.8,per unit,HELMETH press release, from old pypsa cost assumptions,2015.0,, @@ -4036,19 +4036,19 @@ hydro,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of hydro,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate hydro,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative hydro,efficiency,0.9,per unit,DIW DataDoc http://hdl.handle.net/10419/80348, from old pypsa cost assumptions,2015.0,, -hydro,investment,3241.3364440395458,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -hydro,investment,3241.3364440395458,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -hydro,investment,3241.3364440395458,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -hydro,investment,3241.3364440395458,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -hydro,investment,3241.3364440395458,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -hydro,investment,3241.3364440395458,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +hydro,investment,2831.823601240549,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +hydro,investment,2831.823601240549,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +hydro,investment,2831.823601240549,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +hydro,investment,2831.823601240549,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +hydro,investment,2831.823601240549,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +hydro,investment,2831.823601240549,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative hydro,lifetime,80.0,years,IEA2010, from old pypsa cost assumptions,2015.0,, hydrogen storage compressor,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,,2022.0,, hydrogen storage compressor,compression-electricity-input,0.05,MWh_el/MWh_H2,"Based on Stöckl et al (2021): https://doi.org/10.48550/arXiv.2005.03464, table SI.4.",1.707 kWh/kg.,,, -hydrogen storage compressor,investment,2.28,USD/kWh_H2,ICCT IRA e-fuels assumptions ,,2022.0,, +hydrogen storage compressor,investment,1.9919431142982202,USD/kWh_H2,ICCT IRA e-fuels assumptions ,,2022.0,, hydrogen storage compressor,lifetime,30.0,years,ICCT IRA e-fuels assumptions ,,,, hydrogen storage tank type 1,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,,2022.0,, -hydrogen storage tank type 1,investment,16.87,USD/kWh_H2,ICCT IRA e-fuels assumptions ,,2022.0,, +hydrogen storage tank type 1,investment,14.738631727285517,USD/kWh_H2,ICCT IRA e-fuels assumptions ,,2022.0,, hydrogen storage tank type 1,lifetime,30.0,years,ICCT IRA e-fuels assumptions ,,,, hydrogen storage tank type 1,min_fill_level,6.0,%,"Based on Stöckl et al (2021): https://doi.org/10.48550/arXiv.2005.03464, table SI.9.",,,, hydrogen storage tank type 1 including compressor,FOM,1.0794,%/year,"Danish Energy Agency, inputs/technology_data_catalogue_for_energy_storage.xlsx",151a Hydrogen Storage - Tanks: Fixed O&M,2015.0,, @@ -4137,12 +4137,12 @@ offwind,discount rate,0.0515282344979717,per unit,"NREL, NREL ATB 2024",Meaning offwind,discount rate,0.0401070465062936,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced offwind,discount rate,0.0401070465062936,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate offwind,discount rate,0.0401070465062936,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -offwind,investment,4745.533764313401,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -offwind,investment,5877.078717178738,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -offwind,investment,7597.68428408161,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -offwind,investment,4745.533764313401,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -offwind,investment,5877.078717178738,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -offwind,investment,7597.68428408161,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +offwind,investment,4145.979519953417,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +offwind,investment,5134.564246874037,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +offwind,investment,6637.787234336915,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +offwind,investment,4145.979519953417,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +offwind,investment,5134.564246874037,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +offwind,investment,6637.787234336915,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative offwind,lifetime,30.0,years,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",21 Offshore turbines: Technical lifetime [years],2020.0,, offwind-ac-connection-submarine,investment,2841.3251,EUR/MW/km,DEA https://ens.dk/en/our-services/projections-and-models/technology-data, from old pypsa cost assumptions,2015.0,, offwind-ac-connection-underground,investment,1420.1334,EUR/MW/km,DEA https://ens.dk/en/our-services/projections-and-models/technology-data, from old pypsa cost assumptions,2015.0,, @@ -4160,7 +4160,7 @@ oil,CO2 intensity,0.2571,tCO2/MWh_th,Stoichiometric calculation with 44 GJ/t die oil,FOM,2.5143,%/year,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",50 Diesel engine farm: Fixed O&M,2015.0,, oil,VOM,6.3493,EUR/MWh,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",50 Diesel engine farm: Variable O&M,2015.0,, oil,efficiency,0.35,per unit,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","50 Diesel engine farm: Electricity efficiency, annual average",2015.0,, -oil,fuel,44.83,USD/MWh_th,World Bank https://www.worldbank.org/en/research/commodity-markets,,2010.0,, +oil,fuel,51.687866473415866,USD/MWh_th,World Bank https://www.worldbank.org/en/research/commodity-markets,,2010.0,, oil,investment,362.97,EUR/kW,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",50 Diesel engine farm: Specific investment,2015.0,, oil,lifetime,25.0,years,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",50 Diesel engine farm: Technical lifetime,2015.0,, onwind,CF,0.472469901234567,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced @@ -4181,12 +4181,12 @@ onwind,discount rate,0.0499998824996633,per unit,"NREL, NREL ATB 2024",Meaning o onwind,discount rate,0.0365777183152598,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced onwind,discount rate,0.0365777183152598,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate onwind,discount rate,0.0365777183152598,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -onwind,investment,1544.2437353547416,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -onwind,investment,1569.0990734589152,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -onwind,investment,1632.638533920156,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -onwind,investment,1544.2437353547416,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -onwind,investment,1569.0990734589152,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -onwind,investment,1632.638533920156,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +onwind,investment,1349.1428401044038,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +onwind,investment,1370.8579364158788,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +onwind,investment,1426.3697744649985,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +onwind,investment,1349.1428401044038,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +onwind,investment,1370.8579364158788,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +onwind,investment,1426.3697744649985,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative onwind,lifetime,28.5,years,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",20 Onshore turbines: Technical lifetime,2015.0,, organic rankine cycle,FOM,2.0,%/year,"Aghahosseini, Breyer 2020: From hot rock to useful energy: A global estimate of enhanced geothermal systems potential, https://www.sciencedirect.com/science/article/pii/S0306261920312551","Both for flash, binary and ORC plants. See Supplemental Material for details",2020.0,, organic rankine cycle,electricity-input,0.12,MWh_el/MWh_th,"Aghahosseini, Breyer 2020: From hot rock to useful energy: A global estimate of enhanced geothermal systems potential, https://www.sciencedirect.com/science/article/pii/S0306261920312551; Breede et al. 2015: Overcoming challenges in the classification of deep geothermal potential, https://eprints.gla.ac.uk/169585/","Heat-input, Electricity-output. This is a rough estimate, depends on input temperature, implies ~150 C.",2020.0,, @@ -4211,12 +4211,12 @@ ror,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of s ror,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate ror,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative ror,efficiency,0.9,per unit,DIW DataDoc http://hdl.handle.net/10419/80348, from old pypsa cost assumptions,2015.0,, -ror,investment,9005.486475065536,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -ror,investment,9234.349311015783,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -ror,investment,9281.186356512577,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -ror,investment,9005.486475065536,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -ror,investment,9234.349311015783,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -ror,investment,9281.186356512577,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +ror,investment,7867.726655663398,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +ror,investment,8067.674791711581,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +ror,investment,8108.594410251673,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +ror,investment,7867.726655663398,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +ror,investment,8067.674791711581,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +ror,investment,8108.594410251673,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative ror,lifetime,80.0,years,IEA2010, from old pypsa cost assumptions,2015.0,, seawater RO desalination,electricity-input,0.003,MWHh_el/t_H2O,"Caldera et al. (2016): Local cost of seawater RO desalination based on solar PV and windenergy: A global estimate. (https://doi.org/10.1016/j.desal.2016.02.004), Fig. 4.",Desalination using SWRO. Assume medium salinity of 35 Practical Salinity Units (PSUs) = 35 kg/m^3.,,, seawater desalination,FOM,4.0,%/year,"Caldera et al 2016: Local cost of seawater RO desalination based on solar PV and windenergy: A global estimate. (https://doi.org/10.1016/j.desal.2016.02.004), Table 1.",,2015.0,, @@ -4247,12 +4247,12 @@ solar-rooftop,discount rate,0.0461592747895283,per unit,"NREL, NREL ATB 2024",Me solar-rooftop,discount rate,0.0364480268090299,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced solar-rooftop,discount rate,0.0364480268090299,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate solar-rooftop,discount rate,0.0364480268090299,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -solar-rooftop,investment,1692.558588782558,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -solar-rooftop,investment,1744.249794670278,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -solar-rooftop,investment,1818.212696019045,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -solar-rooftop,investment,1692.558588782558,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -solar-rooftop,investment,1744.249794670278,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -solar-rooftop,investment,1818.212696019045,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +solar-rooftop,investment,1478.7194852946182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +solar-rooftop,investment,1523.8799860129584,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +solar-rooftop,investment,1588.4983597213773,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +solar-rooftop,investment,1478.7194852946182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +solar-rooftop,investment,1523.8799860129584,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +solar-rooftop,investment,1588.4983597213773,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative solar-rooftop,lifetime,37.5,years,Calculated. See 'further description'.,Mixed investment costs based on average of 50% 'solar-rooftop commercial' and 50% 'solar-rooftop residential',2020.0,, solar-rooftop commercial,FOM,1.3559,%/year,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",22 Rooftop PV commercial: Fixed O&M [2020-EUR/MW_e/y],2020.0,, solar-rooftop commercial,investment,719.0594,EUR/kW_e,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",22 Rooftop PV commercial: Nominal investment [2020-MEUR/MW_e],2020.0,, @@ -4278,12 +4278,12 @@ solar-utility,discount rate,0.04194588203946,per unit,"NREL, NREL ATB 2024",Mean solar-utility,discount rate,0.0342774493840203,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced solar-utility,discount rate,0.0342774493840203,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate solar-utility,discount rate,0.0342774493840203,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -solar-utility,investment,1456.236613013845,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -solar-utility,investment,1491.6407443350658,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -solar-utility,investment,1540.6284021118563,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -solar-utility,investment,1456.236613013845,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -solar-utility,investment,1491.6407443350658,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -solar-utility,investment,1540.6284021118563,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +solar-utility,investment,1272.2546026674959,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +solar-utility,investment,1303.185749861801,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +solar-utility,investment,1345.9842707363955,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +solar-utility,investment,1272.2546026674959,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +solar-utility,investment,1303.185749861801,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +solar-utility,investment,1345.9842707363955,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative solar-utility,lifetime,37.5,years,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",22 Utility-scale PV: Technical lifetime [years],2020.0,, solar-utility single-axis tracking,FOM,2.0365,%/year,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",22 Utility-scale PV tracker: Fixed O&M [2020-EUR/MW_e/y],2020.0,, solar-utility single-axis tracking,investment,552.4113,EUR/kW_e,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",22 Utility-scale PV tracker: Nominal investment [2020-MEUR/MW_e],2020.0,, diff --git a/outputs/US/costs_2030.csv b/outputs/US/costs_2030.csv index bca9b4e6..b77c9d6d 100644 --- a/outputs/US/costs_2030.csv +++ b/outputs/US/costs_2030.csv @@ -6,12 +6,12 @@ Alkaline electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of s Alkaline electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Alkaline electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Alkaline electrolyzer,efficiency,0.69,p.u.,ICCT IRA e-fuels assumptions ,,,, -Alkaline electrolyzer,investment,1202.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Alkaline electrolyzer,investment,1202.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Alkaline electrolyzer,investment,1142.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Alkaline electrolyzer,investment,1142.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Alkaline electrolyzer,investment,630.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Alkaline electrolyzer,investment,630.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Alkaline electrolyzer,investment,1050.1384313098513,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Alkaline electrolyzer,investment,1050.1384313098513,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Alkaline electrolyzer,investment,997.7188756704244,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Alkaline electrolyzer,investment,997.7188756704244,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Alkaline electrolyzer,investment,550.405334213982,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Alkaline electrolyzer,investment,550.405334213982,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Alkaline electrolyzer,lifetime,30.0,years,ICCT IRA e-fuels assumptions ,,,, Ammonia cracker,FOM,4.3,%/year,"Ishimoto et al. (2020): 10.1016/j.ijhydene.2020.09.017 , table 7.","Estimated based on Labour cost rate, Maintenance cost rate, Insurance rate, Admin. cost rate and Chemical & other consumables cost rate.",2015.0,, Ammonia cracker,ammonia-input,1.46,MWh_NH3/MWh_H2,"ENGIE et al (2020): Ammonia to Green Hydrogen Feasibility Study (https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/880826/HS420_-_Ecuity_-_Ammonia_to_Green_Hydrogen.pdf), Fig. 10.",Assuming a integrated 200t/d cracking and purification facility. Electricity demand (316 MWh per 2186 MWh_LHV H2 output) is assumed to also be ammonia LHV input which seems a fair assumption as the facility has options for a higher degree of integration according to the report).,,, @@ -64,12 +64,12 @@ BioSNG,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015 BioSNG,efficiency,0.63,per unit,"Danish Energy Agency, inputs/data_sheets_for_renewable_fuels.xlsx","84 Gasif. CFB, Bio-SNG: Bio SNG Output",2020.0,, BioSNG,investment,1701.44,EUR/kW_th,"Danish Energy Agency, inputs/data_sheets_for_renewable_fuels.xlsx","84 Gasif. CFB, Bio-SNG: Specific investment",2020.0,, BioSNG,lifetime,25.0,years,TODO,"84 Gasif. CFB, Bio-SNG: Technical lifetime",2020.0,, -Biomass gasification,efficiency,0.4083,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Biomass gasification,investment,1467.7693,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Biomass gasification,efficiency,0.4083333333333333,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, +Biomass gasification,investment,1978.8508861995015,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Biomass gasification,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Biomass gasification CC,FOM,0.02,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Biomass gasification CC,efficiency,0.328,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Biomass gasification CC,investment,3015.5325,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Biomass gasification CC,investment,4065.5510481055235,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Biomass gasification CC,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, BtL,C in fuel,0.2688,per unit,"Stoichiometric calculation, doi:10.1016/j.apenergy.2022.120016",,,, BtL,C stored,0.7312,per unit,"Stoichiometric calculation, doi:10.1016/j.apenergy.2022.120016",,,, @@ -86,12 +86,12 @@ CCGT,FOM,1.97,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data CCGT,FOM,1.97,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced CCGT,FOM,1.97,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate CCGT,FOM,1.97,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -CCGT,VOM,6.94,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -CCGT,VOM,6.94,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -CCGT,VOM,6.94,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -CCGT,VOM,6.94,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -CCGT,VOM,6.94,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -CCGT,VOM,6.94,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +CCGT,VOM,6.0631952689603725,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +CCGT,VOM,6.0631952689603725,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +CCGT,VOM,6.0631952689603725,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +CCGT,VOM,6.0631952689603725,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +CCGT,VOM,6.0631952689603725,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +CCGT,VOM,6.0631952689603725,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative CCGT,c_b,2.0,50oC/100oC,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","05 Gas turb. CC, steam extract.: Cb coefficient",2015.0,, CCGT,c_v,0.15,50oC/100oC,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","05 Gas turb. CC, steam extract.: Cv coefficient",2015.0,, CCGT,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced @@ -101,12 +101,12 @@ CCGT,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of CCGT,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate CCGT,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative CCGT,efficiency,0.58,per unit,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","05 Gas turb. CC, steam extract.: Electricity efficiency, annual average",2015.0,, -CCGT,investment,1270.4759889970424,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -CCGT,investment,1270.4759889970424,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -CCGT,investment,1270.4759889970424,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -CCGT,investment,1270.4759889970424,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -CCGT,investment,1270.4759889970424,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -CCGT,investment,1270.4759889970424,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +CCGT,investment,1109.963113229772,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +CCGT,investment,1109.963113229772,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +CCGT,investment,1109.963113229772,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +CCGT,investment,1109.963113229772,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +CCGT,investment,1109.963113229772,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +CCGT,investment,1109.963113229772,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative CCGT,lifetime,25.0,years,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","05 Gas turb. CC, steam extract.: Technical lifetime",2015.0,, CH4 (g) fill compressor station,FOM,1.7,%/year,Assume same as for H2 (g) fill compressor station.,-,2020.0,, CH4 (g) fill compressor station,investment,1654.96,EUR/MW_CH4,"Guesstimate, based on H2 (g) pipeline and fill compressor station cost.","Assume same ratio as between H2 (g) pipeline and fill compressor station, i.e. 1:19 , due to a lack of reliable numbers.",2020.0,, @@ -157,18 +157,18 @@ CSP - Class 3,FOM,0.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket= CSP - Class 3,FOM,1.08,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced CSP - Class 3,FOM,1.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate CSP - Class 3,FOM,0.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -CSP - Class 3,VOM,2.91,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -CSP - Class 3,VOM,3.0,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -CSP - Class 3,VOM,3.95766,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -CSP - Class 3,VOM,2.91,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -CSP - Class 3,VOM,3.0,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -CSP - Class 3,VOM,3.95766,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -CSP - Class 3,investment,4165.173201214978,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -CSP - Class 3,investment,5179.905077262637,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -CSP - Class 3,investment,7912.019603207439,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -CSP - Class 3,investment,4165.173201214978,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -CSP - Class 3,investment,5179.905077262637,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -CSP - Class 3,investment,7912.019603207439,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +CSP - Class 3,VOM,2.5423484485122025,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +CSP - Class 3,VOM,2.6209777819713427,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +CSP - Class 3,VOM,3.4576463095322345,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +CSP - Class 3,VOM,2.5423484485122025,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +CSP - Class 3,VOM,2.6209777819713427,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +CSP - Class 3,VOM,3.4576463095322345,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +CSP - Class 3,investment,3638.942139482303,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +CSP - Class 3,investment,4525.472040075308,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +CSP - Class 3,investment,6912.409196842806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +CSP - Class 3,investment,3638.942139482303,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +CSP - Class 3,investment,4525.472040075308,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +CSP - Class 3,investment,6912.409196842806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative CSP - Class 8,CF,0.514,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced CSP - Class 8,CF,0.514,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate CSP - Class 8,CF,0.514,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -181,18 +181,18 @@ CSP - Class 8,FOM,0.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket= CSP - Class 8,FOM,1.08,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced CSP - Class 8,FOM,1.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate CSP - Class 8,FOM,0.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -CSP - Class 8,VOM,2.91,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -CSP - Class 8,VOM,3.0,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -CSP - Class 8,VOM,3.95766,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -CSP - Class 8,VOM,2.91,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -CSP - Class 8,VOM,3.0,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -CSP - Class 8,VOM,3.95766,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -CSP - Class 8,investment,4165.173201214978,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -CSP - Class 8,investment,5179.905077262637,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -CSP - Class 8,investment,7912.019603207439,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -CSP - Class 8,investment,4165.173201214978,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -CSP - Class 8,investment,5179.905077262637,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -CSP - Class 8,investment,7912.019603207439,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +CSP - Class 8,VOM,2.5423484485122025,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +CSP - Class 8,VOM,2.6209777819713427,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +CSP - Class 8,VOM,3.4576463095322345,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +CSP - Class 8,VOM,2.5423484485122025,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +CSP - Class 8,VOM,2.6209777819713427,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +CSP - Class 8,VOM,3.4576463095322345,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +CSP - Class 8,investment,3638.942139482303,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +CSP - Class 8,investment,4525.472040075308,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +CSP - Class 8,investment,6912.409196842806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +CSP - Class 8,investment,3638.942139482303,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +CSP - Class 8,investment,4525.472040075308,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +CSP - Class 8,investment,6912.409196842806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Charging infrastructure fast (purely) battery electric vehicles passenger cars,FOM,1.6,%,PATHS TO A CLIMATE-NEUTRAL ENERGY SYSTEM The German energy transformation in its social context. https://www.ise.fraunhofer.de/en/publications/studies/paths-to-a-climate-neutral-energy-system.html,Charging infrastructure fast (purely) battery electric vehicles passenger cars,2020.0,, Charging infrastructure fast (purely) battery electric vehicles passenger cars,investment,448894.0,EUR/Lades�ule,PATHS TO A CLIMATE-NEUTRAL ENERGY SYSTEM The German energy transformation in its social context. https://www.ise.fraunhofer.de/en/publications/studies/paths-to-a-climate-neutral-energy-system.html,Charging infrastructure fast (purely) battery electric vehicles passenger cars,2020.0,, Charging infrastructure fast (purely) battery electric vehicles passenger cars,lifetime,30.0,years,PATHS TO A CLIMATE-NEUTRAL ENERGY SYSTEM The German energy transformation in its social context. https://www.ise.fraunhofer.de/en/publications/studies/paths-to-a-climate-neutral-energy-system.html,Charging infrastructure fast (purely) battery electric vehicles passenger cars,2020.0,, @@ -211,25 +211,25 @@ Coal - IGCC,FOM,2.38,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oe Coal - IGCC,FOM,2.38,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Coal - IGCC,FOM,2.38,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal - IGCC,FOM,2.38,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Coal - IGCC,VOM,15.78,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal - IGCC,VOM,16.01,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal - IGCC,VOM,16.24,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal - IGCC,VOM,15.78,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal - IGCC,VOM,16.01,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal - IGCC,VOM,16.24,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Coal - IGCC,investment,6736.695673228871,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal - IGCC,investment,6837.016558050369,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal - IGCC,investment,6937.337442871868,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal - IGCC,investment,6736.695673228871,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal - IGCC,investment,6837.016558050369,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal - IGCC,investment,6937.337442871868,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal - IGCC,VOM,13.786343133169261,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal - IGCC,VOM,13.9872847631204,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal - IGCC,VOM,14.188226393071533,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal - IGCC,VOM,13.786343133169261,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal - IGCC,VOM,13.9872847631204,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal - IGCC,VOM,14.188226393071533,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal - IGCC,investment,5885.576561145115,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal - IGCC,investment,5973.222831206733,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal - IGCC,investment,6060.869101268351,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal - IGCC,investment,5885.576561145115,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal - IGCC,investment,5973.222831206733,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal - IGCC,investment,6060.869101268351,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal gasification,FOM,0.06,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, -Coal gasification,efficiency,0.6357,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Coal gasification,investment,399.2305,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Coal gasification,efficiency,0.6356666666666667,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, +Coal gasification,investment,538.2432903364873,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Coal gasification,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Coal gasification CC,FOM,0.07,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Coal gasification CC,efficiency,0.609,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Coal gasification CC,investment,649.5969,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Coal gasification CC,investment,875.7882332041481,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Coal gasification CC,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Coal integrated retrofit 90%-CCS,FOM,8.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal integrated retrofit 90%-CCS,FOM,7.91,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -237,52 +237,52 @@ Coal integrated retrofit 90%-CCS,FOM,7.49,%/year,NREL/ATB-https://data.openei.or Coal integrated retrofit 90%-CCS,FOM,8.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Coal integrated retrofit 90%-CCS,FOM,7.91,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal integrated retrofit 90%-CCS,FOM,7.49,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Coal integrated retrofit 90%-CCS,VOM,16.04,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal integrated retrofit 90%-CCS,VOM,16.73,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal integrated retrofit 90%-CCS,VOM,17.42,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal integrated retrofit 90%-CCS,VOM,16.04,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal integrated retrofit 90%-CCS,VOM,16.73,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal integrated retrofit 90%-CCS,VOM,17.42,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal integrated retrofit 90%-CCS,VOM,14.01349454094011,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal integrated retrofit 90%-CCS,VOM,14.61631943079352,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal integrated retrofit 90%-CCS,VOM,15.219144320646931,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal integrated retrofit 90%-CCS,VOM,14.01349454094011,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal integrated retrofit 90%-CCS,VOM,14.61631943079352,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal integrated retrofit 90%-CCS,VOM,15.219144320646931,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal integrated retrofit 90%-CCS,capture_rate,0.9,per unit,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, Coal integrated retrofit 90%-CCS,efficiency,0.386,p.u.,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, -Coal integrated retrofit 90%-CCS,investment,1709.2,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal integrated retrofit 90%-CCS,investment,1896.8,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal integrated retrofit 90%-CCS,investment,2084.4,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal integrated retrofit 90%-CCS,investment,1709.2,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal integrated retrofit 90%-CCS,investment,1896.8,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal integrated retrofit 90%-CCS,investment,2084.4,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal integrated retrofit 90%-CCS,investment,1493.2584083151396,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal integrated retrofit 90%-CCS,investment,1657.1568856144143,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal integrated retrofit 90%-CCS,investment,1821.055362913689,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal integrated retrofit 90%-CCS,investment,1493.2584083151396,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal integrated retrofit 90%-CCS,investment,1657.1568856144143,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal integrated retrofit 90%-CCS,investment,1821.055362913689,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal integrated retrofit 95%-CCS,FOM,8.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal integrated retrofit 95%-CCS,FOM,7.74,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Coal integrated retrofit 95%-CCS,FOM,7.34,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Coal integrated retrofit 95%-CCS,FOM,8.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Coal integrated retrofit 95%-CCS,FOM,7.74,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal integrated retrofit 95%-CCS,FOM,7.34,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Coal integrated retrofit 95%-CCS,VOM,16.36,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal integrated retrofit 95%-CCS,VOM,17.1,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal integrated retrofit 95%-CCS,VOM,17.83,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal integrated retrofit 95%-CCS,VOM,16.36,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal integrated retrofit 95%-CCS,VOM,17.1,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal integrated retrofit 95%-CCS,VOM,17.83,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal integrated retrofit 95%-CCS,VOM,14.293065504350388,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal integrated retrofit 95%-CCS,VOM,14.939573357236654,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal integrated retrofit 95%-CCS,VOM,15.577344617516344,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal integrated retrofit 95%-CCS,VOM,14.293065504350388,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal integrated retrofit 95%-CCS,VOM,14.939573357236654,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal integrated retrofit 95%-CCS,VOM,15.577344617516344,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal integrated retrofit 95%-CCS,capture_rate,0.95,per unit,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, Coal integrated retrofit 95%-CCS,efficiency,0.386,p.u.,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, -Coal integrated retrofit 95%-CCS,investment,1782.1,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal integrated retrofit 95%-CCS,investment,1980.2,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal integrated retrofit 95%-CCS,investment,2178.4,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal integrated retrofit 95%-CCS,investment,1782.1,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal integrated retrofit 95%-CCS,investment,1980.2,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal integrated retrofit 95%-CCS,investment,2178.4,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal integrated retrofit 95%-CCS,investment,1556.948168417043,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal integrated retrofit 95%-CCS,investment,1730.0200679532174,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal integrated retrofit 95%-CCS,investment,1903.1793334154577,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal integrated retrofit 95%-CCS,investment,1556.948168417043,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal integrated retrofit 95%-CCS,investment,1730.0200679532174,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal integrated retrofit 95%-CCS,investment,1903.1793334154577,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-95%-CCS,FOM,2.08,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal-95%-CCS,FOM,2.07,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Coal-95%-CCS,FOM,2.07,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Coal-95%-CCS,FOM,2.08,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Coal-95%-CCS,FOM,2.07,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal-95%-CCS,FOM,2.07,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Coal-95%-CCS,VOM,14.2,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal-95%-CCS,VOM,14.95,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal-95%-CCS,VOM,15.7,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal-95%-CCS,VOM,14.2,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal-95%-CCS,VOM,14.95,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal-95%-CCS,VOM,15.7,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal-95%-CCS,VOM,12.40596150133102,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal-95%-CCS,VOM,13.061205946823856,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal-95%-CCS,VOM,13.716450392316693,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal-95%-CCS,VOM,12.40596150133102,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal-95%-CCS,VOM,13.061205946823856,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal-95%-CCS,VOM,13.716450392316693,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-95%-CCS,capture_rate,0.95,per unit,"NREL, NREL ATB 2024",,,, Coal-95%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal-95%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -291,12 +291,12 @@ Coal-95%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Mea Coal-95%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal-95%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-95%-CCS,efficiency,0.403,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Coal-95%-CCS,investment,5934.993429870862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal-95%-CCS,investment,6068.548696486674,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal-95%-CCS,investment,6202.103963102488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal-95%-CCS,investment,5934.993429870862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal-95%-CCS,investment,6068.548696486674,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal-95%-CCS,investment,6202.103963102488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal-95%-CCS,investment,5185.161971945808,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal-95%-CCS,investment,5301.843767434242,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal-95%-CCS,investment,5418.525562922678,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal-95%-CCS,investment,5185.161971945808,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal-95%-CCS,investment,5301.843767434242,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal-95%-CCS,investment,5418.525562922678,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-95%-CCS,lifetime,40.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Coal-99%-CCS,FOM,2.07,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal-99%-CCS,FOM,2.07,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -304,12 +304,12 @@ Coal-99%-CCS,FOM,2.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=o Coal-99%-CCS,FOM,2.07,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Coal-99%-CCS,FOM,2.07,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal-99%-CCS,FOM,2.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Coal-99%-CCS,VOM,14.49,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal-99%-CCS,VOM,15.29,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal-99%-CCS,VOM,16.09,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal-99%-CCS,VOM,14.49,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal-99%-CCS,VOM,15.29,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal-99%-CCS,VOM,16.09,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal-99%-CCS,VOM,12.659322686921584,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal-99%-CCS,VOM,13.358250095447275,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal-99%-CCS,VOM,14.057177503972968,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal-99%-CCS,VOM,12.659322686921584,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal-99%-CCS,VOM,13.358250095447275,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal-99%-CCS,VOM,14.057177503972968,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-99%-CCS,capture_rate,0.99,per unit,"NREL, NREL ATB 2024",,,, Coal-99%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal-99%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -318,12 +318,12 @@ Coal-99%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Mea Coal-99%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal-99%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-99%-CCS,efficiency,0.403,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Coal-99%-CCS,investment,6042.232996404188,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal-99%-CCS,investment,6192.467227861013,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal-99%-CCS,investment,6342.701459317839,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal-99%-CCS,investment,6042.232996404188,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal-99%-CCS,investment,6192.467227861013,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal-99%-CCS,investment,6342.701459317839,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal-99%-CCS,investment,5278.852812356503,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal-99%-CCS,investment,5410.106339936462,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal-99%-CCS,investment,5541.359867516423,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal-99%-CCS,investment,5278.852812356503,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal-99%-CCS,investment,5410.106339936462,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal-99%-CCS,investment,5541.359867516423,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-99%-CCS,lifetime,40.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Coal-IGCC,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal-IGCC,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -339,12 +339,12 @@ Coal-IGCC-90%-CCS,FOM,2.37,%/year,NREL/ATB-https://data.openei.org/s3_viewer?buc Coal-IGCC-90%-CCS,FOM,2.37,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Coal-IGCC-90%-CCS,FOM,2.37,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal-IGCC-90%-CCS,FOM,2.37,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Coal-IGCC-90%-CCS,VOM,23.46,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal-IGCC-90%-CCS,VOM,23.8,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal-IGCC-90%-CCS,VOM,24.13,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal-IGCC-90%-CCS,VOM,23.46,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal-IGCC-90%-CCS,VOM,23.8,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal-IGCC-90%-CCS,VOM,24.13,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal-IGCC-90%-CCS,VOM,20.496046255015898,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal-IGCC-90%-CCS,VOM,20.79309040363932,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal-IGCC-90%-CCS,VOM,21.081397959656165,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal-IGCC-90%-CCS,VOM,20.496046255015898,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal-IGCC-90%-CCS,VOM,20.79309040363932,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal-IGCC-90%-CCS,VOM,21.081397959656165,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-IGCC-90%-CCS,capture_rate,0.9,per unit,"NREL, NREL ATB 2024",,,, Coal-IGCC-90%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal-IGCC-90%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -353,12 +353,12 @@ Coal-IGCC-90%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024 Coal-IGCC-90%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal-IGCC-90%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-IGCC-90%-CCS,efficiency,0.403,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Coal-IGCC-90%-CCS,investment,9576.690968046338,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal-IGCC-90%-CCS,investment,9718.27684736338,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal-IGCC-90%-CCS,investment,9859.986274568131,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal-IGCC-90%-CCS,investment,9576.690968046338,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal-IGCC-90%-CCS,investment,9718.27684736338,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal-IGCC-90%-CCS,investment,9859.986274568131,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal-IGCC-90%-CCS,investment,8366.764750685026,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal-IGCC-90%-CCS,investment,8490.462565328642,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal-IGCC-90%-CCS,investment,8614.268318728487,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal-IGCC-90%-CCS,investment,8366.764750685026,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal-IGCC-90%-CCS,investment,8490.462565328642,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal-IGCC-90%-CCS,investment,8614.268318728487,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-IGCC-90%-CCS,lifetime,40.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Commercial Battery Storage 1Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial Battery Storage 1Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -366,60 +366,60 @@ Commercial Battery Storage 1Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/ Commercial Battery Storage 1Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial Battery Storage 1Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial Battery Storage 1Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial Battery Storage 1Hr,investment,794.5877644617208,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial Battery Storage 1Hr,investment,1059.7934828817756,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial Battery Storage 1Hr,investment,1258.7875687826013,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial Battery Storage 1Hr,investment,794.5877644617208,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial Battery Storage 1Hr,investment,1059.7934828817756,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial Battery Storage 1Hr,investment,1258.7875687826013,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial Battery Storage 1Hr,investment,694.1989588268161,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial Battery Storage 1Hr,investment,925.8983907037201,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial Battery Storage 1Hr,investment,1099.7514166669737,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial Battery Storage 1Hr,investment,694.1989588268161,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial Battery Storage 1Hr,investment,925.8983907037201,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial Battery Storage 1Hr,investment,1099.7514166669737,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial Battery Storage 2Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial Battery Storage 2Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial Battery Storage 2Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Commercial Battery Storage 2Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial Battery Storage 2Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial Battery Storage 2Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial Battery Storage 2Hr,investment,951.0741194290474,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial Battery Storage 2Hr,investment,1239.767987212379,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial Battery Storage 2Hr,investment,1506.6935737918968,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial Battery Storage 2Hr,investment,951.0741194290474,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial Battery Storage 2Hr,investment,1239.767987212379,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial Battery Storage 2Hr,investment,1506.6935737918968,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial Battery Storage 2Hr,investment,830.9147120104975,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial Battery Storage 2Hr,investment,1083.1347830943257,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial Battery Storage 2Hr,investment,1316.3367937158537,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial Battery Storage 2Hr,investment,830.9147120104975,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial Battery Storage 2Hr,investment,1083.1347830943257,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial Battery Storage 2Hr,investment,1316.3367937158537,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial Battery Storage 4Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial Battery Storage 4Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial Battery Storage 4Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Commercial Battery Storage 4Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial Battery Storage 4Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial Battery Storage 4Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial Battery Storage 4Hr,investment,1264.046829363701,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial Battery Storage 4Hr,investment,1599.716995873586,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial Battery Storage 4Hr,investment,2002.505583810488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial Battery Storage 4Hr,investment,1264.046829363701,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial Battery Storage 4Hr,investment,1599.716995873586,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial Battery Storage 4Hr,investment,2002.505583810488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial Battery Storage 4Hr,investment,1104.3462183778604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial Battery Storage 4Hr,investment,1397.607567875537,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial Battery Storage 4Hr,investment,1749.5075478136137,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial Battery Storage 4Hr,investment,1104.3462183778604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial Battery Storage 4Hr,investment,1397.607567875537,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial Battery Storage 4Hr,investment,1749.5075478136137,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial Battery Storage 6Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial Battery Storage 6Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial Battery Storage 6Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Commercial Battery Storage 6Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial Battery Storage 6Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial Battery Storage 6Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial Battery Storage 6Hr,investment,1577.0195392983542,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial Battery Storage 6Hr,investment,1959.666004534793,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial Battery Storage 6Hr,investment,2498.3175938290783,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial Battery Storage 6Hr,investment,1577.0195392983542,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial Battery Storage 6Hr,investment,1959.666004534793,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial Battery Storage 6Hr,investment,2498.3175938290783,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial Battery Storage 6Hr,investment,1377.777724745223,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial Battery Storage 6Hr,investment,1712.0803526567483,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial Battery Storage 6Hr,investment,2182.678301911373,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial Battery Storage 6Hr,investment,1377.777724745223,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial Battery Storage 6Hr,investment,1712.0803526567483,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial Battery Storage 6Hr,investment,2182.678301911373,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial Battery Storage 8Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial Battery Storage 8Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial Battery Storage 8Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Commercial Battery Storage 8Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial Battery Storage 8Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial Battery Storage 8Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial Battery Storage 8Hr,investment,1889.992249233007,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial Battery Storage 8Hr,investment,2319.6150131959994,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial Battery Storage 8Hr,investment,2994.1296038476694,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial Battery Storage 8Hr,investment,1889.992249233007,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial Battery Storage 8Hr,investment,2319.6150131959994,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial Battery Storage 8Hr,investment,2994.1296038476694,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial Battery Storage 8Hr,investment,1651.2092311125853,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial Battery Storage 8Hr,investment,2026.553137437959,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial Battery Storage 8Hr,investment,2615.849056009133,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial Battery Storage 8Hr,investment,1651.2092311125853,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial Battery Storage 8Hr,investment,2026.553137437959,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial Battery Storage 8Hr,investment,2615.849056009133,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 1,CF,0.572448,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 1,CF,0.572448,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 1,CF,0.572448,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -432,12 +432,12 @@ Commercial DW - Class 1,FOM,0.93,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 1,FOM,1.75,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 1,FOM,1.29,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 1,FOM,0.93,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 1,investment,2172.0696403120173,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 1,investment,2956.386143531626,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 1,investment,4088.8426634833,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 1,investment,2172.0696403120173,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 1,investment,2956.386143531626,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 1,investment,4088.8426634833,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 1,investment,1897.648756050761,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 1,investment,2582.8741323747777,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 1,investment,3572.2552583220854,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 1,investment,1897.648756050761,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 1,investment,2582.8741323747777,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 1,investment,3572.2552583220854,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 10,CF,0.221877,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 10,CF,0.221877,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 10,CF,0.221877,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -450,12 +450,12 @@ Commercial DW - Class 10,FOM,0.93,%/year,NREL/ATB-https://data.openei.org/s3_vie Commercial DW - Class 10,FOM,1.75,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 10,FOM,1.29,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 10,FOM,0.93,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 10,investment,2172.0696403120173,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 10,investment,2956.386143531626,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 10,investment,4088.8426634833,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 10,investment,2172.0696403120173,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 10,investment,2956.386143531626,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 10,investment,4088.8426634833,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 10,investment,1897.648756050761,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 10,investment,2582.8741323747777,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 10,investment,3572.2552583220854,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 10,investment,1897.648756050761,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 10,investment,2582.8741323747777,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 10,investment,3572.2552583220854,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 2,CF,0.537382,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 2,CF,0.537382,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 2,CF,0.537382,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -468,12 +468,12 @@ Commercial DW - Class 2,FOM,0.93,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 2,FOM,1.75,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 2,FOM,1.29,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 2,FOM,0.93,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 2,investment,2172.0696403120173,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 2,investment,2956.386143531626,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 2,investment,4088.8426634833,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 2,investment,2172.0696403120173,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 2,investment,2956.386143531626,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 2,investment,4088.8426634833,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 2,investment,1897.648756050761,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 2,investment,2582.8741323747777,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 2,investment,3572.2552583220854,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 2,investment,1897.648756050761,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 2,investment,2582.8741323747777,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 2,investment,3572.2552583220854,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 3,CF,0.524922,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 3,CF,0.524922,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 3,CF,0.524922,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -486,12 +486,12 @@ Commercial DW - Class 3,FOM,0.93,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 3,FOM,1.75,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 3,FOM,1.29,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 3,FOM,0.93,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 3,investment,2172.0696403120173,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 3,investment,2956.386143531626,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 3,investment,4088.8426634833,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 3,investment,2172.0696403120173,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 3,investment,2956.386143531626,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 3,investment,4088.8426634833,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 3,investment,1897.648756050761,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 3,investment,2582.8741323747777,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 3,investment,3572.2552583220854,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 3,investment,1897.648756050761,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 3,investment,2582.8741323747777,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 3,investment,3572.2552583220854,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 4,CF,0.5118389999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 4,CF,0.5118389999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 4,CF,0.5118389999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -504,12 +504,12 @@ Commercial DW - Class 4,FOM,0.87,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 4,FOM,1.75,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 4,FOM,1.14,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 4,FOM,0.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 4,investment,2172.0696403120173,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 4,investment,3340.60686068319,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 4,investment,4342.788918888147,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 4,investment,2172.0696403120173,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 4,investment,3340.60686068319,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 4,investment,4342.788918888147,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 4,investment,1897.648756050761,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 4,investment,2918.552120050559,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 4,investment,3794.117756065727,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 4,investment,1897.648756050761,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 4,investment,2918.552120050559,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 4,investment,3794.117756065727,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 5,CF,0.495463,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 5,CF,0.495463,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 5,CF,0.495463,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -522,12 +522,12 @@ Commercial DW - Class 5,FOM,0.93,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 5,FOM,1.75,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 5,FOM,1.29,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 5,FOM,0.93,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 5,investment,2172.0696403120173,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 5,investment,2956.386143531626,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 5,investment,4088.8426634833,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 5,investment,2172.0696403120173,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 5,investment,2956.386143531626,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 5,investment,4088.8426634833,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 5,investment,1897.648756050761,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 5,investment,2582.8741323747777,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 5,investment,3572.2552583220854,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 5,investment,1897.648756050761,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 5,investment,2582.8741323747777,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 5,investment,3572.2552583220854,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 6,CF,0.470365,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 6,CF,0.470365,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 6,CF,0.470365,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -540,12 +540,12 @@ Commercial DW - Class 6,FOM,0.93,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 6,FOM,1.75,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 6,FOM,1.29,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 6,FOM,0.93,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 6,investment,2172.0696403120173,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 6,investment,2956.386143531626,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 6,investment,4088.8426634833,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 6,investment,2172.0696403120173,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 6,investment,2956.386143531626,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 6,investment,4088.8426634833,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 6,investment,1897.648756050761,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 6,investment,2582.8741323747777,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 6,investment,3572.2552583220854,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 6,investment,1897.648756050761,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 6,investment,2582.8741323747777,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 6,investment,3572.2552583220854,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 7,CF,0.433786,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 7,CF,0.433786,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 7,CF,0.433786,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -558,12 +558,12 @@ Commercial DW - Class 7,FOM,0.93,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 7,FOM,1.75,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 7,FOM,1.29,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 7,FOM,0.93,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 7,investment,2172.0696403120173,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 7,investment,2956.386143531626,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 7,investment,4088.8426634833,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 7,investment,2172.0696403120173,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 7,investment,2956.386143531626,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 7,investment,4088.8426634833,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 7,investment,1897.648756050761,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 7,investment,2582.8741323747777,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 7,investment,3572.2552583220854,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 7,investment,1897.648756050761,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 7,investment,2582.8741323747777,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 7,investment,3572.2552583220854,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 8,CF,0.388129,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 8,CF,0.388129,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 8,CF,0.388129,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -576,12 +576,12 @@ Commercial DW - Class 8,FOM,0.93,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 8,FOM,1.75,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 8,FOM,1.29,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 8,FOM,0.93,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 8,investment,2172.0696403120173,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 8,investment,2956.386143531626,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 8,investment,4088.8426634833,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 8,investment,2172.0696403120173,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 8,investment,2956.386143531626,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 8,investment,4088.8426634833,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 8,investment,1897.648756050761,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 8,investment,2582.8741323747777,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 8,investment,3572.2552583220854,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 8,investment,1897.648756050761,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 8,investment,2582.8741323747777,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 8,investment,3572.2552583220854,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 9,CF,0.332237,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 9,CF,0.332237,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 9,CF,0.332237,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -594,12 +594,12 @@ Commercial DW - Class 9,FOM,0.93,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 9,FOM,1.75,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 9,FOM,1.29,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 9,FOM,0.93,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 9,investment,2172.0696403120173,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 9,investment,2956.386143531626,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 9,investment,4088.8426634833,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 9,investment,2172.0696403120173,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 9,investment,2956.386143531626,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 9,investment,4088.8426634833,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 9,investment,1897.648756050761,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 9,investment,2582.8741323747777,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 9,investment,3572.2552583220854,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 9,investment,1897.648756050761,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 9,investment,2582.8741323747777,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 9,investment,3572.2552583220854,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 10,CF,0.13090531601074637,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 10,CF,0.12648035472030003,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 10,CF,0.11974504956396947,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -612,12 +612,12 @@ Commercial PV - Class 10,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_vie Commercial PV - Class 10,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 10,FOM,1.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 10,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 10,investment,1310.8854115787103,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 10,investment,1491.8046321857305,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 10,investment,1750.6747869064166,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 10,investment,1310.8854115787103,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 10,investment,1491.8046321857305,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 10,investment,1750.6747869064166,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 10,investment,1145.2671794860528,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 10,investment,1303.3289320002434,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 10,investment,1529.4932399797108,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 10,investment,1145.2671794860528,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 10,investment,1303.3289320002434,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 10,investment,1529.4932399797108,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 2,CF,0.19623762107212717,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 2,CF,0.18960424739842435,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 2,CF,0.17950748203127412,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -630,12 +630,12 @@ Commercial PV - Class 2,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 2,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 2,FOM,1.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 2,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 2,investment,1310.8854115787103,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 2,investment,1491.8046321857305,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 2,investment,1750.6747869064166,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 2,investment,1310.8854115787103,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 2,investment,1491.8046321857305,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 2,investment,1750.6747869064166,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 2,investment,1145.2671794860528,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 2,investment,1303.3289320002434,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 2,investment,1529.4932399797108,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 2,investment,1145.2671794860528,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 2,investment,1303.3289320002434,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 2,investment,1529.4932399797108,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 3,CF,0.18576196456245145,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 3,CF,0.17948269701644434,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 3,CF,0.16992492231411763,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -648,12 +648,12 @@ Commercial PV - Class 3,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 3,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 3,FOM,1.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 3,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 3,investment,1310.8854115787103,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 3,investment,1491.8046321857305,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 3,investment,1750.6747869064166,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 3,investment,1310.8854115787103,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 3,investment,1491.8046321857305,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 3,investment,1750.6747869064166,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 3,investment,1145.2671794860528,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 3,investment,1303.3289320002434,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 3,investment,1529.4932399797108,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 3,investment,1145.2671794860528,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 3,investment,1303.3289320002434,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 3,investment,1529.4932399797108,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 4,CF,0.17594625742326517,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 4,CF,0.16999878789320452,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 4,CF,0.160946048317963,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -666,12 +666,12 @@ Commercial PV - Class 4,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 4,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 4,FOM,1.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 4,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 4,investment,1310.8854115787103,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 4,investment,1491.8046321857305,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 4,investment,1750.6747869064166,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 4,investment,1310.8854115787103,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 4,investment,1491.8046321857305,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 4,investment,1750.6747869064166,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 4,investment,1145.2671794860528,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 4,investment,1303.3289320002434,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 4,investment,1529.4932399797108,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 4,investment,1145.2671794860528,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 4,investment,1303.3289320002434,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 4,investment,1529.4932399797108,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 5,CF,0.16790210628810662,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 5,CF,0.16222655128735883,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 5,CF,0.1535876972155484,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -684,12 +684,12 @@ Commercial PV - Class 5,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 5,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 5,FOM,1.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 5,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 5,investment,1310.8854115787103,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 5,investment,1491.8046321857305,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 5,investment,1750.6747869064166,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 5,investment,1310.8854115787103,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 5,investment,1491.8046321857305,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 5,investment,1750.6747869064166,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 5,investment,1145.2671794860528,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 5,investment,1303.3289320002434,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 5,investment,1529.4932399797108,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 5,investment,1145.2671794860528,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 5,investment,1303.3289320002434,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 5,investment,1529.4932399797108,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 6,CF,0.16567561741711873,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 6,CF,0.1600753238906026,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 6,CF,0.15155102652611524,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -702,12 +702,12 @@ Commercial PV - Class 6,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 6,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 6,FOM,1.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 6,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 6,investment,1310.8854115787103,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 6,investment,1491.8046321857305,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 6,investment,1750.6747869064166,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 6,investment,1310.8854115787103,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 6,investment,1491.8046321857305,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 6,investment,1750.6747869064166,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 6,investment,1145.2671794860528,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 6,investment,1303.3289320002434,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 6,investment,1529.4932399797108,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 6,investment,1145.2671794860528,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 6,investment,1303.3289320002434,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 6,investment,1529.4932399797108,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 7,CF,0.15785573920404042,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 7,CF,0.15251977916254517,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 7,CF,0.1443978280713452,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -720,12 +720,12 @@ Commercial PV - Class 7,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 7,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 7,FOM,1.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 7,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 7,investment,1310.8854115787103,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 7,investment,1491.8046321857305,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 7,investment,1750.6747869064166,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 7,investment,1310.8854115787103,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 7,investment,1491.8046321857305,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 7,investment,1750.6747869064166,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 7,investment,1145.2671794860528,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 7,investment,1303.3289320002434,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 7,investment,1529.4932399797108,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 7,investment,1145.2671794860528,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 7,investment,1303.3289320002434,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 7,investment,1529.4932399797108,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 8,CF,0.14992063011581125,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 8,CF,0.14485289868122725,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 8,CF,0.13713922269135043,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -738,12 +738,12 @@ Commercial PV - Class 8,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 8,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 8,FOM,1.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 8,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 8,investment,1310.8854115787103,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 8,investment,1491.8046321857305,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 8,investment,1750.6747869064166,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 8,investment,1310.8854115787103,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 8,investment,1491.8046321857305,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 8,investment,1750.6747869064166,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 8,investment,1145.2671794860528,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 8,investment,1303.3289320002434,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 8,investment,1529.4932399797108,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 8,investment,1145.2671794860528,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 8,investment,1303.3289320002434,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 8,investment,1529.4932399797108,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 9,CF,0.1439073711227828,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 9,CF,0.13904290445302642,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 9,CF,0.1316386210496107,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -756,12 +756,12 @@ Commercial PV - Class 9,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 9,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 9,FOM,1.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 9,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 9,investment,1310.8854115787103,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 9,investment,1491.8046321857305,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 9,investment,1750.6747869064166,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 9,investment,1310.8854115787103,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 9,investment,1491.8046321857305,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 9,investment,1750.6747869064166,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 9,investment,1145.2671794860528,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 9,investment,1303.3289320002434,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 9,investment,1529.4932399797108,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 9,investment,1145.2671794860528,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 9,investment,1303.3289320002434,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 9,investment,1529.4932399797108,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Compressed-Air-Adiabatic-bicharger,FOM,0.9265,%/year,"Viswanathan_2022, p.64 (p.86) Figure 4.14","{'carrier': ['elec', 'pair', 'elec'], 'technology_type': ['bicharger'], 'type': ['mechanical'], 'note': ['NULL']}",2020.0,, Compressed-Air-Adiabatic-bicharger,efficiency,0.7211,per unit,"Viswanathan_2022, p.59 (p.81)","{'carrier': ['elec', 'pair', 'elec'], 'technology_type': ['bicharger'], 'type': ['mechanical'], 'note': ['AC-AC efficiency at transformer level 0.52^0.5']}",2020.0,, Compressed-Air-Adiabatic-bicharger,investment,946180.9426,EUR/MW,"Viswanathan_2022, p.59 (p.81)","{'carrier': ['elec', 'pair', 'elec'], 'technology_type': ['bicharger'], 'type': ['mechanical'], 'note': ['Turbine Compressor BOP EPC Management']}",2020.0,, @@ -869,7 +869,7 @@ Fischer-Tropsch,carbondioxide-input,0.32,t_CO2/MWh_FT,ICCT IRA e-fuels assumptio Fischer-Tropsch,efficiency,0.7,per unit,ICCT IRA e-fuels assumptions ,,,, Fischer-Tropsch,electricity-input,0.04,MWh_el/MWh_FT,ICCT IRA e-fuels assumptions ,"0.005 MWh_el input per FT output, output increasing from 2020 to 2050 (0.65, 0.7, 0.73, 0.75 MWh liquid FT output).",,, Fischer-Tropsch,hydrogen-input,1.43,MWh_H2/MWh_FT,ICCT IRA e-fuels assumptions ,"0.995 MWh_H2 per output, output increasing from 2020 to 2050 (0.65, 0.7, 0.73, 0.75 MWh liquid FT output).",,, -Fischer-Tropsch,investment,1696429.0,USD/MW_FT,ICCT IRA e-fuels assumptions ,,2022.0,, +Fischer-Tropsch,investment,1482100.9058972877,USD/MW_FT,ICCT IRA e-fuels assumptions ,,2022.0,, Fischer-Tropsch,lifetime,30.0,years,ICCT IRA e-fuels assumptions ,,,, Gasnetz,FOM,2.5,%,"WEGE ZU EINEM KLIMANEUTRALEN ENERGIESYSEM, Anhang zur Studie, Fraunhofer-Institut für Solare Energiesysteme ISE, Freiburg",Gasnetz,2020.0,, Gasnetz,investment,28.0,EUR/kWGas,"WEGE ZU EINEM KLIMANEUTRALEN ENERGIESYSEM, Anhang zur Studie, Fraunhofer-Institut für Solare Energiesysteme ISE, Freiburg",Gasnetz,2020.0,, @@ -892,12 +892,12 @@ Geothermal - Deep EGS / Binary,FOM,1.19,%/year,NREL/ATB-https://data.openei.org/ Geothermal - Deep EGS / Binary,FOM,1.88,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Geothermal - Deep EGS / Binary,FOM,1.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Geothermal - Deep EGS / Binary,FOM,1.19,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Geothermal - Deep EGS / Binary,investment,8512.644694876248,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Geothermal - Deep EGS / Binary,investment,12726.436931790544,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Geothermal - Deep EGS / Binary,investment,18986.506125911485,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Geothermal - Deep EGS / Binary,investment,8512.644694876248,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Geothermal - Deep EGS / Binary,investment,12726.436931790544,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Geothermal - Deep EGS / Binary,investment,18986.506125911485,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Geothermal - Deep EGS / Binary,investment,7437.150870362288,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Geothermal - Deep EGS / Binary,investment,11118.569480627519,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Geothermal - Deep EGS / Binary,investment,16587.736904425597,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Geothermal - Deep EGS / Binary,investment,7437.150870362288,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Geothermal - Deep EGS / Binary,investment,11118.569480627519,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Geothermal - Deep EGS / Binary,investment,16587.736904425597,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Geothermal - Deep EGS / Flash,CF,0.9,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Geothermal - Deep EGS / Flash,CF,0.9,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Geothermal - Deep EGS / Flash,CF,0.9,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -910,12 +910,12 @@ Geothermal - Deep EGS / Flash,FOM,1.36,%/year,NREL/ATB-https://data.openei.org/s Geothermal - Deep EGS / Flash,FOM,2.23,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Geothermal - Deep EGS / Flash,FOM,1.7,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Geothermal - Deep EGS / Flash,FOM,1.36,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Geothermal - Deep EGS / Flash,investment,5268.750642014443,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Geothermal - Deep EGS / Flash,investment,7897.516262797579,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Geothermal - Deep EGS / Flash,investment,10787.387010163457,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Geothermal - Deep EGS / Flash,investment,5268.750642014443,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Geothermal - Deep EGS / Flash,investment,7897.516262797579,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Geothermal - Deep EGS / Flash,investment,10787.387010163457,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Geothermal - Deep EGS / Flash,investment,4603.092790489034,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Geothermal - Deep EGS / Flash,investment,6899.7382191832685,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Geothermal - Deep EGS / Flash,investment,9424.500559721562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Geothermal - Deep EGS / Flash,investment,4603.092790489034,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Geothermal - Deep EGS / Flash,investment,6899.7382191832685,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Geothermal - Deep EGS / Flash,investment,9424.500559721562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Geothermal - Hydro / Binary,CF,0.8,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Geothermal - Hydro / Binary,CF,0.8,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Geothermal - Hydro / Binary,CF,0.8,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -928,12 +928,12 @@ Geothermal - Hydro / Binary,FOM,1.75,%/year,NREL/ATB-https://data.openei.org/s3_ Geothermal - Hydro / Binary,FOM,1.89,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Geothermal - Hydro / Binary,FOM,1.72,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Geothermal - Hydro / Binary,FOM,1.75,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Geothermal - Hydro / Binary,investment,7385.548665839998,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Geothermal - Hydro / Binary,investment,8351.785123897109,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Geothermal - Hydro / Binary,investment,9202.518744942614,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Geothermal - Hydro / Binary,investment,7385.548665839998,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Geothermal - Hydro / Binary,investment,8351.785123897109,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Geothermal - Hydro / Binary,investment,9202.518744942614,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Geothermal - Hydro / Binary,investment,6452.452986944909,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Geothermal - Hydro / Binary,investment,7296.614416511033,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Geothermal - Hydro / Binary,investment,8039.865722889798,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Geothermal - Hydro / Binary,investment,6452.452986944909,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Geothermal - Hydro / Binary,investment,7296.614416511033,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Geothermal - Hydro / Binary,investment,8039.865722889798,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Geothermal - NF EGS / Binary,CF,0.8,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Geothermal - NF EGS / Binary,CF,0.8,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Geothermal - NF EGS / Binary,CF,0.8,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -946,12 +946,12 @@ Geothermal - NF EGS / Binary,FOM,1.55,%/year,NREL/ATB-https://data.openei.org/s3 Geothermal - NF EGS / Binary,FOM,1.97,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Geothermal - NF EGS / Binary,FOM,1.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Geothermal - NF EGS / Binary,FOM,1.55,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Geothermal - NF EGS / Binary,investment,7670.220661208504,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Geothermal - NF EGS / Binary,investment,10474.642867858907,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Geothermal - NF EGS / Binary,investment,12893.31686234416,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Geothermal - NF EGS / Binary,investment,7670.220661208504,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Geothermal - NF EGS / Binary,investment,10474.642867858907,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Geothermal - NF EGS / Binary,investment,12893.31686234416,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Geothermal - NF EGS / Binary,investment,6701.159311948343,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Geothermal - NF EGS / Binary,investment,9151.268743580928,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Geothermal - NF EGS / Binary,investment,11264.365677373502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Geothermal - NF EGS / Binary,investment,6701.159311948343,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Geothermal - NF EGS / Binary,investment,9151.268743580928,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Geothermal - NF EGS / Binary,investment,11264.365677373502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Geothermal - NF EGS / Flash,CF,0.9,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Geothermal - NF EGS / Flash,CF,0.9,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Geothermal - NF EGS / Flash,CF,0.9,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -964,12 +964,12 @@ Geothermal - NF EGS / Flash,FOM,1.67,%/year,NREL/ATB-https://data.openei.org/s3_ Geothermal - NF EGS / Flash,FOM,2.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Geothermal - NF EGS / Flash,FOM,1.81,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Geothermal - NF EGS / Flash,FOM,1.67,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Geothermal - NF EGS / Flash,investment,5723.229627543215,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Geothermal - NF EGS / Flash,investment,8016.06311237957,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Geothermal - NF EGS / Flash,investment,9260.432566564046,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Geothermal - NF EGS / Flash,investment,5723.229627543215,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Geothermal - NF EGS / Flash,investment,8016.06311237957,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Geothermal - NF EGS / Flash,investment,9260.432566564046,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Geothermal - NF EGS / Flash,investment,5000.152564970296,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Geothermal - NF EGS / Flash,investment,7003.307772142301,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Geothermal - NF EGS / Flash,investment,8090.462669469407,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Geothermal - NF EGS / Flash,investment,5000.152564970296,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Geothermal - NF EGS / Flash,investment,7003.307772142301,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Geothermal - NF EGS / Flash,investment,8090.462669469407,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Gravity-Brick-bicharger,FOM,1.5,%/year,"Viswanathan_2022, p.76 (p.98) Sentence 1 in 4.7.2 Operating Costs","{'carrier': ['elec', 'gravity', 'elec'], 'technology_type': ['bicharger'], 'type': ['mechanical'], 'note': ['1.5 percent of capital cost']}",2020.0,, Gravity-Brick-bicharger,efficiency,0.9274,per unit,"Viswanathan_2022, p.77 (p.99) Table 4.36","{'carrier': ['elec', 'gravity', 'elec'], 'technology_type': ['bicharger'], 'type': ['mechanical'], 'note': ['AC-AC efficiency at transformer level 0.86^0.5']}",2020.0,, Gravity-Brick-bicharger,investment,415570.5177,EUR/MW,"Viswanathan_2022, p.71 (p.94) text at the bottom speaks about 0% cost reduction for 2030 compared to 2021","{'carrier': ['elec', 'gravity', 'elec'], 'technology_type': ['bicharger'], 'type': ['mechanical'], 'note': ['Power Equipment']}",2020.0,, @@ -1051,7 +1051,7 @@ Haber-Bosch,lifetime,30.0,years,"Danish Energy Agency, inputs/data_sheets_for_re Haber-Bosch,nitrogen-input,0.1597,t_N2/MWh_NH3,"DECHEMA 2017: DECHEMA: Low carbon energy and feedstock for the European chemical industry (https://dechema.de/dechema_media/Downloads/Positionspapiere/Technology_study_Low_carbon_energy_and_feedstock_for_the_European_chemical_industry.pdf), pg. 57.",".33 MWh electricity are required for ASU per t_NH3, considering 0.4 MWh are required per t_N2 and LHV of NH3 of 5.1666 Mwh.",,, Heavy oil partial oxidation,FOM,0.05,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Heavy oil partial oxidation,efficiency,0.734,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Heavy oil partial oxidation,investment,491.0535,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Heavy oil partial oxidation,investment,662.0382094364353,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Heavy oil partial oxidation,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, HighT-Molten-Salt-charger,FOM,1.075,%/year,"Viswanathan_2022, NULL","{'carrier': ['elec', 'salthight'], 'technology_type': ['charger'], 'type': ['thermal'], 'note': ['Guesstimate, 50% on charger']}",2020.0,, HighT-Molten-Salt-charger,efficiency,0.99,per unit,"Viswanathan_2022, p.107 (p.129)","{'carrier': ['elec', 'salthight'], 'technology_type': ['charger'], 'type': ['thermal'], 'note': ['RTE assume 99% for charge and other for discharge']}",2020.0,, @@ -1095,12 +1095,12 @@ Hydropower - NPD 2,FOM,2.77,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Hydropower - NPD 2,FOM,2.91,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NPD 2,FOM,1.02,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NPD 2,FOM,2.77,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NPD 2,investment,3193.4349202360054,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NPD 2,investment,9150.2555247829,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NPD 2,investment,3356.3001011680417,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NPD 2,investment,3193.4349202360054,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NPD 2,investment,9150.2555247829,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NPD 2,investment,3356.3001011680417,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NPD 2,investment,2789.973991369999,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NPD 2,investment,7994.2054766055035,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NPD 2,investment,2932.262664929869,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NPD 2,investment,2789.973991369999,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NPD 2,investment,7994.2054766055035,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NPD 2,investment,2932.262664929869,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NPD 3,CF,0.32,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NPD 3,CF,0.32,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NPD 3,CF,0.33,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1113,12 +1113,12 @@ Hydropower - NPD 3,FOM,3.05,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Hydropower - NPD 3,FOM,3.21,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NPD 3,FOM,1.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NPD 3,FOM,3.05,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NPD 3,investment,3519.165282100078,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NPD 3,investment,8903.296557617983,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NPD 3,investment,3699.06211594004,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NPD 3,investment,3519.165282100078,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NPD 3,investment,8903.296557617983,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NPD 3,investment,3699.06211594004,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NPD 3,investment,3074.551338489739,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NPD 3,investment,7778.447487939557,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NPD 3,investment,3231.7198733369155,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NPD 3,investment,3074.551338489739,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NPD 3,investment,7778.447487939557,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NPD 3,investment,3231.7198733369155,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NPD 4,CF,0.38,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NPD 4,CF,0.38,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NPD 4,CF,0.38,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1131,12 +1131,12 @@ Hydropower - NPD 4,FOM,2.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Hydropower - NPD 4,FOM,2.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NPD 4,FOM,1.02,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NPD 4,FOM,2.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NPD 4,investment,8465.79597354565,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NPD 4,investment,18463.376230497837,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NPD 4,investment,8904.361035924729,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NPD 4,investment,8465.79597354565,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NPD 4,investment,18463.376230497837,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NPD 4,investment,8904.361035924729,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NPD 4,investment,7396.221051121866,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NPD 4,investment,16130.699626770876,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NPD 4,investment,7779.377479270014,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NPD 4,investment,7396.221051121866,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NPD 4,investment,16130.699626770876,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NPD 4,investment,7779.377479270014,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NPD 5,CF,0.56,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NPD 5,CF,0.56,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NPD 5,CF,0.42,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1149,12 +1149,12 @@ Hydropower - NPD 5,FOM,0.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Hydropower - NPD 5,FOM,0.6,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NPD 5,FOM,0.69,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NPD 5,FOM,0.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NPD 5,investment,5667.2825051121645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NPD 5,investment,4897.664689335287,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NPD 5,investment,5962.142996080623,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NPD 5,investment,5667.2825051121645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NPD 5,investment,4897.664689335287,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NPD 5,investment,5962.142996080623,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NPD 5,investment,4951.273843351291,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NPD 5,investment,4278.890111431122,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NPD 5,investment,5208.881441887788,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NPD 5,investment,4951.273843351291,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NPD 5,investment,4278.890111431122,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NPD 5,investment,5208.881441887788,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NPD 6,CF,0.59,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NPD 6,CF,0.59,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NPD 6,CF,0.44,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1167,12 +1167,12 @@ Hydropower - NPD 6,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Hydropower - NPD 6,FOM,0.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NPD 6,FOM,0.53,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NPD 6,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NPD 6,investment,8533.922585177352,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NPD 6,investment,7371.512274211446,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NPD 6,investment,8979.938995703647,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NPD 6,investment,8533.922585177352,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NPD 6,investment,7371.512274211446,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NPD 6,investment,8979.938995703647,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NPD 6,investment,7455.740496271093,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NPD 6,investment,6440.189963412415,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NPD 6,investment,7845.406863732437,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NPD 6,investment,7455.740496271093,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NPD 6,investment,6440.189963412415,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NPD 6,investment,7845.406863732437,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NPD 7,CF,0.64,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NPD 7,CF,0.64,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NPD 7,CF,0.62,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1185,12 +1185,12 @@ Hydropower - NPD 7,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Hydropower - NPD 7,FOM,0.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NPD 7,FOM,0.4,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NPD 7,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NPD 7,investment,13158.016349679088,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NPD 7,investment,16911.36685926314,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NPD 7,investment,13845.669335836574,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NPD 7,investment,13158.016349679088,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NPD 7,investment,16911.36685926314,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NPD 7,investment,13845.669335836574,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NPD 7,investment,11495.622835774853,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NPD 7,investment,14774.772266965057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NPD 7,investment,12096.397235249859,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NPD 7,investment,11495.622835774853,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NPD 7,investment,14774.772266965057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NPD 7,investment,12096.397235249859,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NPD 8,CF,0.49,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NPD 8,CF,0.49,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NPD 8,CF,0.4,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1203,12 +1203,12 @@ Hydropower - NPD 8,FOM,0.97,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Hydropower - NPD 8,FOM,1.02,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NPD 8,FOM,0.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NPD 8,FOM,0.97,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NPD 8,investment,19945.130033487345,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NPD 8,investment,21757.93658987465,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NPD 8,investment,20986.189817484283,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NPD 8,investment,19945.130033487345,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NPD 8,investment,21757.93658987465,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NPD 8,investment,20986.189817484283,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NPD 8,investment,17425.247558766558,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NPD 8,investment,19009.02279453426,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NPD 8,investment,18334.779079953176,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NPD 8,investment,17425.247558766558,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NPD 8,investment,19009.02279453426,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NPD 8,investment,18334.779079953176,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NSD 2,CF,0.66,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NSD 2,CF,0.66,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NSD 2,CF,0.66,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1221,12 +1221,12 @@ Hydropower - NSD 2,FOM,0.6,%/year,NREL/ATB-https://data.openei.org/s3_viewer?buc Hydropower - NSD 2,FOM,0.4,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NSD 2,FOM,0.61,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NSD 2,FOM,0.6,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NSD 2,investment,8051.713912221715,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NSD 2,investment,8256.09374711682,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NSD 2,investment,8297.608401079888,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NSD 2,investment,8051.713912221715,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NSD 2,investment,8256.09374711682,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NSD 2,investment,8297.608401079888,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NSD 2,investment,7034.454423574224,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NSD 2,investment,7213.0127590219045,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NSD 2,investment,7249.282420909714,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NSD 2,investment,7034.454423574224,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NSD 2,investment,7213.0127590219045,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NSD 2,investment,7249.282420909714,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NSD 3,CF,0.62,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NSD 3,CF,0.62,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NSD 3,CF,0.62,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1239,12 +1239,12 @@ Hydropower - NSD 3,FOM,1.78,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Hydropower - NSD 3,FOM,1.18,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NSD 3,FOM,1.79,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NSD 3,FOM,1.78,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NSD 3,investment,7888.848731289679,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NSD 3,investment,8087.906174651057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NSD 3,investment,8129.420828614125,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NSD 3,investment,7888.848731289679,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NSD 3,investment,8087.906174651057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NSD 3,investment,8129.420828614125,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NSD 3,investment,6892.165750014354,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NSD 3,investment,7066.0741288097515,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NSD 3,investment,7102.3437906975605,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NSD 3,investment,6892.165750014354,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NSD 3,investment,7066.0741288097515,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NSD 3,investment,7102.3437906975605,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NSD 4,CF,0.66,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NSD 4,CF,0.66,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NSD 4,CF,0.66,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1257,12 +1257,12 @@ Hydropower - NSD 4,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Hydropower - NSD 4,FOM,0.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NSD 4,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NSD 4,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NSD 4,investment,7112.844045672329,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NSD 4,investment,7292.740879512291,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NSD 4,investment,7329.997620248378,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NSD 4,investment,7112.844045672329,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NSD 4,investment,7292.740879512291,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NSD 4,investment,7329.997620248378,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NSD 4,investment,6214.202070111444,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NSD 4,investment,6371.370604958621,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NSD 4,investment,6403.920301524604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NSD 4,investment,6214.202070111444,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NSD 4,investment,6371.370604958621,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NSD 4,investment,6403.920301524604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative LNG storage tank,FOM,2.0,%/year,"Guesstimate, based on H2 (l) storage tank with comparable requirements.",Currency year and technology year assumed based on publication date.,2019.0,, LNG storage tank,investment,666.634,EUR/m^3,"Hurskainen 2019, https://cris.vtt.fi/en/publications/liquid-organic-hydrogen-carriers-lohc-concept-evaluation-and-tech pg. 46 (59).",Currency year and technology year assumed based on publication date.,2019.0,, LNG storage tank,lifetime,20.0,years,"Guesstimate, based on H2 (l) storage tank with comparable requirements.",Currency year and technology year assumed based on publication date.,2019.0,, @@ -1302,12 +1302,12 @@ Land-Based Wind - Class 1 - Technology 1,FOM,1.96,%/year,NREL/ATB-https://data.o Land-Based Wind - Class 1 - Technology 1,FOM,1.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 1 - Technology 1,FOM,2.08,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 1 - Technology 1,FOM,1.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 1 - Technology 1,investment,1341.672321975661,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 1 - Technology 1,investment,1407.9532235867798,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 1 - Technology 1,investment,1577.391784816776,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 1 - Technology 1,investment,1341.672321975661,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 1 - Technology 1,investment,1407.9532235867798,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 1 - Technology 1,investment,1577.391784816776,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 1 - Technology 1,investment,1172.1644488613695,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 1 - Technology 1,investment,1230.0713723586266,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 1 - Technology 1,investment,1378.1029404896303,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 1 - Technology 1,investment,1172.1644488613695,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 1 - Technology 1,investment,1230.0713723586266,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 1 - Technology 1,investment,1378.1029404896303,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 10 - Technology 4,CF,0.302727,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 10 - Technology 4,CF,0.276254,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 10 - Technology 4,CF,0.26158,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1320,12 +1320,12 @@ Land-Based Wind - Class 10 - Technology 4,FOM,1.43,%/year,NREL/ATB-https://data. Land-Based Wind - Class 10 - Technology 4,FOM,1.54,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 10 - Technology 4,FOM,1.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 10 - Technology 4,FOM,1.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 10 - Technology 4,investment,1703.2477757786726,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 10 - Technology 4,investment,1844.268639568459,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 10 - Technology 4,investment,2166.3757033102775,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 10 - Technology 4,investment,1703.2477757786726,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 10 - Technology 4,investment,1844.268639568459,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 10 - Technology 4,investment,2166.3757033102775,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 10 - Technology 4,investment,1488.0581925026693,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 10 - Technology 4,investment,1611.2623760984818,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 10 - Technology 4,investment,1892.6741952595928,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 10 - Technology 4,investment,1488.0581925026693,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 10 - Technology 4,investment,1611.2623760984818,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 10 - Technology 4,investment,1892.6741952595928,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 2 - Technology 1,CF,0.533121,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 2 - Technology 1,CF,0.499681999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 2 - Technology 1,CF,0.47314,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1338,12 +1338,12 @@ Land-Based Wind - Class 2 - Technology 1,FOM,1.96,%/year,NREL/ATB-https://data.o Land-Based Wind - Class 2 - Technology 1,FOM,1.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 2 - Technology 1,FOM,2.08,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 2 - Technology 1,FOM,1.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 2 - Technology 1,investment,1341.672321975661,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 2 - Technology 1,investment,1407.9532235867798,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 2 - Technology 1,investment,1577.391784816776,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 2 - Technology 1,investment,1341.672321975661,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 2 - Technology 1,investment,1407.9532235867798,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 2 - Technology 1,investment,1577.391784816776,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 2 - Technology 1,investment,1172.1644488613695,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 2 - Technology 1,investment,1230.0713723586266,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 2 - Technology 1,investment,1378.1029404896303,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 2 - Technology 1,investment,1172.1644488613695,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 2 - Technology 1,investment,1230.0713723586266,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 2 - Technology 1,investment,1378.1029404896303,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 3 - Technology 1,CF,0.521512,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 3 - Technology 1,CF,0.488423999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 3 - Technology 1,CF,0.46248,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1356,12 +1356,12 @@ Land-Based Wind - Class 3 - Technology 1,FOM,1.96,%/year,NREL/ATB-https://data.o Land-Based Wind - Class 3 - Technology 1,FOM,1.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 3 - Technology 1,FOM,2.08,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 3 - Technology 1,FOM,1.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 3 - Technology 1,investment,1341.672321975661,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 3 - Technology 1,investment,1407.9532235867798,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 3 - Technology 1,investment,1577.391784816776,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 3 - Technology 1,investment,1341.672321975661,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 3 - Technology 1,investment,1407.9532235867798,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 3 - Technology 1,investment,1577.391784816776,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 3 - Technology 1,investment,1172.1644488613695,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 3 - Technology 1,investment,1230.0713723586266,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 3 - Technology 1,investment,1378.1029404896303,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 3 - Technology 1,investment,1172.1644488613695,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 3 - Technology 1,investment,1230.0713723586266,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 3 - Technology 1,investment,1378.1029404896303,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 5 - Technology 1,CF,0.492043,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 5 - Technology 1,CF,0.459846,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 5 - Technology 1,CF,0.43542,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1374,12 +1374,12 @@ Land-Based Wind - Class 5 - Technology 1,FOM,1.96,%/year,NREL/ATB-https://data.o Land-Based Wind - Class 5 - Technology 1,FOM,1.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 5 - Technology 1,FOM,2.08,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 5 - Technology 1,FOM,1.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 5 - Technology 1,investment,1341.672321975661,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 5 - Technology 1,investment,1407.9532235867798,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 5 - Technology 1,investment,1577.391784816776,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 5 - Technology 1,investment,1341.672321975661,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 5 - Technology 1,investment,1407.9532235867798,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 5 - Technology 1,investment,1577.391784816776,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 5 - Technology 1,investment,1172.1644488613695,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 5 - Technology 1,investment,1230.0713723586266,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 5 - Technology 1,investment,1378.1029404896303,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 5 - Technology 1,investment,1172.1644488613695,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 5 - Technology 1,investment,1230.0713723586266,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 5 - Technology 1,investment,1378.1029404896303,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 6 - Technology 1,CF,0.467039,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 6 - Technology 1,CF,0.435598,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 6 - Technology 1,CF,0.41246,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1392,12 +1392,12 @@ Land-Based Wind - Class 6 - Technology 1,FOM,1.96,%/year,NREL/ATB-https://data.o Land-Based Wind - Class 6 - Technology 1,FOM,1.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 6 - Technology 1,FOM,2.08,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 6 - Technology 1,FOM,1.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 6 - Technology 1,investment,1341.672321975661,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 6 - Technology 1,investment,1407.9532235867798,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 6 - Technology 1,investment,1577.391784816776,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 6 - Technology 1,investment,1341.672321975661,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 6 - Technology 1,investment,1407.9532235867798,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 6 - Technology 1,investment,1577.391784816776,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 6 - Technology 1,investment,1172.1644488613695,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 6 - Technology 1,investment,1230.0713723586266,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 6 - Technology 1,investment,1378.1029404896303,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 6 - Technology 1,investment,1172.1644488613695,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 6 - Technology 1,investment,1230.0713723586266,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 6 - Technology 1,investment,1378.1029404896303,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 7 - Technology 1,CF,0.432212,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 7 - Technology 1,CF,0.401824,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 7 - Technology 1,CF,0.38048,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1410,12 +1410,12 @@ Land-Based Wind - Class 7 - Technology 1,FOM,1.96,%/year,NREL/ATB-https://data.o Land-Based Wind - Class 7 - Technology 1,FOM,1.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 7 - Technology 1,FOM,1.99,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 7 - Technology 1,FOM,1.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 7 - Technology 1,investment,1341.672321975661,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 7 - Technology 1,investment,1472.8513975886283,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 7 - Technology 1,investment,1577.391784816776,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 7 - Technology 1,investment,1341.672321975661,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 7 - Technology 1,investment,1472.8513975886283,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 7 - Technology 1,investment,1577.391784816776,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 7 - Technology 1,investment,1172.1644488613695,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 7 - Technology 1,investment,1286.7702630750782,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 7 - Technology 1,investment,1378.1029404896303,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 7 - Technology 1,investment,1172.1644488613695,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 7 - Technology 1,investment,1286.7702630750782,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 7 - Technology 1,investment,1378.1029404896303,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 8 - Technology 2,CF,0.392027,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 8 - Technology 2,CF,0.362854,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 8 - Technology 2,CF,0.34358,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1428,12 +1428,12 @@ Land-Based Wind - Class 8 - Technology 2,FOM,1.71,%/year,NREL/ATB-https://data.o Land-Based Wind - Class 8 - Technology 2,FOM,1.78,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 8 - Technology 2,FOM,1.73,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 8 - Technology 2,FOM,1.71,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 8 - Technology 2,investment,1386.41797693764,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 8 - Technology 2,investment,1536.7511381443007,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 8 - Technology 2,investment,1690.996503867789,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 8 - Technology 2,investment,1386.41797693764,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 8 - Technology 2,investment,1536.7511381443007,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 8 - Technology 2,investment,1690.996503867789,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 8 - Technology 2,investment,1211.2569046930707,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 8 - Technology 2,investment,1342.5968631651285,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 8 - Technology 2,investment,1477.3547553428975,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 8 - Technology 2,investment,1211.2569046930707,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 8 - Technology 2,investment,1342.5968631651285,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 8 - Technology 2,investment,1477.3547553428975,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 9 - Technology 3,CF,0.379525,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 9 - Technology 3,CF,0.35073,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 9 - Technology 3,CF,0.3321,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1446,12 +1446,12 @@ Land-Based Wind - Class 9 - Technology 3,FOM,2.35,%/year,NREL/ATB-https://data.o Land-Based Wind - Class 9 - Technology 3,FOM,2.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 9 - Technology 3,FOM,2.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 9 - Technology 3,FOM,2.35,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 9 - Technology 3,investment,1504.4426532502457,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 9 - Technology 3,investment,1535.7527046981145,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 9 - Technology 3,investment,1673.719352494057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 9 - Technology 3,investment,1504.4426532502457,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 9 - Technology 3,investment,1535.7527046981145,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 9 - Technology 3,investment,1673.719352494057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 9 - Technology 3,investment,1314.370256139637,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 9 - Technology 3,investment,1341.7245725387181,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 9 - Technology 3,investment,1462.2604120474616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 9 - Technology 3,investment,1314.370256139637,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 9 - Technology 3,investment,1341.7245725387181,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 9 - Technology 3,investment,1462.2604120474616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 1,CF,0.6035980000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 1,CF,0.6035980000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 1,CF,0.6035980000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1464,12 +1464,12 @@ Large DW - Class 1,FOM,1.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 1,FOM,2.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 1,FOM,1.86,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 1,FOM,1.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 1,investment,1547.0632125354275,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 1,investment,2042.1234405467649,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 1,investment,2426.1347651954716,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 1,investment,1547.0632125354275,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 1,investment,2042.1234405467649,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 1,investment,2426.1347651954716,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 1,investment,1351.6061024535215,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 1,investment,1784.1200552386488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 1,investment,2119.615105215197,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 1,investment,1351.6061024535215,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 1,investment,1784.1200552386488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 1,investment,2119.615105215197,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 10,CF,0.261838,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 10,CF,0.261838,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 10,CF,0.261838,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1482,12 +1482,12 @@ Large DW - Class 10,FOM,1.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?b Large DW - Class 10,FOM,2.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 10,FOM,1.86,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 10,FOM,1.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 10,investment,1547.0632125354275,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 10,investment,2042.1234405467649,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 10,investment,2426.1347651954716,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 10,investment,1547.0632125354275,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 10,investment,2042.1234405467649,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 10,investment,2426.1347651954716,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 10,investment,1351.6061024535215,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 10,investment,1784.1200552386488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 10,investment,2119.615105215197,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 10,investment,1351.6061024535215,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 10,investment,1784.1200552386488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 10,investment,2119.615105215197,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 2,CF,0.572181,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 2,CF,0.572181,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 2,CF,0.572181,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1500,12 +1500,12 @@ Large DW - Class 2,FOM,1.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 2,FOM,2.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 2,FOM,1.86,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 2,FOM,1.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 2,investment,1547.0632125354275,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 2,investment,2042.1234405467649,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 2,investment,2426.1347651954716,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 2,investment,1547.0632125354275,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 2,investment,2042.1234405467649,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 2,investment,2426.1347651954716,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 2,investment,1351.6061024535215,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 2,investment,1784.1200552386488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 2,investment,2119.615105215197,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 2,investment,1351.6061024535215,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 2,investment,1784.1200552386488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 2,investment,2119.615105215197,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 3,CF,0.560611,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 3,CF,0.560611,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 3,CF,0.560611,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1518,12 +1518,12 @@ Large DW - Class 3,FOM,1.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 3,FOM,2.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 3,FOM,1.86,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 3,FOM,1.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 3,investment,1547.0632125354275,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 3,investment,2042.1234405467649,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 3,investment,2426.1347651954716,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 3,investment,1547.0632125354275,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 3,investment,2042.1234405467649,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 3,investment,2426.1347651954716,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 3,investment,1351.6061024535215,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 3,investment,1784.1200552386488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 3,investment,2119.615105215197,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 3,investment,1351.6061024535215,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 3,investment,1784.1200552386488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 3,investment,2119.615105215197,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 4,CF,0.548507,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 4,CF,0.548507,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 4,CF,0.548507,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1536,12 +1536,12 @@ Large DW - Class 4,FOM,1.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 4,FOM,2.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 4,FOM,1.86,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 4,FOM,1.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 4,investment,1547.0632125354275,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 4,investment,2042.1234405467649,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 4,investment,2426.1347651954716,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 4,investment,1547.0632125354275,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 4,investment,2042.1234405467649,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 4,investment,2426.1347651954716,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 4,investment,1351.6061024535215,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 4,investment,1784.1200552386488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 4,investment,2119.615105215197,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 4,investment,1351.6061024535215,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 4,investment,1784.1200552386488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 4,investment,2119.615105215197,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 5,CF,0.533199,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 5,CF,0.533199,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 5,CF,0.533199,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1554,12 +1554,12 @@ Large DW - Class 5,FOM,1.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 5,FOM,2.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 5,FOM,1.86,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 5,FOM,1.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 5,investment,1547.0632125354275,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 5,investment,2042.1234405467649,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 5,investment,2426.1347651954716,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 5,investment,1547.0632125354275,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 5,investment,2042.1234405467649,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 5,investment,2426.1347651954716,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 5,investment,1351.6061024535215,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 5,investment,1784.1200552386488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 5,investment,2119.615105215197,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 5,investment,1351.6061024535215,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 5,investment,1784.1200552386488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 5,investment,2119.615105215197,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 6,CF,0.509525,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 6,CF,0.509525,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 6,CF,0.509525,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1572,12 +1572,12 @@ Large DW - Class 6,FOM,1.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 6,FOM,2.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 6,FOM,1.86,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 6,FOM,1.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 6,investment,1547.0632125354275,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 6,investment,2042.1234405467649,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 6,investment,2426.1347651954716,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 6,investment,1547.0632125354275,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 6,investment,2042.1234405467649,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 6,investment,2426.1347651954716,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 6,investment,1351.6061024535215,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 6,investment,1784.1200552386488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 6,investment,2119.615105215197,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 6,investment,1351.6061024535215,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 6,investment,1784.1200552386488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 6,investment,2119.615105215197,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 7,CF,0.474637,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 7,CF,0.474637,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 7,CF,0.474637,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1590,12 +1590,12 @@ Large DW - Class 7,FOM,1.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 7,FOM,2.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 7,FOM,1.86,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 7,FOM,1.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 7,investment,1547.0632125354275,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 7,investment,2042.1234405467649,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 7,investment,2426.1347651954716,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 7,investment,1547.0632125354275,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 7,investment,2042.1234405467649,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 7,investment,2426.1347651954716,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 7,investment,1351.6061024535215,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 7,investment,1784.1200552386488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 7,investment,2119.615105215197,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 7,investment,1351.6061024535215,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 7,investment,1784.1200552386488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 7,investment,2119.615105215197,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 8,CF,0.42898,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 8,CF,0.42898,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 8,CF,0.42898,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1608,12 +1608,12 @@ Large DW - Class 8,FOM,1.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 8,FOM,2.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 8,FOM,1.86,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 8,FOM,1.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 8,investment,1547.0632125354275,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 8,investment,2042.1234405467649,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 8,investment,2426.1347651954716,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 8,investment,1547.0632125354275,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 8,investment,2042.1234405467649,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 8,investment,2426.1347651954716,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 8,investment,1351.6061024535215,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 8,investment,1784.1200552386488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 8,investment,2119.615105215197,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 8,investment,1351.6061024535215,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 8,investment,1784.1200552386488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 8,investment,2119.615105215197,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 9,CF,0.374957,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 9,CF,0.374957,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 9,CF,0.374957,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1626,12 +1626,12 @@ Large DW - Class 9,FOM,1.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 9,FOM,2.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 9,FOM,1.86,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 9,FOM,1.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 9,investment,1547.0632125354275,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 9,investment,2042.1234405467649,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 9,investment,2426.1347651954716,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 9,investment,1547.0632125354275,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 9,investment,2042.1234405467649,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 9,investment,2426.1347651954716,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 9,investment,1351.6061024535215,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 9,investment,1784.1200552386488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 9,investment,2119.615105215197,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 9,investment,1351.6061024535215,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 9,investment,1784.1200552386488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 9,investment,2119.615105215197,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Lead-Acid-bicharger,FOM,2.4427,%/year,"Viswanathan_2022, p.28 (p.50)","{'carrier': ['elec', 'lead', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['30% assumed of power components every 10 years']}",2020.0,, Lead-Acid-bicharger,efficiency,0.8832,per unit,"Viswanathan_2022, p.33 (p.55)","{'carrier': ['elec', 'lead', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['AC-AC efficiency at transformer level 0.78^0.5']}",2020.0,, Lead-Acid-bicharger,investment,128853.6139,EUR/MW,"Viswanathan_2022, p.33 (p.55)","{'carrier': ['elec', 'lead', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['Power Equipment']}",2020.0,, @@ -1703,12 +1703,12 @@ Midsize DW - Class 1,FOM,1.33,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 1,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 1,FOM,1.6,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 1,FOM,1.33,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 1,investment,1677.554578154704,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 1,investment,2371.640767906984,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 1,investment,2845.9689214883806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 1,investment,1677.554578154704,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 1,investment,2371.640767906984,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 1,investment,2845.9689214883806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 1,investment,1465.6110924625957,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 1,investment,2072.0059198338863,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 1,investment,2486.407103800663,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 1,investment,1465.6110924625957,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 1,investment,2072.0059198338863,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 1,investment,2486.407103800663,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 10,CF,0.236829,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 10,CF,0.236829,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 10,CF,0.236829,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1721,12 +1721,12 @@ Midsize DW - Class 10,FOM,1.33,%/year,NREL/ATB-https://data.openei.org/s3_viewer Midsize DW - Class 10,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 10,FOM,1.6,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 10,FOM,1.33,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 10,investment,1677.554578154704,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 10,investment,2371.640767906984,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 10,investment,2845.9689214883806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 10,investment,1677.554578154704,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 10,investment,2371.640767906984,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 10,investment,2845.9689214883806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 10,investment,1465.6110924625957,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 10,investment,2072.0059198338863,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 10,investment,2486.407103800663,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 10,investment,1465.6110924625957,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 10,investment,2072.0059198338863,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 10,investment,2486.407103800663,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 2,CF,0.550198,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 2,CF,0.550198,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 2,CF,0.550198,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1739,12 +1739,12 @@ Midsize DW - Class 2,FOM,1.33,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 2,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 2,FOM,1.6,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 2,FOM,1.33,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 2,investment,1677.554578154704,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 2,investment,2371.640767906984,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 2,investment,2845.9689214883806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 2,investment,1677.554578154704,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 2,investment,2371.640767906984,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 2,investment,2845.9689214883806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 2,investment,1465.6110924625957,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 2,investment,2072.0059198338863,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 2,investment,2486.407103800663,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 2,investment,1465.6110924625957,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 2,investment,2072.0059198338863,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 2,investment,2486.407103800663,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 3,CF,0.5380940000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 3,CF,0.5380940000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 3,CF,0.5380940000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1757,12 +1757,12 @@ Midsize DW - Class 3,FOM,1.33,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 3,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 3,FOM,1.6,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 3,FOM,1.33,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 3,investment,1677.554578154704,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 3,investment,2371.640767906984,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 3,investment,2845.9689214883806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 3,investment,1677.554578154704,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 3,investment,2371.640767906984,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 3,investment,2845.9689214883806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 3,investment,1465.6110924625957,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 3,investment,2072.0059198338863,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 3,investment,2486.407103800663,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 3,investment,1465.6110924625957,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 3,investment,2072.0059198338863,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 3,investment,2486.407103800663,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 4,CF,0.525456,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 4,CF,0.525456,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 4,CF,0.525456,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1775,12 +1775,12 @@ Midsize DW - Class 4,FOM,1.33,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 4,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 4,FOM,1.6,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 4,FOM,1.33,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 4,investment,1677.554578154704,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 4,investment,2371.640767906984,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 4,investment,2845.9689214883806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 4,investment,1677.554578154704,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 4,investment,2371.640767906984,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 4,investment,2845.9689214883806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 4,investment,1465.6110924625957,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 4,investment,2072.0059198338863,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 4,investment,2486.407103800663,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 4,investment,1465.6110924625957,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 4,investment,2072.0059198338863,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 4,investment,2486.407103800663,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 5,CF,0.509436,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 5,CF,0.509436,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 5,CF,0.509436,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1793,12 +1793,12 @@ Midsize DW - Class 5,FOM,1.33,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 5,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 5,FOM,1.6,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 5,FOM,1.33,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 5,investment,1677.554578154704,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 5,investment,2371.640767906984,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 5,investment,2845.9689214883806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 5,investment,1677.554578154704,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 5,investment,2371.640767906984,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 5,investment,2845.9689214883806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 5,investment,1465.6110924625957,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 5,investment,2072.0059198338863,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 5,investment,2486.407103800663,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 5,investment,1465.6110924625957,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 5,investment,2072.0059198338863,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 5,investment,2486.407103800663,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 6,CF,0.484872,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 6,CF,0.484872,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 6,CF,0.484872,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1811,12 +1811,12 @@ Midsize DW - Class 6,FOM,1.33,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 6,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 6,FOM,1.6,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 6,FOM,1.33,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 6,investment,1677.554578154704,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 6,investment,2371.640767906984,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 6,investment,2845.9689214883806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 6,investment,1677.554578154704,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 6,investment,2371.640767906984,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 6,investment,2845.9689214883806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 6,investment,1465.6110924625957,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 6,investment,2072.0059198338863,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 6,investment,2486.407103800663,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 6,investment,1465.6110924625957,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 6,investment,2072.0059198338863,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 6,investment,2486.407103800663,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 7,CF,0.448916,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 7,CF,0.448916,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 7,CF,0.448916,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1829,12 +1829,12 @@ Midsize DW - Class 7,FOM,1.33,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 7,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 7,FOM,1.6,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 7,FOM,1.33,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 7,investment,1677.554578154704,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 7,investment,2371.640767906984,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 7,investment,2845.9689214883806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 7,investment,1677.554578154704,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 7,investment,2371.640767906984,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 7,investment,2845.9689214883806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 7,investment,1465.6110924625957,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 7,investment,2072.0059198338863,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 7,investment,2486.407103800663,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 7,investment,1465.6110924625957,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 7,investment,2072.0059198338863,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 7,investment,2486.407103800663,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 8,CF,0.402458,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 8,CF,0.402458,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 8,CF,0.402458,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1847,12 +1847,12 @@ Midsize DW - Class 8,FOM,1.33,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 8,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 8,FOM,1.6,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 8,FOM,1.33,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 8,investment,1677.554578154704,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 8,investment,2371.640767906984,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 8,investment,2845.9689214883806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 8,investment,1677.554578154704,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 8,investment,2371.640767906984,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 8,investment,2845.9689214883806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 8,investment,1465.6110924625957,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 8,investment,2072.0059198338863,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 8,investment,2486.407103800663,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 8,investment,1465.6110924625957,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 8,investment,2072.0059198338863,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 8,investment,2486.407103800663,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 9,CF,0.348079,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 9,CF,0.348079,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 9,CF,0.348079,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1865,78 +1865,78 @@ Midsize DW - Class 9,FOM,1.33,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 9,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 9,FOM,1.6,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 9,FOM,1.33,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 9,investment,1677.554578154704,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 9,investment,2371.640767906984,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 9,investment,2845.9689214883806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 9,investment,1677.554578154704,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 9,investment,2371.640767906984,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 9,investment,2845.9689214883806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 9,investment,1465.6110924625957,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 9,investment,2072.0059198338863,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 9,investment,2486.407103800663,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 9,investment,1465.6110924625957,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 9,investment,2072.0059198338863,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 9,investment,2486.407103800663,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 1-on-1 Combined Cycle (H-Frame),FOM,2.23,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 1-on-1 Combined Cycle (H-Frame),FOM,2.28,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG 1-on-1 Combined Cycle (H-Frame),FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG 1-on-1 Combined Cycle (H-Frame),FOM,2.23,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 1-on-1 Combined Cycle (H-Frame),FOM,2.28,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 1-on-1 Combined Cycle (H-Frame),FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 1-on-1 Combined Cycle (H-Frame),VOM,2.4,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 1-on-1 Combined Cycle (H-Frame),VOM,2.42,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 1-on-1 Combined Cycle (H-Frame),VOM,2.43,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 1-on-1 Combined Cycle (H-Frame),VOM,2.4,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 1-on-1 Combined Cycle (H-Frame),VOM,2.42,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 1-on-1 Combined Cycle (H-Frame),VOM,2.43,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 1-on-1 Combined Cycle (H-Frame),investment,1662.6174682778592,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 1-on-1 Combined Cycle (H-Frame),investment,1669.3035975068588,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 1-on-1 Combined Cycle (H-Frame),investment,1674.8753718643582,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 1-on-1 Combined Cycle (H-Frame),investment,1662.6174682778592,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 1-on-1 Combined Cycle (H-Frame),investment,1669.3035975068588,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 1-on-1 Combined Cycle (H-Frame),investment,1674.8753718643582,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 1-on-1 Combined Cycle (H-Frame),VOM,2.096782225577074,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 1-on-1 Combined Cycle (H-Frame),VOM,2.114255410790216,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 1-on-1 Combined Cycle (H-Frame),VOM,2.1229920033967877,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 1-on-1 Combined Cycle (H-Frame),VOM,2.096782225577074,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 1-on-1 Combined Cycle (H-Frame),VOM,2.114255410790216,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 1-on-1 Combined Cycle (H-Frame),VOM,2.1229920033967877,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 1-on-1 Combined Cycle (H-Frame),investment,1452.5611480912376,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 1-on-1 Combined Cycle (H-Frame),investment,1458.402546810103,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 1-on-1 Combined Cycle (H-Frame),investment,1463.2703790758244,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 1-on-1 Combined Cycle (H-Frame),investment,1452.5611480912376,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 1-on-1 Combined Cycle (H-Frame),investment,1458.402546810103,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 1-on-1 Combined Cycle (H-Frame),investment,1463.2703790758244,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.29,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.29,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.5,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.76,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,5.01,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.5,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.76,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,5.01,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2868.349439240757,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,3016.5586371502445,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,3165.882189931232,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2868.349439240757,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,3016.5586371502445,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,3165.882189931232,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.931466672957014,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.158618080727863,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.377032895892142,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.931466672957014,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.158618080727863,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.377032895892142,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2505.960050393328,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2635.4443886615145,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2765.9022933828455,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2505.960050393328,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2635.4443886615145,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2765.9022933828455,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.56,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.83,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,5.1,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.56,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.83,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,5.1,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2900.6657305142544,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,3054.4467027812416,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,3209.342029919728,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2900.6657305142544,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,3054.4467027812416,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,3209.342029919728,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.9838862285964405,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.219774228973861,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.455662229351282,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.9838862285964405,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.219774228973861,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.455662229351282,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2534.1934775345117,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2668.5456480684197,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2803.8713850554714,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2534.1934775345117,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2668.5456480684197,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2803.8713850554714,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame),FOM,2.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (F-Frame),FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG 2-on-1 Combined Cycle (F-Frame),FOM,2.3,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG 2-on-1 Combined Cycle (F-Frame),FOM,2.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 2-on-1 Combined Cycle (F-Frame),FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (F-Frame),FOM,2.3,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (F-Frame),VOM,2.0,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (F-Frame),VOM,2.04,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (F-Frame),VOM,2.08,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (F-Frame),VOM,2.0,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (F-Frame),VOM,2.04,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (F-Frame),VOM,2.08,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (F-Frame),VOM,1.7473185213142284,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (F-Frame),VOM,1.782264891740513,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (F-Frame),VOM,1.8172112621667975,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (F-Frame),VOM,1.7473185213142284,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (F-Frame),VOM,1.782264891740513,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (F-Frame),VOM,1.8172112621667975,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame),discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (F-Frame),discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG 2-on-1 Combined Cycle (F-Frame),discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1944,12 +1944,12 @@ NG 2-on-1 Combined Cycle (F-Frame),discount rate,0.0535847804878049,per unit,"NR NG 2-on-1 Combined Cycle (F-Frame),discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (F-Frame),discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame),efficiency,0.573,p.u.,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, -NG 2-on-1 Combined Cycle (F-Frame),investment,1381.1314277369831,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (F-Frame),investment,1403.307089679831,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (F-Frame),investment,1425.4827516226794,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (F-Frame),investment,1381.1314277369831,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (F-Frame),investment,1403.307089679831,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (F-Frame),investment,1425.4827516226794,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (F-Frame),investment,1206.6382620269972,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (F-Frame),investment,1226.0122344445679,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (F-Frame),investment,1245.3862068621388,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (F-Frame),investment,1206.6382620269972,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (F-Frame),investment,1226.0122344445679,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (F-Frame),investment,1245.3862068621388,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame),lifetime,30.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,FOM,2.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,FOM,2.28,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -1957,12 +1957,12 @@ NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,FOM,2.31,%/year,NREL/ATB-https://data NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,FOM,2.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,FOM,2.28,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,FOM,2.31,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,4.12,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,4.49,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,4.86,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,4.12,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,4.49,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,4.86,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,3.5994761539073106,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,3.922730080350443,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,4.2459840067935755,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,3.5994761539073106,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,3.922730080350443,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,4.2459840067935755,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,capture_rate,0.95,per unit,"NREL, NREL ATB 2024",,,, NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -1971,12 +1971,12 @@ NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,discount rate,0.0535847804878049,per NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,efficiency,0.527,p.u.,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,2394.748618853297,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,2619.736867409128,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,2844.8365514521092,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,2394.748618853297,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,2619.736867409128,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,2844.8365514521092,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,2092.1943078070167,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,2288.7573746968433,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,2485.4177982319843,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,2092.1943078070167,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,2288.7573746968433,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,2485.4177982319843,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,lifetime,30.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,FOM,2.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,FOM,2.28,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -1984,12 +1984,12 @@ NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,FOM,2.31,%/year,NREL/ATB-https://data NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,FOM,2.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,FOM,2.28,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,FOM,2.31,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,4.18,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,4.56,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,4.95,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,4.18,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,4.56,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,4.95,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,3.651895709546737,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,3.9838862285964405,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,4.324613340252715,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,3.651895709546737,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,3.9838862285964405,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,4.324613340252715,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,capture_rate,0.97,per unit,"NREL, NREL ATB 2024",,,, NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -1998,12 +1998,12 @@ NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,discount rate,0.0535847804878049,per NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,efficiency,0.525,p.u.,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,2422.384619666495,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,2654.5047393999253,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,2886.513423646206,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,2422.384619666495,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,2654.5047393999253,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,2886.513423646206,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,2116.338755844995,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,2319.1326480349444,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,2521.8291835795794,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,2116.338755844995,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,2319.1326480349444,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,2521.8291835795794,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,lifetime,30.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, NG 2-on-1 Combined Cycle (H-Frame),FOM,2.19,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (H-Frame),FOM,2.21,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -2011,130 +2011,130 @@ NG 2-on-1 Combined Cycle (H-Frame),FOM,2.23,%/year,NREL/ATB-https://data.openei. NG 2-on-1 Combined Cycle (H-Frame),FOM,2.19,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 2-on-1 Combined Cycle (H-Frame),FOM,2.21,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (H-Frame),FOM,2.23,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (H-Frame),VOM,2.0,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (H-Frame),VOM,2.04,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (H-Frame),VOM,2.08,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (H-Frame),VOM,2.0,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (H-Frame),VOM,2.04,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (H-Frame),VOM,2.08,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (H-Frame),investment,1395.172299117882,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (H-Frame),investment,1427.7114613656793,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (H-Frame),investment,1460.1391881263264,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (H-Frame),investment,1395.172299117882,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (H-Frame),investment,1427.7114613656793,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (H-Frame),investment,1460.1391881263264,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (H-Frame),VOM,1.7473185213142284,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (H-Frame),VOM,1.782264891740513,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (H-Frame),VOM,1.8172112621667975,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (H-Frame),VOM,1.7473185213142284,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (H-Frame),VOM,1.782264891740513,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (H-Frame),VOM,1.8172112621667975,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (H-Frame),investment,1218.905199336615,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (H-Frame),investment,1247.3333397684273,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (H-Frame),investment,1275.6641235549253,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (H-Frame),investment,1218.905199336615,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (H-Frame),investment,1247.3333397684273,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (H-Frame),investment,1275.6641235549253,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.21,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.21,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.02,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.32,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.62,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.02,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.32,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.62,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2338.027955893952,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2523.2337355372365,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2708.4395151805206,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2338.027955893952,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2523.2337355372365,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2708.4395151805206,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.5121102278415988,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.7742080060387337,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.036305784235868,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.5121102278415988,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.7742080060387337,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.036305784235868,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2042.639775341974,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2204.4465198545504,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2366.2532643671266,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2042.639775341974,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2204.4465198545504,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2366.2532643671266,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.23,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.23,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.08,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.39,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.7,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.08,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.39,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.7,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2363.5466824513,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2555.215720349284,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2745.7704033757673,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2363.5466824513,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2555.215720349284,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2745.7704033757673,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.564529783481026,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.835364154284731,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.106198525088437,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.564529783481026,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.835364154284731,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.106198525088437,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2064.934447118978,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2232.3878770597908,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2398.867740547459,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2064.934447118978,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2232.3878770597908,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2398.867740547459,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG Combined Cycle F-Class integrated retrofit 90%-CCS,FOM,6.04,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG Combined Cycle F-Class integrated retrofit 90%-CCS,FOM,5.6,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG Combined Cycle F-Class integrated retrofit 90%-CCS,FOM,5.23,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG Combined Cycle F-Class integrated retrofit 90%-CCS,FOM,6.04,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG Combined Cycle F-Class integrated retrofit 90%-CCS,FOM,5.6,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG Combined Cycle F-Class integrated retrofit 90%-CCS,FOM,5.23,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,4.53,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,4.72,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,4.9,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,4.53,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,4.72,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,4.9,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,3.9576764507767277,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,4.123671710301579,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,4.2809303772198595,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,3.9576764507767277,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,4.123671710301579,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,4.2809303772198595,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG Combined Cycle F-Class integrated retrofit 90%-CCS,capture_rate,0.9,per unit,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, NG Combined Cycle F-Class integrated retrofit 90%-CCS,efficiency,0.536,p.u.,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, -NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,1039.9,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,1163.4,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,1286.9,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,1039.9,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,1163.4,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,1286.9,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,908.5182651573331,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,1016.4151838484868,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,1124.3121025396404,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,908.5182651573331,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,1016.4151838484868,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,1124.3121025396404,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG Combined Cycle F-Class integrated retrofit 95%-CCS,FOM,5.91,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG Combined Cycle F-Class integrated retrofit 95%-CCS,FOM,5.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG Combined Cycle F-Class integrated retrofit 95%-CCS,FOM,5.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG Combined Cycle F-Class integrated retrofit 95%-CCS,FOM,5.91,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG Combined Cycle F-Class integrated retrofit 95%-CCS,FOM,5.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG Combined Cycle F-Class integrated retrofit 95%-CCS,FOM,5.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,4.64,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,4.83,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,5.03,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,4.64,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,4.83,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,5.03,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,4.053778969449009,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,4.219774228973861,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,4.394506081105285,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,4.053778969449009,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,4.219774228973861,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,4.394506081105285,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG Combined Cycle F-Class integrated retrofit 95%-CCS,capture_rate,0.95,per unit,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, NG Combined Cycle F-Class integrated retrofit 95%-CCS,efficiency,0.536,p.u.,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, -NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,1083.6,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,1213.9,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,1344.2,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,1083.6,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,1213.9,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,1344.2,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,946.6971748480488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,1060.534976511671,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,1174.372778175293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,946.6971748480488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,1060.534976511671,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,1174.372778175293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG Combined Cycle H-Class integrated retrofit 90%-CCS,FOM,6.52,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG Combined Cycle H-Class integrated retrofit 90%-CCS,FOM,6.01,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG Combined Cycle H-Class integrated retrofit 90%-CCS,FOM,5.6,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG Combined Cycle H-Class integrated retrofit 90%-CCS,FOM,6.52,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG Combined Cycle H-Class integrated retrofit 90%-CCS,FOM,6.01,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG Combined Cycle H-Class integrated retrofit 90%-CCS,FOM,5.6,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,4.34,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,4.5,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,4.66,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,4.34,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,4.5,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,4.66,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,905.2,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,1012.0,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,1118.9,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,905.2,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,1012.0,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,1118.9,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,3.7916811912518753,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,3.931466672957014,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,4.071252154662152,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,3.7916811912518753,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,3.931466672957014,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,4.071252154662152,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,790.8363627468198,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,884.1431717849996,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,977.5373467492451,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,790.8363627468198,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,884.1431717849996,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,977.5373467492451,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG Combined Cycle H-Class integrated retrofit 95%-CCS,FOM,6.37,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG Combined Cycle H-Class integrated retrofit 95%-CCS,FOM,5.88,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG Combined Cycle H-Class integrated retrofit 95%-CCS,FOM,5.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG Combined Cycle H-Class integrated retrofit 95%-CCS,FOM,6.37,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG Combined Cycle H-Class integrated retrofit 95%-CCS,FOM,5.88,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG Combined Cycle H-Class integrated retrofit 95%-CCS,FOM,5.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,4.43,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,4.61,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,4.78,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,4.43,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,4.61,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,4.78,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,943.3,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,1056.1,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,1169.0,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,943.3,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,1056.1,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,1169.0,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,3.8703105247110154,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,4.027569191629297,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,4.176091265941006,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,3.8703105247110154,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,4.027569191629297,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,4.176091265941006,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,824.1227805778558,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,922.6715451799782,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,1021.3076757081665,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,824.1227805778558,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,922.6715451799782,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,1021.3076757081665,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NH3 (l) storage tank incl. liquefaction,FOM,2.0,%/year,"Guesstimate, based on H2 (l) storage tank.",,2010.0,, NH3 (l) storage tank incl. liquefaction,investment,166.8201,EUR/MWh_NH3,"Calculated based on Morgan E. 2013: doi:10.7275/11KT-3F59 , Fig. 55, Fig 58.","Based on estimated for a double-wall liquid ammonia tank (~ambient pressure, -33°C), inner tank from stainless steel, outer tank from concrete including installations for liquefaction/condensation, boil-off gas recovery and safety installations; the necessary installations make only a small fraction of the total cost. The total cost are driven by material and working time on the tanks. While the costs do not scale strictly linearly, we here assume they do (good approximation c.f. ref. Fig 55.) and take the costs for a 9 kt NH3 (l) tank = 8 M$2010, which is smaller 4-5x smaller than the largest deployed tanks today. @@ -2146,12 +2146,12 @@ NH3 (l) transport ship,capacity,53000.0,t_NH3,"Cihlar et al 2020 based on IEA 20 NH3 (l) transport ship,investment,81164200.0,EUR,"Cihlar et al 2020 based on IEA 2019, Table 3-B",,2019.0,, NH3 (l) transport ship,lifetime,20.0,years,"Guess estimated based on H2 (l) tanker, but more mature technology",,2019.0,, Natural gas steam reforming,FOM,0.05,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, -Natural gas steam reforming,efficiency,0.7623,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Natural gas steam reforming,investment,180.0632,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Natural gas steam reforming,efficiency,0.7623333333333333,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, +Natural gas steam reforming,investment,242.75887320940691,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Natural gas steam reforming,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Natural gas steam reforming CC,FOM,0.05,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Natural gas steam reforming CC,efficiency,0.637,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Natural gas steam reforming CC,investment,323.8999,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Natural gas steam reforming CC,investment,436.6777280424164,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Natural gas steam reforming CC,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Ni-Zn-bicharger,FOM,2.1198,%/year,"Viswanathan_2022, p.51-52 in section 4.4.2","{'carrier': ['elec', 'nizn', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['Guesstimate 30% assumed of power components every 10 years ']}",2020.0,, Ni-Zn-bicharger,efficiency,0.9,per unit,"Viswanathan_2022, p.59 (p.81)","{'carrier': ['elec', 'nizn', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['((0.75-0.87)/2)^0.5 mean value of range efficiency is not RTE but single way AC-store conversion']}",2020.0,, @@ -2172,24 +2172,24 @@ Nuclear - Small,FOM,1.7,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket Nuclear - Small,FOM,1.84,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Nuclear - Small,FOM,1.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Nuclear - Small,FOM,1.7,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Nuclear - Small,VOM,2.2,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Nuclear - Small,VOM,2.6,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Nuclear - Small,VOM,2.8,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Nuclear - Small,VOM,2.2,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Nuclear - Small,VOM,2.6,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Nuclear - Small,VOM,2.8,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Nuclear - Small,fuel,10.0062,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Nuclear - Small,fuel,11.016,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Nuclear - Small,fuel,12.1176,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Nuclear - Small,fuel,10.0062,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Nuclear - Small,fuel,11.016,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Nuclear - Small,fuel,12.1176,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Nuclear - Small,investment,6416.740269468895,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Nuclear - Small,investment,9650.0006770512,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Nuclear - Small,investment,12681.1268480299,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Nuclear - Small,investment,6416.740269468895,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Nuclear - Small,investment,9650.0006770512,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Nuclear - Small,investment,12681.1268480299,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Nuclear - Small,VOM,1.9220503734456513,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Nuclear - Small,VOM,2.271514077708497,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Nuclear - Small,VOM,2.4462459298399195,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Nuclear - Small,VOM,1.9220503734456513,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Nuclear - Small,VOM,2.271514077708497,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Nuclear - Small,VOM,2.4462459298399195,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Nuclear - Small,fuel,8.742009293987216,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Nuclear - Small,fuel,9.62423041539877,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Nuclear - Small,fuel,10.586653456938647,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Nuclear - Small,fuel,8.742009293987216,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Nuclear - Small,fuel,9.62423041539877,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Nuclear - Small,fuel,10.586653456938647,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Nuclear - Small,investment,5606.044559652927,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Nuclear - Small,investment,8430.812456853202,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Nuclear - Small,investment,11078.983906348883,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Nuclear - Small,investment,5606.044559652927,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Nuclear - Small,investment,8430.812456853202,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Nuclear - Small,investment,11078.983906348883,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative OCGT,FOM,1.7795,%/year,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",52 OCGT - Natural gas: Fixed O&M,2015.0,, OCGT,VOM,4.762,EUR/MWh,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",52 OCGT - Natural gas: Variable O&M,2015.0,, OCGT,efficiency,0.41,per unit,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","52 OCGT - Natural gas: Electricity efficiency, annual average",2015.0,, @@ -2207,12 +2207,12 @@ Offshore Wind - Class 1,FOM,1.28,%/year,NREL/ATB-https://data.openei.org/s3_view Offshore Wind - Class 1,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 1,FOM,1.79,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 1,FOM,1.28,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 1,investment,3201.94383126809,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 1,investment,4387.258886079124,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 1,investment,6844.352726331988,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 1,investment,3201.94383126809,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 1,investment,4387.258886079124,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 1,investment,6844.352726331988,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 1,investment,2797.4078802912873,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 1,investment,3832.969354723242,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 1,investment,5979.632142563709,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 1,investment,2797.4078802912873,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 1,investment,3832.969354723242,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 1,investment,5979.632142563709,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 10,CF,0.5038,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 10,CF,0.4811,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 10,CF,0.4655,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2225,12 +2225,12 @@ Offshore Wind - Class 10,FOM,0.55,%/year,NREL/ATB-https://data.openei.org/s3_vie Offshore Wind - Class 10,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 10,FOM,0.78,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 10,FOM,0.55,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 10,investment,6033.959596548557,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 10,investment,8746.289491400554,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 10,investment,13687.049628567844,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 10,investment,6033.959596548557,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 10,investment,8746.289491400554,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 10,investment,13687.049628567844,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 10,investment,5271.624679955511,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 10,investment,7641.276810550095,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 10,investment,11957.817659071812,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 10,investment,5271.624679955511,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 10,investment,7641.276810550095,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 10,investment,11957.817659071812,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 11,CF,0.5011,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 11,CF,0.4785,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 11,CF,0.463,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2243,12 +2243,12 @@ Offshore Wind - Class 11,FOM,0.54,%/year,NREL/ATB-https://data.openei.org/s3_vie Offshore Wind - Class 11,FOM,1.02,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 11,FOM,0.77,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 11,FOM,0.54,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 11,investment,6220.135757084587,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 11,investment,9016.15411716568,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 11,investment,14109.360163800317,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 11,investment,6220.135757084587,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 11,investment,9016.15411716568,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 11,investment,14109.360163800317,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 11,investment,5434.2792067213995,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 11,investment,7877.046539973565,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 11,investment,12326.773169050724,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 11,investment,5434.2792067213995,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 11,investment,7877.046539973565,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 11,investment,12326.773169050724,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 12,CF,0.4913,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 12,CF,0.4692,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 12,CF,0.4539,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2261,12 +2261,12 @@ Offshore Wind - Class 12,FOM,0.55,%/year,NREL/ATB-https://data.openei.org/s3_vie Offshore Wind - Class 12,FOM,1.02,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 12,FOM,0.77,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 12,FOM,0.55,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 12,investment,6477.910926745628,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 12,investment,9389.80193904546,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 12,investment,14694.080933283514,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 12,investment,6477.910926745628,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 12,investment,9389.80193904546,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 12,investment,14694.080933283514,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 12,investment,5659.486870863227,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 12,investment,8203.487419783192,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 12,investment,12837.619884208274,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 12,investment,5659.486870863227,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 12,investment,8203.487419783192,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 12,investment,12837.619884208274,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 13,CF,0.3866,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 13,CF,0.3692,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 13,CF,0.3572,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2279,12 +2279,12 @@ Offshore Wind - Class 13,FOM,0.47,%/year,NREL/ATB-https://data.openei.org/s3_vie Offshore Wind - Class 13,FOM,0.88,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 13,FOM,0.66,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 13,FOM,0.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 13,investment,7216.930332610832,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 13,investment,10461.018573509897,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 13,investment,16370.425496124932,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 13,investment,7216.930332610832,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 13,investment,10461.018573509897,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 13,investment,16370.425496124932,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 13,investment,6305.138018602681,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 13,investment,9139.365752652995,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 13,investment,14302.17383558688,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 13,investment,6305.138018602681,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 13,investment,9139.365752652995,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 13,investment,14302.17383558688,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 14,CF,0.2957,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 14,CF,0.2824,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 14,CF,0.2732,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2297,12 +2297,12 @@ Offshore Wind - Class 14,FOM,0.44,%/year,NREL/ATB-https://data.openei.org/s3_vie Offshore Wind - Class 14,FOM,0.82,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 14,FOM,0.62,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 14,FOM,0.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 14,investment,7842.3824900909085,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 14,investment,11367.618243036664,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 14,investment,17789.1613032302,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 14,investment,7842.3824900909085,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 14,investment,11367.618243036664,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 14,investment,17789.1613032302,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 14,investment,6851.570088083121,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 14,investment,9931.424949643735,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 14,investment,15541.665511890244,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 14,investment,6851.570088083121,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 14,investment,9931.424949643735,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 14,investment,15541.665511890244,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 2,CF,0.4897,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 2,CF,0.4676,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 2,CF,0.4524,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2315,12 +2315,12 @@ Offshore Wind - Class 2,FOM,1.31,%/year,NREL/ATB-https://data.openei.org/s3_view Offshore Wind - Class 2,FOM,2.33,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 2,FOM,1.84,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 2,FOM,1.31,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 2,investment,3112.768473871763,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 2,investment,4265.07192855426,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 2,investment,6653.734722033827,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 2,investment,3112.768473871763,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 2,investment,4265.07192855426,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 2,investment,6653.734722033827,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 2,investment,2719.4990034795783,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 2,investment,3726.219587750127,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 2,investment,5813.096957860643,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 2,investment,2719.4990034795783,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 2,investment,3726.219587750127,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 2,investment,5813.096957860643,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 4,CF,0.4966,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 4,CF,0.4742,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 4,CF,0.4588,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2333,12 +2333,12 @@ Offshore Wind - Class 4,FOM,1.17,%/year,NREL/ATB-https://data.openei.org/s3_view Offshore Wind - Class 4,FOM,2.08,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 4,FOM,1.64,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 4,FOM,1.17,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 4,investment,3482.431674525228,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 4,investment,4771.579483761658,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 4,investment,7443.912828387728,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 4,investment,3482.431674525228,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 4,investment,4771.579483761658,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 4,investment,7443.912828387728,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 4,investment,3042.458682054627,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 4,investment,4168.734603949864,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 4,investment,6503.44337804523,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 4,investment,3042.458682054627,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 4,investment,4168.734603949864,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 4,investment,6503.44337804523,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 5,CF,0.4843,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 5,CF,0.4625,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 5,CF,0.4475,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2351,12 +2351,12 @@ Offshore Wind - Class 5,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_view Offshore Wind - Class 5,FOM,2.01,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 5,FOM,1.58,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 5,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 5,investment,3663.271835200344,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 5,investment,5019.364052756435,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 5,investment,7830.4697587012015,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 5,investment,3663.271835200344,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 5,investment,5019.364052756435,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 5,investment,7830.4697587012015,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 5,investment,3200.4513631271625,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 5,investment,4385.213887300083,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 5,investment,6841.162419984783,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 5,investment,3200.4513631271625,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 5,investment,4385.213887300083,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 5,investment,6841.162419984783,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 6,CF,0.3791,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 6,CF,0.362,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 6,CF,0.3503,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2369,12 +2369,12 @@ Offshore Wind - Class 6,FOM,1.16,%/year,NREL/ATB-https://data.openei.org/s3_view Offshore Wind - Class 6,FOM,2.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 6,FOM,1.63,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 6,FOM,1.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 6,investment,3534.0410562961997,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 6,investment,4842.293871496443,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 6,investment,7554.230958529719,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 6,investment,3534.0410562961997,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 6,investment,4842.293871496443,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 6,investment,7554.230958529719,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 6,investment,3087.5476963756246,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 6,investment,4230.5148836560575,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 6,investment,6599.823834062157,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 6,investment,3087.5476963756246,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 6,investment,4230.5148836560575,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 6,investment,6599.823834062157,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 7,CF,0.2901,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 7,CF,0.277,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 7,CF,0.268,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2387,12 +2387,12 @@ Offshore Wind - Class 7,FOM,1.1,%/year,NREL/ATB-https://data.openei.org/s3_viewe Offshore Wind - Class 7,FOM,1.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 7,FOM,1.54,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 7,FOM,1.1,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 7,investment,3736.9477477597616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 7,investment,5120.313888268424,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 7,investment,7987.956535539072,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 7,investment,3736.9477477597616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 7,investment,5120.313888268424,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 7,investment,7987.956535539072,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 7,investment,3264.819006422061,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 7,investment,4473.4096459569455,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 7,investment,6978.752201000229,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 7,investment,3264.819006422061,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 7,investment,4473.4096459569455,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 7,investment,6978.752201000229,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 8,CF,0.4995,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 8,CF,0.4771,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 8,CF,0.4616,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2405,12 +2405,12 @@ Offshore Wind - Class 8,FOM,0.59,%/year,NREL/ATB-https://data.openei.org/s3_view Offshore Wind - Class 8,FOM,1.1,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 8,FOM,0.83,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 8,FOM,0.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 8,investment,5512.016789483938,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 8,investment,7989.7277739562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 8,investment,12503.108126132236,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 8,investment,5512.016789483938,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 8,investment,7989.7277739562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 8,investment,12503.108126132236,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 8,investment,4815.624513030138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 8,investment,6980.299659846184,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 8,investment,10923.456201392646,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 8,investment,4815.624513030138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 8,investment,6980.299659846184,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 8,investment,10923.456201392646,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 9,CF,0.5028,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 9,CF,0.4802,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 9,CF,0.4646,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2423,12 +2423,12 @@ Offshore Wind - Class 9,FOM,0.57,%/year,NREL/ATB-https://data.openei.org/s3_view Offshore Wind - Class 9,FOM,1.07,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 9,FOM,0.8,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 9,FOM,0.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 9,investment,5864.720071861032,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 9,investment,8500.975188002421,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 9,investment,13303.157760164167,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 9,investment,5864.720071861032,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 9,investment,8500.975188002421,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 9,investment,13303.157760164167,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 9,investment,5123.767001943047,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 9,investment,7426.955697614668,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 9,investment,11622.426973149977,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 9,investment,5123.767001943047,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 9,investment,7426.955697614668,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 9,investment,11622.426973149977,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PEM electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PEM electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PEM electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative @@ -2436,12 +2436,12 @@ PEM electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenar PEM electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PEM electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PEM electrolyzer,efficiency,0.68,p.u.,ICCT IRA e-fuels assumptions ,,,, -PEM electrolyzer,investment,1960.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PEM electrolyzer,investment,1960.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PEM electrolyzer,investment,1862.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PEM electrolyzer,investment,1862.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PEM electrolyzer,investment,425.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PEM electrolyzer,investment,425.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PEM electrolyzer,investment,1712.372150887944,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PEM electrolyzer,investment,1712.372150887944,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PEM electrolyzer,investment,1626.7535433435467,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PEM electrolyzer,investment,1626.7535433435467,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PEM electrolyzer,investment,371.30518577927353,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PEM electrolyzer,investment,371.30518577927353,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PEM electrolyzer,lifetime,30.0,years,ICCT IRA e-fuels assumptions ,,,, PHS,FOM,0.66,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PHS,FOM,0.62,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -2449,12 +2449,12 @@ PHS,FOM,0.62,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data- PHS,FOM,0.66,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PHS,FOM,0.62,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PHS,FOM,0.62,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PHS,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PHS,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PHS,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PHS,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PHS,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PHS,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PHS,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PHS,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PHS,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PHS,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PHS,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PHS,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PHS,discount rate,0.0481937880466246,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PHS,discount rate,0.0481937880466246,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PHS,discount rate,0.0481937880466246,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2462,12 +2462,12 @@ PHS,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of s PHS,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PHS,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PHS,efficiency,0.75,per unit,DIW DataDoc http://hdl.handle.net/10419/80348, from old pypsa cost assumptions,2015.0,, -PHS,investment,3061.3981309677165,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PHS,investment,3224.2384570830204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PHS,investment,3224.2384570830204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PHS,investment,3061.3981309677165,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PHS,investment,3224.2384570830204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PHS,investment,3224.2384570830204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PHS,investment,2674.6188276783264,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PHS,investment,2816.8857865973864,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PHS,investment,2816.8857865973864,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PHS,investment,2674.6188276783264,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PHS,investment,2816.8857865973864,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PHS,investment,2816.8857865973864,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PHS,lifetime,80.0,years,IEA2010, from old pypsa cost assumptions,2015.0,, PV+Storage - Class 1,CF,0.3550632411639196,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 1,CF,0.34292291437874106,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -2481,12 +2481,12 @@ PV+Storage - Class 1,FOM,3.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer? PV+Storage - Class 1,FOM,2.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 1,FOM,2.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 1,FOM,3.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 1,investment,1554.3551117559143,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 1,investment,1855.6807642627937,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 1,investment,2195.280720368845,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 1,investment,1554.3551117559143,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 1,investment,1855.6807642627937,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 1,investment,2195.280720368845,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 1,investment,1357.9767377352782,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 1,investment,1621.232684521461,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 1,investment,1917.927331092262,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 1,investment,1357.9767377352782,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 1,investment,1621.232684521461,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 1,investment,1917.927331092262,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 10,CF,0.2319270155134359,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 10,CF,0.22305431518982652,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 10,CF,0.2106669247149348,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2499,12 +2499,12 @@ PV+Storage - Class 10,FOM,3.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer PV+Storage - Class 10,FOM,2.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 10,FOM,2.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 10,FOM,3.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 10,investment,1554.3551117559143,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 10,investment,1855.6807642627937,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 10,investment,2195.280720368845,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 10,investment,1554.3551117559143,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 10,investment,1855.6807642627937,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 10,investment,2195.280720368845,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 10,investment,1357.9767377352782,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 10,investment,1621.232684521461,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 10,investment,1917.927331092262,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 10,investment,1357.9767377352782,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 10,investment,1621.232684521461,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 10,investment,1917.927331092262,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 2,CF,0.3436824971626568,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 2,CF,0.3320059635008912,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 2,CF,0.3167726023817773,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2517,12 +2517,12 @@ PV+Storage - Class 2,FOM,3.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer? PV+Storage - Class 2,FOM,2.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 2,FOM,2.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 2,FOM,3.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 2,investment,1554.3551117559143,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 2,investment,1855.6807642627937,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 2,investment,2195.280720368845,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 2,investment,1554.3551117559143,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 2,investment,1855.6807642627937,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 2,investment,2195.280720368845,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 2,investment,1357.9767377352782,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 2,investment,1621.232684521461,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 2,investment,1917.927331092262,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 2,investment,1357.9767377352782,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 2,investment,1621.232684521461,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 2,investment,1917.927331092262,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 3,CF,0.3292014468975386,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 3,CF,0.3176854543560891,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 3,CF,0.30233205125608215,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2535,12 +2535,12 @@ PV+Storage - Class 3,FOM,3.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer? PV+Storage - Class 3,FOM,2.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 3,FOM,2.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 3,FOM,3.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 3,investment,1554.3551117559143,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 3,investment,1855.6807642627937,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 3,investment,2195.280720368845,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 3,investment,1554.3551117559143,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 3,investment,1855.6807642627937,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 3,investment,2195.280720368845,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 3,investment,1357.9767377352782,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 3,investment,1621.232684521461,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 3,investment,1917.927331092262,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 3,investment,1357.9767377352782,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 3,investment,1621.232684521461,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 3,investment,1917.927331092262,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 4,CF,0.31503963568544624,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 4,CF,0.30375971654761724,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 4,CF,0.28850054090664873,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2553,12 +2553,12 @@ PV+Storage - Class 4,FOM,3.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer? PV+Storage - Class 4,FOM,2.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 4,FOM,2.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 4,FOM,3.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 4,investment,1554.3551117559143,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 4,investment,1855.6807642627937,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 4,investment,2195.280720368845,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 4,investment,1554.3551117559143,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 4,investment,1855.6807642627937,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 4,investment,2195.280720368845,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 4,investment,1357.9767377352782,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 4,investment,1621.232684521461,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 4,investment,1917.927331092262,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 4,investment,1357.9767377352782,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 4,investment,1621.232684521461,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 4,investment,1917.927331092262,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 5,CF,0.300539422483355,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 5,CF,0.28958025104813295,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 5,CF,0.27473305099077683,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2571,12 +2571,12 @@ PV+Storage - Class 5,FOM,3.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer? PV+Storage - Class 5,FOM,2.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 5,FOM,2.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 5,FOM,3.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 5,investment,1554.3551117559143,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 5,investment,1855.6807642627937,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 5,investment,2195.280720368845,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 5,investment,1554.3551117559143,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 5,investment,1855.6807642627937,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 5,investment,2195.280720368845,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 5,investment,1357.9767377352782,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 5,investment,1621.232684521461,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 5,investment,1917.927331092262,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 5,investment,1357.9767377352782,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 5,investment,1621.232684521461,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 5,investment,1917.927331092262,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 6,CF,0.2862572929183903,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 6,CF,0.2756114711475572,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 6,CF,0.2611740397097814,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2589,12 +2589,12 @@ PV+Storage - Class 6,FOM,3.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer? PV+Storage - Class 6,FOM,2.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 6,FOM,2.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 6,FOM,3.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 6,investment,1554.3551117559143,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 6,investment,1855.6807642627937,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 6,investment,2195.280720368845,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 6,investment,1554.3551117559143,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 6,investment,1855.6807642627937,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 6,investment,2195.280720368845,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 6,investment,1357.9767377352782,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 6,investment,1621.232684521461,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 6,investment,1917.927331092262,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 6,investment,1357.9767377352782,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 6,investment,1621.232684521461,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 6,investment,1917.927331092262,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 7,CF,0.2727590831084671,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 7,CF,0.2624939294213551,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 7,CF,0.2484154893661901,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2607,12 +2607,12 @@ PV+Storage - Class 7,FOM,3.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer? PV+Storage - Class 7,FOM,2.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 7,FOM,2.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 7,FOM,3.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 7,investment,1554.3551117559143,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 7,investment,1855.6807642627937,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 7,investment,2195.280720368845,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 7,investment,1554.3551117559143,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 7,investment,1855.6807642627937,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 7,investment,2195.280720368845,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 7,investment,1357.9767377352782,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 7,investment,1621.232684521461,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 7,investment,1917.927331092262,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 7,investment,1357.9767377352782,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 7,investment,1621.232684521461,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 7,investment,1917.927331092262,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 8,CF,0.2627892655577428,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 8,CF,0.2529912954502521,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 8,CF,0.23937350255286224,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2625,12 +2625,12 @@ PV+Storage - Class 8,FOM,3.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer? PV+Storage - Class 8,FOM,2.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 8,FOM,2.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 8,FOM,3.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 8,investment,1554.3551117559143,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 8,investment,1855.6807642627937,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 8,investment,2195.280720368845,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 8,investment,1554.3551117559143,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 8,investment,1855.6807642627937,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 8,investment,2195.280720368845,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 8,investment,1357.9767377352782,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 8,investment,1621.232684521461,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 8,investment,1917.927331092262,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 8,investment,1357.9767377352782,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 8,investment,1621.232684521461,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 8,investment,1917.927331092262,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 9,CF,0.25098331801384477,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 9,CF,0.2415856038826027,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 9,CF,0.22841716106097537,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2643,336 +2643,336 @@ PV+Storage - Class 9,FOM,3.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer? PV+Storage - Class 9,FOM,2.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 9,FOM,2.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 9,FOM,3.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 9,investment,1554.3551117559143,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 9,investment,1855.6807642627937,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 9,investment,2195.280720368845,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 9,investment,1554.3551117559143,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 9,investment,1855.6807642627937,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 9,investment,2195.280720368845,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 9,investment,1357.9767377352782,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 9,investment,1621.232684521461,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 9,investment,1917.927331092262,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 9,investment,1357.9767377352782,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 9,investment,1621.232684521461,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 9,investment,1917.927331092262,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 10,FOM,0.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 10,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 10,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 10,FOM,0.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 10,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 10,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 10,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 10,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 10,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 10,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 10,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 10,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 10,investment,4279.201417729289,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 10,investment,4506.818514417017,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 10,investment,4506.818514417017,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 10,investment,4279.201417729289,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 10,investment,4506.818514417017,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 10,investment,4506.818514417017,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 10,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 10,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 10,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 10,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 10,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 10,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 10,investment,3738.563946816245,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 10,investment,3937.4237312213645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 10,investment,3937.4237312213645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 10,investment,3738.563946816245,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 10,investment,3937.4237312213645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 10,investment,3937.4237312213645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 11,FOM,0.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 11,FOM,0.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 11,FOM,0.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 11,FOM,0.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 11,FOM,0.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 11,FOM,0.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 11,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 11,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 11,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 11,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 11,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 11,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 11,investment,4342.683310588514,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 11,investment,4573.677103704925,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 11,investment,4573.677103704925,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 11,investment,4342.683310588514,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 11,investment,4573.677103704925,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 11,investment,4573.677103704925,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 11,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 11,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 11,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 11,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 11,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 11,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 11,investment,3794.0254903967502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 11,investment,3995.835356907216,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 11,investment,3995.835356907216,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 11,investment,3794.0254903967502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 11,investment,3995.835356907216,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 11,investment,3995.835356907216,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 12,FOM,0.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 12,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 12,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 12,FOM,0.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 12,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 12,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 12,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 12,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 12,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 12,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 12,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 12,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 12,investment,4399.715903999715,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 12,investment,4633.743345701827,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 12,investment,4633.743345701827,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 12,investment,4399.715903999715,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 12,investment,4633.743345701827,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 12,investment,4633.743345701827,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 12,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 12,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 12,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 12,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 12,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 12,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 12,investment,3843.852543789738,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 12,investment,4048.3127854806808,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 12,investment,4048.3127854806808,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 12,investment,3843.852543789738,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 12,investment,4048.3127854806808,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 12,investment,4048.3127854806808,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 13,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 13,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 13,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 13,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 13,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 13,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 13,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 13,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 13,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 13,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 13,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 13,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 13,investment,4452.140032678538,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 13,investment,4688.955991863566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 13,investment,4688.955991863566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 13,investment,4452.140032678538,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 13,investment,4688.955991863566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 13,investment,4688.955991863566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 13,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 13,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 13,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 13,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 13,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 13,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 13,investment,3889.6533692918715,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 13,investment,4096.549825105269,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 13,investment,4096.549825105269,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 13,investment,3889.6533692918715,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 13,investment,4096.549825105269,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 13,investment,4096.549825105269,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 14,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 14,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 14,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 14,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 14,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 14,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 14,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 14,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 14,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 14,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 14,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 14,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 14,investment,4501.483036977709,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 14,investment,4740.923624050991,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 14,investment,4740.923624050991,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 14,investment,4501.483036977709,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 14,investment,4740.923624050991,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 14,investment,4740.923624050991,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 14,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 14,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 14,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 14,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 14,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 14,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 14,investment,3932.7623419464862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 14,investment,4141.951828220235,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 14,investment,4141.951828220235,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 14,investment,3932.7623419464862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 14,investment,4141.951828220235,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 14,investment,4141.951828220235,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 15,FOM,0.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 15,FOM,0.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 15,FOM,0.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 15,FOM,0.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 15,FOM,0.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 15,FOM,0.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 15,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 15,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 15,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 15,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 15,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 15,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 15,investment,4548.800747415581,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 15,investment,4790.75823398024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 15,investment,4790.75823398024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 15,investment,4548.800747415581,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 15,investment,4790.75823398024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 15,investment,4790.75823398024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 15,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 15,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 15,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 15,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 15,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 15,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 15,investment,3974.101897863625,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 15,investment,4185.490296686159,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 15,investment,4185.490296686159,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 15,investment,3974.101897863625,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 15,investment,4185.490296686159,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 15,investment,4185.490296686159,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 2,FOM,0.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 2,FOM,0.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 2,FOM,0.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 2,FOM,0.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 2,FOM,0.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 2,FOM,0.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 2,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 2,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 2,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 2,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 2,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 2,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 2,investment,3413.536154682859,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 2,investment,3595.107226740458,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 2,investment,3595.107226740458,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 2,investment,3413.536154682859,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 2,investment,3595.107226740458,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 2,investment,3595.107226740458,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 2,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 2,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 2,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 2,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 2,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 2,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 2,investment,2982.267473126555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 2,investment,3140.898721697117,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 2,investment,3140.898721697117,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 2,investment,2982.267473126555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 2,investment,3140.898721697117,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 2,investment,3140.898721697117,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 3,FOM,0.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 3,FOM,0.53,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 3,FOM,0.53,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 3,FOM,0.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 3,FOM,0.53,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 3,FOM,0.53,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 3,investment,3602.3895422620662,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 3,investment,3794.0060072760057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 3,investment,3794.0060072760057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 3,investment,3602.3895422620662,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 3,investment,3794.0060072760057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 3,investment,3794.0060072760057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 3,investment,3147.2609840915966,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 3,investment,3314.668483245405,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 3,investment,3314.668483245405,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 3,investment,3147.2609840915966,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 3,investment,3314.668483245405,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 3,investment,3314.668483245405,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 4,FOM,0.54,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 4,FOM,0.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 4,FOM,0.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 4,FOM,0.54,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 4,FOM,0.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 4,FOM,0.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 4,investment,3746.3362615920546,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 4,investment,3945.609466995887,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 4,investment,3945.609466995887,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 4,investment,3746.3362615920546,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 4,investment,3945.609466995887,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 4,investment,3945.609466995887,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 4,investment,3273.0213684754517,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 4,investment,3447.118249777337,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 4,investment,3447.118249777337,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 4,investment,3273.0213684754517,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 4,investment,3447.118249777337,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 4,investment,3447.118249777337,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 5,FOM,0.52,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 5,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 5,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 5,FOM,0.52,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 5,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 5,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 5,investment,3861.731740728215,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 5,investment,4067.1430035329063,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 5,investment,4067.1430035329063,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 5,investment,3861.731740728215,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 5,investment,4067.1430035329063,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 5,investment,4067.1430035329063,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 5,investment,3373.8376974607227,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 5,investment,3553.2971494533135,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 5,investment,3553.2971494533135,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 5,investment,3373.8376974607227,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 5,investment,3553.2971494533135,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 5,investment,3553.2971494533135,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 6,FOM,0.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 6,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 6,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 6,FOM,0.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 6,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 6,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 6,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 6,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 6,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 6,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 6,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 6,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 6,investment,3963.2264731653418,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 6,investment,4174.036391950732,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 6,investment,4174.036391950732,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 6,investment,3963.2264731653418,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 6,investment,4174.036391950732,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 6,investment,4174.036391950732,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 6,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 6,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 6,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 6,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 6,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 6,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 6,investment,3462.509510362335,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 6,investment,3646.685548147565,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 6,investment,3646.685548147565,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 6,investment,3462.509510362335,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 6,investment,3646.685548147565,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 6,investment,3646.685548147565,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 7,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 7,FOM,0.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 7,FOM,0.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 7,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 7,FOM,0.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 7,FOM,0.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 7,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 7,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 7,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 7,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 7,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 7,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 7,investment,4054.657806268795,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 7,investment,4270.331093836284,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 7,investment,4270.331093836284,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 7,investment,4054.657806268795,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 7,investment,4270.331093836284,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 7,investment,4270.331093836284,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 7,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 7,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 7,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 7,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 7,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 7,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 7,investment,3542.3893412423918,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 7,investment,3730.8143062020936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 7,investment,3730.8143062020936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 7,investment,3542.3893412423918,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 7,investment,3730.8143062020936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 7,investment,3730.8143062020936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 8,FOM,0.49,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 8,FOM,0.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 8,FOM,0.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 8,FOM,0.49,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 8,FOM,0.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 8,FOM,0.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 8,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 8,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 8,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 8,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 8,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 8,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 8,investment,4137.394390891431,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 8,investment,4357.468560619698,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 8,investment,4357.468560619698,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 8,investment,4137.394390891431,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 8,investment,4357.468560619698,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 8,investment,4357.468560619698,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 8,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 8,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 8,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 8,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 8,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 8,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 8,investment,3614.6729245930987,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 8,investment,3806.942761007625,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 8,investment,3806.942761007625,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 8,investment,3614.6729245930987,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 8,investment,3806.942761007625,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 8,investment,3806.942761007625,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 9,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 9,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 9,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 9,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 9,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 9,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 9,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 9,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 9,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 9,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 9,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 9,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 9,investment,4209.513297155092,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 9,investment,4433.423578918661,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 9,investment,4433.423578918661,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 9,investment,4209.513297155092,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 9,investment,4433.423578918661,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 9,investment,4433.423578918661,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 9,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 9,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 9,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 9,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 9,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 9,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 9,investment,3677.6802749188087,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 9,investment,3873.301566137895,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 9,investment,3873.301566137895,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 9,investment,3677.6802749188087,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 9,investment,3873.301566137895,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 9,investment,3873.301566137895,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower One New Reservoir - National Class 1,FOM,1.15,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower One New Reservoir - National Class 1,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower One New Reservoir - National Class 1,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower One New Reservoir - National Class 1,FOM,1.15,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower One New Reservoir - National Class 1,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower One New Reservoir - National Class 1,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1748.071464724747,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1841.0539894441488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1841.0539894441488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1748.071464724747,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1841.0539894441488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1841.0539894441488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1527.2188234472212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1608.4538672476056,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1608.4538672476056,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1527.2188234472212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1608.4538672476056,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1608.4538672476056,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower One New Reservoir - National Class 3,FOM,0.91,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower One New Reservoir - National Class 3,FOM,0.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower One New Reservoir - National Class 3,FOM,0.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower One New Reservoir - National Class 3,FOM,0.91,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower One New Reservoir - National Class 3,FOM,0.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower One New Reservoir - National Class 3,FOM,0.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2205.725705471519,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2323.0515408689403,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2323.0515408689403,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2205.725705471519,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2323.0515408689403,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2323.0515408689403,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 3,investment,1927.0526890546391,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2029.5554916639283,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2029.5554916639283,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 3,investment,1927.0526890546391,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2029.5554916639283,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2029.5554916639283,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower One New Reservoir - National Class 4,FOM,0.8,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower One New Reservoir - National Class 4,FOM,0.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower One New Reservoir - National Class 4,FOM,0.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower One New Reservoir - National Class 4,FOM,0.8,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower One New Reservoir - National Class 4,FOM,0.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower One New Reservoir - National Class 4,FOM,0.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2527.7987696579603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2662.256151022745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2662.256151022745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2527.7987696579603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2662.256151022745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2662.256151022745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2208.4348041893363,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2325.9047405823862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2325.9047405823862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2208.4348041893363,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2325.9047405823862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2325.9047405823862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower One New Reservoir - National Class 5,FOM,0.61,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower One New Reservoir - National Class 5,FOM,0.58,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower One New Reservoir - National Class 5,FOM,0.58,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower One New Reservoir - National Class 5,FOM,0.61,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower One New Reservoir - National Class 5,FOM,0.58,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower One New Reservoir - National Class 5,FOM,0.58,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3284.339596391947,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3459.038511093646,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3459.038511093646,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3284.339596391947,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3459.038511093646,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3459.038511093646,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 5,investment,2869.393703530673,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3022.0210281865598,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3022.0210281865598,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 5,investment,2869.393703530673,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3022.0210281865598,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3022.0210281865598,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped-Heat-charger,FOM,0.366,%/year,"Viswanathan_2022, NULL","{'carrier': ['elec', 'phes'], 'technology_type': ['charger'], 'type': ['thermal'], 'note': ['Guesstimate, 50% on charger']}",2020.0,, Pumped-Heat-charger,efficiency,0.99,per unit,"Viswanathan_2022, NULL","{'carrier': ['elec', 'phes'], 'technology_type': ['charger'], 'type': ['thermal'], 'note': ['Charger']}",2020.0,, Pumped-Heat-charger,investment,761782.6727,EUR/MW,"Georgiou_2018, Figure 9 of reference roughly 80% of capital cost are power related 47%/80% of costs are required for liquefaction (charging)","{'carrier': ['elec', 'phes'], 'technology_type': ['charger'], 'type': ['thermal'], 'note': ['Power Equipment Charge']}",2020.0,, @@ -2997,24 +2997,24 @@ Residential Battery Storage - 5 kW - 12.5 kWh,FOM,2.41,%/year,NREL/ATB-https://d Residential Battery Storage - 5 kW - 12.5 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential Battery Storage - 5 kW - 12.5 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential Battery Storage - 5 kW - 12.5 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential Battery Storage - 5 kW - 12.5 kWh,investment,2115.2222358763574,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential Battery Storage - 5 kW - 12.5 kWh,investment,2976.1954719589603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential Battery Storage - 5 kW - 12.5 kWh,investment,3350.9394113782237,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential Battery Storage - 5 kW - 12.5 kWh,investment,2115.2222358763574,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential Battery Storage - 5 kW - 12.5 kWh,investment,2976.1954719589603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential Battery Storage - 5 kW - 12.5 kWh,investment,3350.9394113782237,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential Battery Storage - 5 kW - 12.5 kWh,investment,1847.9834947212264,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential Battery Storage - 5 kW - 12.5 kWh,investment,2600.180735602716,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential Battery Storage - 5 kW - 12.5 kWh,investment,2927.5792486514842,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential Battery Storage - 5 kW - 12.5 kWh,investment,1847.9834947212264,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential Battery Storage - 5 kW - 12.5 kWh,investment,2600.180735602716,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential Battery Storage - 5 kW - 12.5 kWh,investment,2927.5792486514842,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential Battery Storage - 5 kW - 20 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential Battery Storage - 5 kW - 20 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential Battery Storage - 5 kW - 20 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Residential Battery Storage - 5 kW - 20 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential Battery Storage - 5 kW - 20 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential Battery Storage - 5 kW - 20 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential Battery Storage - 5 kW - 20 kWh,investment,2626.5222423660407,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential Battery Storage - 5 kW - 20 kWh,investment,3568.5005659365142,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential Battery Storage - 5 kW - 20 kWh,investment,4160.941932023233,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential Battery Storage - 5 kW - 20 kWh,investment,2626.5222423660407,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential Battery Storage - 5 kW - 20 kWh,investment,3568.5005659365142,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential Battery Storage - 5 kW - 20 kWh,investment,4160.941932023233,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential Battery Storage - 5 kW - 20 kWh,investment,2294.685480364981,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential Battery Storage - 5 kW - 20 kWh,investment,3117.653566090589,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential Battery Storage - 5 kW - 20 kWh,investment,3635.2454519686016,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential Battery Storage - 5 kW - 20 kWh,investment,2294.685480364981,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential Battery Storage - 5 kW - 20 kWh,investment,3117.653566090589,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential Battery Storage - 5 kW - 20 kWh,investment,3635.2454519686016,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 1,CF,0.49395000000000006,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 1,CF,0.49395000000000006,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 1,CF,0.49395000000000006,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3027,12 +3027,12 @@ Residential DW - Class 1,FOM,0.74,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential DW - Class 1,FOM,1.55,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 1,FOM,0.97,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 1,FOM,0.74,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 1,investment,2456.9416827093214,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 1,investment,3931.1066923349144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 1,investment,5110.438700035389,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 1,investment,2456.9416827093214,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 1,investment,3931.1066923349144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 1,investment,5110.438700035389,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 1,investment,2146.529853993472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 1,investment,3434.447766389555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 1,investment,4464.782096306421,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 1,investment,2146.529853993472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 1,investment,3434.447766389555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 1,investment,4464.782096306421,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 10,CF,0.196957,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 10,CF,0.196957,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 10,CF,0.196957,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3045,12 +3045,12 @@ Residential DW - Class 10,FOM,0.74,%/year,NREL/ATB-https://data.openei.org/s3_vi Residential DW - Class 10,FOM,1.55,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 10,FOM,0.97,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 10,FOM,0.74,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 10,investment,2456.9416827093214,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 10,investment,3931.1066923349144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 10,investment,5110.438700035389,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 10,investment,2456.9416827093214,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 10,investment,3931.1066923349144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 10,investment,5110.438700035389,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 10,investment,2146.529853993472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 10,investment,3434.447766389555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 10,investment,4464.782096306421,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 10,investment,2146.529853993472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 10,investment,3434.447766389555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 10,investment,4464.782096306421,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 2,CF,0.462355,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 2,CF,0.462355,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 2,CF,0.462355,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3063,12 +3063,12 @@ Residential DW - Class 2,FOM,0.74,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential DW - Class 2,FOM,1.55,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 2,FOM,0.97,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 2,FOM,0.74,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 2,investment,2456.9416827093214,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 2,investment,3931.1066923349144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 2,investment,5110.438700035389,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 2,investment,2456.9416827093214,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 2,investment,3931.1066923349144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 2,investment,5110.438700035389,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 2,investment,2146.529853993472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 2,investment,3434.447766389555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 2,investment,4464.782096306421,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 2,investment,2146.529853993472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 2,investment,3434.447766389555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 2,investment,4464.782096306421,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 3,CF,0.45185300000000006,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 3,CF,0.45185300000000006,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 3,CF,0.45185300000000006,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3081,12 +3081,12 @@ Residential DW - Class 3,FOM,0.74,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential DW - Class 3,FOM,1.55,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 3,FOM,0.97,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 3,FOM,0.74,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 3,investment,2456.9416827093214,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 3,investment,3931.1066923349144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 3,investment,5110.438700035389,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 3,investment,2456.9416827093214,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 3,investment,3931.1066923349144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 3,investment,5110.438700035389,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 3,investment,2146.529853993472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 3,investment,3434.447766389555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 3,investment,4464.782096306421,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 3,investment,2146.529853993472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 3,investment,3434.447766389555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 3,investment,4464.782096306421,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 4,CF,0.440728,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 4,CF,0.440728,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 4,CF,0.440728,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3099,12 +3099,12 @@ Residential DW - Class 4,FOM,0.74,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential DW - Class 4,FOM,1.55,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 4,FOM,0.97,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 4,FOM,0.74,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 4,investment,2456.9416827093214,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 4,investment,3931.1066923349144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 4,investment,5110.438700035389,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 4,investment,2456.9416827093214,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 4,investment,3931.1066923349144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 4,investment,5110.438700035389,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 4,investment,2146.529853993472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 4,investment,3434.447766389555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 4,investment,4464.782096306421,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 4,investment,2146.529853993472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 4,investment,3434.447766389555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 4,investment,4464.782096306421,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 5,CF,0.426488,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 5,CF,0.426488,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 5,CF,0.426488,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3117,12 +3117,12 @@ Residential DW - Class 5,FOM,0.74,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential DW - Class 5,FOM,1.55,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 5,FOM,0.97,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 5,FOM,0.74,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 5,investment,2456.9416827093214,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 5,investment,3931.1066923349144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 5,investment,5110.438700035389,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 5,investment,2456.9416827093214,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 5,investment,3931.1066923349144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 5,investment,5110.438700035389,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 5,investment,2146.529853993472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 5,investment,3434.447766389555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 5,investment,4464.782096306421,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 5,investment,2146.529853993472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 5,investment,3434.447766389555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 5,investment,4464.782096306421,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 6,CF,0.404505,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 6,CF,0.404505,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 6,CF,0.404505,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3135,12 +3135,12 @@ Residential DW - Class 6,FOM,0.74,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential DW - Class 6,FOM,1.55,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 6,FOM,0.97,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 6,FOM,0.74,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 6,investment,2456.9416827093214,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 6,investment,3931.1066923349144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 6,investment,5110.438700035389,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 6,investment,2456.9416827093214,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 6,investment,3931.1066923349144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 6,investment,5110.438700035389,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 6,investment,2146.529853993472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 6,investment,3434.447766389555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 6,investment,4464.782096306421,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 6,investment,2146.529853993472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 6,investment,3434.447766389555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 6,investment,4464.782096306421,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 7,CF,0.372376,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 7,CF,0.372376,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 7,CF,0.372376,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3153,12 +3153,12 @@ Residential DW - Class 7,FOM,0.74,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential DW - Class 7,FOM,1.55,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 7,FOM,0.97,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 7,FOM,0.74,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 7,investment,2456.9416827093214,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 7,investment,3931.1066923349144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 7,investment,5110.438700035389,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 7,investment,2456.9416827093214,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 7,investment,3931.1066923349144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 7,investment,5110.438700035389,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 7,investment,2146.529853993472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 7,investment,3434.447766389555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 7,investment,4464.782096306421,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 7,investment,2146.529853993472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 7,investment,3434.447766389555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 7,investment,4464.782096306421,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 8,CF,0.331525,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 8,CF,0.331525,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 8,CF,0.331525,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3171,12 +3171,12 @@ Residential DW - Class 8,FOM,0.74,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential DW - Class 8,FOM,1.55,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 8,FOM,0.97,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 8,FOM,0.74,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 8,investment,2456.9416827093214,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 8,investment,3931.1066923349144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 8,investment,5110.438700035389,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 8,investment,2456.9416827093214,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 8,investment,3931.1066923349144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 8,investment,5110.438700035389,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 8,investment,2146.529853993472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 8,investment,3434.447766389555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 8,investment,4464.782096306421,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 8,investment,2146.529853993472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 8,investment,3434.447766389555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 8,investment,4464.782096306421,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 9,CF,0.285334,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 9,CF,0.285334,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 9,CF,0.285334,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3189,12 +3189,12 @@ Residential DW - Class 9,FOM,0.74,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential DW - Class 9,FOM,1.55,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 9,FOM,0.97,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 9,FOM,0.74,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 9,investment,2456.9416827093214,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 9,investment,3931.1066923349144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 9,investment,5110.438700035389,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 9,investment,2456.9416827093214,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 9,investment,3931.1066923349144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 9,investment,5110.438700035389,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 9,investment,2146.529853993472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 9,investment,3434.447766389555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 9,investment,4464.782096306421,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 9,investment,2146.529853993472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 9,investment,3434.447766389555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 9,investment,4464.782096306421,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 1,CF,0.1901320475346393,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 1,CF,0.18679819600263592,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 1,CF,0.1846378442763413,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3207,12 +3207,12 @@ Residential PV - Class 1,FOM,1.14,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential PV - Class 1,FOM,1.19,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 1,FOM,1.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 1,FOM,1.14,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 1,investment,1822.2864252891352,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 1,investment,2110.9266135087,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 1,investment,2521.3726794199097,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 1,investment,1822.2864252891352,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 1,investment,2110.9266135087,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 1,investment,2521.3726794199097,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 1,investment,1592.0574110236014,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 1,investment,1844.2305844594366,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 1,investment,2202.8205909430453,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 1,investment,1592.0574110236014,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 1,investment,1844.2305844594366,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 1,investment,2202.8205909430453,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 10,CF,0.12322125464581848,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 10,CF,0.12106064377614636,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 10,CF,0.11966055760633976,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3225,12 +3225,12 @@ Residential PV - Class 10,FOM,1.14,%/year,NREL/ATB-https://data.openei.org/s3_vi Residential PV - Class 10,FOM,1.19,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 10,FOM,1.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 10,FOM,1.14,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 10,investment,1822.2864252891352,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 10,investment,2110.9266135087,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 10,investment,2521.3726794199097,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 10,investment,1822.2864252891352,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 10,investment,2110.9266135087,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 10,investment,2521.3726794199097,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 10,investment,1592.0574110236014,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 10,investment,1844.2305844594366,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 10,investment,2202.8205909430453,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 10,investment,1592.0574110236014,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 10,investment,1844.2305844594366,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 10,investment,2202.8205909430453,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 2,CF,0.1871906081895675,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 2,CF,0.18390833303405624,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 2,CF,0.1817814030462288,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3243,12 +3243,12 @@ Residential PV - Class 2,FOM,1.14,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential PV - Class 2,FOM,1.19,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 2,FOM,1.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 2,FOM,1.14,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 2,investment,1822.2864252891352,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 2,investment,2110.9266135087,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 2,investment,2521.3726794199097,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 2,investment,1822.2864252891352,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 2,investment,2110.9266135087,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 2,investment,2521.3726794199097,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 2,investment,1592.0574110236014,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 2,investment,1844.2305844594366,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 2,investment,2202.8205909430453,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 2,investment,1592.0574110236014,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 2,investment,1844.2305844594366,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 2,investment,2202.8205909430453,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 3,CF,0.17463235036794963,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 3,CF,0.17157027673880268,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 3,CF,0.1695860383924738,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3261,12 +3261,12 @@ Residential PV - Class 3,FOM,1.14,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential PV - Class 3,FOM,1.19,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 3,FOM,1.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 3,FOM,1.14,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 3,investment,1822.2864252891352,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 3,investment,2110.9266135087,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 3,investment,2521.3726794199097,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 3,investment,1822.2864252891352,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 3,investment,2110.9266135087,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 3,investment,2521.3726794199097,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 3,investment,1592.0574110236014,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 3,investment,1844.2305844594366,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 3,investment,2202.8205909430453,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 3,investment,1592.0574110236014,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 3,investment,1844.2305844594366,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 3,investment,2202.8205909430453,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 4,CF,0.1650231182032012,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 4,CF,0.16212953670249433,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 4,CF,0.16025448206067328,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3279,12 +3279,12 @@ Residential PV - Class 4,FOM,1.14,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential PV - Class 4,FOM,1.19,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 4,FOM,1.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 4,FOM,1.14,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 4,investment,1822.2864252891352,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 4,investment,2110.9266135087,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 4,investment,2521.3726794199097,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 4,investment,1822.2864252891352,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 4,investment,2110.9266135087,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 4,investment,2521.3726794199097,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 4,investment,1592.0574110236014,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 4,investment,1844.2305844594366,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 4,investment,2202.8205909430453,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 4,investment,1592.0574110236014,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 4,investment,1844.2305844594366,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 4,investment,2202.8205909430453,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 5,CF,0.15630349593810275,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 5,CF,0.15356280778927411,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 5,CF,0.15178682877019675,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3297,12 +3297,12 @@ Residential PV - Class 5,FOM,1.14,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential PV - Class 5,FOM,1.19,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 5,FOM,1.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 5,FOM,1.14,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 5,investment,1822.2864252891352,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 5,investment,2110.9266135087,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 5,investment,2521.3726794199097,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 5,investment,1822.2864252891352,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 5,investment,2110.9266135087,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 5,investment,2521.3726794199097,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 5,investment,1592.0574110236014,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 5,investment,1844.2305844594366,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 5,investment,2202.8205909430453,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 5,investment,1592.0574110236014,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 5,investment,1844.2305844594366,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 5,investment,2202.8205909430453,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 6,CF,0.1543639033027186,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 6,CF,0.15165722474860435,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 6,CF,0.14990328410944517,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3315,12 +3315,12 @@ Residential PV - Class 6,FOM,1.14,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential PV - Class 6,FOM,1.19,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 6,FOM,1.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 6,FOM,1.14,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 6,investment,1822.2864252891352,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 6,investment,2110.9266135087,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 6,investment,2521.3726794199097,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 6,investment,1822.2864252891352,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 6,investment,2110.9266135087,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 6,investment,2521.3726794199097,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 6,investment,1592.0574110236014,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 6,investment,1844.2305844594366,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 6,investment,2202.8205909430453,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 6,investment,1592.0574110236014,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 6,investment,1844.2305844594366,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 6,investment,2202.8205909430453,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 7,CF,0.14755851194978065,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 7,CF,0.14497116185545067,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 7,CF,0.14329454662854071,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3333,12 +3333,12 @@ Residential PV - Class 7,FOM,1.14,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential PV - Class 7,FOM,1.19,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 7,FOM,1.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 7,FOM,1.14,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 7,investment,1822.2864252891352,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 7,investment,2110.9266135087,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 7,investment,2521.3726794199097,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 7,investment,1822.2864252891352,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 7,investment,2110.9266135087,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 7,investment,2521.3726794199097,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 7,investment,1592.0574110236014,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 7,investment,1844.2305844594366,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 7,investment,2202.8205909430453,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 7,investment,1592.0574110236014,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 7,investment,1844.2305844594366,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 7,investment,2202.8205909430453,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 8,CF,0.1405644633456977,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 8,CF,0.13809974970301236,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 8,CF,0.13650260348288767,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3351,12 +3351,12 @@ Residential PV - Class 8,FOM,1.14,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential PV - Class 8,FOM,1.19,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 8,FOM,1.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 8,FOM,1.14,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 8,investment,1822.2864252891352,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 8,investment,2110.9266135087,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 8,investment,2521.3726794199097,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 8,investment,1822.2864252891352,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 8,investment,2110.9266135087,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 8,investment,2521.3726794199097,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 8,investment,1592.0574110236014,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 8,investment,1844.2305844594366,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 8,investment,2202.8205909430453,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 8,investment,1592.0574110236014,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 8,investment,1844.2305844594366,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 8,investment,2202.8205909430453,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 9,CF,0.13496922975475495,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 9,CF,0.13260262518058788,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 9,CF,0.1310690541057579,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3369,12 +3369,12 @@ Residential PV - Class 9,FOM,1.14,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential PV - Class 9,FOM,1.19,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 9,FOM,1.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 9,FOM,1.14,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 9,investment,1822.2864252891352,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 9,investment,2110.9266135087,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 9,investment,2521.3726794199097,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 9,investment,1822.2864252891352,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 9,investment,2110.9266135087,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 9,investment,2521.3726794199097,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 9,investment,1592.0574110236014,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 9,investment,1844.2305844594366,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 9,investment,2202.8205909430453,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 9,investment,1592.0574110236014,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 9,investment,1844.2305844594366,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 9,investment,2202.8205909430453,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative SMR,FOM,5.0,%/year,Danish Energy Agency,"Technology data for renewable fuels, in pdf on table 3 p.311",2015.0,, SMR,efficiency,0.76,per unit (in LHV),"IEA Global average levelised cost of hydrogen production by energy source and technology, 2019 and 2050 (2020), https://www.iea.org/data-and-statistics/charts/global-average-levelised-cost-of-hydrogen-production-by-energy-source-and-technology-2019-and-2050",,,, SMR,investment,522201.0492,EUR/MW_CH4,Danish Energy Agency,"Technology data for renewable fuels, in pdf on table 3 p.311",2015.0,, @@ -3391,12 +3391,12 @@ SOEC,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and finan SOEC,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced SOEC,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced SOEC,efficiency,0.84,p.u.,ICCT IRA e-fuels assumptions ,,,, -SOEC,investment,2166.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -SOEC,investment,2166.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -SOEC,investment,2058.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -SOEC,investment,2058.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -SOEC,investment,747.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -SOEC,investment,747.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +SOEC,investment,1892.3459585833093,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +SOEC,investment,1892.3459585833093,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +SOEC,investment,1797.990758432341,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +SOEC,investment,1797.990758432341,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +SOEC,investment,652.6234677108642,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +SOEC,investment,652.6234677108642,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced SOEC,lifetime,30.0,years,ICCT IRA e-fuels assumptions ,,,, Sand-charger,FOM,1.075,%/year,"Viswanathan_2022, NULL","{'carrier': ['elec', 'sand'], 'technology_type': ['charger'], 'type': ['thermal'], 'note': ['Guesstimate, 50% on charger']}",2020.0,, Sand-charger,efficiency,0.99,per unit,"Viswanathan_2022, p.107 (p.129)","{'carrier': ['elec', 'sand'], 'technology_type': ['charger'], 'type': ['thermal'], 'note': ['RTE assume 99% for charge and other for discharge']}",2020.0,, @@ -3411,7 +3411,7 @@ Sand-store,investment,6700.8517,EUR/MWh,"Viswanathan_2022, p.100 (p.122)","{'car Sand-store,lifetime,35.0,years,"Viswanathan_2022, p.107 (p.129)","{'carrier': ['sand'], 'technology_type': ['store'], 'type': ['thermal'], 'note': ['NULL']}",2020.0,, Solid biomass steam reforming,FOM,0.05,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Solid biomass steam reforming,efficiency,0.712,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Solid biomass steam reforming,investment,590.7702,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Solid biomass steam reforming,investment,796.4750872147151,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Solid biomass steam reforming,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Steam methane reforming,FOM,3.0,%/year,"International Energy Agency (2015): Technology Roadmap Hydrogen and Fuel Cells , table 15.",Large scale SMR facility (150-300 MW).,2015.0,, Steam methane reforming,investment,497454.611,EUR/MW_H2,"International Energy Agency (2015): Technology Roadmap Hydrogen and Fuel Cells , table 15.",Large scale SMR facility (150-300 MW). Currency conversion 1.17 USD = 1 EUR.,2015.0,, @@ -3438,12 +3438,12 @@ Utility PV - Class 1,FOM,1.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Utility PV - Class 1,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 1,FOM,1.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 1,FOM,1.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 1,investment,1069.5664843527793,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 1,investment,1193.4809439770536,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 1,investment,1364.9377461958204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 1,investment,1069.5664843527793,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 1,investment,1193.4809439770536,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 1,investment,1364.9377461958204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 1,investment,934.4366639432781,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 1,investment,1042.6956791233474,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 1,investment,1192.4905021844281,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 1,investment,934.4366639432781,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 1,investment,1042.6956791233474,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 1,investment,1192.4905021844281,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 10,CF,0.21813391206516003,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 10,CF,0.20926121174155063,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 10,CF,0.19687382126665892,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3456,12 +3456,12 @@ Utility PV - Class 10,FOM,1.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer Utility PV - Class 10,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 10,FOM,1.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 10,FOM,1.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 10,investment,1069.5664843527793,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 10,investment,1193.4809439770536,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 10,investment,1364.9377461958204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 10,investment,1069.5664843527793,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 10,investment,1193.4809439770536,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 10,investment,1364.9377461958204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 10,investment,934.4366639432781,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 10,investment,1042.6956791233474,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 10,investment,1192.4905021844281,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 10,investment,934.4366639432781,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 10,investment,1042.6956791233474,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 10,investment,1192.4905021844281,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 2,CF,0.329889393714381,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 2,CF,0.31821286005261534,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 2,CF,0.30297949893350146,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3474,12 +3474,12 @@ Utility PV - Class 2,FOM,1.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Utility PV - Class 2,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 2,FOM,1.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 2,FOM,1.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 2,investment,1069.5664843527793,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 2,investment,1193.4809439770536,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 2,investment,1364.9377461958204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 2,investment,1069.5664843527793,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 2,investment,1193.4809439770536,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 2,investment,1364.9377461958204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 2,investment,934.4366639432781,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 2,investment,1042.6956791233474,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 2,investment,1192.4905021844281,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 2,investment,934.4366639432781,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 2,investment,1042.6956791233474,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 2,investment,1192.4905021844281,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 3,CF,0.3154083434492628,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 3,CF,0.30389235090781325,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 3,CF,0.2885389478078063,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3492,12 +3492,12 @@ Utility PV - Class 3,FOM,1.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Utility PV - Class 3,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 3,FOM,1.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 3,FOM,1.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 3,investment,1069.5664843527793,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 3,investment,1193.4809439770536,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 3,investment,1364.9377461958204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 3,investment,1069.5664843527793,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 3,investment,1193.4809439770536,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 3,investment,1364.9377461958204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 3,investment,934.4366639432781,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 3,investment,1042.6956791233474,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 3,investment,1192.4905021844281,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 3,investment,934.4366639432781,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 3,investment,1042.6956791233474,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 3,investment,1192.4905021844281,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 4,CF,0.3012465322371704,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 4,CF,0.2899666130993414,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 4,CF,0.2747074374583729,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3510,12 +3510,12 @@ Utility PV - Class 4,FOM,1.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Utility PV - Class 4,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 4,FOM,1.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 4,FOM,1.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 4,investment,1069.5664843527793,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 4,investment,1193.4809439770536,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 4,investment,1364.9377461958204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 4,investment,1069.5664843527793,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 4,investment,1193.4809439770536,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 4,investment,1364.9377461958204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 4,investment,934.4366639432781,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 4,investment,1042.6956791233474,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 4,investment,1192.4905021844281,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 4,investment,934.4366639432781,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 4,investment,1042.6956791233474,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 4,investment,1192.4905021844281,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 6,CF,0.27246418947011447,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 6,CF,0.26181836769928135,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 6,CF,0.24738093626150556,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3528,12 +3528,12 @@ Utility PV - Class 6,FOM,1.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Utility PV - Class 6,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 6,FOM,1.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 6,FOM,1.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 6,investment,1069.5664843527793,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 6,investment,1193.4809439770536,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 6,investment,1364.9377461958204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 6,investment,1069.5664843527793,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 6,investment,1193.4809439770536,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 6,investment,1364.9377461958204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 6,investment,934.4366639432781,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 6,investment,1042.6956791233474,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 6,investment,1192.4905021844281,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 6,investment,934.4366639432781,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 6,investment,1042.6956791233474,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 6,investment,1192.4905021844281,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 7,CF,0.25896597966019125,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 7,CF,0.24870082597307924,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 7,CF,0.23462238591791423,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3546,12 +3546,12 @@ Utility PV - Class 7,FOM,1.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Utility PV - Class 7,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 7,FOM,1.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 7,FOM,1.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 7,investment,1069.5664843527793,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 7,investment,1193.4809439770536,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 7,investment,1364.9377461958204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 7,investment,1069.5664843527793,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 7,investment,1193.4809439770536,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 7,investment,1364.9377461958204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 7,investment,934.4366639432781,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 7,investment,1042.6956791233474,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 7,investment,1192.4905021844281,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 7,investment,934.4366639432781,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 7,investment,1042.6956791233474,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 7,investment,1192.4905021844281,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 8,CF,0.24899616210946693,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 8,CF,0.23919819200197623,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 8,CF,0.2255803991045864,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3564,12 +3564,12 @@ Utility PV - Class 8,FOM,1.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Utility PV - Class 8,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 8,FOM,1.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 8,FOM,1.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 8,investment,1069.5664843527793,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 8,investment,1193.4809439770536,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 8,investment,1364.9377461958204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 8,investment,1069.5664843527793,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 8,investment,1193.4809439770536,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 8,investment,1364.9377461958204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 8,investment,934.4366639432781,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 8,investment,1042.6956791233474,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 8,investment,1192.4905021844281,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 8,investment,934.4366639432781,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 8,investment,1042.6956791233474,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 8,investment,1192.4905021844281,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 9,CF,0.23719021456556896,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 9,CF,0.22779250043432683,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 9,CF,0.21462405761269948,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3582,60 +3582,60 @@ Utility PV - Class 9,FOM,1.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Utility PV - Class 9,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 9,FOM,1.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 9,FOM,1.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 9,investment,1069.5664843527793,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 9,investment,1193.4809439770536,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 9,investment,1364.9377461958204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 9,investment,1069.5664843527793,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 9,investment,1193.4809439770536,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 9,investment,1364.9377461958204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 9,investment,934.4366639432781,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 9,investment,1042.6956791233474,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 9,investment,1192.4905021844281,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 9,investment,934.4366639432781,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 9,investment,1042.6956791233474,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 9,investment,1192.4905021844281,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility-Scale Battery Storage - 10Hr,FOM,2.31,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility-Scale Battery Storage - 10Hr,FOM,2.33,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility-Scale Battery Storage - 10Hr,FOM,2.35,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Utility-Scale Battery Storage - 10Hr,FOM,2.31,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility-Scale Battery Storage - 10Hr,FOM,2.33,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility-Scale Battery Storage - 10Hr,FOM,2.35,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility-Scale Battery Storage - 10Hr,investment,2352.1577501920124,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility-Scale Battery Storage - 10Hr,investment,2979.3356753381063,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility-Scale Battery Storage - 10Hr,investment,3756.270404463208,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility-Scale Battery Storage - 10Hr,investment,2352.1577501920124,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility-Scale Battery Storage - 10Hr,investment,2979.3356753381063,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility-Scale Battery Storage - 10Hr,investment,3756.270404463208,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility-Scale Battery Storage - 10Hr,investment,2054.9844009816547,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility-Scale Battery Storage - 10Hr,investment,2602.924203365254,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility-Scale Battery Storage - 10Hr,investment,3281.7004243915253,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility-Scale Battery Storage - 10Hr,investment,2054.9844009816547,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility-Scale Battery Storage - 10Hr,investment,2602.924203365254,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility-Scale Battery Storage - 10Hr,investment,3281.7004243915253,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility-Scale Battery Storage - 2Hr,FOM,2.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility-Scale Battery Storage - 2Hr,FOM,2.15,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility-Scale Battery Storage - 2Hr,FOM,2.19,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Utility-Scale Battery Storage - 2Hr,FOM,2.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility-Scale Battery Storage - 2Hr,FOM,2.15,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility-Scale Battery Storage - 2Hr,FOM,2.19,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility-Scale Battery Storage - 2Hr,investment,706.0799039513817,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility-Scale Battery Storage - 2Hr,investment,941.9756031780385,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility-Scale Battery Storage - 2Hr,investment,1114.4629409705717,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility-Scale Battery Storage - 2Hr,investment,706.0799039513817,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility-Scale Battery Storage - 2Hr,investment,941.9756031780385,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility-Scale Battery Storage - 2Hr,investment,1114.4629409705717,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility-Scale Battery Storage - 2Hr,investment,616.8732468510103,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility-Scale Battery Storage - 2Hr,investment,822.9657090295642,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility-Scale Battery Storage - 2Hr,investment,973.6608690381028,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility-Scale Battery Storage - 2Hr,investment,616.8732468510103,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility-Scale Battery Storage - 2Hr,investment,822.9657090295642,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility-Scale Battery Storage - 2Hr,investment,973.6608690381028,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility-Scale Battery Storage - 4Hr,FOM,2.19,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility-Scale Battery Storage - 4Hr,FOM,2.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility-Scale Battery Storage - 4Hr,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Utility-Scale Battery Storage - 4Hr,FOM,2.19,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility-Scale Battery Storage - 4Hr,FOM,2.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility-Scale Battery Storage - 4Hr,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility-Scale Battery Storage - 4Hr,investment,1117.5993655115392,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility-Scale Battery Storage - 4Hr,investment,1451.3156212180554,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility-Scale Battery Storage - 4Hr,investment,1774.9148068437305,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility-Scale Battery Storage - 4Hr,investment,1117.5993655115392,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility-Scale Battery Storage - 4Hr,investment,1451.3156212180554,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility-Scale Battery Storage - 4Hr,investment,1774.9148068437305,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility-Scale Battery Storage - 4Hr,investment,976.4010353836712,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility-Scale Battery Storage - 4Hr,investment,1267.9553326134867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility-Scale Battery Storage - 4Hr,investment,1550.6707578764583,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility-Scale Battery Storage - 4Hr,investment,976.4010353836712,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility-Scale Battery Storage - 4Hr,investment,1267.9553326134867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility-Scale Battery Storage - 4Hr,investment,1550.6707578764583,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility-Scale Battery Storage - 8Hr,FOM,2.28,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility-Scale Battery Storage - 8Hr,FOM,2.31,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility-Scale Battery Storage - 8Hr,FOM,2.33,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Utility-Scale Battery Storage - 8Hr,FOM,2.28,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility-Scale Battery Storage - 8Hr,FOM,2.31,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility-Scale Battery Storage - 8Hr,FOM,2.33,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility-Scale Battery Storage - 8Hr,investment,1940.638288631855,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility-Scale Battery Storage - 8Hr,investment,2469.995657298089,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility-Scale Battery Storage - 8Hr,investment,3095.8185385900483,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility-Scale Battery Storage - 8Hr,investment,1940.638288631855,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility-Scale Battery Storage - 8Hr,investment,2469.995657298089,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility-Scale Battery Storage - 8Hr,investment,3095.8185385900483,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility-Scale Battery Storage - 8Hr,investment,1695.4566124489938,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility-Scale Battery Storage - 8Hr,investment,2157.934579781331,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility-Scale Battery Storage - 8Hr,investment,2704.6905355531694,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility-Scale Battery Storage - 8Hr,investment,1695.4566124489938,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility-Scale Battery Storage - 8Hr,investment,2157.934579781331,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility-Scale Battery Storage - 8Hr,investment,2704.6905355531694,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Vanadium-Redox-Flow-bicharger,FOM,2.4395,%/year,"Viswanathan_2022, p.28 (p.50)","{'carrier': ['elec', 'vanadium', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['30% assumed of power components every 10 years']}",2020.0,, Vanadium-Redox-Flow-bicharger,efficiency,0.8062,per unit,"Viswanathan_2022, p.42 (p.64)","{'carrier': ['elec', 'vanadium', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['AC-AC efficiency at transformer level 0.65^0.5']}",2020.0,, Vanadium-Redox-Flow-bicharger,investment,129023.0526,EUR/MW,"Viswanathan_2022, p.42 (p.64)","{'carrier': ['elec', 'vanadium', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['Power Equipment']}",2020.0,, @@ -3682,12 +3682,12 @@ battery storage,FOM,2.31,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucke battery storage,FOM,2.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced battery storage,FOM,2.28,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate battery storage,FOM,2.31,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -battery storage,investment,1529.1188270716973,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -battery storage,investment,1960.6556392580724,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -battery storage,investment,2435.3666727168898,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -battery storage,investment,1529.1188270716973,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -battery storage,investment,1960.6556392580724,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -battery storage,investment,2435.3666727168898,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +battery storage,investment,1335.9288239163327,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +battery storage,investment,1712.944956197409,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +battery storage,investment,2127.680646714814,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +battery storage,investment,1335.9288239163327,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +battery storage,investment,1712.944956197409,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +battery storage,investment,2127.680646714814,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative battery storage,lifetime,25.0,years,"Danish Energy Agency, inputs/technology_data_catalogue_for_energy_storage.xlsx",: Technical lifetime,2015.0,, biochar pyrolysis,FOM,3.4167,%/year,"Danish Energy Agency, inputs/data_sheets_for_renewable_fuels.xlsx","105 Slow pyrolysis, Straw: Fixed O&M",2020.0,, biochar pyrolysis,VOM,823.497,EUR/MWh_biochar,"Danish Energy Agency, inputs/data_sheets_for_renewable_fuels.xlsx","105 Slow pyrolysis, Straw: Variable O&M",2020.0,, @@ -3732,12 +3732,12 @@ biomass,FOM,3.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-d biomass,FOM,3.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced biomass,FOM,3.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate biomass,FOM,3.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -biomass,VOM,5.246639999999999,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -biomass,VOM,5.246639999999999,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -biomass,VOM,5.246639999999999,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -biomass,VOM,5.246639999999999,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -biomass,VOM,5.246639999999999,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -biomass,VOM,5.246639999999999,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +biomass,VOM,4.583775623334041,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +biomass,VOM,4.583775623334041,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +biomass,VOM,4.583775623334041,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +biomass,VOM,4.583775623334041,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +biomass,VOM,4.583775623334041,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +biomass,VOM,4.583775623334041,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative biomass,discount rate,0.0538314857296738,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced biomass,discount rate,0.0538314857296738,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate biomass,discount rate,0.0538314857296738,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3745,18 +3745,18 @@ biomass,discount rate,0.0471698161746512,per unit,"NREL, NREL ATB 2024",Meaning biomass,discount rate,0.0471698161746512,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate biomass,discount rate,0.0471698161746512,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative biomass,efficiency,0.468,per unit,DIW DataDoc http://hdl.handle.net/10419/80348, from old pypsa cost assumptions,2015.0,, -biomass,fuel,73.57007249999998,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -biomass,fuel,73.57007249999998,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -biomass,fuel,73.57007249999998,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -biomass,fuel,73.57007249999998,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -biomass,fuel,73.57007249999998,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -biomass,fuel,73.57007249999998,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -biomass,investment,4778.09277674874,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -biomass,investment,4778.09277674874,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -biomass,investment,4778.09277674874,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -biomass,investment,4778.09277674874,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -biomass,investment,4778.09277674874,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -biomass,investment,4778.09277674874,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +biomass,fuel,64.27517514684027,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +biomass,fuel,64.27517514684027,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +biomass,fuel,64.27517514684027,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +biomass,fuel,64.27517514684027,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +biomass,fuel,64.27517514684027,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +biomass,fuel,64.27517514684027,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +biomass,investment,4174.425002685402,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +biomass,investment,4174.425002685402,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +biomass,investment,4174.425002685402,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +biomass,investment,4174.425002685402,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +biomass,investment,4174.425002685402,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +biomass,investment,4174.425002685402,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative biomass,lifetime,30.0,years,ECF2010 in DIW DataDoc http://hdl.handle.net/10419/80348, from old pypsa cost assumptions,2015.0,, biomass CHP,FOM,3.5822,%/year,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","09c Straw, Large, 40 degree: Fixed O&M",2015.0,, biomass CHP,VOM,2.222,EUR/MWh_e,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","09c Straw, Large, 40 degree: Variable O&M ",2015.0,, @@ -3922,12 +3922,12 @@ coal,FOM,2.14,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data coal,FOM,2.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced coal,FOM,2.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate coal,FOM,2.14,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -coal,VOM,8.9,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -coal,VOM,8.99,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -coal,VOM,9.07,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -coal,VOM,8.9,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -coal,VOM,8.99,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -coal,VOM,9.07,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +coal,VOM,7.775567419848317,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +coal,VOM,7.854196753307456,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +coal,VOM,7.924089494160026,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +coal,VOM,7.775567419848317,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +coal,VOM,7.854196753307456,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +coal,VOM,7.924089494160026,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative coal,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced coal,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate coal,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3935,13 +3935,13 @@ coal,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of coal,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate coal,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative coal,efficiency,0.356,p.u.,"Lazard's levelized cost of energy analysis - version 16.0 (2023): https://www.lazard.com/media/typdgxmm/lazards-lcoeplus-april-2023.pdf , pg. 49 (Levelized Cost of Energy - Key Assumptions), accessed: 2023-12-14.","Calculated based on average of listed range, i.e. 1 / ((8.75+12) MMbtu/MWh_th /2 / (3.4095 MMbtu/MWh_th)), rounded up.",2023.0,, -coal,fuel,8.12,USD/MWh_th,"EIA, https://www.eia.gov/coal/annual/",46.97 USD/short ton of bituminous coal with energy content = 19.73 million BTU/short ton,2023.0,, -coal,investment,3987.63162376685,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -coal,investment,3905.5958263266098,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -coal,investment,3823.56002888637,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -coal,investment,3987.63162376685,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -coal,investment,3905.5958263266098,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -coal,investment,3823.56002888637,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +coal,fuel,6.887488540325987,USD/MWh_th,"EIA, https://www.eia.gov/coal/annual/",46.97 USD/short ton of bituminous coal with energy content = 19.73 million BTU/short ton,2023.0,, +coal,investment,3483.831296193074,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +coal,investment,3412.159962054017,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +coal,investment,3340.4886279149605,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +coal,investment,3483.831296193074,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +coal,investment,3412.159962054017,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +coal,investment,3340.4886279149605,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative coal,lifetime,40.0,years,"Lazard's levelized cost of energy analysis - version 16.0 (2023): https://www.lazard.com/media/typdgxmm/lazards-lcoeplus-april-2023.pdf , pg. 49 (Levelized Cost of Energy - Key Assumptions), accessed: 2023-12-14.",,2023.0,, csp-tower,CF,0.666,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced csp-tower,CF,0.666,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -3955,24 +3955,24 @@ csp-tower,FOM,0.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi csp-tower,FOM,1.08,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced csp-tower,FOM,1.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate csp-tower,FOM,0.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -csp-tower,VOM,2.91,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -csp-tower,VOM,3.0,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -csp-tower,VOM,3.95766,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -csp-tower,VOM,2.91,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -csp-tower,VOM,3.0,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -csp-tower,VOM,3.95766,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +csp-tower,VOM,2.5423484485122025,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +csp-tower,VOM,2.6209777819713427,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +csp-tower,VOM,3.4576463095322345,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +csp-tower,VOM,2.5423484485122025,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +csp-tower,VOM,2.6209777819713427,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +csp-tower,VOM,3.4576463095322345,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative csp-tower,discount rate,0.052579121612842,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced csp-tower,discount rate,0.052579121612842,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate csp-tower,discount rate,0.052579121612842,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative csp-tower,discount rate,0.0416031281240576,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced csp-tower,discount rate,0.0416031281240576,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate csp-tower,discount rate,0.0416031281240576,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -csp-tower,investment,4165.173201214978,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -csp-tower,investment,5179.905077262637,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -csp-tower,investment,7912.019603207439,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -csp-tower,investment,4165.173201214978,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -csp-tower,investment,5179.905077262637,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -csp-tower,investment,7912.019603207439,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +csp-tower,investment,3638.942139482303,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +csp-tower,investment,4525.472040075308,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +csp-tower,investment,6912.409196842806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +csp-tower,investment,3638.942139482303,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +csp-tower,investment,4525.472040075308,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +csp-tower,investment,6912.409196842806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative csp-tower,lifetime,30.0,years,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),-,2020.0,, csp-tower TES,FOM,1.1,%/year,see solar-tower.,-,2020.0,, csp-tower TES,investment,14.52,EUR/kWh_th,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,"Based on NREL’s SAM (v2021.12.2) numbers for a CSP power plant, 2020 numbers. CAPEX degression (=learning) taken from ATB database (“moderate”) scenario. Costs include the TES incl. EPC cost for the default installation size (104 MWe plant, 2.791 MW_th TES). Total costs (69390776.7 USD) are divided by TES size to obtain EUR/kW_th. Exchange rate: 1.16 USD to 1 EUR.",2020.0,, @@ -4038,12 +4038,12 @@ direct air capture,compression-heat-output,0.2,MWh/tCO2,"Danish Energy Agency, i direct air capture,electricity-input,0.24,MWh_el/t_CO2,ICCT IRA e-fuels assumptions ,,,, direct air capture,heat-input,1.17,MWh_th/t_CO2,ICCT IRA e-fuels assumptions ,,,, direct air capture,heat-output,1.0,MWh/tCO2,"Danish Energy Agency, inputs/technology_data_for_carbon_capture_transport_storage.xlsx",403.a Direct air capture,2020.0,, -direct air capture,investment,12398844.91,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -direct air capture,investment,12398844.91,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -direct air capture,investment,19180739.93,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -direct air capture,investment,19180739.93,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -direct air capture,investment,7103597.31,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -direct air capture,investment,7103597.31,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +direct air capture,investment,10832365.677072823,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +direct air capture,investment,10832365.677072823,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +direct air capture,investment,16757431.066100188,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +direct air capture,investment,16757431.066100188,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +direct air capture,investment,6206123.573860465,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +direct air capture,investment,6206123.573860465,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced direct air capture,lifetime,20.0,years,"Danish Energy Agency, inputs/technology_data_for_carbon_capture_transport_storage.xlsx",403.a Direct air capture,2020.0,, direct air capture,years,30.0,years,ICCT IRA e-fuels assumptions ,,,, direct firing gas,FOM,1.1818,%/year,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",312.a Direct firing Natural Gas: Fixed O&M,2019.0,, @@ -4124,7 +4124,7 @@ fuel cell,investment,1164.0438,EUR/kW_e,"Danish Energy Agency, inputs/technology fuel cell,lifetime,10.0,years,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",12 LT-PEMFC CHP: Technical lifetime,2015.0,, fuelwood,fuel,14.5224,EUR/MWhth,"JRC ENSPRESO ca avg for MINBIOWOO (FuelwoodRW), ENS_BaU_GFTM",,2010.0,, gas,CO2 intensity,0.198,tCO2/MWh_th,Stoichiometric calculation with 50 GJ/t CH4,,,, -gas,fuel,14.05,USD/MWh_th,World Bank https://www.worldbank.org/en/research/commodity-markets,,2010.0,, +gas,fuel,16.199297879801314,USD/MWh_th,World Bank https://www.worldbank.org/en/research/commodity-markets,,2010.0,, gas boiler steam,FOM,4.18,%/year,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",311.1c Steam boiler Gas: Fixed O&M,2019.0,, gas boiler steam,VOM,1.007,EUR/MWh,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",311.1c Steam boiler Gas: Variable O&M,2019.0,, gas boiler steam,efficiency,0.93,per unit,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx","311.1c Steam boiler Gas: Total efficiency, net, annual average",2019.0,, @@ -4156,12 +4156,12 @@ geothermal,discount rate,0.0400999293962161,per unit,"NREL, NREL ATB 2024",Meani geothermal,discount rate,0.0400999293962161,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative geothermal,district heat surcharge,25.0,%,Frey et al. 2022: Techno-Economic Assessment of Geothermal Resources in the Variscan Basement of the Northern Upper Rhine Graben,"If capital cost of electric generation from EGS is 100%, district heating adds additional 25%. Costs incurred by piping.",2020.0,, geothermal,district heat-input,0.8,MWh_thdh/MWh_th,"Aghahosseini, Breyer 2020: From hot rock to useful energy: A global estimate of enhanced geothermal systems potential, https://www.sciencedirect.com/science/article/pii/S0306261920312551; Breede et al. 2015: Overcoming challenges in the classification of deep geothermal potential, https://eprints.gla.ac.uk/169585/","Heat-input, District Heat-output. This is an assessment of typical heat losses when heat is transmitted from the EGS plant to the DH network, This is a rough estimate, depends on local conditions",2020.0,, -geothermal,investment,5863.524250014293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -geothermal,investment,6482.25884787322,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -geothermal,investment,6935.767666070807,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -geothermal,investment,5863.524250014293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -geothermal,investment,6482.25884787322,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -geothermal,investment,6935.767666070807,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +geothermal,investment,5122.722261112547,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +geothermal,investment,5663.285472420954,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +geothermal,investment,6059.4976512289395,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +geothermal,investment,5122.722261112547,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +geothermal,investment,5663.285472420954,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +geothermal,investment,6059.4976512289395,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative geothermal,lifetime,30.0,years,"Aghahosseini, Breyer 2020: From hot rock to useful energy: A global estimate of enhanced geothermal systems potential, https://www.sciencedirect.com/science/article/pii/S0306261920312551",,2020.0,, helmeth,FOM,3.0,%/year,no source, from old pypsa cost assumptions,2015.0,, helmeth,efficiency,0.8,per unit,HELMETH press release, from old pypsa cost assumptions,2015.0,, @@ -4192,19 +4192,19 @@ hydro,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of hydro,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate hydro,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative hydro,efficiency,0.9,per unit,DIW DataDoc http://hdl.handle.net/10419/80348, from old pypsa cost assumptions,2015.0,, -hydro,investment,3079.5357414142545,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -hydro,investment,3241.3364440395458,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -hydro,investment,3241.3364440395458,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -hydro,investment,3079.5357414142545,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -hydro,investment,3241.3364440395458,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -hydro,investment,3241.3364440395458,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +hydro,investment,2690.4649190111354,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +hydro,investment,2831.823601240549,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +hydro,investment,2831.823601240549,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +hydro,investment,2690.4649190111354,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +hydro,investment,2831.823601240549,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +hydro,investment,2831.823601240549,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative hydro,lifetime,80.0,years,IEA2010, from old pypsa cost assumptions,2015.0,, hydrogen storage compressor,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,,2022.0,, hydrogen storage compressor,compression-electricity-input,0.05,MWh_el/MWh_H2,"Based on Stöckl et al (2021): https://doi.org/10.48550/arXiv.2005.03464, table SI.4.",1.707 kWh/kg.,,, -hydrogen storage compressor,investment,2.28,USD/kWh_H2,ICCT IRA e-fuels assumptions ,,2022.0,, +hydrogen storage compressor,investment,1.9919431142982202,USD/kWh_H2,ICCT IRA e-fuels assumptions ,,2022.0,, hydrogen storage compressor,lifetime,30.0,years,ICCT IRA e-fuels assumptions ,,,, hydrogen storage tank type 1,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,,2022.0,, -hydrogen storage tank type 1,investment,16.87,USD/kWh_H2,ICCT IRA e-fuels assumptions ,,2022.0,, +hydrogen storage tank type 1,investment,14.738631727285517,USD/kWh_H2,ICCT IRA e-fuels assumptions ,,2022.0,, hydrogen storage tank type 1,lifetime,30.0,years,ICCT IRA e-fuels assumptions ,,,, hydrogen storage tank type 1,min_fill_level,6.0,%,"Based on Stöckl et al (2021): https://doi.org/10.48550/arXiv.2005.03464, table SI.9.",,,, hydrogen storage tank type 1 including compressor,FOM,1.1133,%/year,"Danish Energy Agency, inputs/technology_data_catalogue_for_energy_storage.xlsx",151a Hydrogen Storage - Tanks: Fixed O&M,2015.0,, @@ -4285,12 +4285,12 @@ nuclear,FOM,1.72,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-d nuclear,FOM,1.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced nuclear,FOM,2.3,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate nuclear,FOM,1.72,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -nuclear,VOM,1.9,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -nuclear,VOM,2.8,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -nuclear,VOM,3.4,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -nuclear,VOM,1.9,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -nuclear,VOM,2.8,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -nuclear,VOM,3.4,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +nuclear,VOM,1.6599525952485168,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +nuclear,VOM,2.4462459298399195,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +nuclear,VOM,2.970441486234188,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +nuclear,VOM,1.6599525952485168,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +nuclear,VOM,2.4462459298399195,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +nuclear,VOM,2.970441486234188,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative nuclear,discount rate,0.0564730561021376,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced nuclear,discount rate,0.0564730561021376,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate nuclear,discount rate,0.0564730561021376,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -4298,18 +4298,18 @@ nuclear,discount rate,0.0471844359305569,per unit,"NREL, NREL ATB 2024",Meaning nuclear,discount rate,0.0471844359305569,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate nuclear,discount rate,0.0471844359305569,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative nuclear,efficiency,0.326,p.u.,"Lazard's levelized cost of energy analysis - version 16.0 (2023): https://www.lazard.com/media/typdgxmm/lazards-lcoeplus-april-2023.pdf , pg. 49 (Levelized Cost of Energy - Key Assumptions), accessed: 2023-12-14.","Based on heat rate of 10.45 MMBtu/MWh_e and 3.4095 MMBtu/MWh_th, i.e. 1/(10.45/3.4095) = 0.3260.",2023.0,, -nuclear,fuel,9.13239,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -nuclear,fuel,10.18209,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -nuclear,fuel,11.33676,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -nuclear,fuel,9.13239,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -nuclear,fuel,10.18209,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -nuclear,fuel,11.33676,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -nuclear,investment,6471.3372806070765,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -nuclear,investment,7616.358969954001,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -nuclear,investment,11836.117690043657,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -nuclear,investment,6471.3372806070765,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -nuclear,investment,7616.358969954001,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -nuclear,investment,11836.117690043657,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +nuclear,fuel,7.978597095432423,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +nuclear,fuel,8.895677221344195,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +nuclear,fuel,9.904465359847146,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +nuclear,fuel,7.978597095432423,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +nuclear,fuel,8.895677221344195,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +nuclear,fuel,9.904465359847146,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +nuclear,investment,5653.743744037998,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +nuclear,investment,6654.102546589192,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +nuclear,investment,10340.733830134131,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +nuclear,investment,5653.743744037998,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +nuclear,investment,6654.102546589192,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +nuclear,investment,10340.733830134131,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative nuclear,lifetime,40.0,years,"Lazard's levelized cost of energy analysis - version 16.0 (2023): https://www.lazard.com/media/typdgxmm/lazards-lcoeplus-april-2023.pdf , pg. 49 (Levelized Cost of Energy - Key Assumptions), accessed: 2023-12-14.",,2023.0,, offwind,CF,0.4941,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced offwind,CF,0.4718,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -4329,12 +4329,12 @@ offwind,discount rate,0.0515227657596506,per unit,"NREL, NREL ATB 2024",Meaning offwind,discount rate,0.0401070465062936,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced offwind,discount rate,0.0401070465062936,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate offwind,discount rate,0.0401070465062936,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -offwind,investment,3247.777507897582,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -offwind,investment,4450.059465713347,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -offwind,investment,6942.324850188543,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -offwind,investment,3247.777507897582,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -offwind,investment,4450.059465713347,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -offwind,investment,6942.324850188543,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +offwind,investment,2837.450896328606,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +offwind,investment,3887.8356626953155,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +offwind,investment,6065.226395857233,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +offwind,investment,2837.450896328606,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +offwind,investment,3887.8356626953155,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +offwind,investment,6065.226395857233,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative offwind,lifetime,30.0,years,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",21 Offshore turbines: Technical lifetime [years],2020.0,, offwind-ac-connection-submarine,investment,2841.3251,EUR/MW/km,DEA https://ens.dk/en/our-services/projections-and-models/technology-data, from old pypsa cost assumptions,2015.0,, offwind-ac-connection-underground,investment,1420.1334,EUR/MW/km,DEA https://ens.dk/en/our-services/projections-and-models/technology-data, from old pypsa cost assumptions,2015.0,, @@ -4352,7 +4352,7 @@ oil,CO2 intensity,0.2571,tCO2/MWh_th,Stoichiometric calculation with 44 GJ/t die oil,FOM,2.463,%/year,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",50 Diesel engine farm: Fixed O&M,2015.0,, oil,VOM,6.3493,EUR/MWh,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",50 Diesel engine farm: Variable O&M,2015.0,, oil,efficiency,0.35,per unit,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","50 Diesel engine farm: Electricity efficiency, annual average",2015.0,, -oil,fuel,44.22,USD/MWh_th,World Bank https://www.worldbank.org/en/research/commodity-markets,,2010.0,, +oil,fuel,50.984551761196734,USD/MWh_th,World Bank https://www.worldbank.org/en/research/commodity-markets,,2010.0,, oil,investment,362.97,EUR/kW,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",50 Diesel engine farm: Specific investment,2015.0,, oil,lifetime,25.0,years,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",50 Diesel engine farm: Technical lifetime,2015.0,, onwind,CF,0.508116999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced @@ -4373,12 +4373,12 @@ onwind,discount rate,0.0519007613262936,per unit,"NREL, NREL ATB 2024",Meaning o onwind,discount rate,0.0365777183152598,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced onwind,discount rate,0.0365777183152598,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate onwind,discount rate,0.0365777183152598,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -onwind,investment,1341.672321975661,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -onwind,investment,1407.9532235867798,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -onwind,investment,1577.391784816776,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -onwind,investment,1341.672321975661,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -onwind,investment,1407.9532235867798,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -onwind,investment,1577.391784816776,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +onwind,investment,1172.1644488613695,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +onwind,investment,1230.0713723586266,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +onwind,investment,1378.1029404896303,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +onwind,investment,1172.1644488613695,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +onwind,investment,1230.0713723586266,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +onwind,investment,1378.1029404896303,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative onwind,lifetime,30.0,years,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",20 Onshore turbines: Technical lifetime,2015.0,, organic rankine cycle,FOM,2.0,%/year,"Aghahosseini, Breyer 2020: From hot rock to useful energy: A global estimate of enhanced geothermal systems potential, https://www.sciencedirect.com/science/article/pii/S0306261920312551","Both for flash, binary and ORC plants. See Supplemental Material for details",2020.0,, organic rankine cycle,electricity-input,0.12,MWh_el/MWh_th,"Aghahosseini, Breyer 2020: From hot rock to useful energy: A global estimate of enhanced geothermal systems potential, https://www.sciencedirect.com/science/article/pii/S0306261920312551; Breede et al. 2015: Overcoming challenges in the classification of deep geothermal potential, https://eprints.gla.ac.uk/169585/","Heat-input, Electricity-output. This is a rough estimate, depends on input temperature, implies ~150 C.",2020.0,, @@ -4403,12 +4403,12 @@ ror,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of s ror,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate ror,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative ror,efficiency,0.9,per unit,DIW DataDoc http://hdl.handle.net/10419/80348, from old pypsa cost assumptions,2015.0,, -ror,investment,9005.486475065536,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -ror,investment,9234.349311015783,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -ror,investment,9281.186356512577,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -ror,investment,9005.486475065536,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -ror,investment,9234.349311015783,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -ror,investment,9281.186356512577,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +ror,investment,7867.726655663398,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +ror,investment,8067.674791711581,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +ror,investment,8108.594410251673,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +ror,investment,7867.726655663398,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +ror,investment,8067.674791711581,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +ror,investment,8108.594410251673,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative ror,lifetime,80.0,years,IEA2010, from old pypsa cost assumptions,2015.0,, seawater RO desalination,electricity-input,0.003,MWHh_el/t_H2O,"Caldera et al. (2016): Local cost of seawater RO desalination based on solar PV and windenergy: A global estimate. (https://doi.org/10.1016/j.desal.2016.02.004), Fig. 4.",Desalination using SWRO. Assume medium salinity of 35 Practical Salinity Units (PSUs) = 35 kg/m^3.,,, seawater desalination,FOM,4.0,%/year,"Caldera et al 2016: Local cost of seawater RO desalination based on solar PV and windenergy: A global estimate. (https://doi.org/10.1016/j.desal.2016.02.004), Table 1.",,2015.0,, @@ -4439,12 +4439,12 @@ solar-rooftop,discount rate,0.0461590732529815,per unit,"NREL, NREL ATB 2024",Me solar-rooftop,discount rate,0.0364480268090299,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced solar-rooftop,discount rate,0.0364480268090299,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate solar-rooftop,discount rate,0.0364480268090299,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -solar-rooftop,investment,1310.8854115787103,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -solar-rooftop,investment,1491.8046321857305,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -solar-rooftop,investment,1750.6747869064166,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -solar-rooftop,investment,1310.8854115787103,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -solar-rooftop,investment,1491.8046321857305,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -solar-rooftop,investment,1750.6747869064166,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +solar-rooftop,investment,1145.2671794860528,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +solar-rooftop,investment,1303.3289320002434,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +solar-rooftop,investment,1529.4932399797108,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +solar-rooftop,investment,1145.2671794860528,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +solar-rooftop,investment,1303.3289320002434,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +solar-rooftop,investment,1529.4932399797108,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative solar-rooftop,lifetime,40.0,years,Calculated. See 'further description'.,Mixed investment costs based on average of 50% 'solar-rooftop commercial' and 50% 'solar-rooftop residential',2020.0,, solar-rooftop commercial,FOM,1.573,%/year,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",22 Rooftop PV commercial: Fixed O&M [2020-EUR/MW_e/y],2020.0,, solar-rooftop commercial,investment,565.8069,EUR/kW_e,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",22 Rooftop PV commercial: Nominal investment [2020-MEUR/MW_e],2020.0,, @@ -4470,12 +4470,12 @@ solar-utility,discount rate,0.0438437157985803,per unit,"NREL, NREL ATB 2024",Me solar-utility,discount rate,0.0342774493840203,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced solar-utility,discount rate,0.0342774493840203,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate solar-utility,discount rate,0.0342774493840203,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -solar-utility,investment,1069.5664843527793,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -solar-utility,investment,1193.4809439770536,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -solar-utility,investment,1364.9377461958204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -solar-utility,investment,1069.5664843527793,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -solar-utility,investment,1193.4809439770536,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -solar-utility,investment,1364.9377461958204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +solar-utility,investment,934.4366639432781,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +solar-utility,investment,1042.6956791233474,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +solar-utility,investment,1192.4905021844281,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +solar-utility,investment,934.4366639432781,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +solar-utility,investment,1042.6956791233474,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +solar-utility,investment,1192.4905021844281,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative solar-utility,lifetime,40.0,years,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",22 Utility-scale PV: Technical lifetime [years],2020.0,, solar-utility single-axis tracking,FOM,2.2884,%/year,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",22 Utility-scale PV tracker: Fixed O&M [2020-EUR/MW_e/y],2020.0,, solar-utility single-axis tracking,investment,454.4703,EUR/kW_e,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",22 Utility-scale PV tracker: Nominal investment [2020-MEUR/MW_e],2020.0,, diff --git a/outputs/US/costs_2035.csv b/outputs/US/costs_2035.csv index 6c264a02..d43bfce1 100644 --- a/outputs/US/costs_2035.csv +++ b/outputs/US/costs_2035.csv @@ -6,12 +6,12 @@ Alkaline electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of s Alkaline electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Alkaline electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Alkaline electrolyzer,efficiency,0.715,p.u.,ICCT IRA e-fuels assumptions ,,,, -Alkaline electrolyzer,investment,1092.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Alkaline electrolyzer,investment,1092.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Alkaline electrolyzer,investment,1014.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Alkaline electrolyzer,investment,1014.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Alkaline electrolyzer,investment,614.5,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Alkaline electrolyzer,investment,614.5,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Alkaline electrolyzer,investment,954.0359126375687,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Alkaline electrolyzer,investment,954.0359126375687,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Alkaline electrolyzer,investment,885.8904903063138,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Alkaline electrolyzer,investment,885.8904903063138,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Alkaline electrolyzer,investment,536.8636156737966,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Alkaline electrolyzer,investment,536.8636156737966,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Alkaline electrolyzer,lifetime,30.0,years,ICCT IRA e-fuels assumptions ,,,, Ammonia cracker,FOM,4.3,%/year,"Ishimoto et al. (2020): 10.1016/j.ijhydene.2020.09.017 , table 7.","Estimated based on Labour cost rate, Maintenance cost rate, Insurance rate, Admin. cost rate and Chemical & other consumables cost rate.",2015.0,, Ammonia cracker,ammonia-input,1.46,MWh_NH3/MWh_H2,"ENGIE et al (2020): Ammonia to Green Hydrogen Feasibility Study (https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/880826/HS420_-_Ecuity_-_Ammonia_to_Green_Hydrogen.pdf), Fig. 10.",Assuming a integrated 200t/d cracking and purification facility. Electricity demand (316 MWh per 2186 MWh_LHV H2 output) is assumed to also be ammonia LHV input which seems a fair assumption as the facility has options for a higher degree of integration according to the report).,,, @@ -65,11 +65,11 @@ BioSNG,efficiency,0.6475,per unit,"Danish Energy Agency, inputs/data_sheets_for_ BioSNG,investment,1674.855,EUR/kW_th,"Danish Energy Agency, inputs/data_sheets_for_renewable_fuels.xlsx","84 Gasif. CFB, Bio-SNG: Specific investment",2020.0,, BioSNG,lifetime,25.0,years,TODO,"84 Gasif. CFB, Bio-SNG: Technical lifetime",2020.0,, Biomass gasification,efficiency,0.4375,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Biomass gasification,investment,1467.7693,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Biomass gasification,investment,1978.8508861995015,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Biomass gasification,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Biomass gasification CC,FOM,0.02,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Biomass gasification CC,efficiency,0.421,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Biomass gasification CC,investment,3015.5325,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Biomass gasification CC,investment,4065.5510481055235,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Biomass gasification CC,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, BtL,C in fuel,0.2805,per unit,"Stoichiometric calculation, doi:10.1016/j.apenergy.2022.120016",,,, BtL,C stored,0.7195,per unit,"Stoichiometric calculation, doi:10.1016/j.apenergy.2022.120016",,,, @@ -86,12 +86,12 @@ CCGT,FOM,1.98,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data CCGT,FOM,1.98,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced CCGT,FOM,1.98,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate CCGT,FOM,1.98,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -CCGT,VOM,6.94,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -CCGT,VOM,6.94,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -CCGT,VOM,6.94,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -CCGT,VOM,6.94,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -CCGT,VOM,6.94,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -CCGT,VOM,6.94,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +CCGT,VOM,6.0631952689603725,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +CCGT,VOM,6.0631952689603725,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +CCGT,VOM,6.0631952689603725,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +CCGT,VOM,6.0631952689603725,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +CCGT,VOM,6.0631952689603725,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +CCGT,VOM,6.0631952689603725,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative CCGT,c_b,2.05,50oC/100oC,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","05 Gas turb. CC, steam extract.: Cb coefficient",2015.0,, CCGT,c_v,0.15,50oC/100oC,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","05 Gas turb. CC, steam extract.: Cv coefficient",2015.0,, CCGT,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced @@ -101,12 +101,12 @@ CCGT,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of CCGT,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate CCGT,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative CCGT,efficiency,0.585,per unit,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","05 Gas turb. CC, steam extract.: Electricity efficiency, annual average",2015.0,, -CCGT,investment,1221.4443746510465,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -CCGT,investment,1221.4443746510465,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -CCGT,investment,1221.4443746510465,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -CCGT,investment,1221.4443746510465,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -CCGT,investment,1221.4443746510465,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -CCGT,investment,1221.4443746510465,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +CCGT,investment,1067.1261892914245,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +CCGT,investment,1067.1261892914245,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +CCGT,investment,1067.1261892914245,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +CCGT,investment,1067.1261892914245,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +CCGT,investment,1067.1261892914245,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +CCGT,investment,1067.1261892914245,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative CCGT,lifetime,25.0,years,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","05 Gas turb. CC, steam extract.: Technical lifetime",2015.0,, CH4 (g) fill compressor station,FOM,1.7,%/year,Assume same as for H2 (g) fill compressor station.,-,2020.0,, CH4 (g) fill compressor station,investment,1654.96,EUR/MW_CH4,"Guesstimate, based on H2 (g) pipeline and fill compressor station cost.","Assume same ratio as between H2 (g) pipeline and fill compressor station, i.e. 1:19 , due to a lack of reliable numbers.",2020.0,, @@ -157,18 +157,18 @@ CSP - Class 3,FOM,0.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket= CSP - Class 3,FOM,1.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced CSP - Class 3,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate CSP - Class 3,FOM,0.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -CSP - Class 3,VOM,2.91,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -CSP - Class 3,VOM,3.0,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -CSP - Class 3,VOM,3.95766,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -CSP - Class 3,VOM,2.91,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -CSP - Class 3,VOM,3.0,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -CSP - Class 3,VOM,3.95766,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -CSP - Class 3,investment,3911.490232203063,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -CSP - Class 3,investment,4998.702956539839,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -CSP - Class 3,investment,7912.019603207439,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -CSP - Class 3,investment,3911.490232203063,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -CSP - Class 3,investment,4998.702956539839,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -CSP - Class 3,investment,7912.019603207439,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +CSP - Class 3,VOM,2.5423484485122025,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +CSP - Class 3,VOM,2.6209777819713427,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +CSP - Class 3,VOM,3.4576463095322345,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +CSP - Class 3,VOM,2.5423484485122025,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +CSP - Class 3,VOM,2.6209777819713427,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +CSP - Class 3,VOM,3.4576463095322345,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +CSP - Class 3,investment,3417.309664334052,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +CSP - Class 3,investment,4367.1631292551265,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +CSP - Class 3,investment,6912.409196842806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +CSP - Class 3,investment,3417.309664334052,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +CSP - Class 3,investment,4367.1631292551265,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +CSP - Class 3,investment,6912.409196842806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative CSP - Class 8,CF,0.514,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced CSP - Class 8,CF,0.514,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate CSP - Class 8,CF,0.514,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -181,18 +181,18 @@ CSP - Class 8,FOM,0.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket= CSP - Class 8,FOM,1.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced CSP - Class 8,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate CSP - Class 8,FOM,0.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -CSP - Class 8,VOM,2.91,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -CSP - Class 8,VOM,3.0,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -CSP - Class 8,VOM,3.95766,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -CSP - Class 8,VOM,2.91,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -CSP - Class 8,VOM,3.0,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -CSP - Class 8,VOM,3.95766,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -CSP - Class 8,investment,3911.490232203063,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -CSP - Class 8,investment,4998.702956539839,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -CSP - Class 8,investment,7912.019603207439,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -CSP - Class 8,investment,3911.490232203063,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -CSP - Class 8,investment,4998.702956539839,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -CSP - Class 8,investment,7912.019603207439,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +CSP - Class 8,VOM,2.5423484485122025,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +CSP - Class 8,VOM,2.6209777819713427,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +CSP - Class 8,VOM,3.4576463095322345,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +CSP - Class 8,VOM,2.5423484485122025,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +CSP - Class 8,VOM,2.6209777819713427,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +CSP - Class 8,VOM,3.4576463095322345,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +CSP - Class 8,investment,3417.309664334052,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +CSP - Class 8,investment,4367.1631292551265,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +CSP - Class 8,investment,6912.409196842806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +CSP - Class 8,investment,3417.309664334052,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +CSP - Class 8,investment,4367.1631292551265,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +CSP - Class 8,investment,6912.409196842806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Charging infrastructure fast (purely) battery electric vehicles passenger cars,FOM,1.6,%,PATHS TO A CLIMATE-NEUTRAL ENERGY SYSTEM The German energy transformation in its social context. https://www.ise.fraunhofer.de/en/publications/studies/paths-to-a-climate-neutral-energy-system.html,Charging infrastructure fast (purely) battery electric vehicles passenger cars,2020.0,, Charging infrastructure fast (purely) battery electric vehicles passenger cars,investment,448894.0,EUR/Lades�ule,PATHS TO A CLIMATE-NEUTRAL ENERGY SYSTEM The German energy transformation in its social context. https://www.ise.fraunhofer.de/en/publications/studies/paths-to-a-climate-neutral-energy-system.html,Charging infrastructure fast (purely) battery electric vehicles passenger cars,2020.0,, Charging infrastructure fast (purely) battery electric vehicles passenger cars,lifetime,30.0,years,PATHS TO A CLIMATE-NEUTRAL ENERGY SYSTEM The German energy transformation in its social context. https://www.ise.fraunhofer.de/en/publications/studies/paths-to-a-climate-neutral-energy-system.html,Charging infrastructure fast (purely) battery electric vehicles passenger cars,2020.0,, @@ -211,25 +211,25 @@ Coal - IGCC,FOM,2.38,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oe Coal - IGCC,FOM,2.39,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Coal - IGCC,FOM,2.38,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal - IGCC,FOM,2.38,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Coal - IGCC,VOM,15.37,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal - IGCC,VOM,15.74,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal - IGCC,VOM,16.11,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal - IGCC,VOM,15.37,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal - IGCC,VOM,15.74,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal - IGCC,VOM,16.11,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Coal - IGCC,investment,6543.343228960835,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal - IGCC,investment,6706.302892851915,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal - IGCC,investment,6869.262556742994,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal - IGCC,investment,6543.343228960835,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal - IGCC,investment,6706.302892851915,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal - IGCC,investment,6869.262556742994,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal - IGCC,VOM,13.428142836299845,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal - IGCC,VOM,13.751396762742978,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal - IGCC,VOM,14.07465068918611,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal - IGCC,VOM,13.428142836299845,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal - IGCC,VOM,13.751396762742978,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal - IGCC,VOM,14.07465068918611,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal - IGCC,investment,5716.652407639658,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal - IGCC,investment,5859.02362711167,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal - IGCC,investment,6001.394846583682,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal - IGCC,investment,5716.652407639658,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal - IGCC,investment,5859.02362711167,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal - IGCC,investment,6001.394846583682,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal gasification,FOM,0.06,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Coal gasification,efficiency,0.6735,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Coal gasification,investment,399.2305,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Coal gasification,investment,538.2432903364873,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Coal gasification,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Coal gasification CC,FOM,0.07,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Coal gasification CC,efficiency,0.609,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Coal gasification CC,investment,649.5969,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Coal gasification CC,investment,875.7882332041481,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Coal gasification CC,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Coal integrated retrofit 90%-CCS,FOM,9.78,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal integrated retrofit 90%-CCS,FOM,8.6,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -237,52 +237,52 @@ Coal integrated retrofit 90%-CCS,FOM,7.78,%/year,NREL/ATB-https://data.openei.or Coal integrated retrofit 90%-CCS,FOM,9.78,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Coal integrated retrofit 90%-CCS,FOM,8.6,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal integrated retrofit 90%-CCS,FOM,7.78,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Coal integrated retrofit 90%-CCS,VOM,15.08,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal integrated retrofit 90%-CCS,VOM,16.2,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal integrated retrofit 90%-CCS,VOM,17.32,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal integrated retrofit 90%-CCS,VOM,15.08,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal integrated retrofit 90%-CCS,VOM,16.2,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal integrated retrofit 90%-CCS,VOM,17.32,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal integrated retrofit 90%-CCS,VOM,13.174781650709281,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal integrated retrofit 90%-CCS,VOM,14.15328002264525,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal integrated retrofit 90%-CCS,VOM,15.131778394581218,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal integrated retrofit 90%-CCS,VOM,13.174781650709281,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal integrated retrofit 90%-CCS,VOM,14.15328002264525,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal integrated retrofit 90%-CCS,VOM,15.131778394581218,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal integrated retrofit 90%-CCS,capture_rate,0.9,per unit,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, Coal integrated retrofit 90%-CCS,efficiency,0.386,p.u.,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, -Coal integrated retrofit 90%-CCS,investment,1369.6,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal integrated retrofit 90%-CCS,investment,1674.4,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal integrated retrofit 90%-CCS,investment,1979.2,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal integrated retrofit 90%-CCS,investment,1369.6,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal integrated retrofit 90%-CCS,investment,1674.4,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal integrated retrofit 90%-CCS,investment,1979.2,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal integrated retrofit 90%-CCS,investment,1196.5637233959835,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal integrated retrofit 90%-CCS,investment,1462.855066044272,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal integrated retrofit 90%-CCS,investment,1729.1464086925605,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal integrated retrofit 90%-CCS,investment,1196.5637233959835,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal integrated retrofit 90%-CCS,investment,1462.855066044272,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal integrated retrofit 90%-CCS,investment,1729.1464086925605,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal integrated retrofit 95%-CCS,FOM,9.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal integrated retrofit 95%-CCS,FOM,8.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Coal integrated retrofit 95%-CCS,FOM,7.62,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Coal integrated retrofit 95%-CCS,FOM,9.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Coal integrated retrofit 95%-CCS,FOM,8.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal integrated retrofit 95%-CCS,FOM,7.62,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Coal integrated retrofit 95%-CCS,VOM,15.34,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal integrated retrofit 95%-CCS,VOM,16.53,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal integrated retrofit 95%-CCS,VOM,17.72,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal integrated retrofit 95%-CCS,VOM,15.34,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal integrated retrofit 95%-CCS,VOM,16.53,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal integrated retrofit 95%-CCS,VOM,17.72,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal integrated retrofit 95%-CCS,VOM,13.401933058480132,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal integrated retrofit 95%-CCS,VOM,14.441587578662098,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal integrated retrofit 95%-CCS,VOM,15.481242098844062,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal integrated retrofit 95%-CCS,VOM,13.401933058480132,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal integrated retrofit 95%-CCS,VOM,14.441587578662098,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal integrated retrofit 95%-CCS,VOM,15.481242098844062,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal integrated retrofit 95%-CCS,capture_rate,0.95,per unit,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, Coal integrated retrofit 95%-CCS,efficiency,0.386,p.u.,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, -Coal integrated retrofit 95%-CCS,investment,1424.5,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal integrated retrofit 95%-CCS,investment,1746.5,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal integrated retrofit 95%-CCS,investment,2068.5,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal integrated retrofit 95%-CCS,investment,1424.5,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal integrated retrofit 95%-CCS,investment,1746.5,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal integrated retrofit 95%-CCS,investment,2068.5,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal integrated retrofit 95%-CCS,investment,1244.527616806059,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal integrated retrofit 95%-CCS,investment,1525.84589873765,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal integrated retrofit 95%-CCS,investment,1807.1641806692407,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal integrated retrofit 95%-CCS,investment,1244.527616806059,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal integrated retrofit 95%-CCS,investment,1525.84589873765,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal integrated retrofit 95%-CCS,investment,1807.1641806692407,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-95%-CCS,FOM,2.1,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal-95%-CCS,FOM,2.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Coal-95%-CCS,FOM,2.07,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Coal-95%-CCS,FOM,2.1,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Coal-95%-CCS,FOM,2.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal-95%-CCS,FOM,2.07,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Coal-95%-CCS,VOM,12.99,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal-95%-CCS,VOM,14.22,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal-95%-CCS,VOM,15.44,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal-95%-CCS,VOM,12.99,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal-95%-CCS,VOM,14.22,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal-95%-CCS,VOM,15.44,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal-95%-CCS,VOM,11.348833795935914,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal-95%-CCS,VOM,12.423434686544164,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal-95%-CCS,VOM,13.489298984545842,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal-95%-CCS,VOM,11.348833795935914,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal-95%-CCS,VOM,12.423434686544164,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal-95%-CCS,VOM,13.489298984545842,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-95%-CCS,capture_rate,0.95,per unit,"NREL, NREL ATB 2024",,,, Coal-95%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal-95%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -291,12 +291,12 @@ Coal-95%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Mea Coal-95%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal-95%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-95%-CCS,efficiency,0.403,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Coal-95%-CCS,investment,5464.8937171297275,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal-95%-CCS,investment,5681.967355838315,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal-95%-CCS,investment,5899.040994546902,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal-95%-CCS,investment,5464.8937171297275,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal-95%-CCS,investment,5681.967355838315,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal-95%-CCS,investment,5899.040994546902,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal-95%-CCS,investment,4774.455004477266,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal-95%-CCS,investment,4964.10339917956,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal-95%-CCS,investment,5153.751793881854,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal-95%-CCS,investment,4774.455004477266,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal-95%-CCS,investment,4964.10339917956,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal-95%-CCS,investment,5153.751793881854,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-95%-CCS,lifetime,40.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Coal-99%-CCS,FOM,2.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal-99%-CCS,FOM,2.08,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -304,12 +304,12 @@ Coal-99%-CCS,FOM,2.07,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=o Coal-99%-CCS,FOM,2.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Coal-99%-CCS,FOM,2.08,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal-99%-CCS,FOM,2.07,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Coal-99%-CCS,VOM,13.22,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal-99%-CCS,VOM,14.52,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal-99%-CCS,VOM,15.82,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal-99%-CCS,VOM,13.22,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal-99%-CCS,VOM,14.52,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal-99%-CCS,VOM,15.82,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal-99%-CCS,VOM,11.54977542588705,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal-99%-CCS,VOM,12.685532464741298,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal-99%-CCS,VOM,13.821289503595546,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal-99%-CCS,VOM,11.54977542588705,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal-99%-CCS,VOM,12.685532464741298,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal-99%-CCS,VOM,13.821289503595546,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-99%-CCS,capture_rate,0.99,per unit,"NREL, NREL ATB 2024",,,, Coal-99%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal-99%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -318,12 +318,12 @@ Coal-99%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Mea Coal-99%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal-99%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-99%-CCS,efficiency,0.403,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Coal-99%-CCS,investment,5544.211461040321,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal-99%-CCS,investment,5788.465635045373,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal-99%-CCS,investment,6032.596261162715,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal-99%-CCS,investment,5544.211461040321,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal-99%-CCS,investment,5788.465635045373,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal-99%-CCS,investment,6032.596261162715,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal-99%-CCS,investment,4843.751685979186,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal-99%-CCS,investment,5057.146607052854,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal-99%-CCS,investment,5270.433589370288,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal-99%-CCS,investment,4843.751685979186,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal-99%-CCS,investment,5057.146607052854,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal-99%-CCS,investment,5270.433589370288,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-99%-CCS,lifetime,40.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Coal-IGCC,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal-IGCC,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -339,12 +339,12 @@ Coal-IGCC-90%-CCS,FOM,2.37,%/year,NREL/ATB-https://data.openei.org/s3_viewer?buc Coal-IGCC-90%-CCS,FOM,2.37,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Coal-IGCC-90%-CCS,FOM,2.37,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal-IGCC-90%-CCS,FOM,2.37,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Coal-IGCC-90%-CCS,VOM,22.86,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal-IGCC-90%-CCS,VOM,23.4,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal-IGCC-90%-CCS,VOM,23.94,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal-IGCC-90%-CCS,VOM,22.86,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal-IGCC-90%-CCS,VOM,23.4,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal-IGCC-90%-CCS,VOM,23.94,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal-IGCC-90%-CCS,VOM,19.97185069862163,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal-IGCC-90%-CCS,VOM,20.44362669937647,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal-IGCC-90%-CCS,VOM,20.915402700131313,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal-IGCC-90%-CCS,VOM,19.97185069862163,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal-IGCC-90%-CCS,VOM,20.44362669937647,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal-IGCC-90%-CCS,VOM,20.915402700131313,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-IGCC-90%-CCS,capture_rate,0.9,per unit,"NREL, NREL ATB 2024",,,, Coal-IGCC-90%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal-IGCC-90%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -353,12 +353,12 @@ Coal-IGCC-90%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024 Coal-IGCC-90%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal-IGCC-90%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-IGCC-90%-CCS,efficiency,0.403,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Coal-IGCC-90%-CCS,investment,9298.95531647155,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal-IGCC-90%-CCS,investment,9529.001483389817,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal-IGCC-90%-CCS,investment,9759.171198195789,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal-IGCC-90%-CCS,investment,9298.95531647155,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal-IGCC-90%-CCS,investment,9529.001483389817,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal-IGCC-90%-CCS,investment,9759.171198195789,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal-IGCC-90%-CCS,investment,8124.118426672077,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal-IGCC-90%-CCS,investment,8325.10039077889,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal-IGCC-90%-CCS,investment,8526.190293641936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal-IGCC-90%-CCS,investment,8124.118426672077,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal-IGCC-90%-CCS,investment,8325.10039077889,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal-IGCC-90%-CCS,investment,8526.190293641936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-IGCC-90%-CCS,lifetime,40.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Commercial Battery Storage 1Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial Battery Storage 1Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -366,60 +366,60 @@ Commercial Battery Storage 1Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/ Commercial Battery Storage 1Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial Battery Storage 1Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial Battery Storage 1Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial Battery Storage 1Hr,investment,719.8762917955719,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial Battery Storage 1Hr,investment,993.556390201665,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial Battery Storage 1Hr,investment,1240.8146015422617,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial Battery Storage 1Hr,investment,719.8762917955719,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial Battery Storage 1Hr,investment,993.556390201665,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial Battery Storage 1Hr,investment,1240.8146015422617,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial Battery Storage 1Hr,investment,628.9265888547043,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial Battery Storage 1Hr,investment,868.0297412847378,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial Battery Storage 1Hr,investment,1084.049167395964,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial Battery Storage 1Hr,investment,628.9265888547043,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial Battery Storage 1Hr,investment,868.0297412847378,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial Battery Storage 1Hr,investment,1084.049167395964,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial Battery Storage 2Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial Battery Storage 2Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial Battery Storage 2Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Commercial Battery Storage 2Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial Battery Storage 2Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial Battery Storage 2Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial Battery Storage 2Hr,investment,861.6489467102847,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial Battery Storage 2Hr,investment,1162.2824880116057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial Battery Storage 2Hr,investment,1485.1810049402825,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial Battery Storage 2Hr,investment,861.6489467102847,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial Battery Storage 2Hr,investment,1162.2824880116057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial Battery Storage 2Hr,investment,1485.1810049402825,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial Battery Storage 2Hr,investment,752.7875817288885,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial Battery Storage 2Hr,investment,1015.4388591509306,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial Battery Storage 2Hr,investment,1297.542138718117,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial Battery Storage 2Hr,investment,752.7875817288885,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial Battery Storage 2Hr,investment,1015.4388591509306,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial Battery Storage 2Hr,investment,1297.542138718117,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial Battery Storage 4Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial Battery Storage 4Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial Battery Storage 4Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Commercial Battery Storage 4Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial Battery Storage 4Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial Battery Storage 4Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial Battery Storage 4Hr,investment,1145.1942565397103,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial Battery Storage 4Hr,investment,1499.734683631487,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial Battery Storage 4Hr,investment,1973.9138117363236,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial Battery Storage 4Hr,investment,1145.1942565397103,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial Battery Storage 4Hr,investment,1499.734683631487,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial Battery Storage 4Hr,investment,1973.9138117363236,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial Battery Storage 4Hr,investment,1000.5095674772568,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial Battery Storage 4Hr,investment,1310.257094883316,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial Battery Storage 4Hr,investment,1724.5280813624227,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial Battery Storage 4Hr,investment,1000.5095674772568,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial Battery Storage 4Hr,investment,1310.257094883316,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial Battery Storage 4Hr,investment,1724.5280813624227,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial Battery Storage 6Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial Battery Storage 6Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial Battery Storage 6Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Commercial Battery Storage 6Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial Battery Storage 6Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial Battery Storage 6Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial Battery Storage 6Hr,investment,1428.7395663691364,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial Battery Storage 6Hr,investment,1837.1868792513685,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial Battery Storage 6Hr,investment,2462.6466185323648,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial Battery Storage 6Hr,investment,1428.7395663691364,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial Battery Storage 6Hr,investment,1837.1868792513685,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial Battery Storage 6Hr,investment,2462.6466185323648,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial Battery Storage 6Hr,investment,1248.2315532256257,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial Battery Storage 6Hr,investment,1605.0753306157014,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial Battery Storage 6Hr,investment,2151.514024006728,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial Battery Storage 6Hr,investment,1248.2315532256257,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial Battery Storage 6Hr,investment,1605.0753306157014,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial Battery Storage 6Hr,investment,2151.514024006728,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial Battery Storage 8Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial Battery Storage 8Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial Battery Storage 8Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Commercial Battery Storage 8Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial Battery Storage 8Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial Battery Storage 8Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial Battery Storage 8Hr,investment,1712.2848761985622,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial Battery Storage 8Hr,investment,2174.63907487125,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial Battery Storage 8Hr,investment,2951.379425328406,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial Battery Storage 8Hr,investment,1712.2848761985622,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial Battery Storage 8Hr,investment,2174.63907487125,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial Battery Storage 8Hr,investment,2951.379425328406,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial Battery Storage 8Hr,investment,1495.9535389739942,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial Battery Storage 8Hr,investment,1899.8935663480872,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial Battery Storage 8Hr,investment,2578.4999666510334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial Battery Storage 8Hr,investment,1495.9535389739942,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial Battery Storage 8Hr,investment,1899.8935663480872,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial Battery Storage 8Hr,investment,2578.4999666510334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 1,CF,0.572448,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 1,CF,0.572448,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 1,CF,0.572448,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -432,12 +432,12 @@ Commercial DW - Class 1,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 1,FOM,2.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 1,FOM,1.49,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 1,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 1,investment,1754.464758936496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 1,investment,2515.5321234912035,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 1,investment,3646.351471133737,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 1,investment,1754.464758936496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 1,investment,2515.5321234912035,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 1,investment,3646.351471133737,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 1,investment,1532.8043841414212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 1,investment,2197.7179351685454,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 1,investment,3185.6687303666813,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 1,investment,1532.8043841414212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 1,investment,2197.7179351685454,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 1,investment,3185.6687303666813,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 10,CF,0.221877,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 10,CF,0.221877,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 10,CF,0.221877,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -450,12 +450,12 @@ Commercial DW - Class 10,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_vie Commercial DW - Class 10,FOM,2.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 10,FOM,1.49,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 10,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 10,investment,1754.464758936496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 10,investment,2515.5321234912035,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 10,investment,3646.351471133737,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 10,investment,1754.464758936496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 10,investment,2515.5321234912035,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 10,investment,3646.351471133737,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 10,investment,1532.8043841414212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 10,investment,2197.7179351685454,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 10,investment,3185.6687303666813,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 10,investment,1532.8043841414212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 10,investment,2197.7179351685454,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 10,investment,3185.6687303666813,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 2,CF,0.537382,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 2,CF,0.537382,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 2,CF,0.537382,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -468,12 +468,12 @@ Commercial DW - Class 2,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 2,FOM,2.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 2,FOM,1.49,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 2,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 2,investment,1754.464758936496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 2,investment,2515.5321234912035,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 2,investment,3646.351471133737,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 2,investment,1754.464758936496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 2,investment,2515.5321234912035,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 2,investment,3646.351471133737,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 2,investment,1532.8043841414212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 2,investment,2197.7179351685454,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 2,investment,3185.6687303666813,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 2,investment,1532.8043841414212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 2,investment,2197.7179351685454,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 2,investment,3185.6687303666813,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 3,CF,0.524922,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 3,CF,0.524922,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 3,CF,0.524922,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -486,12 +486,12 @@ Commercial DW - Class 3,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 3,FOM,2.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 3,FOM,1.49,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 3,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 3,investment,1754.464758936496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 3,investment,2515.5321234912035,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 3,investment,3646.351471133737,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 3,investment,1754.464758936496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 3,investment,2515.5321234912035,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 3,investment,3646.351471133737,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 3,investment,1532.8043841414212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 3,investment,2197.7179351685454,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 3,investment,3185.6687303666813,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 3,investment,1532.8043841414212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 3,investment,2197.7179351685454,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 3,investment,3185.6687303666813,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 4,CF,0.5118389999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 4,CF,0.5118389999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 4,CF,0.5118389999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -504,12 +504,12 @@ Commercial DW - Class 4,FOM,1.05,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 4,FOM,2.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 4,FOM,1.36,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 4,FOM,1.05,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 4,investment,1754.464758936496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 4,investment,2741.2833469945417,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 4,investment,3563.668351092904,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 4,investment,1754.464758936496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 4,investment,2741.2833469945417,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 4,investment,3563.668351092904,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 4,investment,1532.8043841414212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 4,investment,2394.947582186911,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 4,investment,3113.4318568429835,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 4,investment,1532.8043841414212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 4,investment,2394.947582186911,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 4,investment,3113.4318568429835,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 5,CF,0.495463,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 5,CF,0.495463,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 5,CF,0.495463,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -522,12 +522,12 @@ Commercial DW - Class 5,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 5,FOM,2.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 5,FOM,1.49,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 5,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 5,investment,1754.464758936496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 5,investment,2515.5321234912035,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 5,investment,3646.351471133737,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 5,investment,1754.464758936496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 5,investment,2515.5321234912035,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 5,investment,3646.351471133737,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 5,investment,1532.8043841414212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 5,investment,2197.7179351685454,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 5,investment,3185.6687303666813,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 5,investment,1532.8043841414212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 5,investment,2197.7179351685454,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 5,investment,3185.6687303666813,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 6,CF,0.470365,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 6,CF,0.470365,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 6,CF,0.470365,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -540,12 +540,12 @@ Commercial DW - Class 6,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 6,FOM,2.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 6,FOM,1.49,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 6,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 6,investment,1754.464758936496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 6,investment,2515.5321234912035,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 6,investment,3646.351471133737,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 6,investment,1754.464758936496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 6,investment,2515.5321234912035,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 6,investment,3646.351471133737,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 6,investment,1532.8043841414212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 6,investment,2197.7179351685454,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 6,investment,3185.6687303666813,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 6,investment,1532.8043841414212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 6,investment,2197.7179351685454,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 6,investment,3185.6687303666813,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 7,CF,0.433786,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 7,CF,0.433786,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 7,CF,0.433786,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -558,12 +558,12 @@ Commercial DW - Class 7,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 7,FOM,2.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 7,FOM,1.49,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 7,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 7,investment,1754.464758936496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 7,investment,2515.5321234912035,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 7,investment,3646.351471133737,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 7,investment,1754.464758936496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 7,investment,2515.5321234912035,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 7,investment,3646.351471133737,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 7,investment,1532.8043841414212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 7,investment,2197.7179351685454,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 7,investment,3185.6687303666813,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 7,investment,1532.8043841414212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 7,investment,2197.7179351685454,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 7,investment,3185.6687303666813,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 8,CF,0.388129,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 8,CF,0.388129,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 8,CF,0.388129,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -576,12 +576,12 @@ Commercial DW - Class 8,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 8,FOM,2.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 8,FOM,1.49,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 8,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 8,investment,1754.464758936496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 8,investment,2515.5321234912035,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 8,investment,3646.351471133737,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 8,investment,1754.464758936496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 8,investment,2515.5321234912035,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 8,investment,3646.351471133737,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 8,investment,1532.8043841414212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 8,investment,2197.7179351685454,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 8,investment,3185.6687303666813,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 8,investment,1532.8043841414212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 8,investment,2197.7179351685454,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 8,investment,3185.6687303666813,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 9,CF,0.332237,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 9,CF,0.332237,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 9,CF,0.332237,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -594,12 +594,12 @@ Commercial DW - Class 9,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 9,FOM,2.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 9,FOM,1.49,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 9,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 9,investment,1754.464758936496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 9,investment,2515.5321234912035,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 9,investment,3646.351471133737,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 9,investment,1754.464758936496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 9,investment,2515.5321234912035,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 9,investment,3646.351471133737,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 9,investment,1532.8043841414212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 9,investment,2197.7179351685454,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 9,investment,3185.6687303666813,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 9,investment,1532.8043841414212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 9,investment,2197.7179351685454,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 9,investment,3185.6687303666813,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 10,CF,0.13597816439564503,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 10,CF,0.12954185706408672,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 10,CF,0.11974504956396947,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -612,12 +612,12 @@ Commercial PV - Class 10,FOM,1.04,%/year,NREL/ATB-https://data.openei.org/s3_vie Commercial PV - Class 10,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 10,FOM,1.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 10,FOM,1.04,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 10,investment,929.2122343748616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 10,investment,1239.359469701182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 10,investment,1683.1368777937876,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 10,investment,929.2122343748616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 10,investment,1239.359469701182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 10,investment,1683.1368777937876,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 10,investment,811.8148736774867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 10,investment,1082.7778779875277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 10,investment,1470.488120238044,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 10,investment,811.8148736774867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 10,investment,1082.7778779875277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 10,investment,1470.488120238044,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 2,CF,0.20384222972706023,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 2,CF,0.19419368620167424,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 2,CF,0.17950748203127412,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -630,12 +630,12 @@ Commercial PV - Class 2,FOM,1.04,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 2,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 2,FOM,1.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 2,FOM,1.04,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 2,investment,929.2122343748616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 2,investment,1239.359469701182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 2,investment,1683.1368777937876,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 2,investment,929.2122343748616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 2,investment,1239.359469701182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 2,investment,1683.1368777937876,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 2,investment,811.8148736774867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 2,investment,1082.7778779875277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 2,investment,1470.488120238044,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 2,investment,811.8148736774867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 2,investment,1082.7778779875277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 2,investment,1470.488120238044,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 3,CF,0.19296062012987605,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 3,CF,0.1838271400629563,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 3,CF,0.16992492231411763,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -648,12 +648,12 @@ Commercial PV - Class 3,FOM,1.04,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 3,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 3,FOM,1.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 3,FOM,1.04,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 3,investment,929.2122343748616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 3,investment,1239.359469701182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 3,investment,1683.1368777937876,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 3,investment,929.2122343748616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 3,investment,1239.359469701182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 3,investment,1683.1368777937876,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 3,investment,811.8148736774867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 3,investment,1082.7778779875277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 3,investment,1470.488120238044,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 3,investment,811.8148736774867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 3,investment,1082.7778779875277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 3,investment,1470.488120238044,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 4,CF,0.18276453428931144,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 4,CF,0.17411366951831436,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 4,CF,0.160946048317963,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -666,12 +666,12 @@ Commercial PV - Class 4,FOM,1.04,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 4,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 4,FOM,1.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 4,FOM,1.04,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 4,investment,929.2122343748616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 4,investment,1239.359469701182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 4,investment,1683.1368777937876,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 4,investment,929.2122343748616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 4,investment,1239.359469701182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 4,investment,1683.1368777937876,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 4,investment,811.8148736774867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 4,investment,1082.7778779875277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 4,investment,1470.488120238044,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 4,investment,811.8148736774867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 4,investment,1082.7778779875277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 4,investment,1470.488120238044,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 5,CF,0.1744086558665422,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 5,CF,0.16615330313818158,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 5,CF,0.1535876972155484,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -684,12 +684,12 @@ Commercial PV - Class 5,FOM,1.04,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 5,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 5,FOM,1.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 5,FOM,1.04,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 5,investment,929.2122343748616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 5,investment,1239.359469701182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 5,investment,1683.1368777937876,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 5,investment,929.2122343748616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 5,investment,1239.359469701182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 5,investment,1683.1368777937876,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 5,investment,811.8148736774867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 5,investment,1082.7778779875277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 5,investment,1470.488120238044,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 5,investment,811.8148736774867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 5,investment,1082.7778779875277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 5,investment,1470.488120238044,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 6,CF,0.1720958860039385,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 6,CF,0.16395000451082395,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 6,CF,0.15155102652611524,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -702,12 +702,12 @@ Commercial PV - Class 6,FOM,1.04,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 6,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 6,FOM,1.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 6,FOM,1.04,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 6,investment,929.2122343748616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 6,investment,1239.359469701182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 6,investment,1683.1368777937876,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 6,investment,929.2122343748616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 6,investment,1239.359469701182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 6,investment,1683.1368777937876,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 6,investment,811.8148736774867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 6,investment,1082.7778779875277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 6,investment,1470.488120238044,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 6,investment,811.8148736774867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 6,investment,1082.7778779875277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 6,investment,1470.488120238044,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 7,CF,0.16397297153708384,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 7,CF,0.15621157511309053,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 7,CF,0.1443978280713452,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -720,12 +720,12 @@ Commercial PV - Class 7,FOM,1.04,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 7,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 7,FOM,1.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 7,FOM,1.04,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 7,investment,929.2122343748616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 7,investment,1239.359469701182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 7,investment,1683.1368777937876,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 7,investment,929.2122343748616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 7,investment,1239.359469701182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 7,investment,1683.1368777937876,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 7,investment,811.8148736774867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 7,investment,1082.7778779875277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 7,investment,1470.488120238044,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 7,investment,811.8148736774867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 7,investment,1082.7778779875277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 7,investment,1470.488120238044,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 8,CF,0.1557303607632934,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 8,CF,0.1483591150402624,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 8,CF,0.13713922269135043,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -738,12 +738,12 @@ Commercial PV - Class 8,FOM,1.04,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 8,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 8,FOM,1.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 8,FOM,1.04,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 8,investment,929.2122343748616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 8,investment,1239.359469701182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 8,investment,1683.1368777937876,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 8,investment,929.2122343748616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 8,investment,1239.359469701182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 8,investment,1683.1368777937876,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 8,investment,811.8148736774867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 8,investment,1082.7778779875277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 8,investment,1470.488120238044,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 8,investment,811.8148736774867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 8,investment,1082.7778779875277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 8,investment,1470.488120238044,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 9,CF,0.1494840757014975,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 9,CF,0.14240848781821538,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 9,CF,0.1316386210496107,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -756,12 +756,12 @@ Commercial PV - Class 9,FOM,1.04,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 9,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 9,FOM,1.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 9,FOM,1.04,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 9,investment,929.2122343748616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 9,investment,1239.359469701182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 9,investment,1683.1368777937876,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 9,investment,929.2122343748616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 9,investment,1239.359469701182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 9,investment,1683.1368777937876,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 9,investment,811.8148736774867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 9,investment,1082.7778779875277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 9,investment,1470.488120238044,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 9,investment,811.8148736774867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 9,investment,1082.7778779875277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 9,investment,1470.488120238044,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Compressed-Air-Adiabatic-bicharger,FOM,0.9265,%/year,"Viswanathan_2022, p.64 (p.86) Figure 4.14","{'carrier': ['elec', 'pair', 'elec'], 'technology_type': ['bicharger'], 'type': ['mechanical'], 'note': ['NULL']}",2020.0,, Compressed-Air-Adiabatic-bicharger,efficiency,0.7211,per unit,"Viswanathan_2022, p.59 (p.81)","{'carrier': ['elec', 'pair', 'elec'], 'technology_type': ['bicharger'], 'type': ['mechanical'], 'note': ['AC-AC efficiency at transformer level 0.52^0.5']}",2020.0,, Compressed-Air-Adiabatic-bicharger,investment,946180.9426,EUR/MW,"Viswanathan_2022, p.59 (p.81)","{'carrier': ['elec', 'pair', 'elec'], 'technology_type': ['bicharger'], 'type': ['mechanical'], 'note': ['Turbine Compressor BOP EPC Management']}",2020.0,, @@ -869,7 +869,7 @@ Fischer-Tropsch,carbondioxide-input,0.32,t_CO2/MWh_FT,ICCT IRA e-fuels assumptio Fischer-Tropsch,efficiency,0.7,per unit,ICCT IRA e-fuels assumptions ,,,, Fischer-Tropsch,electricity-input,0.04,MWh_el/MWh_FT,ICCT IRA e-fuels assumptions ,"0.005 MWh_el input per FT output, output increasing from 2020 to 2050 (0.65, 0.7, 0.73, 0.75 MWh liquid FT output).",,, Fischer-Tropsch,hydrogen-input,1.43,MWh_H2/MWh_FT,ICCT IRA e-fuels assumptions ,"0.995 MWh_H2 per output, output increasing from 2020 to 2050 (0.65, 0.7, 0.73, 0.75 MWh liquid FT output).",,, -Fischer-Tropsch,investment,1696429.0,USD/MW_FT,ICCT IRA e-fuels assumptions ,,2022.0,, +Fischer-Tropsch,investment,1482100.9058972877,USD/MW_FT,ICCT IRA e-fuels assumptions ,,2022.0,, Fischer-Tropsch,lifetime,30.0,years,ICCT IRA e-fuels assumptions ,,,, Gasnetz,FOM,2.5,%,"WEGE ZU EINEM KLIMANEUTRALEN ENERGIESYSEM, Anhang zur Studie, Fraunhofer-Institut für Solare Energiesysteme ISE, Freiburg",Gasnetz,2020.0,, Gasnetz,investment,28.0,EUR/kWGas,"WEGE ZU EINEM KLIMANEUTRALEN ENERGIESYSEM, Anhang zur Studie, Fraunhofer-Institut für Solare Energiesysteme ISE, Freiburg",Gasnetz,2020.0,, @@ -892,12 +892,12 @@ Geothermal - Deep EGS / Binary,FOM,1.22,%/year,NREL/ATB-https://data.openei.org/ Geothermal - Deep EGS / Binary,FOM,1.82,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Geothermal - Deep EGS / Binary,FOM,1.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Geothermal - Deep EGS / Binary,FOM,1.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Geothermal - Deep EGS / Binary,investment,6556.085999289953,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Geothermal - Deep EGS / Binary,investment,11162.632987477911,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Geothermal - Deep EGS / Binary,investment,18520.159928858993,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Geothermal - Deep EGS / Binary,investment,6556.085999289953,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Geothermal - Deep EGS / Binary,investment,11162.632987477911,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Geothermal - Deep EGS / Binary,investment,18520.159928858993,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Geothermal - Deep EGS / Binary,investment,5727.785246944118,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Geothermal - Deep EGS / Binary,investment,9752.337682826666,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Geothermal - Deep EGS / Binary,investment,16180.30923069846,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Geothermal - Deep EGS / Binary,investment,5727.785246944118,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Geothermal - Deep EGS / Binary,investment,9752.337682826666,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Geothermal - Deep EGS / Binary,investment,16180.30923069846,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Geothermal - Deep EGS / Flash,CF,0.9,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Geothermal - Deep EGS / Flash,CF,0.9,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Geothermal - Deep EGS / Flash,CF,0.9,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -910,12 +910,12 @@ Geothermal - Deep EGS / Flash,FOM,1.4,%/year,NREL/ATB-https://data.openei.org/s3 Geothermal - Deep EGS / Flash,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Geothermal - Deep EGS / Flash,FOM,1.8,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Geothermal - Deep EGS / Flash,FOM,1.4,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Geothermal - Deep EGS / Flash,investment,4109.4564523426925,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Geothermal - Deep EGS / Flash,investment,7004.068501412051,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Geothermal - Deep EGS / Flash,investment,10523.979234528,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Geothermal - Deep EGS / Flash,investment,4109.4564523426925,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Geothermal - Deep EGS / Flash,investment,7004.068501412051,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Geothermal - Deep EGS / Flash,investment,10523.979234528,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Geothermal - Deep EGS / Flash,investment,3590.264685856324,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Geothermal - Deep EGS / Flash,investment,6119.1693085354345,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Geothermal - Deep EGS / Flash,investment,9194.371917208555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Geothermal - Deep EGS / Flash,investment,3590.264685856324,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Geothermal - Deep EGS / Flash,investment,6119.1693085354345,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Geothermal - Deep EGS / Flash,investment,9194.371917208555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Geothermal - Hydro / Binary,CF,0.8,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Geothermal - Hydro / Binary,CF,0.8,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Geothermal - Hydro / Binary,CF,0.8,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -928,12 +928,12 @@ Geothermal - Hydro / Binary,FOM,1.8,%/year,NREL/ATB-https://data.openei.org/s3_v Geothermal - Hydro / Binary,FOM,1.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Geothermal - Hydro / Binary,FOM,1.69,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Geothermal - Hydro / Binary,FOM,1.8,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Geothermal - Hydro / Binary,investment,6474.209453868171,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Geothermal - Hydro / Binary,investment,7885.60691828464,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Geothermal - Hydro / Binary,investment,8978.419282073719,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Geothermal - Hydro / Binary,investment,6474.209453868171,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Geothermal - Hydro / Binary,investment,7885.60691828464,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Geothermal - Hydro / Binary,investment,8978.419282073719,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Geothermal - Hydro / Binary,investment,5656.253044805766,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Geothermal - Hydro / Binary,investment,6889.333510061184,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Geothermal - Hydro / Binary,investment,7844.079151846103,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Geothermal - Hydro / Binary,investment,5656.253044805766,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Geothermal - Hydro / Binary,investment,6889.333510061184,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Geothermal - Hydro / Binary,investment,7844.079151846103,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Geothermal - NF EGS / Binary,CF,0.8,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Geothermal - NF EGS / Binary,CF,0.8,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Geothermal - NF EGS / Binary,CF,0.8,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -946,12 +946,12 @@ Geothermal - NF EGS / Binary,FOM,1.59,%/year,NREL/ATB-https://data.openei.org/s3 Geothermal - NF EGS / Binary,FOM,1.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Geothermal - NF EGS / Binary,FOM,1.71,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Geothermal - NF EGS / Binary,FOM,1.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Geothermal - NF EGS / Binary,investment,6172.659717932562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Geothermal - NF EGS / Binary,investment,9459.38676755924,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Geothermal - NF EGS / Binary,investment,12577.784697029365,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Geothermal - NF EGS / Binary,investment,6172.659717932562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Geothermal - NF EGS / Binary,investment,9459.38676755924,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Geothermal - NF EGS / Binary,investment,12577.784697029365,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Geothermal - NF EGS / Binary,investment,5392.801325456913,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Geothermal - NF EGS / Binary,investment,8264.280849615494,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Geothermal - NF EGS / Binary,investment,10988.69807911104,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Geothermal - NF EGS / Binary,investment,5392.801325456913,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Geothermal - NF EGS / Binary,investment,8264.280849615494,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Geothermal - NF EGS / Binary,investment,10988.69807911104,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Geothermal - NF EGS / Flash,CF,0.9,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Geothermal - NF EGS / Flash,CF,0.9,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Geothermal - NF EGS / Flash,CF,0.9,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -964,12 +964,12 @@ Geothermal - NF EGS / Flash,FOM,1.71,%/year,NREL/ATB-https://data.openei.org/s3_ Geothermal - NF EGS / Flash,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Geothermal - NF EGS / Flash,FOM,1.9,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Geothermal - NF EGS / Flash,FOM,1.71,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Geothermal - NF EGS / Flash,investment,4645.790145550401,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Geothermal - NF EGS / Flash,investment,7357.035207141998,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Geothermal - NF EGS / Flash,investment,9034.818817333768,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Geothermal - NF EGS / Flash,investment,4645.790145550401,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Geothermal - NF EGS / Flash,investment,7357.035207141998,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Geothermal - NF EGS / Flash,investment,9034.818817333768,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Geothermal - NF EGS / Flash,investment,4058.83758372967,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Geothermal - NF EGS / Flash,investment,6427.541939700037,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Geothermal - NF EGS / Flash,investment,7893.353128122802,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Geothermal - NF EGS / Flash,investment,4058.83758372967,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Geothermal - NF EGS / Flash,investment,6427.541939700037,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Geothermal - NF EGS / Flash,investment,7893.353128122802,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Gravity-Brick-bicharger,FOM,1.5,%/year,"Viswanathan_2022, p.76 (p.98) Sentence 1 in 4.7.2 Operating Costs","{'carrier': ['elec', 'gravity', 'elec'], 'technology_type': ['bicharger'], 'type': ['mechanical'], 'note': ['1.5 percent of capital cost']}",2020.0,, Gravity-Brick-bicharger,efficiency,0.9274,per unit,"Viswanathan_2022, p.77 (p.99) Table 4.36","{'carrier': ['elec', 'gravity', 'elec'], 'technology_type': ['bicharger'], 'type': ['mechanical'], 'note': ['AC-AC efficiency at transformer level 0.86^0.5']}",2020.0,, Gravity-Brick-bicharger,investment,415570.5177,EUR/MW,"Viswanathan_2022, p.71 (p.94) text at the bottom speaks about 0% cost reduction for 2030 compared to 2021","{'carrier': ['elec', 'gravity', 'elec'], 'technology_type': ['bicharger'], 'type': ['mechanical'], 'note': ['Power Equipment']}",2020.0,, @@ -1051,7 +1051,7 @@ Haber-Bosch,lifetime,30.0,years,"Danish Energy Agency, inputs/data_sheets_for_re Haber-Bosch,nitrogen-input,0.1597,t_N2/MWh_NH3,"DECHEMA 2017: DECHEMA: Low carbon energy and feedstock for the European chemical industry (https://dechema.de/dechema_media/Downloads/Positionspapiere/Technology_study_Low_carbon_energy_and_feedstock_for_the_European_chemical_industry.pdf), pg. 57.",".33 MWh electricity are required for ASU per t_NH3, considering 0.4 MWh are required per t_N2 and LHV of NH3 of 5.1666 Mwh.",,, Heavy oil partial oxidation,FOM,0.05,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Heavy oil partial oxidation,efficiency,0.734,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Heavy oil partial oxidation,investment,491.0535,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Heavy oil partial oxidation,investment,662.0382094364353,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Heavy oil partial oxidation,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, HighT-Molten-Salt-charger,FOM,1.075,%/year,"Viswanathan_2022, NULL","{'carrier': ['elec', 'salthight'], 'technology_type': ['charger'], 'type': ['thermal'], 'note': ['Guesstimate, 50% on charger']}",2020.0,, HighT-Molten-Salt-charger,efficiency,0.99,per unit,"Viswanathan_2022, p.107 (p.129)","{'carrier': ['elec', 'salthight'], 'technology_type': ['charger'], 'type': ['thermal'], 'note': ['RTE assume 99% for charge and other for discharge']}",2020.0,, @@ -1095,12 +1095,12 @@ Hydropower - NPD 2,FOM,2.77,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Hydropower - NPD 2,FOM,2.92,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NPD 2,FOM,1.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NPD 2,FOM,2.77,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NPD 2,investment,3048.66587051864,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NPD 2,investment,6357.064447883142,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NPD 2,investment,3356.3001011680417,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NPD 2,investment,3048.66587051864,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NPD 2,investment,6357.064447883142,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NPD 2,investment,3356.3001011680417,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NPD 2,investment,2663.4951704278924,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NPD 2,investment,5553.908225487212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NPD 2,investment,2932.262664929869,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NPD 2,investment,2663.4951704278924,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NPD 2,investment,5553.908225487212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NPD 2,investment,2932.262664929869,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NPD 3,CF,0.32,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NPD 3,CF,0.32,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NPD 3,CF,0.33,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1113,12 +1113,12 @@ Hydropower - NPD 3,FOM,3.05,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Hydropower - NPD 3,FOM,3.19,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NPD 3,FOM,1.74,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NPD 3,FOM,3.05,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NPD 3,investment,3358.4290577815323,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NPD 3,investment,6487.995279612818,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NPD 3,investment,3699.06211594004,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NPD 3,investment,3358.4290577815323,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NPD 3,investment,6487.995279612818,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NPD 3,investment,3699.06211594004,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NPD 3,investment,2934.122647590782,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NPD 3,investment,5668.297159133382,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NPD 3,investment,3231.7198733369155,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NPD 3,investment,2934.122647590782,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NPD 3,investment,5668.297159133382,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NPD 3,investment,3231.7198733369155,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NPD 4,CF,0.38,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NPD 4,CF,0.38,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NPD 4,CF,0.38,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1131,12 +1131,12 @@ Hydropower - NPD 4,FOM,2.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Hydropower - NPD 4,FOM,2.21,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NPD 4,FOM,1.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NPD 4,FOM,2.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NPD 4,investment,8081.519304810585,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NPD 4,investment,14239.526309332348,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NPD 4,investment,8904.361035924729,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NPD 4,investment,8081.519304810585,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NPD 4,investment,14239.526309332348,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NPD 4,investment,8904.361035924729,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NPD 4,investment,7060.494180827011,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NPD 4,investment,12440.494027518826,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NPD 4,investment,7779.377479270014,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NPD 4,investment,7060.494180827011,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NPD 4,investment,12440.494027518826,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NPD 4,investment,7779.377479270014,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NPD 5,CF,0.56,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NPD 5,CF,0.56,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NPD 5,CF,0.42,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1149,12 +1149,12 @@ Hydropower - NPD 5,FOM,0.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Hydropower - NPD 5,FOM,0.61,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NPD 5,FOM,0.65,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NPD 5,FOM,0.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NPD 5,investment,5417.130103027011,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NPD 5,investment,5220.201616279123,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NPD 5,investment,5969.594344227839,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NPD 5,investment,5417.130103027011,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NPD 5,investment,5220.201616279123,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NPD 5,investment,5969.594344227839,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NPD 5,investment,4732.725880693975,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NPD 5,investment,4560.677484559491,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NPD 5,investment,5215.391381200985,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NPD 5,investment,4732.725880693975,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NPD 5,investment,4560.677484559491,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NPD 5,investment,5215.391381200985,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NPD 6,CF,0.59,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NPD 6,CF,0.59,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NPD 6,CF,0.44,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1167,12 +1167,12 @@ Hydropower - NPD 6,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Hydropower - NPD 6,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NPD 6,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NPD 6,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NPD 6,investment,8154.9683079760125,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NPD 6,investment,7859.04333870081,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NPD 6,investment,8987.390343850864,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NPD 6,investment,8154.9683079760125,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NPD 6,investment,7859.04333870081,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NPD 6,investment,8987.390343850864,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NPD 6,investment,7124.663582628521,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NPD 6,investment,6866.125992761567,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NPD 6,investment,7851.916803045633,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NPD 6,investment,7124.663582628521,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NPD 6,investment,6866.125992761567,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NPD 6,investment,7851.916803045633,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NPD 7,CF,0.64,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NPD 7,CF,0.64,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NPD 7,CF,0.62,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1185,12 +1185,12 @@ Hydropower - NPD 7,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Hydropower - NPD 7,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NPD 7,FOM,0.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NPD 7,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NPD 7,investment,12550.199236527502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NPD 7,investment,15796.858072100777,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NPD 7,investment,13833.960074462377,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NPD 7,investment,12550.199236527502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NPD 7,investment,15796.858072100777,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NPD 7,investment,13833.960074462377,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NPD 7,investment,10964.597786084096,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NPD 7,investment,13801.071343976932,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NPD 7,investment,12086.167330614837,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NPD 7,investment,10964.597786084096,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NPD 7,investment,13801.071343976932,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NPD 7,investment,12086.167330614837,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NPD 8,CF,0.49,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NPD 8,CF,0.49,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NPD 8,CF,0.4,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1203,12 +1203,12 @@ Hydropower - NPD 8,FOM,0.97,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Hydropower - NPD 8,FOM,1.02,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NPD 8,FOM,0.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NPD 8,FOM,0.97,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NPD 8,investment,19041.387951060555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NPD 8,investment,21498.20388302879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NPD 8,investment,20986.189817484283,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NPD 8,investment,19041.387951060555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NPD 8,investment,21498.20388302879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NPD 8,investment,20986.189817484283,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NPD 8,investment,16635.68491920885,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NPD 8,investment,18782.104909902835,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NPD 8,investment,18334.779079953176,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NPD 8,investment,16635.68491920885,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NPD 8,investment,18782.104909902835,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NPD 8,investment,18334.779079953176,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NSD 2,CF,0.66,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NSD 2,CF,0.66,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NSD 2,CF,0.66,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1221,12 +1221,12 @@ Hydropower - NSD 2,FOM,0.6,%/year,NREL/ATB-https://data.openei.org/s3_viewer?buc Hydropower - NSD 2,FOM,0.34,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NSD 2,FOM,0.61,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NSD 2,FOM,0.6,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NSD 2,investment,8051.713912221715,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NSD 2,investment,8256.09374711682,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NSD 2,investment,8297.608401079888,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NSD 2,investment,8051.713912221715,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NSD 2,investment,8256.09374711682,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NSD 2,investment,8297.608401079888,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NSD 2,investment,7034.454423574224,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NSD 2,investment,7213.0127590219045,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NSD 2,investment,7249.282420909714,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NSD 2,investment,7034.454423574224,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NSD 2,investment,7213.0127590219045,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NSD 2,investment,7249.282420909714,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NSD 3,CF,0.62,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NSD 3,CF,0.62,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NSD 3,CF,0.62,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1239,12 +1239,12 @@ Hydropower - NSD 3,FOM,1.78,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Hydropower - NSD 3,FOM,0.99,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NSD 3,FOM,1.79,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NSD 3,FOM,1.78,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NSD 3,investment,7888.848731289679,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NSD 3,investment,8087.906174651057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NSD 3,investment,8129.420828614125,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NSD 3,investment,7888.848731289679,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NSD 3,investment,8087.906174651057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NSD 3,investment,8129.420828614125,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NSD 3,investment,6892.165750014354,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NSD 3,investment,7066.0741288097515,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NSD 3,investment,7102.3437906975605,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NSD 3,investment,6892.165750014354,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NSD 3,investment,7066.0741288097515,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NSD 3,investment,7102.3437906975605,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NSD 4,CF,0.66,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NSD 4,CF,0.66,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NSD 4,CF,0.66,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1257,12 +1257,12 @@ Hydropower - NSD 4,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Hydropower - NSD 4,FOM,0.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NSD 4,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NSD 4,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NSD 4,investment,7112.844045672329,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NSD 4,investment,7292.740879512291,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NSD 4,investment,7329.997620248378,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NSD 4,investment,7112.844045672329,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NSD 4,investment,7292.740879512291,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NSD 4,investment,7329.997620248378,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NSD 4,investment,6214.202070111444,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NSD 4,investment,6371.370604958621,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NSD 4,investment,6403.920301524604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NSD 4,investment,6214.202070111444,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NSD 4,investment,6371.370604958621,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NSD 4,investment,6403.920301524604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative LNG storage tank,FOM,2.0,%/year,"Guesstimate, based on H2 (l) storage tank with comparable requirements.",Currency year and technology year assumed based on publication date.,2019.0,, LNG storage tank,investment,666.634,EUR/m^3,"Hurskainen 2019, https://cris.vtt.fi/en/publications/liquid-organic-hydrogen-carriers-lohc-concept-evaluation-and-tech pg. 46 (59).",Currency year and technology year assumed based on publication date.,2019.0,, LNG storage tank,lifetime,20.0,years,"Guesstimate, based on H2 (l) storage tank with comparable requirements.",Currency year and technology year assumed based on publication date.,2019.0,, @@ -1302,12 +1302,12 @@ Land-Based Wind - Class 1 - Technology 1,FOM,1.99,%/year,NREL/ATB-https://data.o Land-Based Wind - Class 1 - Technology 1,FOM,1.89,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 1 - Technology 1,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 1 - Technology 1,FOM,1.99,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 1 - Technology 1,investment,1258.7992531108473,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 1 - Technology 1,investment,1334.6919677529645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 1 - Technology 1,investment,1522.1515178729378,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 1 - Technology 1,investment,1258.7992531108473,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 1 - Technology 1,investment,1334.6919677529645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 1 - Technology 1,investment,1522.1515178729378,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 1 - Technology 1,investment,1099.7616247885503,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 1 - Technology 1,investment,1166.0659977520438,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 1 - Technology 1,investment,1329.841769712975,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 1 - Technology 1,investment,1099.7616247885503,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 1 - Technology 1,investment,1166.0659977520438,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 1 - Technology 1,investment,1329.841769712975,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 10 - Technology 4,CF,0.303744,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 10 - Technology 4,CF,0.2773705,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 10 - Technology 4,CF,0.263175,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1320,12 +1320,12 @@ Land-Based Wind - Class 10 - Technology 4,FOM,1.45,%/year,NREL/ATB-https://data. Land-Based Wind - Class 10 - Technology 4,FOM,1.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 10 - Technology 4,FOM,1.62,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 10 - Technology 4,FOM,1.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 10 - Technology 4,investment,1593.5777496573576,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 10 - Technology 4,investment,1749.0457893627308,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 10 - Technology 4,investment,2091.6656174664568,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 10 - Technology 4,investment,1593.5777496573576,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 10 - Technology 4,investment,1749.0457893627308,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 10 - Technology 4,investment,2091.6656174664568,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 10 - Technology 4,investment,1392.2439585652749,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 10 - Technology 4,investment,1528.070051190082,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 10 - Technology 4,investment,1827.4030368976507,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 10 - Technology 4,investment,1392.2439585652749,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 10 - Technology 4,investment,1528.070051190082,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 10 - Technology 4,investment,1827.4030368976507,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 2 - Technology 1,CF,0.535140488160291,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 2 - Technology 1,CF,0.501701499999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 2 - Technology 1,CF,0.476024999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1338,12 +1338,12 @@ Land-Based Wind - Class 2 - Technology 1,FOM,1.99,%/year,NREL/ATB-https://data.o Land-Based Wind - Class 2 - Technology 1,FOM,1.89,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 2 - Technology 1,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 2 - Technology 1,FOM,1.99,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 2 - Technology 1,investment,1258.7992531108473,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 2 - Technology 1,investment,1334.6919677529645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 2 - Technology 1,investment,1522.1515178729378,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 2 - Technology 1,investment,1258.7992531108473,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 2 - Technology 1,investment,1334.6919677529645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 2 - Technology 1,investment,1522.1515178729378,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 2 - Technology 1,investment,1099.7616247885503,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 2 - Technology 1,investment,1166.0659977520438,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 2 - Technology 1,investment,1329.841769712975,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 2 - Technology 1,investment,1099.7616247885503,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 2 - Technology 1,investment,1166.0659977520438,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 2 - Technology 1,investment,1329.841769712975,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 3 - Technology 1,CF,0.523386404371584,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 3 - Technology 1,CF,0.490397999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 3 - Technology 1,CF,0.465299999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1356,12 +1356,12 @@ Land-Based Wind - Class 3 - Technology 1,FOM,1.99,%/year,NREL/ATB-https://data.o Land-Based Wind - Class 3 - Technology 1,FOM,1.89,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 3 - Technology 1,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 3 - Technology 1,FOM,1.99,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 3 - Technology 1,investment,1258.7992531108473,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 3 - Technology 1,investment,1334.6919677529645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 3 - Technology 1,investment,1522.1515178729378,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 3 - Technology 1,investment,1258.7992531108473,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 3 - Technology 1,investment,1334.6919677529645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 3 - Technology 1,investment,1522.1515178729378,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 3 - Technology 1,investment,1099.7616247885503,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 3 - Technology 1,investment,1166.0659977520438,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 3 - Technology 1,investment,1329.841769712975,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 3 - Technology 1,investment,1099.7616247885503,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 3 - Technology 1,investment,1166.0659977520438,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 3 - Technology 1,investment,1329.841769712975,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 5 - Technology 1,CF,0.493549114754098,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 5 - Technology 1,CF,0.4617045,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 5 - Technology 1,CF,0.438074999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1374,12 +1374,12 @@ Land-Based Wind - Class 5 - Technology 1,FOM,1.99,%/year,NREL/ATB-https://data.o Land-Based Wind - Class 5 - Technology 1,FOM,1.89,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 5 - Technology 1,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 5 - Technology 1,FOM,1.99,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 5 - Technology 1,investment,1258.7992531108473,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 5 - Technology 1,investment,1334.6919677529645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 5 - Technology 1,investment,1522.1515178729378,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 5 - Technology 1,investment,1258.7992531108473,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 5 - Technology 1,investment,1334.6919677529645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 5 - Technology 1,investment,1522.1515178729378,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 5 - Technology 1,investment,1099.7616247885503,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 5 - Technology 1,investment,1166.0659977520438,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 5 - Technology 1,investment,1329.841769712975,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 5 - Technology 1,investment,1099.7616247885503,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 5 - Technology 1,investment,1166.0659977520438,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 5 - Technology 1,investment,1329.841769712975,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 6 - Technology 1,CF,0.468232626593806,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 6 - Technology 1,CF,0.4373585,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 6 - Technology 1,CF,0.414974999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1392,12 +1392,12 @@ Land-Based Wind - Class 6 - Technology 1,FOM,1.99,%/year,NREL/ATB-https://data.o Land-Based Wind - Class 6 - Technology 1,FOM,1.89,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 6 - Technology 1,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 6 - Technology 1,FOM,1.99,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 6 - Technology 1,investment,1258.7992531108473,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 6 - Technology 1,investment,1334.6919677529645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 6 - Technology 1,investment,1522.1515178729378,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 6 - Technology 1,investment,1258.7992531108473,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 6 - Technology 1,investment,1334.6919677529645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 6 - Technology 1,investment,1522.1515178729378,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 6 - Technology 1,investment,1099.7616247885503,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 6 - Technology 1,investment,1166.0659977520438,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 6 - Technology 1,investment,1329.841769712975,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 6 - Technology 1,investment,1099.7616247885503,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 6 - Technology 1,investment,1166.0659977520438,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 6 - Technology 1,investment,1329.841769712975,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 7 - Technology 1,CF,0.432970375227686,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 7 - Technology 1,CF,0.403448,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 7 - Technology 1,CF,0.3828,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1410,12 +1410,12 @@ Land-Based Wind - Class 7 - Technology 1,FOM,1.99,%/year,NREL/ATB-https://data.o Land-Based Wind - Class 7 - Technology 1,FOM,1.89,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 7 - Technology 1,FOM,2.04,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 7 - Technology 1,FOM,1.99,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 7 - Technology 1,investment,1258.7992531108473,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 7 - Technology 1,investment,1383.3655982543562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 7 - Technology 1,investment,1522.1515178729378,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 7 - Technology 1,investment,1258.7992531108473,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 7 - Technology 1,investment,1383.3655982543562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 7 - Technology 1,investment,1522.1515178729378,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 7 - Technology 1,investment,1099.7616247885503,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 7 - Technology 1,investment,1208.5901657893874,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 7 - Technology 1,investment,1329.841769712975,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 7 - Technology 1,investment,1099.7616247885503,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 7 - Technology 1,investment,1208.5901657893874,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 7 - Technology 1,investment,1329.841769712975,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 8 - Technology 2,CF,0.393344,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 8 - Technology 2,CF,0.364320499999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 8 - Technology 2,CF,0.345674999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1428,12 +1428,12 @@ Land-Based Wind - Class 8 - Technology 2,FOM,1.74,%/year,NREL/ATB-https://data.o Land-Based Wind - Class 8 - Technology 2,FOM,1.72,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 8 - Technology 2,FOM,1.77,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 8 - Technology 2,FOM,1.74,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 8 - Technology 2,investment,1299.6858853500237,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 8 - Technology 2,investment,1457.3773443138912,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 8 - Technology 2,investment,1632.4124855989478,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 8 - Technology 2,investment,1299.6858853500237,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 8 - Technology 2,investment,1457.3773443138912,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 8 - Technology 2,investment,1632.4124855989478,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 8 - Technology 2,investment,1135.4826096813886,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 8 - Technology 2,investment,1273.2512131317028,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 8 - Technology 2,investment,1426.172285255819,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 8 - Technology 2,investment,1135.4826096813886,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 8 - Technology 2,investment,1273.2512131317028,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 8 - Technology 2,investment,1426.172285255819,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 9 - Technology 3,CF,0.380799999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 9 - Technology 3,CF,0.3521475,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 9 - Technology 3,CF,0.334125,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1446,12 +1446,12 @@ Land-Based Wind - Class 9 - Technology 3,FOM,2.39,%/year,NREL/ATB-https://data.o Land-Based Wind - Class 9 - Technology 3,FOM,2.14,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 9 - Technology 3,FOM,2.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 9 - Technology 3,FOM,2.39,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 9 - Technology 3,investment,1411.8619771576411,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 9 - Technology 3,investment,1456.8118317966066,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 9 - Technology 3,investment,1613.5086111648604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 9 - Technology 3,investment,1411.8619771576411,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 9 - Technology 3,investment,1456.8118317966066,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 9 - Technology 3,investment,1613.5086111648604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 9 - Technology 3,investment,1233.4862911134362,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 9 - Technology 3,investment,1272.7571478839595,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 9 - Technology 3,investment,1409.6567402941791,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 9 - Technology 3,investment,1233.4862911134362,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 9 - Technology 3,investment,1272.7571478839595,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 9 - Technology 3,investment,1409.6567402941791,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 1,CF,0.6035980000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 1,CF,0.6035980000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 1,CF,0.6035980000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1464,12 +1464,12 @@ Large DW - Class 1,FOM,1.63,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 1,FOM,2.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 1,FOM,1.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 1,FOM,1.63,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 1,investment,1446.282683603144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 1,investment,1909.09314235615,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 1,investment,2290.91177082738,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 1,investment,1446.282683603144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 1,investment,1909.09314235615,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 1,investment,2290.91177082738,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 1,investment,1263.5582600579098,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 1,investment,1667.896903276441,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 1,investment,2001.4762839317293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 1,investment,1263.5582600579098,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 1,investment,1667.896903276441,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 1,investment,2001.4762839317293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 10,CF,0.261838,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 10,CF,0.261838,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 10,CF,0.261838,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1482,12 +1482,12 @@ Large DW - Class 10,FOM,1.63,%/year,NREL/ATB-https://data.openei.org/s3_viewer?b Large DW - Class 10,FOM,2.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 10,FOM,1.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 10,FOM,1.63,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 10,investment,1446.282683603144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 10,investment,1909.09314235615,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 10,investment,2290.91177082738,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 10,investment,1446.282683603144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 10,investment,1909.09314235615,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 10,investment,2290.91177082738,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 10,investment,1263.5582600579098,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 10,investment,1667.896903276441,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 10,investment,2001.4762839317293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 10,investment,1263.5582600579098,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 10,investment,1667.896903276441,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 10,investment,2001.4762839317293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 2,CF,0.572181,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 2,CF,0.572181,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 2,CF,0.572181,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1500,12 +1500,12 @@ Large DW - Class 2,FOM,1.63,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 2,FOM,2.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 2,FOM,1.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 2,FOM,1.63,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 2,investment,1446.282683603144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 2,investment,1909.09314235615,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 2,investment,2290.91177082738,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 2,investment,1446.282683603144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 2,investment,1909.09314235615,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 2,investment,2290.91177082738,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 2,investment,1263.5582600579098,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 2,investment,1667.896903276441,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 2,investment,2001.4762839317293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 2,investment,1263.5582600579098,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 2,investment,1667.896903276441,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 2,investment,2001.4762839317293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 3,CF,0.560611,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 3,CF,0.560611,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 3,CF,0.560611,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1518,12 +1518,12 @@ Large DW - Class 3,FOM,1.63,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 3,FOM,2.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 3,FOM,1.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 3,FOM,1.63,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 3,investment,1446.282683603144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 3,investment,1909.09314235615,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 3,investment,2290.91177082738,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 3,investment,1446.282683603144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 3,investment,1909.09314235615,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 3,investment,2290.91177082738,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 3,investment,1263.5582600579098,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 3,investment,1667.896903276441,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 3,investment,2001.4762839317293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 3,investment,1263.5582600579098,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 3,investment,1667.896903276441,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 3,investment,2001.4762839317293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 4,CF,0.548507,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 4,CF,0.548507,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 4,CF,0.548507,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1536,12 +1536,12 @@ Large DW - Class 4,FOM,1.63,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 4,FOM,2.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 4,FOM,1.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 4,FOM,1.63,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 4,investment,1446.282683603144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 4,investment,1909.09314235615,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 4,investment,2290.91177082738,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 4,investment,1446.282683603144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 4,investment,1909.09314235615,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 4,investment,2290.91177082738,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 4,investment,1263.5582600579098,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 4,investment,1667.896903276441,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 4,investment,2001.4762839317293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 4,investment,1263.5582600579098,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 4,investment,1667.896903276441,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 4,investment,2001.4762839317293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 5,CF,0.533199,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 5,CF,0.533199,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 5,CF,0.533199,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1554,12 +1554,12 @@ Large DW - Class 5,FOM,1.63,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 5,FOM,2.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 5,FOM,1.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 5,FOM,1.63,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 5,investment,1446.282683603144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 5,investment,1909.09314235615,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 5,investment,2290.91177082738,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 5,investment,1446.282683603144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 5,investment,1909.09314235615,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 5,investment,2290.91177082738,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 5,investment,1263.5582600579098,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 5,investment,1667.896903276441,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 5,investment,2001.4762839317293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 5,investment,1263.5582600579098,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 5,investment,1667.896903276441,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 5,investment,2001.4762839317293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 6,CF,0.509525,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 6,CF,0.509525,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 6,CF,0.509525,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1572,12 +1572,12 @@ Large DW - Class 6,FOM,1.63,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 6,FOM,2.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 6,FOM,1.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 6,FOM,1.63,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 6,investment,1446.282683603144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 6,investment,1909.09314235615,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 6,investment,2290.91177082738,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 6,investment,1446.282683603144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 6,investment,1909.09314235615,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 6,investment,2290.91177082738,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 6,investment,1263.5582600579098,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 6,investment,1667.896903276441,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 6,investment,2001.4762839317293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 6,investment,1263.5582600579098,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 6,investment,1667.896903276441,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 6,investment,2001.4762839317293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 7,CF,0.474637,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 7,CF,0.474637,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 7,CF,0.474637,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1590,12 +1590,12 @@ Large DW - Class 7,FOM,1.63,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 7,FOM,2.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 7,FOM,1.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 7,FOM,1.63,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 7,investment,1446.282683603144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 7,investment,1909.09314235615,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 7,investment,2290.91177082738,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 7,investment,1446.282683603144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 7,investment,1909.09314235615,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 7,investment,2290.91177082738,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 7,investment,1263.5582600579098,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 7,investment,1667.896903276441,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 7,investment,2001.4762839317293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 7,investment,1263.5582600579098,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 7,investment,1667.896903276441,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 7,investment,2001.4762839317293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 8,CF,0.42898,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 8,CF,0.42898,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 8,CF,0.42898,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1608,12 +1608,12 @@ Large DW - Class 8,FOM,1.63,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 8,FOM,2.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 8,FOM,1.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 8,FOM,1.63,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 8,investment,1446.282683603144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 8,investment,1909.09314235615,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 8,investment,2290.91177082738,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 8,investment,1446.282683603144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 8,investment,1909.09314235615,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 8,investment,2290.91177082738,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 8,investment,1263.5582600579098,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 8,investment,1667.896903276441,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 8,investment,2001.4762839317293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 8,investment,1263.5582600579098,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 8,investment,1667.896903276441,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 8,investment,2001.4762839317293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 9,CF,0.374957,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 9,CF,0.374957,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 9,CF,0.374957,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1626,12 +1626,12 @@ Large DW - Class 9,FOM,1.63,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 9,FOM,2.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 9,FOM,1.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 9,FOM,1.63,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 9,investment,1446.282683603144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 9,investment,1909.09314235615,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 9,investment,2290.91177082738,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 9,investment,1446.282683603144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 9,investment,1909.09314235615,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 9,investment,2290.91177082738,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 9,investment,1263.5582600579098,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 9,investment,1667.896903276441,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 9,investment,2001.4762839317293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 9,investment,1263.5582600579098,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 9,investment,1667.896903276441,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 9,investment,2001.4762839317293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Lead-Acid-bicharger,FOM,2.4427,%/year,"Viswanathan_2022, p.28 (p.50)","{'carrier': ['elec', 'lead', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['30% assumed of power components every 10 years']}",2020.0,, Lead-Acid-bicharger,efficiency,0.8832,per unit,"Viswanathan_2022, p.33 (p.55)","{'carrier': ['elec', 'lead', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['AC-AC efficiency at transformer level 0.78^0.5']}",2020.0,, Lead-Acid-bicharger,investment,128853.6139,EUR/MW,"Viswanathan_2022, p.33 (p.55)","{'carrier': ['elec', 'lead', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['Power Equipment']}",2020.0,, @@ -1703,12 +1703,12 @@ Midsize DW - Class 1,FOM,1.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 1,FOM,2.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 1,FOM,1.72,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 1,FOM,1.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 1,investment,1454.9872197328566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 1,investment,2168.3188655995264,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 1,investment,2601.982638719432,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 1,investment,1454.9872197328566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 1,investment,2168.3188655995264,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 1,investment,2601.982638719432,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 1,investment,1271.1630586573576,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 1,investment,1894.3718569885548,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 1,investment,2273.246228386266,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 1,investment,1271.1630586573576,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 1,investment,1894.3718569885548,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 1,investment,2273.246228386266,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 10,CF,0.236829,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 10,CF,0.236829,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 10,CF,0.236829,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1721,12 +1721,12 @@ Midsize DW - Class 10,FOM,1.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer Midsize DW - Class 10,FOM,2.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 10,FOM,1.72,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 10,FOM,1.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 10,investment,1454.9872197328566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 10,investment,2168.3188655995264,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 10,investment,2601.982638719432,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 10,investment,1454.9872197328566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 10,investment,2168.3188655995264,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 10,investment,2601.982638719432,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 10,investment,1271.1630586573576,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 10,investment,1894.3718569885548,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 10,investment,2273.246228386266,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 10,investment,1271.1630586573576,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 10,investment,1894.3718569885548,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 10,investment,2273.246228386266,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 2,CF,0.550198,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 2,CF,0.550198,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 2,CF,0.550198,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1739,12 +1739,12 @@ Midsize DW - Class 2,FOM,1.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 2,FOM,2.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 2,FOM,1.72,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 2,FOM,1.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 2,investment,1454.9872197328566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 2,investment,2168.3188655995264,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 2,investment,2601.982638719432,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 2,investment,1454.9872197328566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 2,investment,2168.3188655995264,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 2,investment,2601.982638719432,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 2,investment,1271.1630586573576,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 2,investment,1894.3718569885548,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 2,investment,2273.246228386266,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 2,investment,1271.1630586573576,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 2,investment,1894.3718569885548,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 2,investment,2273.246228386266,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 3,CF,0.5380940000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 3,CF,0.5380940000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 3,CF,0.5380940000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1757,12 +1757,12 @@ Midsize DW - Class 3,FOM,1.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 3,FOM,2.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 3,FOM,1.72,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 3,FOM,1.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 3,investment,1454.9872197328566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 3,investment,2168.3188655995264,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 3,investment,2601.982638719432,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 3,investment,1454.9872197328566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 3,investment,2168.3188655995264,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 3,investment,2601.982638719432,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 3,investment,1271.1630586573576,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 3,investment,1894.3718569885548,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 3,investment,2273.246228386266,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 3,investment,1271.1630586573576,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 3,investment,1894.3718569885548,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 3,investment,2273.246228386266,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 4,CF,0.525456,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 4,CF,0.525456,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 4,CF,0.525456,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1775,12 +1775,12 @@ Midsize DW - Class 4,FOM,1.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 4,FOM,2.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 4,FOM,1.72,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 4,FOM,1.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 4,investment,1454.9872197328566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 4,investment,2168.3188655995264,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 4,investment,2601.982638719432,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 4,investment,1454.9872197328566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 4,investment,2168.3188655995264,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 4,investment,2601.982638719432,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 4,investment,1271.1630586573576,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 4,investment,1894.3718569885548,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 4,investment,2273.246228386266,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 4,investment,1271.1630586573576,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 4,investment,1894.3718569885548,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 4,investment,2273.246228386266,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 5,CF,0.509436,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 5,CF,0.509436,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 5,CF,0.509436,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1793,12 +1793,12 @@ Midsize DW - Class 5,FOM,1.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 5,FOM,2.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 5,FOM,1.72,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 5,FOM,1.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 5,investment,1454.9872197328566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 5,investment,2168.3188655995264,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 5,investment,2601.982638719432,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 5,investment,1454.9872197328566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 5,investment,2168.3188655995264,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 5,investment,2601.982638719432,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 5,investment,1271.1630586573576,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 5,investment,1894.3718569885548,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 5,investment,2273.246228386266,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 5,investment,1271.1630586573576,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 5,investment,1894.3718569885548,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 5,investment,2273.246228386266,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 6,CF,0.484872,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 6,CF,0.484872,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 6,CF,0.484872,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1811,12 +1811,12 @@ Midsize DW - Class 6,FOM,1.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 6,FOM,2.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 6,FOM,1.72,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 6,FOM,1.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 6,investment,1454.9872197328566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 6,investment,2168.3188655995264,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 6,investment,2601.982638719432,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 6,investment,1454.9872197328566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 6,investment,2168.3188655995264,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 6,investment,2601.982638719432,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 6,investment,1271.1630586573576,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 6,investment,1894.3718569885548,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 6,investment,2273.246228386266,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 6,investment,1271.1630586573576,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 6,investment,1894.3718569885548,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 6,investment,2273.246228386266,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 7,CF,0.448916,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 7,CF,0.448916,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 7,CF,0.448916,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1829,12 +1829,12 @@ Midsize DW - Class 7,FOM,1.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 7,FOM,2.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 7,FOM,1.72,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 7,FOM,1.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 7,investment,1454.9872197328566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 7,investment,2168.3188655995264,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 7,investment,2601.982638719432,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 7,investment,1454.9872197328566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 7,investment,2168.3188655995264,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 7,investment,2601.982638719432,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 7,investment,1271.1630586573576,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 7,investment,1894.3718569885548,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 7,investment,2273.246228386266,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 7,investment,1271.1630586573576,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 7,investment,1894.3718569885548,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 7,investment,2273.246228386266,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 8,CF,0.402458,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 8,CF,0.402458,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 8,CF,0.402458,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1847,12 +1847,12 @@ Midsize DW - Class 8,FOM,1.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 8,FOM,2.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 8,FOM,1.72,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 8,FOM,1.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 8,investment,1454.9872197328566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 8,investment,2168.3188655995264,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 8,investment,2601.982638719432,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 8,investment,1454.9872197328566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 8,investment,2168.3188655995264,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 8,investment,2601.982638719432,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 8,investment,1271.1630586573576,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 8,investment,1894.3718569885548,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 8,investment,2273.246228386266,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 8,investment,1271.1630586573576,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 8,investment,1894.3718569885548,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 8,investment,2273.246228386266,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 9,CF,0.348079,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 9,CF,0.348079,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 9,CF,0.348079,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1865,78 +1865,78 @@ Midsize DW - Class 9,FOM,1.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 9,FOM,2.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 9,FOM,1.72,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 9,FOM,1.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 9,investment,1454.9872197328566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 9,investment,2168.3188655995264,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 9,investment,2601.982638719432,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 9,investment,1454.9872197328566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 9,investment,2168.3188655995264,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 9,investment,2601.982638719432,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 9,investment,1271.1630586573576,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 9,investment,1894.3718569885548,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 9,investment,2273.246228386266,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 9,investment,1271.1630586573576,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 9,investment,1894.3718569885548,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 9,investment,2273.246228386266,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 1-on-1 Combined Cycle (H-Frame),FOM,2.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 1-on-1 Combined Cycle (H-Frame),FOM,2.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG 1-on-1 Combined Cycle (H-Frame),FOM,2.28,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG 1-on-1 Combined Cycle (H-Frame),FOM,2.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 1-on-1 Combined Cycle (H-Frame),FOM,2.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 1-on-1 Combined Cycle (H-Frame),FOM,2.28,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 1-on-1 Combined Cycle (H-Frame),VOM,2.32,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 1-on-1 Combined Cycle (H-Frame),VOM,2.35,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 1-on-1 Combined Cycle (H-Frame),VOM,2.37,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 1-on-1 Combined Cycle (H-Frame),VOM,2.32,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 1-on-1 Combined Cycle (H-Frame),VOM,2.35,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 1-on-1 Combined Cycle (H-Frame),VOM,2.37,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 1-on-1 Combined Cycle (H-Frame),investment,1600.2135954738644,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 1-on-1 Combined Cycle (H-Frame),investment,1610.2427893173638,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 1-on-1 Combined Cycle (H-Frame),investment,1620.2719831608629,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 1-on-1 Combined Cycle (H-Frame),investment,1600.2135954738644,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 1-on-1 Combined Cycle (H-Frame),investment,1610.2427893173638,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 1-on-1 Combined Cycle (H-Frame),investment,1620.2719831608629,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 1-on-1 Combined Cycle (H-Frame),VOM,2.0268894847245047,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 1-on-1 Combined Cycle (H-Frame),VOM,2.0530992625442184,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 1-on-1 Combined Cycle (H-Frame),VOM,2.070572447757361,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 1-on-1 Combined Cycle (H-Frame),VOM,2.0268894847245047,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 1-on-1 Combined Cycle (H-Frame),VOM,2.0530992625442184,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 1-on-1 Combined Cycle (H-Frame),VOM,2.070572447757361,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 1-on-1 Combined Cycle (H-Frame),investment,1398.0414267151589,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 1-on-1 Combined Cycle (H-Frame),investment,1406.8035247934572,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 1-on-1 Combined Cycle (H-Frame),investment,1415.5656228717555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 1-on-1 Combined Cycle (H-Frame),investment,1398.0414267151589,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 1-on-1 Combined Cycle (H-Frame),investment,1406.8035247934572,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 1-on-1 Combined Cycle (H-Frame),investment,1415.5656228717555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.28,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.3,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.28,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.3,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.0,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.41,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.83,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.0,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.41,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.83,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2522.8994290757864,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2764.714436191266,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,3006.5294433067456,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2522.8994290757864,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2764.714436191266,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,3006.5294433067456,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.4946370426284568,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.852837339497874,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.219774228973861,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.4946370426284568,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.852837339497874,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.219774228973861,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2204.154449918607,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2415.4183702509117,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2626.6822905832164,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2204.154449918607,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2415.4183702509117,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2626.6822905832164,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.3,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.3,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.04,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.48,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.91,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.04,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.48,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.91,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2546.3008813772844,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2797.030727464763,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,3047.760573552242,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2546.3008813772844,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2797.030727464763,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,3047.760573552242,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.529583413054741,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.913993487743872,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.289666969826431,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.529583413054741,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.913993487743872,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.289666969826431,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2224.5993454346367,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2443.651797392095,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2662.704249349554,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2224.5993454346367,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2443.651797392095,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2662.704249349554,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame),FOM,2.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (F-Frame),FOM,2.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG 2-on-1 Combined Cycle (F-Frame),FOM,2.31,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG 2-on-1 Combined Cycle (F-Frame),FOM,2.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 2-on-1 Combined Cycle (F-Frame),FOM,2.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (F-Frame),FOM,2.31,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (F-Frame),VOM,1.89,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (F-Frame),VOM,1.96,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (F-Frame),VOM,2.03,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (F-Frame),VOM,1.89,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (F-Frame),VOM,1.96,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (F-Frame),VOM,2.03,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (F-Frame),VOM,1.6512160026419458,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (F-Frame),VOM,1.7123721508879437,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (F-Frame),VOM,1.7735282991339416,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (F-Frame),VOM,1.6512160026419458,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (F-Frame),VOM,1.7123721508879437,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (F-Frame),VOM,1.7735282991339416,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame),discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (F-Frame),discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG 2-on-1 Combined Cycle (F-Frame),discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1944,12 +1944,12 @@ NG 2-on-1 Combined Cycle (F-Frame),discount rate,0.0535847804878049,per unit,"NR NG 2-on-1 Combined Cycle (F-Frame),discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (F-Frame),discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame),efficiency,0.573,p.u.,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, -NG 2-on-1 Combined Cycle (F-Frame),investment,1307.2496997565393,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (F-Frame),investment,1343.3547975931365,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (F-Frame),investment,1379.348459942583,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (F-Frame),investment,1307.2496997565393,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (F-Frame),investment,1343.3547975931365,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (F-Frame),investment,1379.348459942583,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (F-Frame),investment,1142.0908061835325,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (F-Frame),investment,1173.6343592654068,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (F-Frame),investment,1205.0805557019662,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (F-Frame),investment,1142.0908061835325,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (F-Frame),investment,1173.6343592654068,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (F-Frame),investment,1205.0805557019662,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame),lifetime,30.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,FOM,2.18,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -1957,12 +1957,12 @@ NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,FOM,2.32,%/year,NREL/ATB-https://data NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,FOM,2.18,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,FOM,2.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,3.5,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,4.1,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,4.7,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,3.5,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,4.1,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,4.7,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,3.0578074122998995,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,3.5820029686941677,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,4.106198525088437,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,3.0578074122998995,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,3.5820029686941677,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,4.106198525088437,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,capture_rate,0.95,per unit,"NREL, NREL ATB 2024",,,, NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -1971,12 +1971,12 @@ NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,discount rate,0.0535847804878049,per NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,efficiency,0.527,p.u.,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,1971.628074144783,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,2337.247907483902,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,2702.867740823021,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,1971.628074144783,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,2337.247907483902,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,2702.867740823021,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,1722.531125548141,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,2041.958278824773,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,2361.385432101405,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,1722.531125548141,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,2041.958278824773,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,2361.385432101405,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,lifetime,30.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,FOM,2.18,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -1984,12 +1984,12 @@ NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,FOM,2.32,%/year,NREL/ATB-https://data NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,FOM,2.18,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,FOM,2.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,3.54,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,4.16,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,4.78,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,3.54,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,4.16,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,4.78,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,3.0927537827261844,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,3.634422524333595,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,4.176091265941006,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,3.0927537827261844,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,3.634422524333595,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,4.176091265941006,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,capture_rate,0.97,per unit,"NREL, NREL ATB 2024",,,, NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -1998,12 +1998,12 @@ NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,discount rate,0.0535847804878049,per NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,efficiency,0.525,p.u.,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,1988.2319617301316,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,2365.3296502456997,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,2742.427338761268,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,1988.2319617301316,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,2365.3296502456997,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,2742.427338761268,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,1737.0372656999905,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,2066.4921534440086,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,2395.9470411880266,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,1737.0372656999905,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,2066.4921534440086,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,2395.9470411880266,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,lifetime,30.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, NG 2-on-1 Combined Cycle (H-Frame),FOM,2.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (H-Frame),FOM,2.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -2011,154 +2011,154 @@ NG 2-on-1 Combined Cycle (H-Frame),FOM,2.22,%/year,NREL/ATB-https://data.openei. NG 2-on-1 Combined Cycle (H-Frame),FOM,2.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 2-on-1 Combined Cycle (H-Frame),FOM,2.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (H-Frame),FOM,2.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (H-Frame),VOM,1.89,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (H-Frame),VOM,1.96,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (H-Frame),VOM,2.02,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (H-Frame),VOM,1.89,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (H-Frame),VOM,1.96,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (H-Frame),VOM,2.02,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (H-Frame),investment,1307.2496997565393,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (H-Frame),investment,1359.958685178485,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (H-Frame),investment,1412.7791060875804,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (H-Frame),investment,1307.2496997565393,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (H-Frame),investment,1359.958685178485,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (H-Frame),investment,1412.7791060875804,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (H-Frame),VOM,1.6512160026419458,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (H-Frame),VOM,1.7123721508879437,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (H-Frame),VOM,1.7647917065273706,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (H-Frame),VOM,1.6512160026419458,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (H-Frame),VOM,1.7123721508879437,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (H-Frame),VOM,1.7647917065273706,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (H-Frame),investment,1142.0908061835325,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (H-Frame),investment,1188.1404994172563,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (H-Frame),investment,1234.2875492962942,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (H-Frame),investment,1142.0908061835325,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (H-Frame),investment,1188.1404994172563,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (H-Frame),investment,1234.2875492962942,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.18,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.18,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.5,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.98,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.46,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.5,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.98,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.46,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,1971.628074144783,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2272.6153249369077,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2573.602575729032,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,1971.628074144783,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2272.6153249369077,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2573.602575729032,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.0578074122998995,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.4771638574153143,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.896520302530729,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.0578074122998995,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.4771638574153143,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.896520302530729,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,1722.531125548141,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,1985.491424542406,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2248.451723536671,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,1722.531125548141,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,1985.491424542406,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2248.451723536671,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.54,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.04,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.54,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.54,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.04,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.54,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,1988.0090907558315,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2298.914099904305,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2608.704754181279,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,1988.0090907558315,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2298.914099904305,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2608.704754181279,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.0927537827261844,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.529583413054741,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.9664130433832985,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.0927537827261844,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.529583413054741,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.9664130433832985,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,1736.8425524093616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2008.4675928366105,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2279.119066810715,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,1736.8425524093616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2008.4675928366105,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2279.119066810715,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG Combined Cycle F-Class integrated retrofit 90%-CCS,FOM,7.0,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG Combined Cycle F-Class integrated retrofit 90%-CCS,FOM,5.99,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG Combined Cycle F-Class integrated retrofit 90%-CCS,FOM,5.3,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG Combined Cycle F-Class integrated retrofit 90%-CCS,FOM,7.0,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG Combined Cycle F-Class integrated retrofit 90%-CCS,FOM,5.99,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG Combined Cycle F-Class integrated retrofit 90%-CCS,FOM,5.3,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,4.16,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,4.46,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,4.76,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,4.16,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,4.46,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,4.76,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,3.634422524333595,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,3.896520302530729,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,4.158618080727863,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,3.634422524333595,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,3.896520302530729,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,4.158618080727863,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG Combined Cycle F-Class integrated retrofit 90%-CCS,capture_rate,0.9,per unit,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, NG Combined Cycle F-Class integrated retrofit 90%-CCS,efficiency,0.536,p.u.,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, -NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,818.6,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,1019.2,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,1219.8,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,818.6,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,1019.2,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,1219.8,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,715.1774707739137,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,890.4335184617308,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,1065.6895661495478,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,715.1774707739137,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,890.4335184617308,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,1065.6895661495478,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG Combined Cycle F-Class integrated retrofit 95%-CCS,FOM,6.85,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG Combined Cycle F-Class integrated retrofit 95%-CCS,FOM,5.85,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG Combined Cycle F-Class integrated retrofit 95%-CCS,FOM,5.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG Combined Cycle F-Class integrated retrofit 95%-CCS,FOM,6.85,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG Combined Cycle F-Class integrated retrofit 95%-CCS,FOM,5.85,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG Combined Cycle F-Class integrated retrofit 95%-CCS,FOM,5.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,4.25,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,4.57,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,4.89,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,4.25,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,4.57,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,4.89,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,3.713051857792735,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,3.992622821203012,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,4.272193784613288,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,3.713051857792735,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,3.992622821203012,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,4.272193784613288,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG Combined Cycle F-Class integrated retrofit 95%-CCS,capture_rate,0.95,per unit,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, NG Combined Cycle F-Class integrated retrofit 95%-CCS,efficiency,0.536,p.u.,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, -NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,850.7,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,1062.4,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,1274.1,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,850.7,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,1062.4,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,1274.1,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,743.2219330410071,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,928.1755985221182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,1113.129264003229,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,743.2219330410071,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,928.1755985221182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,1113.129264003229,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG Combined Cycle H-Class integrated retrofit 90%-CCS,FOM,7.6,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG Combined Cycle H-Class integrated retrofit 90%-CCS,FOM,6.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG Combined Cycle H-Class integrated retrofit 90%-CCS,FOM,5.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG Combined Cycle H-Class integrated retrofit 90%-CCS,FOM,7.6,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG Combined Cycle H-Class integrated retrofit 90%-CCS,FOM,6.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG Combined Cycle H-Class integrated retrofit 90%-CCS,FOM,5.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,4.01,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,4.27,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,4.53,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,4.01,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,4.27,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,4.53,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,713.3,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,887.0,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,1060.6,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,713.3,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,887.0,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,1060.6,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,3.5033736352350275,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,3.730525043005877,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,3.9576764507767277,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,3.5033736352350275,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,3.730525043005877,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,3.9576764507767277,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,623.1811506267195,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,774.9357642028602,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,926.6030118529352,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,623.1811506267195,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,774.9357642028602,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,926.6030118529352,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG Combined Cycle H-Class integrated retrofit 95%-CCS,FOM,7.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG Combined Cycle H-Class integrated retrofit 95%-CCS,FOM,6.3,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG Combined Cycle H-Class integrated retrofit 95%-CCS,FOM,5.55,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG Combined Cycle H-Class integrated retrofit 95%-CCS,FOM,7.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG Combined Cycle H-Class integrated retrofit 95%-CCS,FOM,6.3,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG Combined Cycle H-Class integrated retrofit 95%-CCS,FOM,5.55,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,4.09,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,4.37,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,4.65,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,4.09,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,4.37,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,4.65,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,741.3,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,924.7,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,1108.1,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,741.3,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,924.7,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,1108.1,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,3.573266376087597,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,3.817890969071589,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,4.062515562055581,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,3.573266376087597,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,3.817890969071589,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,4.062515562055581,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,647.6436099251187,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,807.8727183296336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,968.1018267341482,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,647.6436099251187,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,807.8727183296336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,968.1018267341482,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG Fuel Cell,FOM,2.36,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG Fuel Cell,FOM,2.36,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG Fuel Cell,FOM,2.36,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG Fuel Cell,FOM,2.36,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Fuel Cell,VOM,7.79,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Fuel Cell,VOM,7.79,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Fuel Cell,VOM,7.79,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Fuel Cell,VOM,7.79,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Fuel Cell,investment,1721.2325345187542,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Fuel Cell,investment,1721.2325345187542,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Fuel Cell,investment,1721.2325345187542,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Fuel Cell,investment,1721.2325345187542,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Fuel Cell,VOM,6.80580564051892,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Fuel Cell,VOM,6.80580564051892,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Fuel Cell,VOM,6.80580564051892,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Fuel Cell,VOM,6.80580564051892,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Fuel Cell,investment,1503.7707435266254,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Fuel Cell,investment,1503.7707435266254,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Fuel Cell,investment,1503.7707435266254,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Fuel Cell,investment,1503.7707435266254,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG Fuel Cell 98% CCS,FOM,2.36,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG Fuel Cell 98% CCS,FOM,2.36,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG Fuel Cell 98% CCS,FOM,2.36,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG Fuel Cell 98% CCS,FOM,2.36,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Fuel Cell 98% CCS,VOM,8.59,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Fuel Cell 98% CCS,VOM,8.59,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Fuel Cell 98% CCS,VOM,8.59,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Fuel Cell 98% CCS,VOM,8.59,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Fuel Cell 98% CCS,investment,2476.9880083699904,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Fuel Cell 98% CCS,investment,2476.9880083699904,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Fuel Cell 98% CCS,investment,2476.9880083699904,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Fuel Cell 98% CCS,investment,2476.9880083699904,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Fuel Cell 98% CCS,VOM,7.504733049044611,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Fuel Cell 98% CCS,VOM,7.504733049044611,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Fuel Cell 98% CCS,VOM,7.504733049044611,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Fuel Cell 98% CCS,VOM,7.504733049044611,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Fuel Cell 98% CCS,investment,2164.043512049064,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Fuel Cell 98% CCS,investment,2164.043512049064,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Fuel Cell 98% CCS,investment,2164.043512049064,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Fuel Cell 98% CCS,investment,2164.043512049064,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NH3 (l) storage tank incl. liquefaction,FOM,2.0,%/year,"Guesstimate, based on H2 (l) storage tank.",,2010.0,, NH3 (l) storage tank incl. liquefaction,investment,166.8201,EUR/MWh_NH3,"Calculated based on Morgan E. 2013: doi:10.7275/11KT-3F59 , Fig. 55, Fig 58.","Based on estimated for a double-wall liquid ammonia tank (~ambient pressure, -33°C), inner tank from stainless steel, outer tank from concrete including installations for liquefaction/condensation, boil-off gas recovery and safety installations; the necessary installations make only a small fraction of the total cost. The total cost are driven by material and working time on the tanks. While the costs do not scale strictly linearly, we here assume they do (good approximation c.f. ref. Fig 55.) and take the costs for a 9 kt NH3 (l) tank = 8 M$2010, which is smaller 4-5x smaller than the largest deployed tanks today. @@ -2171,11 +2171,11 @@ NH3 (l) transport ship,investment,81164200.0,EUR,"Cihlar et al 2020 based on IEA NH3 (l) transport ship,lifetime,20.0,years,"Guess estimated based on H2 (l) tanker, but more mature technology",,2019.0,, Natural gas steam reforming,FOM,0.05,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Natural gas steam reforming,efficiency,0.7685,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Natural gas steam reforming,investment,180.0632,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Natural gas steam reforming,investment,242.75887320940691,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Natural gas steam reforming,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Natural gas steam reforming CC,FOM,0.05,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Natural gas steam reforming CC,efficiency,0.6515,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Natural gas steam reforming CC,investment,323.8999,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Natural gas steam reforming CC,investment,436.6777280424164,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Natural gas steam reforming CC,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Ni-Zn-bicharger,FOM,2.1198,%/year,"Viswanathan_2022, p.51-52 in section 4.4.2","{'carrier': ['elec', 'nizn', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['Guesstimate 30% assumed of power components every 10 years ']}",2020.0,, Ni-Zn-bicharger,efficiency,0.9,per unit,"Viswanathan_2022, p.59 (p.81)","{'carrier': ['elec', 'nizn', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['((0.75-0.87)/2)^0.5 mean value of range efficiency is not RTE but single way AC-store conversion']}",2020.0,, @@ -2196,24 +2196,24 @@ Nuclear - Small,FOM,1.79,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucke Nuclear - Small,FOM,3.07,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Nuclear - Small,FOM,1.73,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Nuclear - Small,FOM,1.79,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Nuclear - Small,VOM,2.2,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Nuclear - Small,VOM,2.6,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Nuclear - Small,VOM,2.8,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Nuclear - Small,VOM,2.2,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Nuclear - Small,VOM,2.6,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Nuclear - Small,VOM,2.8,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Nuclear - Small,fuel,10.0062,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Nuclear - Small,fuel,11.016,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Nuclear - Small,fuel,12.1176,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Nuclear - Small,fuel,10.0062,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Nuclear - Small,fuel,11.016,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Nuclear - Small,fuel,12.1176,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Nuclear - Small,investment,3838.585696914429,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Nuclear - Small,investment,7862.963514634311,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Nuclear - Small,investment,12053.348291196737,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Nuclear - Small,investment,3838.585696914429,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Nuclear - Small,investment,7862.963514634311,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Nuclear - Small,investment,12053.348291196737,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Nuclear - Small,VOM,1.9220503734456513,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Nuclear - Small,VOM,2.271514077708497,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Nuclear - Small,VOM,2.4462459298399195,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Nuclear - Small,VOM,1.9220503734456513,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Nuclear - Small,VOM,2.271514077708497,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Nuclear - Small,VOM,2.4462459298399195,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Nuclear - Small,fuel,8.742009293987216,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Nuclear - Small,fuel,9.62423041539877,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Nuclear - Small,fuel,10.586653456938647,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Nuclear - Small,fuel,8.742009293987216,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Nuclear - Small,fuel,9.62423041539877,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Nuclear - Small,fuel,10.586653456938647,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Nuclear - Small,investment,3353.6159419352334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Nuclear - Small,investment,6869.550890769276,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Nuclear - Small,investment,10530.519356529632,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Nuclear - Small,investment,3353.6159419352334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Nuclear - Small,investment,6869.550890769276,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Nuclear - Small,investment,10530.519356529632,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative OCGT,FOM,1.785,%/year,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",52 OCGT - Natural gas: Fixed O&M,2015.0,, OCGT,VOM,4.762,EUR/MWh,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",52 OCGT - Natural gas: Variable O&M,2015.0,, OCGT,efficiency,0.415,per unit,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","52 OCGT - Natural gas: Electricity efficiency, annual average",2015.0,, @@ -2231,12 +2231,12 @@ Offshore Wind - Class 1,FOM,2.11,%/year,NREL/ATB-https://data.openei.org/s3_view Offshore Wind - Class 1,FOM,2.37,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 1,FOM,2.19,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 1,FOM,2.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 1,investment,2884.275059395028,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 1,investment,3386.8417865142433,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 1,investment,4003.3242223556554,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 1,investment,2884.275059395028,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 1,investment,3386.8417865142433,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 1,investment,4003.3242223556554,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 1,investment,2519.873615922814,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 1,investment,2958.9456911686534,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 1,investment,3497.5412802739584,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 1,investment,2519.873615922814,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 1,investment,2958.9456911686534,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 1,investment,3497.5412802739584,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 10,CF,0.5143,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 10,CF,0.488,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 10,CF,0.4693,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2249,12 +2249,12 @@ Offshore Wind - Class 10,FOM,0.85,%/year,NREL/ATB-https://data.openei.org/s3_vie Offshore Wind - Class 10,FOM,1.36,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 10,FOM,1.07,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 10,FOM,0.85,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 10,investment,4228.288907717445,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 10,investment,5889.8185291012305,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 10,investment,8350.62381009344,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 10,investment,4228.288907717445,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 10,investment,5889.8185291012305,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 10,investment,8350.62381009344,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 10,investment,3694.0837609611,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 10,investment,5145.694501539153,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 10,investment,7295.5998239519295,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 10,investment,3694.0837609611,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 10,investment,5145.694501539153,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 10,investment,7295.5998239519295,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 11,CF,0.5116,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 11,CF,0.4854,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 11,CF,0.4668,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2267,12 +2267,12 @@ Offshore Wind - Class 11,FOM,0.83,%/year,NREL/ATB-https://data.openei.org/s3_vie Offshore Wind - Class 11,FOM,1.34,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 11,FOM,1.05,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 11,FOM,0.83,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 11,investment,4358.751770530551,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 11,investment,6071.547413308626,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 11,investment,8608.280128503658,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 11,investment,4358.751770530551,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 11,investment,6071.547413308626,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 11,investment,8608.280128503658,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 11,investment,3808.0638492296084,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 11,investment,5304.463624155828,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 11,investment,7520.703652597834,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 11,investment,3808.0638492296084,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 11,investment,5304.463624155828,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 11,investment,7520.703652597834,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 12,CF,0.5016,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 12,CF,0.476,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 12,CF,0.4577,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2285,12 +2285,12 @@ Offshore Wind - Class 12,FOM,0.84,%/year,NREL/ATB-https://data.openei.org/s3_vie Offshore Wind - Class 12,FOM,1.35,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 12,FOM,1.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 12,FOM,0.84,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 12,investment,4539.387267577848,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 12,investment,6323.164713405064,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 12,investment,8965.024907752282,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 12,investment,4539.387267577848,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 12,investment,6323.164713405064,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 12,investment,8965.024907752282,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 12,investment,3965.8777240283807,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 12,investment,5524.291408526621,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 12,investment,7832.377032679472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 12,investment,3965.8777240283807,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 12,investment,5524.291408526621,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 12,investment,7832.377032679472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 13,CF,0.3947,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 13,CF,0.3745,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 13,CF,0.3601,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2303,12 +2303,12 @@ Offshore Wind - Class 13,FOM,0.72,%/year,NREL/ATB-https://data.openei.org/s3_vie Offshore Wind - Class 13,FOM,1.15,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 13,FOM,0.91,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 13,FOM,0.72,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 13,investment,5057.2540976039545,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 13,investment,7044.530273774768,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 13,investment,9987.781718592576,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 13,investment,5057.2540976039545,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 13,investment,7044.530273774768,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 13,investment,9987.781718592576,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 13,investment,4418.316875867832,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 13,investment,6154.519110662722,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 13,investment,8725.917991870232,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 13,investment,4418.316875867832,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 13,investment,6154.519110662722,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 13,investment,8725.917991870232,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 14,CF,0.3019,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 14,CF,0.2865,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 14,CF,0.2754,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2321,12 +2321,12 @@ Offshore Wind - Class 14,FOM,0.67,%/year,NREL/ATB-https://data.openei.org/s3_vie Offshore Wind - Class 14,FOM,1.08,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 14,FOM,0.85,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 14,FOM,0.67,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 14,investment,5495.53892833311,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 14,investment,7655.041432080621,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 14,investment,10853.368393613986,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 14,investment,5495.53892833311,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 14,investment,7655.041432080621,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 14,investment,10853.368393613986,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 14,investment,4801.228477039895,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 14,investment,6687.897837851132,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 14,investment,9482.145806404085,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 14,investment,4801.228477039895,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 14,investment,6687.897837851132,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 14,investment,9482.145806404085,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 2,CF,0.4999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 2,CF,0.4744,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 2,CF,0.4562,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2339,12 +2339,12 @@ Offshore Wind - Class 2,FOM,2.16,%/year,NREL/ATB-https://data.openei.org/s3_view Offshore Wind - Class 2,FOM,2.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 2,FOM,2.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 2,FOM,2.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 2,investment,2803.9468028506017,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 2,investment,3292.516799548639,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 2,investment,3891.829997000289,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 2,investment,2803.9468028506017,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 2,investment,3292.516799548639,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 2,investment,3891.829997000289,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 2,investment,2449.694090700336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 2,investment,2876.537792794792,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 2,investment,3400.1333177824513,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 2,investment,2449.694090700336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 2,investment,2876.537792794792,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 2,investment,3400.1333177824513,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 4,CF,0.507,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 4,CF,0.4811,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 4,CF,0.4626,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2357,12 +2357,12 @@ Offshore Wind - Class 4,FOM,1.93,%/year,NREL/ATB-https://data.openei.org/s3_view Offshore Wind - Class 4,FOM,2.17,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 4,FOM,2.01,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 4,FOM,1.93,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 4,investment,3136.935301391185,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 4,investment,3683.5265496259526,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 4,investment,4354.012355166543,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 4,investment,3136.935301391185,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 4,investment,3683.5265496259526,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 4,investment,4354.012355166543,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 4,investment,2740.612576142624,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 4,investment,3218.1470819570604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 4,investment,3803.923215106742,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 4,investment,2740.612576142624,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 4,investment,3218.1470819570604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 4,investment,3803.923215106742,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 5,CF,0.4945,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 5,CF,0.4692,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 5,CF,0.4512,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2375,12 +2375,12 @@ Offshore Wind - Class 5,FOM,1.86,%/year,NREL/ATB-https://data.openei.org/s3_view Offshore Wind - Class 5,FOM,2.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 5,FOM,1.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 5,FOM,1.86,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 5,investment,3299.834134021,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 5,investment,3874.809433542761,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 5,investment,4580.113001270816,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 5,investment,3299.834134021,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 5,investment,3874.809433542761,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 5,investment,4580.113001270816,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 5,investment,2882.9306498198953,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 5,investment,3385.2631448961797,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 5,investment,4001.4581384162975,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 5,investment,2882.9306498198953,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 5,investment,3385.2631448961797,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 5,investment,4001.4581384162975,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 6,CF,0.387,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 6,CF,0.3673,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 6,CF,0.3531,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2393,12 +2393,12 @@ Offshore Wind - Class 6,FOM,1.91,%/year,NREL/ATB-https://data.openei.org/s3_view Offshore Wind - Class 6,FOM,2.15,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 6,FOM,1.99,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 6,FOM,1.91,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 6,investment,3183.4245446681775,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 6,investment,3738.116193032553,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 6,investment,4418.538495311793,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 6,investment,3183.4245446681775,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 6,investment,3738.116193032553,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 6,investment,4418.538495311793,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 6,investment,2781.2283340525105,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 6,investment,3265.8398294552067,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 6,investment,3860.2970749990986,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 6,investment,2781.2283340525105,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 6,investment,3265.8398294552067,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 6,investment,3860.2970749990986,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 7,CF,0.2962,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 7,CF,0.281,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 7,CF,0.2702,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2411,12 +2411,12 @@ Offshore Wind - Class 7,FOM,1.81,%/year,NREL/ATB-https://data.openei.org/s3_view Offshore Wind - Class 7,FOM,2.04,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 7,FOM,1.89,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 7,FOM,1.81,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 7,investment,3366.2004729173455,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 7,investment,3952.739821754335,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 7,investment,4672.228485831879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 7,investment,3366.2004729173455,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 7,investment,3952.739821754335,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 7,investment,4672.228485831879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 7,investment,2940.9122163925963,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 7,investment,3453.347750243826,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 7,investment,4081.9356845529874,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 7,investment,2940.9122163925963,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 7,investment,3453.347750243826,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 7,investment,4081.9356845529874,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 8,CF,0.51,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 8,CF,0.484,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 8,CF,0.4654,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2429,12 +2429,12 @@ Offshore Wind - Class 8,FOM,0.9,%/year,NREL/ATB-https://data.openei.org/s3_viewe Offshore Wind - Class 8,FOM,1.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 8,FOM,1.14,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 8,FOM,0.9,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 8,investment,3862.538263632611,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 8,investment,5380.344016502699,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 8,investment,7628.287594219106,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 8,investment,3862.538263632611,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 8,investment,5380.344016502699,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 8,investment,7628.287594219106,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 8,investment,3374.5423236650804,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 8,investment,4700.587375538676,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 8,investment,6664.5240996453,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 8,investment,3374.5423236650804,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 8,investment,4700.587375538676,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 8,investment,6664.5240996453,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 9,CF,0.5133,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 9,CF,0.4871,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 9,CF,0.4684,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2447,12 +2447,12 @@ Offshore Wind - Class 9,FOM,0.87,%/year,NREL/ATB-https://data.openei.org/s3_view Offshore Wind - Class 9,FOM,1.4,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 9,FOM,1.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 9,FOM,0.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 9,investment,4109.694650549806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 9,investment,5724.62194257839,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 9,investment,8116.406909634869,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 9,investment,4109.694650549806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 9,investment,5724.62194257839,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 9,investment,8116.406909634869,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 9,investment,3590.472789925841,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 9,investment,5001.3689738945295,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 9,investment,7090.974059863893,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 9,investment,3590.472789925841,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 9,investment,5001.3689738945295,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 9,investment,7090.974059863893,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PEM electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PEM electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PEM electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative @@ -2460,12 +2460,12 @@ PEM electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenar PEM electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PEM electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PEM electrolyzer,efficiency,0.695,p.u.,ICCT IRA e-fuels assumptions ,,,, -PEM electrolyzer,investment,1781.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PEM electrolyzer,investment,1781.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PEM electrolyzer,investment,1654.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PEM electrolyzer,investment,1654.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PEM electrolyzer,investment,414.5,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PEM electrolyzer,investment,414.5,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PEM electrolyzer,investment,1555.9871432303203,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PEM electrolyzer,investment,1555.9871432303203,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PEM electrolyzer,investment,1445.032417126867,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PEM electrolyzer,investment,1445.032417126867,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PEM electrolyzer,investment,362.13176354237385,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PEM electrolyzer,investment,362.13176354237385,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PEM electrolyzer,lifetime,30.0,years,ICCT IRA e-fuels assumptions ,,,, PHS,FOM,0.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PHS,FOM,0.62,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -2473,12 +2473,12 @@ PHS,FOM,0.62,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data- PHS,FOM,0.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PHS,FOM,0.62,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PHS,FOM,0.62,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PHS,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PHS,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PHS,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PHS,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PHS,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PHS,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PHS,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PHS,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PHS,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PHS,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PHS,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PHS,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PHS,discount rate,0.0481937880466246,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PHS,discount rate,0.0481937880466246,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PHS,discount rate,0.0481937880466246,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2486,12 +2486,12 @@ PHS,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of s PHS,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PHS,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PHS,efficiency,0.75,per unit,DIW DataDoc http://hdl.handle.net/10419/80348, from old pypsa cost assumptions,2015.0,, -PHS,investment,2963.693935298534,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PHS,investment,3224.2384570830204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PHS,investment,3224.2384570830204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PHS,investment,2963.693935298534,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PHS,investment,3224.2384570830204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PHS,investment,3224.2384570830204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PHS,investment,2589.2586523268906,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PHS,investment,2816.8857865973864,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PHS,investment,2816.8857865973864,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PHS,investment,2589.2586523268906,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PHS,investment,2816.8857865973864,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PHS,investment,2816.8857865973864,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PHS,lifetime,80.0,years,IEA2010, from old pypsa cost assumptions,2015.0,, PV+Storage - Class 1,CF,0.3706689120891035,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 1,CF,0.3517839593121589,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -2505,12 +2505,12 @@ PV+Storage - Class 1,FOM,3.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer? PV+Storage - Class 1,FOM,3.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 1,FOM,3.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 1,FOM,3.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 1,investment,1146.00902438583,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 1,investment,1522.3609880093677,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 1,investment,2002.4835174366733,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 1,investment,1146.00902438583,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 1,investment,1522.3609880093677,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 1,investment,2002.4835174366733,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 1,investment,1001.2213969513049,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 1,investment,1330.024775237498,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 1,investment,1749.4882693217814,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 1,investment,1001.2213969513049,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 1,investment,1330.024775237498,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 1,investment,1749.4882693217814,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 10,CF,0.24373817706815865,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 10,CF,0.22993619878698873,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 10,CF,0.2106669247149348,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2523,12 +2523,12 @@ PV+Storage - Class 10,FOM,3.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer PV+Storage - Class 10,FOM,3.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 10,FOM,3.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 10,FOM,3.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 10,investment,1146.00902438583,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 10,investment,1522.3609880093677,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 10,investment,2002.4835174366733,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 10,investment,1146.00902438583,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 10,investment,1522.3609880093677,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 10,investment,2002.4835174366733,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 10,investment,1001.2213969513049,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 10,investment,1330.024775237498,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 10,investment,1749.4882693217814,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 10,investment,1001.2213969513049,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 10,investment,1330.024775237498,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 10,investment,1749.4882693217814,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 2,CF,0.35863243870759,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 2,CF,0.34046894190039917,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 2,CF,0.3167726023817773,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2541,12 +2541,12 @@ PV+Storage - Class 2,FOM,3.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer? PV+Storage - Class 2,FOM,3.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 2,FOM,3.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 2,FOM,3.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 2,investment,1146.00902438583,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 2,investment,1522.3609880093677,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 2,investment,2002.4835174366733,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 2,investment,1146.00902438583,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 2,investment,1522.3609880093677,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 2,investment,2002.4835174366733,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 2,investment,1001.2213969513049,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 2,investment,1330.024775237498,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 2,investment,1749.4882693217814,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 2,investment,1001.2213969513049,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 2,investment,1330.024775237498,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 2,investment,1749.4882693217814,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 3,CF,0.34412888892056986,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 3,CF,0.32621512274498154,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 3,CF,0.30233205125608215,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2559,12 +2559,12 @@ PV+Storage - Class 3,FOM,3.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer? PV+Storage - Class 3,FOM,3.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 3,FOM,3.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 3,FOM,3.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 3,investment,1146.00902438583,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 3,investment,1522.3609880093677,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 3,investment,2002.4835174366733,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 3,investment,1146.00902438583,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 3,investment,1522.3609880093677,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 3,investment,2002.4835174366733,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 3,investment,1001.2213969513049,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 3,investment,1330.024775237498,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 3,investment,1749.4882693217814,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 3,investment,1001.2213969513049,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 3,investment,1330.024775237498,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 3,investment,1749.4882693217814,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 4,CF,0.32978357722922286,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 4,CF,0.31223703634815564,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 4,CF,0.28850054090664873,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2577,12 +2577,12 @@ PV+Storage - Class 4,FOM,3.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer? PV+Storage - Class 4,FOM,3.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 4,FOM,3.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 4,FOM,3.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 4,investment,1146.00902438583,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 4,investment,1522.3609880093677,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 4,investment,2002.4835174366733,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 4,investment,1146.00902438583,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 4,investment,1522.3609880093677,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 4,investment,2002.4835174366733,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 4,investment,1001.2213969513049,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 4,investment,1330.024775237498,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 4,investment,1749.4882693217814,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 4,investment,1001.2213969513049,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 4,investment,1330.024775237498,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 4,investment,1749.4882693217814,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 5,CF,0.3148762955347873,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 5,CF,0.2978286955244422,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 5,CF,0.27473305099077683,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2595,12 +2595,12 @@ PV+Storage - Class 5,FOM,3.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer? PV+Storage - Class 5,FOM,3.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 5,FOM,3.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 5,FOM,3.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 5,investment,1146.00902438583,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 5,investment,1522.3609880093677,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 5,investment,2002.4835174366733,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 5,investment,1146.00902438583,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 5,investment,1522.3609880093677,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 5,investment,2002.4835174366733,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 5,investment,1001.2213969513049,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 5,investment,1330.024775237498,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 5,investment,1749.4882693217814,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 5,investment,1001.2213969513049,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 5,investment,1330.024775237498,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 5,investment,1749.4882693217814,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 6,CF,0.3001924335898397,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 6,CF,0.283632266390766,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 6,CF,0.2611740397097814,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2613,12 +2613,12 @@ PV+Storage - Class 6,FOM,3.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer? PV+Storage - Class 6,FOM,3.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 6,FOM,3.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 6,FOM,3.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 6,investment,1146.00902438583,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 6,investment,1522.3609880093677,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 6,investment,2002.4835174366733,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 6,investment,1146.00902438583,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 6,investment,1522.3609880093677,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 6,investment,2002.4835174366733,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 6,investment,1001.2213969513049,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 6,investment,1330.024775237498,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 6,investment,1749.4882693217814,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 6,investment,1001.2213969513049,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 6,investment,1330.024775237498,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 6,investment,1749.4882693217814,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 7,CF,0.2862833018541765,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 7,CF,0.2703152850075578,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 7,CF,0.2484154893661901,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2631,12 +2631,12 @@ PV+Storage - Class 7,FOM,3.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer? PV+Storage - Class 7,FOM,3.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 7,FOM,3.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 7,FOM,3.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 7,investment,1146.00902438583,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 7,investment,1522.3609880093677,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 7,investment,2002.4835174366733,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 7,investment,1146.00902438583,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 7,investment,1522.3609880093677,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 7,investment,2002.4835174366733,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 7,investment,1001.2213969513049,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 7,investment,1330.024775237498,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 7,investment,1749.4882693217814,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 7,investment,1001.2213969513049,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 7,investment,1330.024775237498,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 7,investment,1749.4882693217814,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 8,CF,0.27579802278267646,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 8,CF,0.2605567359488021,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 8,CF,0.23937350255286224,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2649,12 +2649,12 @@ PV+Storage - Class 8,FOM,3.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer? PV+Storage - Class 8,FOM,3.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 8,FOM,3.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 8,FOM,3.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 8,investment,1146.00902438583,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 8,investment,1522.3609880093677,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 8,investment,2002.4835174366733,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 8,investment,1146.00902438583,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 8,investment,1522.3609880093677,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 8,investment,2002.4835174366733,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 8,investment,1001.2213969513049,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 8,investment,1330.024775237498,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 8,investment,1749.4882693217814,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 8,investment,1001.2213969513049,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 8,investment,1330.024775237498,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 8,investment,1749.4882693217814,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 9,CF,0.2635200718765501,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 9,CF,0.24890140545017353,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 9,CF,0.22841716106097537,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2667,336 +2667,336 @@ PV+Storage - Class 9,FOM,3.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer? PV+Storage - Class 9,FOM,3.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 9,FOM,3.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 9,FOM,3.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 9,investment,1146.00902438583,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 9,investment,1522.3609880093677,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 9,investment,2002.4835174366733,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 9,investment,1146.00902438583,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 9,investment,1522.3609880093677,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 9,investment,2002.4835174366733,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 9,investment,1001.2213969513049,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 9,investment,1330.024775237498,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 9,investment,1749.4882693217814,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 9,investment,1001.2213969513049,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 9,investment,1330.024775237498,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 9,investment,1749.4882693217814,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 10,FOM,0.49,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 10,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 10,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 10,FOM,0.49,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 10,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 10,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 10,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 10,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 10,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 10,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 10,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 10,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 10,investment,4142.631159716651,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 10,investment,4506.818514417017,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 10,investment,4506.818514417017,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 10,investment,4142.631159716651,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 10,investment,4506.818514417017,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 10,investment,4506.818514417017,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 10,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 10,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 10,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 10,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 10,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 10,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 10,investment,3619.248076173173,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 10,investment,3937.4237312213645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 10,investment,3937.4237312213645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 10,investment,3619.248076173173,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 10,investment,3937.4237312213645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 10,investment,3937.4237312213645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 11,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 11,FOM,0.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 11,FOM,0.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 11,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 11,FOM,0.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 11,FOM,0.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 11,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 11,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 11,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 11,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 11,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 11,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 11,investment,4204.087034718669,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 11,investment,4573.677103704925,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 11,investment,4573.677103704925,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 11,investment,4204.087034718669,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 11,investment,4573.677103704925,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 11,investment,4573.677103704925,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 11,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 11,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 11,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 11,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 11,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 11,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 11,investment,3672.9395704904723,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 11,investment,3995.835356907216,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 11,investment,3995.835356907216,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 11,investment,3672.9395704904723,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 11,investment,3995.835356907216,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 11,investment,3995.835356907216,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 12,FOM,0.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 12,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 12,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 12,FOM,0.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 12,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 12,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 12,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 12,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 12,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 12,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 12,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 12,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 12,investment,4259.299438978448,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 12,investment,4633.743345701827,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 12,investment,4633.743345701827,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 12,investment,4259.299438978448,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 12,investment,4633.743345701827,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 12,investment,4633.743345701827,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 12,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 12,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 12,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 12,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 12,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 12,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 12,investment,3721.1763987751724,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 12,investment,4048.3127854806808,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 12,investment,4048.3127854806808,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 12,investment,3721.1763987751724,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 12,investment,4048.3127854806808,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 12,investment,4048.3127854806808,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 13,FOM,0.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 13,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 13,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 13,FOM,0.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 13,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 13,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 13,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 13,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 13,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 13,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 13,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 13,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 13,investment,4310.050457167521,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 13,investment,4688.955991863566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 13,investment,4688.955991863566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 13,investment,4310.050457167521,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 13,investment,4688.955991863566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 13,investment,4688.955991863566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 13,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 13,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 13,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 13,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 13,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 13,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 13,investment,3765.5154958038333,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 13,investment,4096.549825105269,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 13,investment,4096.549825105269,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 13,investment,3765.5154958038333,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 13,investment,4096.549825105269,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 13,investment,4096.549825105269,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 14,FOM,0.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 14,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 14,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 14,FOM,0.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 14,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 14,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 14,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 14,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 14,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 14,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 14,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 14,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 14,investment,4357.818684733739,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 14,investment,4740.923624050991,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 14,investment,4740.923624050991,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 14,investment,4357.818684733739,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 14,investment,4740.923624050991,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 14,investment,4740.923624050991,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 14,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 14,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 14,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 14,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 14,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 14,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 14,investment,3807.2486501822364,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 14,investment,4141.951828220235,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 14,investment,4141.951828220235,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 14,investment,3807.2486501822364,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 14,investment,4141.951828220235,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 14,investment,4141.951828220235,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 15,FOM,0.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 15,FOM,0.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 15,FOM,0.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 15,FOM,0.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 15,FOM,0.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 15,FOM,0.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 15,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 15,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 15,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 15,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 15,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 15,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 15,investment,4403.626255476786,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 15,investment,4790.75823398024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 15,investment,4790.75823398024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 15,investment,4403.626255476786,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 15,investment,4790.75823398024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 15,investment,4790.75823398024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 15,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 15,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 15,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 15,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 15,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 15,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 15,investment,3847.2688585701053,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 15,investment,4185.490296686159,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 15,investment,4185.490296686159,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 15,investment,3847.2688585701053,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 15,investment,4185.490296686159,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 15,investment,4185.490296686159,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 2,FOM,0.61,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 2,FOM,0.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 2,FOM,0.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 2,FOM,0.61,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 2,FOM,0.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 2,FOM,0.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 2,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 2,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 2,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 2,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 2,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 2,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 2,investment,3304.5935114482995,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 2,investment,3595.107226740458,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 2,investment,3595.107226740458,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 2,investment,3304.5935114482995,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 2,investment,3595.107226740458,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 2,investment,3595.107226740458,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 2,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 2,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 2,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 2,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 2,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 2,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 2,investment,2887.088723984218,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 2,investment,3140.898721697117,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 2,investment,3140.898721697117,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 2,investment,2887.088723984218,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 2,investment,3140.898721697117,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 2,investment,3140.898721697117,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 3,FOM,0.58,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 3,FOM,0.53,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 3,FOM,0.53,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 3,FOM,0.58,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 3,FOM,0.53,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 3,FOM,0.53,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 3,investment,3487.4196632537023,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 3,investment,3794.0060072760057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 3,investment,3794.0060072760057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 3,investment,3487.4196632537023,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 3,investment,3794.0060072760057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 3,investment,3794.0060072760057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 3,investment,3046.8164845993115,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 3,investment,3314.668483245405,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 3,investment,3314.668483245405,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 3,investment,3046.8164845993115,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 3,investment,3314.668483245405,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 3,investment,3314.668483245405,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 4,FOM,0.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 4,FOM,0.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 4,FOM,0.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 4,FOM,0.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 4,FOM,0.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 4,FOM,0.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 4,investment,3626.772338349755,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 4,investment,3945.609466995887,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 4,investment,3945.609466995887,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 4,investment,3626.772338349755,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 4,investment,3945.609466995887,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 4,investment,3945.609466995887,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 4,investment,3168.56323969432,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 4,investment,3447.118249777337,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 4,investment,3447.118249777337,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 4,investment,3168.56323969432,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 4,investment,3447.118249777337,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 4,investment,3447.118249777337,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 5,FOM,0.54,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 5,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 5,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 5,FOM,0.54,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 5,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 5,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 5,investment,3738.484983045399,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 5,investment,4067.1430035329063,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 5,investment,4067.1430035329063,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 5,investment,3738.484983045399,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 5,investment,4067.1430035329063,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 5,investment,4067.1430035329063,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 5,investment,3266.1620262651672,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 5,investment,3553.2971494533135,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 5,investment,3553.2971494533135,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 5,investment,3266.1620262651672,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 5,investment,3553.2971494533135,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 5,investment,3553.2971494533135,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 6,FOM,0.53,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 6,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 6,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 6,FOM,0.53,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 6,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 6,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 6,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 6,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 6,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 6,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 6,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 6,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 6,investment,3836.740521894107,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 6,investment,4174.036391950732,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 6,investment,4174.036391950732,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 6,investment,3836.740521894107,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 6,investment,4174.036391950732,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 6,investment,4174.036391950732,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 6,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 6,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 6,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 6,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 6,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 6,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 6,investment,3352.0038876911963,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 6,investment,3646.685548147565,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 6,investment,3646.685548147565,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 6,investment,3352.0038876911963,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 6,investment,3646.685548147565,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 6,investment,3646.685548147565,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 7,FOM,0.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 7,FOM,0.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 7,FOM,0.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 7,FOM,0.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 7,FOM,0.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 7,FOM,0.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 7,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 7,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 7,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 7,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 7,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 7,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 7,investment,3925.2538337283017,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 7,investment,4270.331093836284,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 7,investment,4270.331093836284,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 7,investment,3925.2538337283017,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 7,investment,4270.331093836284,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 7,investment,4270.331093836284,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 7,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 7,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 7,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 7,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 7,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 7,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 7,investment,3429.334362266571,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 7,investment,3730.8143062020936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 7,investment,3730.8143062020936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 7,investment,3429.334362266571,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 7,investment,3730.8143062020936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 7,investment,3730.8143062020936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 8,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 8,FOM,0.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 8,FOM,0.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 8,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 8,FOM,0.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 8,FOM,0.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 8,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 8,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 8,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 8,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 8,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 8,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 8,investment,4005.34988905447,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 8,investment,4357.468560619698,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 8,investment,4357.468560619698,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 8,investment,4005.34988905447,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 8,investment,4357.468560619698,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 8,investment,4357.468560619698,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 8,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 8,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 8,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 8,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 8,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 8,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 8,investment,3499.3110227443826,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 8,investment,3806.942761007625,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 8,investment,3806.942761007625,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 8,investment,3499.3110227443826,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 8,investment,3806.942761007625,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 8,investment,3806.942761007625,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 9,FOM,0.49,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 9,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 9,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 9,FOM,0.49,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 9,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 9,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 9,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 9,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 9,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 9,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 9,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 9,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 9,investment,4075.1671280969513,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 9,investment,4433.423578918661,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 9,investment,4433.423578918661,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 9,investment,4075.1671280969513,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 9,investment,4433.423578918661,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 9,investment,4433.423578918661,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 9,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 9,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 9,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 9,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 9,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 9,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 9,investment,3560.3075001873576,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 9,investment,3873.301566137895,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 9,investment,3873.301566137895,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 9,investment,3560.3075001873576,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 9,investment,3873.301566137895,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 9,investment,3873.301566137895,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower One New Reservoir - National Class 1,FOM,1.19,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower One New Reservoir - National Class 1,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower One New Reservoir - National Class 1,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower One New Reservoir - National Class 1,FOM,1.19,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower One New Reservoir - National Class 1,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower One New Reservoir - National Class 1,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1692.2819498931062,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1841.0539894441488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1841.0539894441488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1692.2819498931062,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1841.0539894441488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1841.0539894441488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1478.4777971669907,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1608.4538672476056,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1608.4538672476056,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1478.4777971669907,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1608.4538672476056,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1608.4538672476056,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower One New Reservoir - National Class 3,FOM,0.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower One New Reservoir - National Class 3,FOM,0.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower One New Reservoir - National Class 3,FOM,0.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower One New Reservoir - National Class 3,FOM,0.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower One New Reservoir - National Class 3,FOM,0.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower One New Reservoir - National Class 3,FOM,0.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2135.3302042330665,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2323.0515408689403,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2323.0515408689403,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2135.3302042330665,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2323.0515408689403,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2323.0515408689403,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 3,investment,1865.5510074890656,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2029.5554916639283,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2029.5554916639283,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 3,investment,1865.5510074890656,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2029.5554916639283,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2029.5554916639283,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower One New Reservoir - National Class 4,FOM,0.82,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower One New Reservoir - National Class 4,FOM,0.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower One New Reservoir - National Class 4,FOM,0.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower One New Reservoir - National Class 4,FOM,0.82,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower One New Reservoir - National Class 4,FOM,0.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower One New Reservoir - National Class 4,FOM,0.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2447.124340839089,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2662.256151022745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2662.256151022745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2447.124340839089,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2662.256151022745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2662.256151022745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2137.9528423535066,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2325.9047405823862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2325.9047405823862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2137.9528423535066,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2325.9047405823862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2325.9047405823862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower One New Reservoir - National Class 5,FOM,0.63,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower One New Reservoir - National Class 5,FOM,0.58,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower One New Reservoir - National Class 5,FOM,0.58,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower One New Reservoir - National Class 5,FOM,0.63,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower One New Reservoir - National Class 5,FOM,0.58,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower One New Reservoir - National Class 5,FOM,0.58,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3179.520247570927,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3459.038511093646,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3459.038511093646,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3179.520247570927,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3459.038511093646,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3459.038511093646,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 5,investment,2777.8173087371406,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3022.0210281865598,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3022.0210281865598,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 5,investment,2777.8173087371406,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3022.0210281865598,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3022.0210281865598,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped-Heat-charger,FOM,0.366,%/year,"Viswanathan_2022, NULL","{'carrier': ['elec', 'phes'], 'technology_type': ['charger'], 'type': ['thermal'], 'note': ['Guesstimate, 50% on charger']}",2020.0,, Pumped-Heat-charger,efficiency,0.99,per unit,"Viswanathan_2022, NULL","{'carrier': ['elec', 'phes'], 'technology_type': ['charger'], 'type': ['thermal'], 'note': ['Charger']}",2020.0,, Pumped-Heat-charger,investment,761782.6727,EUR/MW,"Georgiou_2018, Figure 9 of reference roughly 80% of capital cost are power related 47%/80% of costs are required for liquefaction (charging)","{'carrier': ['elec', 'phes'], 'technology_type': ['charger'], 'type': ['thermal'], 'note': ['Power Equipment Charge']}",2020.0,, @@ -3021,24 +3021,24 @@ Residential Battery Storage - 5 kW - 12.5 kWh,FOM,2.41,%/year,NREL/ATB-https://d Residential Battery Storage - 5 kW - 12.5 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential Battery Storage - 5 kW - 12.5 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential Battery Storage - 5 kW - 12.5 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential Battery Storage - 5 kW - 12.5 kWh,investment,1916.337511838904,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential Battery Storage - 5 kW - 12.5 kWh,investment,2790.1832549615256,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential Battery Storage - 5 kW - 12.5 kWh,investment,3303.0947028994865,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential Battery Storage - 5 kW - 12.5 kWh,investment,1916.337511838904,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential Battery Storage - 5 kW - 12.5 kWh,investment,2790.1832549615256,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential Battery Storage - 5 kW - 12.5 kWh,investment,3303.0947028994865,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential Battery Storage - 5 kW - 12.5 kWh,investment,1674.2260137626706,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential Battery Storage - 5 kW - 12.5 kWh,investment,2437.6694396275466,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential Battery Storage - 5 kW - 12.5 kWh,investment,2885.7792760155958,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential Battery Storage - 5 kW - 12.5 kWh,investment,1674.2260137626706,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential Battery Storage - 5 kW - 12.5 kWh,investment,2437.6694396275466,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential Battery Storage - 5 kW - 12.5 kWh,investment,2885.7792760155958,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential Battery Storage - 5 kW - 20 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential Battery Storage - 5 kW - 20 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential Battery Storage - 5 kW - 20 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Residential Battery Storage - 5 kW - 20 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential Battery Storage - 5 kW - 20 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential Battery Storage - 5 kW - 20 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential Battery Storage - 5 kW - 20 kWh,investment,2379.562304780675,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential Battery Storage - 5 kW - 20 kWh,investment,3345.469280565482,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential Battery Storage - 5 kW - 20 kWh,investment,4101.532008627236,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential Battery Storage - 5 kW - 20 kWh,investment,2379.562304780675,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential Battery Storage - 5 kW - 20 kWh,investment,3345.469280565482,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential Battery Storage - 5 kW - 20 kWh,investment,4101.532008627236,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential Battery Storage - 5 kW - 20 kWh,investment,2078.926643882223,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential Battery Storage - 5 kW - 20 kWh,investment,2922.8002182099267,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential Battery Storage - 5 kW - 20 kWh,investment,3583.3414222187594,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential Battery Storage - 5 kW - 20 kWh,investment,2078.926643882223,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential Battery Storage - 5 kW - 20 kWh,investment,2922.8002182099267,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential Battery Storage - 5 kW - 20 kWh,investment,3583.3414222187594,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 1,CF,0.49395000000000006,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 1,CF,0.49395000000000006,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 1,CF,0.49395000000000006,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3051,12 +3051,12 @@ Residential DW - Class 1,FOM,0.9,%/year,NREL/ATB-https://data.openei.org/s3_view Residential DW - Class 1,FOM,1.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 1,FOM,1.17,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 1,FOM,0.9,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 1,investment,1994.989902557042,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 1,investment,3191.983844091268,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 1,investment,4149.578997318648,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 1,investment,1994.989902557042,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 1,investment,3191.983844091268,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 1,investment,4149.578997318648,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 1,investment,1742.9414032863936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 1,investment,2788.7062452582304,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 1,investment,3625.3181188356994,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 1,investment,1742.9414032863936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 1,investment,2788.7062452582304,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 1,investment,3625.3181188356994,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 10,CF,0.196957,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 10,CF,0.196957,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 10,CF,0.196957,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3069,12 +3069,12 @@ Residential DW - Class 10,FOM,0.9,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential DW - Class 10,FOM,1.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 10,FOM,1.17,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 10,FOM,0.9,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 10,investment,1994.989902557042,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 10,investment,3191.983844091268,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 10,investment,4149.578997318648,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 10,investment,1994.989902557042,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 10,investment,3191.983844091268,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 10,investment,4149.578997318648,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 10,investment,1742.9414032863936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 10,investment,2788.7062452582304,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 10,investment,3625.3181188356994,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 10,investment,1742.9414032863936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 10,investment,2788.7062452582304,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 10,investment,3625.3181188356994,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 2,CF,0.462355,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 2,CF,0.462355,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 2,CF,0.462355,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3087,12 +3087,12 @@ Residential DW - Class 2,FOM,0.9,%/year,NREL/ATB-https://data.openei.org/s3_view Residential DW - Class 2,FOM,1.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 2,FOM,1.17,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 2,FOM,0.9,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 2,investment,1994.989902557042,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 2,investment,3191.983844091268,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 2,investment,4149.578997318648,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 2,investment,1994.989902557042,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 2,investment,3191.983844091268,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 2,investment,4149.578997318648,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 2,investment,1742.9414032863936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 2,investment,2788.7062452582304,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 2,investment,3625.3181188356994,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 2,investment,1742.9414032863936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 2,investment,2788.7062452582304,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 2,investment,3625.3181188356994,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 3,CF,0.45185300000000006,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 3,CF,0.45185300000000006,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 3,CF,0.45185300000000006,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3105,12 +3105,12 @@ Residential DW - Class 3,FOM,0.9,%/year,NREL/ATB-https://data.openei.org/s3_view Residential DW - Class 3,FOM,1.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 3,FOM,1.17,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 3,FOM,0.9,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 3,investment,1994.989902557042,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 3,investment,3191.983844091268,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 3,investment,4149.578997318648,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 3,investment,1994.989902557042,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 3,investment,3191.983844091268,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 3,investment,4149.578997318648,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 3,investment,1742.9414032863936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 3,investment,2788.7062452582304,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 3,investment,3625.3181188356994,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 3,investment,1742.9414032863936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 3,investment,2788.7062452582304,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 3,investment,3625.3181188356994,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 4,CF,0.440728,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 4,CF,0.440728,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 4,CF,0.440728,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3123,12 +3123,12 @@ Residential DW - Class 4,FOM,0.9,%/year,NREL/ATB-https://data.openei.org/s3_view Residential DW - Class 4,FOM,1.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 4,FOM,1.17,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 4,FOM,0.9,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 4,investment,1994.989902557042,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 4,investment,3191.983844091268,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 4,investment,4149.578997318648,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 4,investment,1994.989902557042,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 4,investment,3191.983844091268,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 4,investment,4149.578997318648,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 4,investment,1742.9414032863936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 4,investment,2788.7062452582304,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 4,investment,3625.3181188356994,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 4,investment,1742.9414032863936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 4,investment,2788.7062452582304,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 4,investment,3625.3181188356994,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 5,CF,0.426488,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 5,CF,0.426488,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 5,CF,0.426488,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3141,12 +3141,12 @@ Residential DW - Class 5,FOM,0.9,%/year,NREL/ATB-https://data.openei.org/s3_view Residential DW - Class 5,FOM,1.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 5,FOM,1.17,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 5,FOM,0.9,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 5,investment,1994.989902557042,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 5,investment,3191.983844091268,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 5,investment,4149.578997318648,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 5,investment,1994.989902557042,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 5,investment,3191.983844091268,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 5,investment,4149.578997318648,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 5,investment,1742.9414032863936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 5,investment,2788.7062452582304,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 5,investment,3625.3181188356994,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 5,investment,1742.9414032863936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 5,investment,2788.7062452582304,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 5,investment,3625.3181188356994,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 6,CF,0.404505,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 6,CF,0.404505,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 6,CF,0.404505,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3159,12 +3159,12 @@ Residential DW - Class 6,FOM,0.9,%/year,NREL/ATB-https://data.openei.org/s3_view Residential DW - Class 6,FOM,1.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 6,FOM,1.17,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 6,FOM,0.9,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 6,investment,1994.989902557042,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 6,investment,3191.983844091268,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 6,investment,4149.578997318648,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 6,investment,1994.989902557042,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 6,investment,3191.983844091268,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 6,investment,4149.578997318648,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 6,investment,1742.9414032863936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 6,investment,2788.7062452582304,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 6,investment,3625.3181188356994,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 6,investment,1742.9414032863936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 6,investment,2788.7062452582304,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 6,investment,3625.3181188356994,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 7,CF,0.372376,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 7,CF,0.372376,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 7,CF,0.372376,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3177,12 +3177,12 @@ Residential DW - Class 7,FOM,0.9,%/year,NREL/ATB-https://data.openei.org/s3_view Residential DW - Class 7,FOM,1.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 7,FOM,1.17,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 7,FOM,0.9,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 7,investment,1994.989902557042,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 7,investment,3191.983844091268,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 7,investment,4149.578997318648,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 7,investment,1994.989902557042,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 7,investment,3191.983844091268,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 7,investment,4149.578997318648,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 7,investment,1742.9414032863936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 7,investment,2788.7062452582304,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 7,investment,3625.3181188356994,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 7,investment,1742.9414032863936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 7,investment,2788.7062452582304,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 7,investment,3625.3181188356994,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 8,CF,0.331525,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 8,CF,0.331525,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 8,CF,0.331525,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3195,12 +3195,12 @@ Residential DW - Class 8,FOM,0.9,%/year,NREL/ATB-https://data.openei.org/s3_view Residential DW - Class 8,FOM,1.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 8,FOM,1.17,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 8,FOM,0.9,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 8,investment,1994.989902557042,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 8,investment,3191.983844091268,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 8,investment,4149.578997318648,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 8,investment,1994.989902557042,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 8,investment,3191.983844091268,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 8,investment,4149.578997318648,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 8,investment,1742.9414032863936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 8,investment,2788.7062452582304,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 8,investment,3625.3181188356994,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 8,investment,1742.9414032863936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 8,investment,2788.7062452582304,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 8,investment,3625.3181188356994,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 9,CF,0.285334,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 9,CF,0.285334,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 9,CF,0.285334,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3213,12 +3213,12 @@ Residential DW - Class 9,FOM,0.9,%/year,NREL/ATB-https://data.openei.org/s3_view Residential DW - Class 9,FOM,1.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 9,FOM,1.17,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 9,FOM,0.9,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 9,investment,1994.989902557042,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 9,investment,3191.983844091268,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 9,investment,4149.578997318648,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 9,investment,1994.989902557042,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 9,investment,3191.983844091268,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 9,investment,4149.578997318648,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 9,investment,1742.9414032863936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 9,investment,2788.7062452582304,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 9,investment,3625.3181188356994,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 9,investment,1742.9414032863936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 9,investment,2788.7062452582304,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 9,investment,3625.3181188356994,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 1,CF,0.19262941265204728,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 1,CF,0.18778017406004235,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 1,CF,0.1846378442763413,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3231,12 +3231,12 @@ Residential PV - Class 1,FOM,1.15,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential PV - Class 1,FOM,1.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 1,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 1,FOM,1.15,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 1,investment,1208.073423882336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 1,investment,1702.885175115879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 1,investment,2406.507002392236,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 1,investment,1208.073423882336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 1,investment,1702.885175115879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 1,investment,2406.507002392236,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 1,investment,1055.4445343285502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 1,investment,1487.7414030756993,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 1,investment,2102.467128476169,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 1,investment,1055.4445343285502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 1,investment,1487.7414030756993,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 1,investment,2102.467128476169,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 10,CF,0.12483975330012692,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 10,CF,0.12169704658060394,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 10,CF,0.11966055760633976,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3249,12 +3249,12 @@ Residential PV - Class 10,FOM,1.15,%/year,NREL/ATB-https://data.openei.org/s3_vi Residential PV - Class 10,FOM,1.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 10,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 10,FOM,1.15,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 10,investment,1208.073423882336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 10,investment,1702.885175115879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 10,investment,2406.507002392236,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 10,investment,1208.073423882336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 10,investment,1702.885175115879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 10,investment,2406.507002392236,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 10,investment,1055.4445343285502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 10,investment,1487.7414030756993,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 10,investment,2102.467128476169,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 10,investment,1055.4445343285502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 10,investment,1487.7414030756993,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 10,investment,2102.467128476169,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 2,CF,0.1896493378001759,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 2,CF,0.1848751193921595,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 2,CF,0.1817814030462288,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3267,12 +3267,12 @@ Residential PV - Class 2,FOM,1.15,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential PV - Class 2,FOM,1.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 2,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 2,FOM,1.15,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 2,investment,1208.073423882336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 2,investment,1702.885175115879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 2,investment,2406.507002392236,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 2,investment,1208.073423882336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 2,investment,1702.885175115879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 2,investment,2406.507002392236,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 2,investment,1055.4445343285502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 2,investment,1487.7414030756993,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 2,investment,2102.467128476169,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 2,investment,1055.4445343285502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 2,investment,1487.7414030756993,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 2,investment,2102.467128476169,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 3,CF,0.17692612853862053,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 3,CF,0.17247220325986126,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 3,CF,0.1695860383924738,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3285,12 +3285,12 @@ Residential PV - Class 3,FOM,1.15,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential PV - Class 3,FOM,1.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 3,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 3,FOM,1.15,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 3,investment,1208.073423882336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 3,investment,1702.885175115879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 3,investment,2406.507002392236,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 3,investment,1208.073423882336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 3,investment,1702.885175115879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 3,investment,2406.507002392236,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 3,investment,1055.4445343285502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 3,investment,1487.7414030756993,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 3,investment,2102.467128476169,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 3,investment,1055.4445343285502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 3,investment,1487.7414030756993,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 3,investment,2102.467128476169,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 4,CF,0.16719068008616828,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 4,CF,0.16298183426695853,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 4,CF,0.16025448206067328,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3303,12 +3303,12 @@ Residential PV - Class 4,FOM,1.15,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential PV - Class 4,FOM,1.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 4,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 4,FOM,1.15,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 4,investment,1208.073423882336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 4,investment,1702.885175115879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 4,investment,2406.507002392236,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 4,investment,1208.073423882336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 4,investment,1702.885175115879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 4,investment,2406.507002392236,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 4,investment,1055.4445343285502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 4,investment,1487.7414030756993,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 4,investment,2102.467128476169,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 4,investment,1055.4445343285502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 4,investment,1487.7414030756993,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 4,investment,2102.467128476169,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 5,CF,0.15835652646896928,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 5,CF,0.15437007097976382,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 5,CF,0.15178682877019675,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3321,12 +3321,12 @@ Residential PV - Class 5,FOM,1.15,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential PV - Class 5,FOM,1.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 5,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 5,FOM,1.15,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 5,investment,1208.073423882336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 5,investment,1702.885175115879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 5,investment,2406.507002392236,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 5,investment,1208.073423882336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 5,investment,1702.885175115879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 5,investment,2406.507002392236,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 5,investment,1055.4445343285502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 5,investment,1487.7414030756993,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 5,investment,2102.467128476169,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 5,investment,1055.4445343285502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 5,investment,1487.7414030756993,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 5,investment,2102.467128476169,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 6,CF,0.15639145748147906,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 6,CF,0.15245447049367689,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 6,CF,0.14990328410944517,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3339,12 +3339,12 @@ Residential PV - Class 6,FOM,1.15,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential PV - Class 6,FOM,1.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 6,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 6,FOM,1.15,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 6,investment,1208.073423882336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 6,investment,1702.885175115879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 6,investment,2406.507002392236,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 6,investment,1208.073423882336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 6,investment,1702.885175115879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 6,investment,2406.507002392236,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 6,investment,1055.4445343285502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 6,investment,1487.7414030756993,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 6,investment,2102.467128476169,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 6,investment,1055.4445343285502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 6,investment,1487.7414030756993,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 6,investment,2102.467128476169,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 7,CF,0.1494966780048899,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 7,CF,0.1457332596858643,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 7,CF,0.14329454662854071,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3357,12 +3357,12 @@ Residential PV - Class 7,FOM,1.15,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential PV - Class 7,FOM,1.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 7,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 7,FOM,1.15,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 7,investment,1208.073423882336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 7,investment,1702.885175115879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 7,investment,2406.507002392236,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 7,investment,1208.073423882336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 7,investment,1702.885175115879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 7,investment,2406.507002392236,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 7,investment,1055.4445343285502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 7,investment,1487.7414030756993,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 7,investment,2102.467128476169,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 7,investment,1055.4445343285502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 7,investment,1487.7414030756993,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 7,investment,2102.467128476169,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 8,CF,0.1424107632833385,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 8,CF,0.1388257252576146,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 8,CF,0.13650260348288767,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3375,12 +3375,12 @@ Residential PV - Class 8,FOM,1.15,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential PV - Class 8,FOM,1.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 8,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 8,FOM,1.15,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 8,investment,1208.073423882336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 8,investment,1702.885175115879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 8,investment,2406.507002392236,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 8,investment,1208.073423882336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 8,investment,1702.885175115879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 8,investment,2406.507002392236,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 8,investment,1055.4445343285502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 8,investment,1487.7414030756993,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 8,investment,2102.467128476169,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 8,investment,1055.4445343285502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 8,investment,1487.7414030756993,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 8,investment,2102.467128476169,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 9,CF,0.13674203686793523,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 9,CF,0.1332997029418742,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 9,CF,0.1310690541057579,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3393,12 +3393,12 @@ Residential PV - Class 9,FOM,1.15,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential PV - Class 9,FOM,1.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 9,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 9,FOM,1.15,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 9,investment,1208.073423882336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 9,investment,1702.885175115879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 9,investment,2406.507002392236,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 9,investment,1208.073423882336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 9,investment,1702.885175115879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 9,investment,2406.507002392236,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 9,investment,1055.4445343285502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 9,investment,1487.7414030756993,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 9,investment,2102.467128476169,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 9,investment,1055.4445343285502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 9,investment,1487.7414030756993,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 9,investment,2102.467128476169,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative SMR,FOM,5.0,%/year,Danish Energy Agency,"Technology data for renewable fuels, in pdf on table 3 p.311",2015.0,, SMR,efficiency,0.76,per unit (in LHV),"IEA Global average levelised cost of hydrogen production by energy source and technology, 2019 and 2050 (2020), https://www.iea.org/data-and-statistics/charts/global-average-levelised-cost-of-hydrogen-production-by-energy-source-and-technology-2019-and-2050",,,, SMR,investment,522201.0492,EUR/MW_CH4,Danish Energy Agency,"Technology data for renewable fuels, in pdf on table 3 p.311",2015.0,, @@ -3415,12 +3415,12 @@ SOEC,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and finan SOEC,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced SOEC,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced SOEC,efficiency,0.855,p.u.,ICCT IRA e-fuels assumptions ,,,, -SOEC,investment,1968.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -SOEC,investment,1968.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -SOEC,investment,1827.5,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -SOEC,investment,1827.5,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -SOEC,investment,728.5,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -SOEC,investment,728.5,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +SOEC,investment,1719.3614249732007,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +SOEC,investment,1719.3614249732007,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +SOEC,investment,1596.6122988508762,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +SOEC,investment,1596.6122988508762,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +SOEC,investment,636.4607713887077,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +SOEC,investment,636.4607713887077,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced SOEC,lifetime,30.0,years,ICCT IRA e-fuels assumptions ,,,, Sand-charger,FOM,1.075,%/year,"Viswanathan_2022, NULL","{'carrier': ['elec', 'sand'], 'technology_type': ['charger'], 'type': ['thermal'], 'note': ['Guesstimate, 50% on charger']}",2020.0,, Sand-charger,efficiency,0.99,per unit,"Viswanathan_2022, p.107 (p.129)","{'carrier': ['elec', 'sand'], 'technology_type': ['charger'], 'type': ['thermal'], 'note': ['RTE assume 99% for charge and other for discharge']}",2020.0,, @@ -3435,7 +3435,7 @@ Sand-store,investment,6700.8517,EUR/MWh,"Viswanathan_2022, p.100 (p.122)","{'car Sand-store,lifetime,35.0,years,"Viswanathan_2022, p.107 (p.129)","{'carrier': ['sand'], 'technology_type': ['store'], 'type': ['thermal'], 'note': ['NULL']}",2020.0,, Solid biomass steam reforming,FOM,0.05,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Solid biomass steam reforming,efficiency,0.712,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Solid biomass steam reforming,investment,590.7702,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Solid biomass steam reforming,investment,796.4750872147151,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Solid biomass steam reforming,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Steam methane reforming,FOM,3.0,%/year,"International Energy Agency (2015): Technology Roadmap Hydrogen and Fuel Cells , table 15.",Large scale SMR facility (150-300 MW).,2015.0,, Steam methane reforming,investment,497454.611,EUR/MW_H2,"International Energy Agency (2015): Technology Roadmap Hydrogen and Fuel Cells , table 15.",Large scale SMR facility (150-300 MW). Currency conversion 1.17 USD = 1 EUR.,2015.0,, @@ -3462,12 +3462,12 @@ Utility PV - Class 1,FOM,1.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Utility PV - Class 1,FOM,1.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 1,FOM,1.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 1,FOM,1.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 1,investment,682.8963556917138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 1,investment,895.3211436190419,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 1,investment,1189.2470902797832,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 1,investment,682.8963556917138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 1,investment,895.3211436190419,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 1,investment,1189.2470902797832,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 1,investment,596.6187252190604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 1,investment,782.205608384894,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 1,investment,1038.9967336324596,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 1,investment,596.6187252190604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 1,investment,782.205608384894,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 1,investment,1038.9967336324596,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 10,CF,0.2299450736198828,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 10,CF,0.21614309533871287,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 10,CF,0.19687382126665892,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3480,12 +3480,12 @@ Utility PV - Class 10,FOM,1.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer Utility PV - Class 10,FOM,1.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 10,FOM,1.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 10,FOM,1.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 10,investment,682.8963556917138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 10,investment,895.3211436190419,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 10,investment,1189.2470902797832,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 10,investment,682.8963556917138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 10,investment,895.3211436190419,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 10,investment,1189.2470902797832,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 10,investment,596.6187252190604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 10,investment,782.205608384894,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 10,investment,1038.9967336324596,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 10,investment,596.6187252190604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 10,investment,782.205608384894,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 10,investment,1038.9967336324596,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 2,CF,0.34483933525931415,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 2,CF,0.32667583845212333,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 2,CF,0.30297949893350146,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3498,12 +3498,12 @@ Utility PV - Class 2,FOM,1.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Utility PV - Class 2,FOM,1.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 2,FOM,1.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 2,FOM,1.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 2,investment,682.8963556917138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 2,investment,895.3211436190419,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 2,investment,1189.2470902797832,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 2,investment,682.8963556917138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 2,investment,895.3211436190419,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 2,investment,1189.2470902797832,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 2,investment,596.6187252190604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 2,investment,782.205608384894,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 2,investment,1038.9967336324596,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 2,investment,596.6187252190604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 2,investment,782.205608384894,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 2,investment,1038.9967336324596,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 3,CF,0.33033578547229403,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 3,CF,0.3124220192967057,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 3,CF,0.2885389478078063,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3516,12 +3516,12 @@ Utility PV - Class 3,FOM,1.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Utility PV - Class 3,FOM,1.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 3,FOM,1.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 3,FOM,1.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 3,investment,682.8963556917138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 3,investment,895.3211436190419,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 3,investment,1189.2470902797832,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 3,investment,682.8963556917138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 3,investment,895.3211436190419,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 3,investment,1189.2470902797832,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 3,investment,596.6187252190604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 3,investment,782.205608384894,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 3,investment,1038.9967336324596,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 3,investment,596.6187252190604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 3,investment,782.205608384894,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 3,investment,1038.9967336324596,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 4,CF,0.315990473780947,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 4,CF,0.2984439328998798,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 4,CF,0.2747074374583729,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3534,12 +3534,12 @@ Utility PV - Class 4,FOM,1.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Utility PV - Class 4,FOM,1.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 4,FOM,1.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 4,FOM,1.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 4,investment,682.8963556917138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 4,investment,895.3211436190419,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 4,investment,1189.2470902797832,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 4,investment,682.8963556917138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 4,investment,895.3211436190419,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 4,investment,1189.2470902797832,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 4,investment,596.6187252190604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 4,investment,782.205608384894,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 4,investment,1038.9967336324596,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 4,investment,596.6187252190604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 4,investment,782.205608384894,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 4,investment,1038.9967336324596,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 6,CF,0.2863993301415639,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 6,CF,0.26983916294249016,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 6,CF,0.24738093626150556,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3552,12 +3552,12 @@ Utility PV - Class 6,FOM,1.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Utility PV - Class 6,FOM,1.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 6,FOM,1.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 6,FOM,1.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 6,investment,682.8963556917138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 6,investment,895.3211436190419,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 6,investment,1189.2470902797832,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 6,investment,682.8963556917138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 6,investment,895.3211436190419,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 6,investment,1189.2470902797832,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 6,investment,596.6187252190604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 6,investment,782.205608384894,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 6,investment,1038.9967336324596,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 6,investment,596.6187252190604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 6,investment,782.205608384894,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 6,investment,1038.9967336324596,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 7,CF,0.27249019840590066,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 7,CF,0.25652218155928197,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 7,CF,0.23462238591791423,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3570,12 +3570,12 @@ Utility PV - Class 7,FOM,1.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Utility PV - Class 7,FOM,1.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 7,FOM,1.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 7,FOM,1.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 7,investment,682.8963556917138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 7,investment,895.3211436190419,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 7,investment,1189.2470902797832,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 7,investment,682.8963556917138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 7,investment,895.3211436190419,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 7,investment,1189.2470902797832,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 7,investment,596.6187252190604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 7,investment,782.205608384894,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 7,investment,1038.9967336324596,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 7,investment,596.6187252190604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 7,investment,782.205608384894,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 7,investment,1038.9967336324596,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 8,CF,0.2620049193344006,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 8,CF,0.24676363250052624,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 8,CF,0.2255803991045864,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3588,12 +3588,12 @@ Utility PV - Class 8,FOM,1.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Utility PV - Class 8,FOM,1.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 8,FOM,1.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 8,FOM,1.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 8,investment,682.8963556917138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 8,investment,895.3211436190419,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 8,investment,1189.2470902797832,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 8,investment,682.8963556917138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 8,investment,895.3211436190419,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 8,investment,1189.2470902797832,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 8,investment,596.6187252190604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 8,investment,782.205608384894,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 8,investment,1038.9967336324596,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 8,investment,596.6187252190604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 8,investment,782.205608384894,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 8,investment,1038.9967336324596,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 9,CF,0.24972696842827424,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 9,CF,0.23510830200189767,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 9,CF,0.21462405761269948,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3606,60 +3606,60 @@ Utility PV - Class 9,FOM,1.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Utility PV - Class 9,FOM,1.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 9,FOM,1.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 9,FOM,1.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 9,investment,682.8963556917138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 9,investment,895.3211436190419,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 9,investment,1189.2470902797832,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 9,investment,682.8963556917138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 9,investment,895.3211436190419,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 9,investment,1189.2470902797832,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 9,investment,596.6187252190604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 9,investment,782.205608384894,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 9,investment,1038.9967336324596,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 9,investment,596.6187252190604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 9,investment,782.205608384894,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 9,investment,1038.9967336324596,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility-Scale Battery Storage - 10Hr,FOM,2.3,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility-Scale Battery Storage - 10Hr,FOM,2.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility-Scale Battery Storage - 10Hr,FOM,2.34,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Utility-Scale Battery Storage - 10Hr,FOM,2.3,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility-Scale Battery Storage - 10Hr,FOM,2.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility-Scale Battery Storage - 10Hr,FOM,2.34,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility-Scale Battery Storage - 10Hr,investment,2156.471001630565,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility-Scale Battery Storage - 10Hr,investment,2736.552302851726,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility-Scale Battery Storage - 10Hr,investment,3631.2270561573023,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility-Scale Battery Storage - 10Hr,investment,2156.471001630565,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility-Scale Battery Storage - 10Hr,investment,2736.552302851726,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility-Scale Battery Storage - 10Hr,investment,3631.2270561573023,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility-Scale Battery Storage - 10Hr,investment,1884.0208609130657,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility-Scale Battery Storage - 10Hr,investment,2390.814261658962,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility-Scale Battery Storage - 10Hr,investment,3172.455145160498,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility-Scale Battery Storage - 10Hr,investment,1884.0208609130657,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility-Scale Battery Storage - 10Hr,investment,2390.814261658962,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility-Scale Battery Storage - 10Hr,investment,3172.455145160498,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility-Scale Battery Storage - 2Hr,FOM,2.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility-Scale Battery Storage - 2Hr,FOM,2.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility-Scale Battery Storage - 2Hr,FOM,2.18,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Utility-Scale Battery Storage - 2Hr,FOM,2.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility-Scale Battery Storage - 2Hr,FOM,2.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility-Scale Battery Storage - 2Hr,FOM,2.18,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility-Scale Battery Storage - 2Hr,investment,652.7919980471177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility-Scale Battery Storage - 2Hr,investment,884.3444377495222,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility-Scale Battery Storage - 2Hr,investment,1079.8589990064552,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility-Scale Battery Storage - 2Hr,investment,652.7919980471177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility-Scale Battery Storage - 2Hr,investment,884.3444377495222,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility-Scale Battery Storage - 2Hr,investment,1079.8589990064552,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility-Scale Battery Storage - 2Hr,investment,570.3177743767252,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility-Scale Battery Storage - 2Hr,investment,772.6157076504788,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility-Scale Battery Storage - 2Hr,investment,943.428814685911,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility-Scale Battery Storage - 2Hr,investment,570.3177743767252,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility-Scale Battery Storage - 2Hr,investment,772.6157076504788,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility-Scale Battery Storage - 2Hr,investment,943.428814685911,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility-Scale Battery Storage - 4Hr,FOM,2.17,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility-Scale Battery Storage - 4Hr,FOM,2.23,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility-Scale Battery Storage - 4Hr,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Utility-Scale Battery Storage - 4Hr,FOM,2.17,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility-Scale Battery Storage - 4Hr,FOM,2.23,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility-Scale Battery Storage - 4Hr,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility-Scale Battery Storage - 4Hr,investment,1028.7117489429795,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility-Scale Battery Storage - 4Hr,investment,1347.3964040250733,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility-Scale Battery Storage - 4Hr,investment,1717.701013294167,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility-Scale Battery Storage - 4Hr,investment,1028.7117489429795,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility-Scale Battery Storage - 4Hr,investment,1347.3964040250733,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility-Scale Battery Storage - 4Hr,investment,1717.701013294167,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility-Scale Battery Storage - 4Hr,investment,898.7435460108104,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility-Scale Battery Storage - 4Hr,investment,1177.1653461525998,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility-Scale Battery Storage - 4Hr,investment,1500.685397304558,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility-Scale Battery Storage - 4Hr,investment,898.7435460108104,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility-Scale Battery Storage - 4Hr,investment,1177.1653461525998,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility-Scale Battery Storage - 4Hr,investment,1500.685397304558,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility-Scale Battery Storage - 8Hr,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility-Scale Battery Storage - 8Hr,FOM,2.3,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility-Scale Battery Storage - 8Hr,FOM,2.33,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Utility-Scale Battery Storage - 8Hr,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility-Scale Battery Storage - 8Hr,FOM,2.3,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility-Scale Battery Storage - 8Hr,FOM,2.33,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility-Scale Battery Storage - 8Hr,investment,1780.5512507347034,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility-Scale Battery Storage - 8Hr,investment,2273.500336576175,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility-Scale Battery Storage - 8Hr,investment,2993.3850418695906,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility-Scale Battery Storage - 8Hr,investment,1780.5512507347034,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility-Scale Battery Storage - 8Hr,investment,2273.500336576175,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility-Scale Battery Storage - 8Hr,investment,2993.3850418695906,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility-Scale Battery Storage - 8Hr,investment,1555.595089278981,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility-Scale Battery Storage - 8Hr,investment,1986.2646231568413,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility-Scale Battery Storage - 8Hr,investment,2615.1985625418515,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility-Scale Battery Storage - 8Hr,investment,1555.595089278981,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility-Scale Battery Storage - 8Hr,investment,1986.2646231568413,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility-Scale Battery Storage - 8Hr,investment,2615.1985625418515,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Vanadium-Redox-Flow-bicharger,FOM,2.4395,%/year,"Viswanathan_2022, p.28 (p.50)","{'carrier': ['elec', 'vanadium', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['30% assumed of power components every 10 years']}",2020.0,, Vanadium-Redox-Flow-bicharger,efficiency,0.8062,per unit,"Viswanathan_2022, p.42 (p.64)","{'carrier': ['elec', 'vanadium', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['AC-AC efficiency at transformer level 0.65^0.5']}",2020.0,, Vanadium-Redox-Flow-bicharger,investment,129023.0526,EUR/MW,"Viswanathan_2022, p.42 (p.64)","{'carrier': ['elec', 'vanadium', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['Power Equipment']}",2020.0,, @@ -3706,12 +3706,12 @@ battery storage,FOM,2.31,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucke battery storage,FOM,2.23,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced battery storage,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate battery storage,FOM,2.31,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -battery storage,investment,1404.6314998388416,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -battery storage,investment,1810.448370300624,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -battery storage,investment,2355.543027581879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -battery storage,investment,1404.6314998388416,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -battery storage,investment,1810.448370300624,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -battery storage,investment,2355.543027581879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +battery storage,investment,1227.1693176448957,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +battery storage,investment,1581.7149846547204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +battery storage,investment,2057.9419799232046,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +battery storage,investment,1227.1693176448957,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +battery storage,investment,1581.7149846547204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +battery storage,investment,2057.9419799232046,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative battery storage,lifetime,27.5,years,"Danish Energy Agency, inputs/technology_data_catalogue_for_energy_storage.xlsx",: Technical lifetime,2015.0,, biochar pyrolysis,FOM,3.3913,%/year,"Danish Energy Agency, inputs/data_sheets_for_renewable_fuels.xlsx","105 Slow pyrolysis, Straw: Fixed O&M",2020.0,, biochar pyrolysis,VOM,823.497,EUR/MWh_biochar,"Danish Energy Agency, inputs/data_sheets_for_renewable_fuels.xlsx","105 Slow pyrolysis, Straw: Variable O&M",2020.0,, @@ -3756,12 +3756,12 @@ biomass,FOM,3.54,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-d biomass,FOM,3.54,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced biomass,FOM,3.54,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate biomass,FOM,3.54,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -biomass,VOM,5.246639999999999,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -biomass,VOM,5.246639999999999,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -biomass,VOM,5.246639999999999,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -biomass,VOM,5.246639999999999,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -biomass,VOM,5.246639999999999,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -biomass,VOM,5.246639999999999,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +biomass,VOM,4.583775623334041,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +biomass,VOM,4.583775623334041,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +biomass,VOM,4.583775623334041,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +biomass,VOM,4.583775623334041,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +biomass,VOM,4.583775623334041,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +biomass,VOM,4.583775623334041,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative biomass,discount rate,0.0540457018738165,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced biomass,discount rate,0.0540457018738165,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate biomass,discount rate,0.0540457018738165,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3769,18 +3769,18 @@ biomass,discount rate,0.0471698161746512,per unit,"NREL, NREL ATB 2024",Meaning biomass,discount rate,0.0471698161746512,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate biomass,discount rate,0.0471698161746512,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative biomass,efficiency,0.468,per unit,DIW DataDoc http://hdl.handle.net/10419/80348, from old pypsa cost assumptions,2015.0,, -biomass,fuel,73.57007249999998,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -biomass,fuel,73.57007249999998,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -biomass,fuel,73.57007249999998,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -biomass,fuel,73.57007249999998,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -biomass,fuel,73.57007249999998,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -biomass,fuel,73.57007249999998,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -biomass,investment,4622.580626925884,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -biomass,investment,4622.580626925884,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -biomass,investment,4622.580626925884,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -biomass,investment,4622.580626925884,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -biomass,investment,4622.580626925884,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -biomass,investment,4622.580626925884,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +biomass,fuel,64.27517514684027,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +biomass,fuel,64.27517514684027,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +biomass,fuel,64.27517514684027,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +biomass,fuel,64.27517514684027,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +biomass,fuel,64.27517514684027,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +biomass,fuel,64.27517514684027,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +biomass,investment,4038.560372847967,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +biomass,investment,4038.560372847967,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +biomass,investment,4038.560372847967,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +biomass,investment,4038.560372847967,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +biomass,investment,4038.560372847967,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +biomass,investment,4038.560372847967,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative biomass,lifetime,30.0,years,ECF2010 in DIW DataDoc http://hdl.handle.net/10419/80348, from old pypsa cost assumptions,2015.0,, biomass CHP,FOM,3.5717,%/year,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","09c Straw, Large, 40 degree: Fixed O&M",2015.0,, biomass CHP,VOM,2.222,EUR/MWh_e,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","09c Straw, Large, 40 degree: Variable O&M ",2015.0,, @@ -3946,12 +3946,12 @@ coal,FOM,2.15,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data coal,FOM,2.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced coal,FOM,2.14,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate coal,FOM,2.15,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -coal,VOM,8.65,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -coal,VOM,8.79,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -coal,VOM,8.94,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -coal,VOM,8.65,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -coal,VOM,8.79,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -coal,VOM,8.94,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +coal,VOM,7.557152604684038,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +coal,VOM,7.679464901176033,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +coal,VOM,7.810513790274601,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +coal,VOM,7.557152604684038,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +coal,VOM,7.679464901176033,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +coal,VOM,7.810513790274601,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative coal,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced coal,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate coal,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3959,13 +3959,13 @@ coal,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of coal,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate coal,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative coal,efficiency,0.356,p.u.,"Lazard's levelized cost of energy analysis - version 16.0 (2023): https://www.lazard.com/media/typdgxmm/lazards-lcoeplus-april-2023.pdf , pg. 49 (Levelized Cost of Energy - Key Assumptions), accessed: 2023-12-14.","Calculated based on average of listed range, i.e. 1 / ((8.75+12) MMbtu/MWh_th /2 / (3.4095 MMbtu/MWh_th)), rounded up.",2023.0,, -coal,fuel,8.12,USD/MWh_th,"EIA, https://www.eia.gov/coal/annual/",46.97 USD/short ton of bituminous coal with energy content = 19.73 million BTU/short ton,2023.0,, -coal,investment,3930.799595419696,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -coal,investment,3797.4914245793057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -coal,investment,3664.306801626627,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -coal,investment,3930.799595419696,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -coal,investment,3797.4914245793057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -coal,investment,3664.306801626627,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +coal,fuel,6.887488540325987,USD/MWh_th,"EIA, https://www.eia.gov/coal/annual/",46.97 USD/short ton of bituminous coal with energy content = 19.73 million BTU/short ton,2023.0,, +coal,investment,3434.179468325655,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +coal,investment,3317.7135503496875,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +coal,investment,3201.3555711299537,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +coal,investment,3434.179468325655,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +coal,investment,3317.7135503496875,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +coal,investment,3201.3555711299537,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative coal,lifetime,40.0,years,"Lazard's levelized cost of energy analysis - version 16.0 (2023): https://www.lazard.com/media/typdgxmm/lazards-lcoeplus-april-2023.pdf , pg. 49 (Levelized Cost of Energy - Key Assumptions), accessed: 2023-12-14.",,2023.0,, csp-tower,CF,0.666,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced csp-tower,CF,0.666,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -3979,24 +3979,24 @@ csp-tower,FOM,0.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi csp-tower,FOM,1.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced csp-tower,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate csp-tower,FOM,0.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -csp-tower,VOM,2.91,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -csp-tower,VOM,3.0,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -csp-tower,VOM,3.95766,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -csp-tower,VOM,2.91,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -csp-tower,VOM,3.0,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -csp-tower,VOM,3.95766,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +csp-tower,VOM,2.5423484485122025,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +csp-tower,VOM,2.6209777819713427,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +csp-tower,VOM,3.4576463095322345,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +csp-tower,VOM,2.5423484485122025,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +csp-tower,VOM,2.6209777819713427,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +csp-tower,VOM,3.4576463095322345,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative csp-tower,discount rate,0.052578925571245,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced csp-tower,discount rate,0.052578925571245,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate csp-tower,discount rate,0.052578925571245,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative csp-tower,discount rate,0.0416031281240576,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced csp-tower,discount rate,0.0416031281240576,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate csp-tower,discount rate,0.0416031281240576,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -csp-tower,investment,3911.490232203063,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -csp-tower,investment,4998.702956539839,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -csp-tower,investment,7912.019603207439,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -csp-tower,investment,3911.490232203063,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -csp-tower,investment,4998.702956539839,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -csp-tower,investment,7912.019603207439,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +csp-tower,investment,3417.309664334052,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +csp-tower,investment,4367.1631292551265,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +csp-tower,investment,6912.409196842806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +csp-tower,investment,3417.309664334052,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +csp-tower,investment,4367.1631292551265,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +csp-tower,investment,6912.409196842806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative csp-tower,lifetime,30.0,years,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),-,2020.0,, csp-tower TES,FOM,1.2,%/year,see solar-tower.,-,2020.0,, csp-tower TES,investment,13.955,EUR/kWh_th,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,"Based on NREL’s SAM (v2021.12.2) numbers for a CSP power plant, 2020 numbers. CAPEX degression (=learning) taken from ATB database (“moderate”) scenario. Costs include the TES incl. EPC cost for the default installation size (104 MWe plant, 2.791 MW_th TES). Total costs (69390776.7 USD) are divided by TES size to obtain EUR/kW_th. Exchange rate: 1.16 USD to 1 EUR.",2020.0,, @@ -4062,12 +4062,12 @@ direct air capture,compression-heat-output,0.2,MWh/tCO2,"Danish Energy Agency, i direct air capture,electricity-input,0.24,MWh_el/t_CO2,ICCT IRA e-fuels assumptions ,,,, direct air capture,heat-input,1.17,MWh_th/t_CO2,ICCT IRA e-fuels assumptions ,,,, direct air capture,heat-output,0.875,MWh/tCO2,"Danish Energy Agency, inputs/technology_data_for_carbon_capture_transport_storage.xlsx",403.a Direct air capture,2020.0,, -direct air capture,investment,12398844.91,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -direct air capture,investment,12398844.91,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -direct air capture,investment,19180739.93,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -direct air capture,investment,19180739.93,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -direct air capture,investment,7103597.31,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -direct air capture,investment,7103597.31,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +direct air capture,investment,10832365.677072823,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +direct air capture,investment,10832365.677072823,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +direct air capture,investment,16757431.066100188,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +direct air capture,investment,16757431.066100188,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +direct air capture,investment,6206123.573860465,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +direct air capture,investment,6206123.573860465,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced direct air capture,lifetime,20.0,years,"Danish Energy Agency, inputs/technology_data_for_carbon_capture_transport_storage.xlsx",403.a Direct air capture,2020.0,, direct air capture,years,30.0,years,ICCT IRA e-fuels assumptions ,,,, direct firing gas,FOM,1.1667,%/year,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",312.a Direct firing Natural Gas: Fixed O&M,2019.0,, @@ -4148,7 +4148,7 @@ fuel cell,investment,1084.6772,EUR/kW_e,"Danish Energy Agency, inputs/technology fuel cell,lifetime,10.0,years,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",12 LT-PEMFC CHP: Technical lifetime,2015.0,, fuelwood,fuel,13.8577,EUR/MWhth,"JRC ENSPRESO ca avg for MINBIOWOO (FuelwoodRW), ENS_BaU_GFTM",,2010.0,, gas,CO2 intensity,0.198,tCO2/MWh_th,Stoichiometric calculation with 50 GJ/t CH4,,,, -gas,fuel,14.05,USD/MWh_th,World Bank https://www.worldbank.org/en/research/commodity-markets,,2010.0,, +gas,fuel,16.199297879801314,USD/MWh_th,World Bank https://www.worldbank.org/en/research/commodity-markets,,2010.0,, gas boiler steam,FOM,4.07,%/year,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",311.1c Steam boiler Gas: Fixed O&M,2019.0,, gas boiler steam,VOM,1.007,EUR/MWh,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",311.1c Steam boiler Gas: Variable O&M,2019.0,, gas boiler steam,efficiency,0.93,per unit,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx","311.1c Steam boiler Gas: Total efficiency, net, annual average",2019.0,, @@ -4180,12 +4180,12 @@ geothermal,discount rate,0.0400999293962161,per unit,"NREL, NREL ATB 2024",Meani geothermal,discount rate,0.0400999293962161,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative geothermal,district heat surcharge,25.0,%,Frey et al. 2022: Techno-Economic Assessment of Geothermal Resources in the Variscan Basement of the Northern Upper Rhine Graben,"If capital cost of electric generation from EGS is 100%, district heating adds additional 25%. Costs incurred by piping.",2020.0,, geothermal,district heat-input,0.8,MWh_thdh/MWh_th,"Aghahosseini, Breyer 2020: From hot rock to useful energy: A global estimate of enhanced geothermal systems potential, https://www.sciencedirect.com/science/article/pii/S0306261920312551; Breede et al. 2015: Overcoming challenges in the classification of deep geothermal potential, https://eprints.gla.ac.uk/169585/","Heat-input, District Heat-output. This is an assessment of typical heat losses when heat is transmitted from the EGS plant to the DH network, This is a rough estimate, depends on local conditions",2020.0,, -geothermal,investment,5241.014052442069,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -geothermal,investment,6171.787697859847,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -geothermal,investment,6767.773118766325,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -geothermal,investment,5241.014052442069,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -geothermal,investment,6171.787697859847,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -geothermal,investment,6767.773118766325,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +geothermal,investment,4578.8604621500845,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +geothermal,investment,5392.039477044907,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +geothermal,investment,5912.72765923648,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +geothermal,investment,4578.8604621500845,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +geothermal,investment,5392.039477044907,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +geothermal,investment,5912.72765923648,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative geothermal,lifetime,30.0,years,"Aghahosseini, Breyer 2020: From hot rock to useful energy: A global estimate of enhanced geothermal systems potential, https://www.sciencedirect.com/science/article/pii/S0306261920312551",,2020.0,, helmeth,FOM,3.0,%/year,no source, from old pypsa cost assumptions,2015.0,, helmeth,efficiency,0.8,per unit,HELMETH press release, from old pypsa cost assumptions,2015.0,, @@ -4216,19 +4216,19 @@ hydro,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of hydro,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate hydro,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative hydro,efficiency,0.9,per unit,DIW DataDoc http://hdl.handle.net/10419/80348, from old pypsa cost assumptions,2015.0,, -hydro,investment,2940.089083230616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -hydro,investment,3241.3364440395458,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -hydro,investment,3241.3364440395458,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -hydro,investment,2940.089083230616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -hydro,investment,3241.3364440395458,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -hydro,investment,3241.3364440395458,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +hydro,investment,2568.6360547213126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +hydro,investment,2831.823601240549,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +hydro,investment,2831.823601240549,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +hydro,investment,2568.6360547213126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +hydro,investment,2831.823601240549,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +hydro,investment,2831.823601240549,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative hydro,lifetime,80.0,years,IEA2010, from old pypsa cost assumptions,2015.0,, hydrogen storage compressor,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,,2022.0,, hydrogen storage compressor,compression-electricity-input,0.05,MWh_el/MWh_H2,"Based on Stöckl et al (2021): https://doi.org/10.48550/arXiv.2005.03464, table SI.4.",1.707 kWh/kg.,,, -hydrogen storage compressor,investment,2.28,USD/kWh_H2,ICCT IRA e-fuels assumptions ,,2022.0,, +hydrogen storage compressor,investment,1.9919431142982202,USD/kWh_H2,ICCT IRA e-fuels assumptions ,,2022.0,, hydrogen storage compressor,lifetime,30.0,years,ICCT IRA e-fuels assumptions ,,,, hydrogen storage tank type 1,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,,2022.0,, -hydrogen storage tank type 1,investment,16.87,USD/kWh_H2,ICCT IRA e-fuels assumptions ,,2022.0,, +hydrogen storage tank type 1,investment,14.738631727285517,USD/kWh_H2,ICCT IRA e-fuels assumptions ,,2022.0,, hydrogen storage tank type 1,lifetime,30.0,years,ICCT IRA e-fuels assumptions ,,,, hydrogen storage tank type 1,min_fill_level,6.0,%,"Based on Stöckl et al (2021): https://doi.org/10.48550/arXiv.2005.03464, table SI.9.",,,, hydrogen storage tank type 1 including compressor,FOM,1.3897,%/year,"Danish Energy Agency, inputs/technology_data_catalogue_for_energy_storage.xlsx",151a Hydrogen Storage - Tanks: Fixed O&M,2015.0,, @@ -4309,12 +4309,12 @@ nuclear,FOM,1.72,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-d nuclear,FOM,2.54,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced nuclear,FOM,2.4,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate nuclear,FOM,1.72,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -nuclear,VOM,1.9,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -nuclear,VOM,2.8,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -nuclear,VOM,3.4,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -nuclear,VOM,1.9,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -nuclear,VOM,2.8,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -nuclear,VOM,3.4,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +nuclear,VOM,1.6599525952485168,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +nuclear,VOM,2.4462459298399195,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +nuclear,VOM,2.970441486234188,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +nuclear,VOM,1.6599525952485168,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +nuclear,VOM,2.4462459298399195,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +nuclear,VOM,2.970441486234188,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative nuclear,discount rate,0.0564721990412151,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced nuclear,discount rate,0.0564721990412151,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate nuclear,discount rate,0.0564721990412151,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -4322,18 +4322,18 @@ nuclear,discount rate,0.0471844359305569,per unit,"NREL, NREL ATB 2024",Meaning nuclear,discount rate,0.0471844359305569,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate nuclear,discount rate,0.0471844359305569,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative nuclear,efficiency,0.326,p.u.,"Lazard's levelized cost of energy analysis - version 16.0 (2023): https://www.lazard.com/media/typdgxmm/lazards-lcoeplus-april-2023.pdf , pg. 49 (Levelized Cost of Energy - Key Assumptions), accessed: 2023-12-14.","Based on heat rate of 10.45 MMBtu/MWh_e and 3.4095 MMBtu/MWh_th, i.e. 1/(10.45/3.4095) = 0.3260.",2023.0,, -nuclear,fuel,9.13239,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -nuclear,fuel,10.18209,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -nuclear,fuel,11.33676,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -nuclear,fuel,9.13239,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -nuclear,fuel,10.18209,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -nuclear,fuel,11.33676,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -nuclear,investment,4959.342588876451,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -nuclear,investment,7290.87354388759,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -nuclear,investment,11836.117690043657,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -nuclear,investment,4959.342588876451,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -nuclear,investment,7290.87354388759,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -nuclear,investment,11836.117690043657,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +nuclear,fuel,7.978597095432423,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +nuclear,fuel,8.895677221344195,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +nuclear,fuel,9.904465359847146,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +nuclear,fuel,7.978597095432423,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +nuclear,fuel,8.895677221344195,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +nuclear,fuel,9.904465359847146,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +nuclear,investment,4332.775579543139,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +nuclear,investment,6369.739189897346,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +nuclear,investment,10340.733830134131,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +nuclear,investment,4332.775579543139,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +nuclear,investment,6369.739189897346,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +nuclear,investment,10340.733830134131,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative nuclear,lifetime,40.0,years,"Lazard's levelized cost of energy analysis - version 16.0 (2023): https://www.lazard.com/media/typdgxmm/lazards-lcoeplus-april-2023.pdf , pg. 49 (Levelized Cost of Energy - Key Assumptions), accessed: 2023-12-14.",,2023.0,, offwind,CF,0.5044,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced offwind,CF,0.4787,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -4353,12 +4353,12 @@ offwind,discount rate,0.0515170197171646,per unit,"NREL, NREL ATB 2024",Meaning offwind,discount rate,0.0401070465062936,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced offwind,discount rate,0.0401070465062936,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate offwind,discount rate,0.0401070465062936,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -offwind,investment,2925.561456124764,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -offwind,investment,3435.322120848647,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -offwind,investment,4060.6290403263183,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -offwind,investment,2925.561456124764,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -offwind,investment,3435.322120848647,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -offwind,investment,4060.6290403263183,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +offwind,investment,2555.9438587649115,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +offwind,investment,3001.3009842196584,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +offwind,investment,3547.6061651742984,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +offwind,investment,2555.9438587649115,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +offwind,investment,3001.3009842196584,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +offwind,investment,3547.6061651742984,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative offwind,lifetime,30.0,years,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",21 Offshore turbines: Technical lifetime [years],2020.0,, offwind-ac-connection-submarine,investment,2841.3251,EUR/MW/km,DEA https://ens.dk/en/our-services/projections-and-models/technology-data, from old pypsa cost assumptions,2015.0,, offwind-ac-connection-underground,investment,1420.1334,EUR/MW/km,DEA https://ens.dk/en/our-services/projections-and-models/technology-data, from old pypsa cost assumptions,2015.0,, @@ -4376,7 +4376,7 @@ oil,CO2 intensity,0.2571,tCO2/MWh_th,Stoichiometric calculation with 44 GJ/t die oil,FOM,2.4498,%/year,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",50 Diesel engine farm: Fixed O&M,2015.0,, oil,VOM,6.3493,EUR/MWh,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",50 Diesel engine farm: Variable O&M,2015.0,, oil,efficiency,0.35,per unit,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","50 Diesel engine farm: Electricity efficiency, annual average",2015.0,, -oil,fuel,44.22,USD/MWh_th,World Bank https://www.worldbank.org/en/research/commodity-markets,,2010.0,, +oil,fuel,50.984551761196734,USD/MWh_th,World Bank https://www.worldbank.org/en/research/commodity-markets,,2010.0,, oil,investment,361.1181,EUR/kW,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",50 Diesel engine farm: Specific investment,2015.0,, oil,lifetime,25.0,years,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",50 Diesel engine farm: Technical lifetime,2015.0,, onwind,CF,0.509823999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced @@ -4397,12 +4397,12 @@ onwind,discount rate,0.0527004871619183,per unit,"NREL, NREL ATB 2024",Meaning o onwind,discount rate,0.0365777183152598,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced onwind,discount rate,0.0365777183152598,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate onwind,discount rate,0.0365777183152598,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -onwind,investment,1258.7992531108473,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -onwind,investment,1334.6919677529645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -onwind,investment,1522.1515178729378,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -onwind,investment,1258.7992531108473,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -onwind,investment,1334.6919677529645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -onwind,investment,1522.1515178729378,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +onwind,investment,1099.7616247885503,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +onwind,investment,1166.0659977520438,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +onwind,investment,1329.841769712975,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +onwind,investment,1099.7616247885503,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +onwind,investment,1166.0659977520438,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +onwind,investment,1329.841769712975,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative onwind,lifetime,30.0,years,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",20 Onshore turbines: Technical lifetime,2015.0,, organic rankine cycle,FOM,2.0,%/year,"Aghahosseini, Breyer 2020: From hot rock to useful energy: A global estimate of enhanced geothermal systems potential, https://www.sciencedirect.com/science/article/pii/S0306261920312551","Both for flash, binary and ORC plants. See Supplemental Material for details",2020.0,, organic rankine cycle,electricity-input,0.12,MWh_el/MWh_th,"Aghahosseini, Breyer 2020: From hot rock to useful energy: A global estimate of enhanced geothermal systems potential, https://www.sciencedirect.com/science/article/pii/S0306261920312551; Breede et al. 2015: Overcoming challenges in the classification of deep geothermal potential, https://eprints.gla.ac.uk/169585/","Heat-input, Electricity-output. This is a rough estimate, depends on input temperature, implies ~150 C.",2020.0,, @@ -4427,12 +4427,12 @@ ror,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of s ror,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate ror,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative ror,efficiency,0.9,per unit,DIW DataDoc http://hdl.handle.net/10419/80348, from old pypsa cost assumptions,2015.0,, -ror,investment,9005.486475065536,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -ror,investment,9234.349311015783,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -ror,investment,9281.186356512577,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -ror,investment,9005.486475065536,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -ror,investment,9234.349311015783,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -ror,investment,9281.186356512577,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +ror,investment,7867.726655663398,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +ror,investment,8067.674791711581,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +ror,investment,8108.594410251673,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +ror,investment,7867.726655663398,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +ror,investment,8067.674791711581,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +ror,investment,8108.594410251673,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative ror,lifetime,80.0,years,IEA2010, from old pypsa cost assumptions,2015.0,, seawater RO desalination,electricity-input,0.003,MWHh_el/t_H2O,"Caldera et al. (2016): Local cost of seawater RO desalination based on solar PV and windenergy: A global estimate. (https://doi.org/10.1016/j.desal.2016.02.004), Fig. 4.",Desalination using SWRO. Assume medium salinity of 35 Practical Salinity Units (PSUs) = 35 kg/m^3.,,, seawater desalination,FOM,4.0,%/year,"Caldera et al 2016: Local cost of seawater RO desalination based on solar PV and windenergy: A global estimate. (https://doi.org/10.1016/j.desal.2016.02.004), Table 1.",,2015.0,, @@ -4463,12 +4463,12 @@ solar-rooftop,discount rate,0.0461588052507387,per unit,"NREL, NREL ATB 2024",Me solar-rooftop,discount rate,0.0364480268090299,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced solar-rooftop,discount rate,0.0364480268090299,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate solar-rooftop,discount rate,0.0364480268090299,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -solar-rooftop,investment,929.2122343748616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -solar-rooftop,investment,1239.359469701182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -solar-rooftop,investment,1683.1368777937876,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -solar-rooftop,investment,929.2122343748616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -solar-rooftop,investment,1239.359469701182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -solar-rooftop,investment,1683.1368777937876,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +solar-rooftop,investment,811.8148736774867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +solar-rooftop,investment,1082.7778779875277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +solar-rooftop,investment,1470.488120238044,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +solar-rooftop,investment,811.8148736774867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +solar-rooftop,investment,1082.7778779875277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +solar-rooftop,investment,1470.488120238044,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative solar-rooftop,lifetime,40.0,years,Calculated. See 'further description'.,Mixed investment costs based on average of 50% 'solar-rooftop commercial' and 50% 'solar-rooftop residential',2020.0,, solar-rooftop commercial,FOM,1.6467,%/year,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",22 Rooftop PV commercial: Fixed O&M [2020-EUR/MW_e/y],2020.0,, solar-rooftop commercial,investment,513.1614,EUR/kW_e,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",22 Rooftop PV commercial: Nominal investment [2020-MEUR/MW_e],2020.0,, @@ -4494,12 +4494,12 @@ solar-utility,discount rate,0.0467530940390637,per unit,"NREL, NREL ATB 2024",Me solar-utility,discount rate,0.0342774493840203,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced solar-utility,discount rate,0.0342774493840203,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate solar-utility,discount rate,0.0342774493840203,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -solar-utility,investment,682.8963556917138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -solar-utility,investment,895.3211436190419,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -solar-utility,investment,1189.2470902797832,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -solar-utility,investment,682.8963556917138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -solar-utility,investment,895.3211436190419,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -solar-utility,investment,1189.2470902797832,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +solar-utility,investment,596.6187252190604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +solar-utility,investment,782.205608384894,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +solar-utility,investment,1038.9967336324596,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +solar-utility,investment,596.6187252190604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +solar-utility,investment,782.205608384894,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +solar-utility,investment,1038.9967336324596,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative solar-utility,lifetime,40.0,years,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",22 Utility-scale PV: Technical lifetime [years],2020.0,, solar-utility single-axis tracking,FOM,2.3606,%/year,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",22 Utility-scale PV tracker: Fixed O&M [2020-EUR/MW_e/y],2020.0,, solar-utility single-axis tracking,investment,419.3908,EUR/kW_e,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",22 Utility-scale PV tracker: Nominal investment [2020-MEUR/MW_e],2020.0,, diff --git a/outputs/US/costs_2040.csv b/outputs/US/costs_2040.csv index c8f1c453..3c7c8ffa 100644 --- a/outputs/US/costs_2040.csv +++ b/outputs/US/costs_2040.csv @@ -6,12 +6,12 @@ Alkaline electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of s Alkaline electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Alkaline electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Alkaline electrolyzer,efficiency,0.74,p.u.,ICCT IRA e-fuels assumptions ,,,, -Alkaline electrolyzer,investment,982.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Alkaline electrolyzer,investment,982.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Alkaline electrolyzer,investment,886.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Alkaline electrolyzer,investment,886.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Alkaline electrolyzer,investment,599.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Alkaline electrolyzer,investment,599.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Alkaline electrolyzer,investment,857.9333939652861,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Alkaline electrolyzer,investment,857.9333939652861,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Alkaline electrolyzer,investment,774.0621049422032,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Alkaline electrolyzer,investment,774.0621049422032,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Alkaline electrolyzer,investment,523.3218971336114,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Alkaline electrolyzer,investment,523.3218971336114,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Alkaline electrolyzer,lifetime,30.0,years,ICCT IRA e-fuels assumptions ,,,, Ammonia cracker,FOM,4.3,%/year,"Ishimoto et al. (2020): 10.1016/j.ijhydene.2020.09.017 , table 7.","Estimated based on Labour cost rate, Maintenance cost rate, Insurance rate, Admin. cost rate and Chemical & other consumables cost rate.",2015.0,, Ammonia cracker,ammonia-input,1.46,MWh_NH3/MWh_H2,"ENGIE et al (2020): Ammonia to Green Hydrogen Feasibility Study (https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/880826/HS420_-_Ecuity_-_Ammonia_to_Green_Hydrogen.pdf), Fig. 10.",Assuming a integrated 200t/d cracking and purification facility. Electricity demand (316 MWh per 2186 MWh_LHV H2 output) is assumed to also be ammonia LHV input which seems a fair assumption as the facility has options for a higher degree of integration according to the report).,,, @@ -64,12 +64,12 @@ BioSNG,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015 BioSNG,efficiency,0.665,per unit,"Danish Energy Agency, inputs/data_sheets_for_renewable_fuels.xlsx","84 Gasif. CFB, Bio-SNG: Bio SNG Output",2020.0,, BioSNG,investment,1648.27,EUR/kW_th,"Danish Energy Agency, inputs/data_sheets_for_renewable_fuels.xlsx","84 Gasif. CFB, Bio-SNG: Specific investment",2020.0,, BioSNG,lifetime,25.0,years,TODO,"84 Gasif. CFB, Bio-SNG: Technical lifetime",2020.0,, -Biomass gasification,efficiency,0.4667,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Biomass gasification,investment,1467.7693,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Biomass gasification,efficiency,0.4666666666666667,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, +Biomass gasification,investment,1978.8508861995015,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Biomass gasification,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Biomass gasification CC,FOM,0.02,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Biomass gasification CC,efficiency,0.514,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Biomass gasification CC,investment,3015.5325,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Biomass gasification CC,investment,4065.5510481055235,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Biomass gasification CC,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, BtL,C in fuel,0.2922,per unit,"Stoichiometric calculation, doi:10.1016/j.apenergy.2022.120016",,,, BtL,C stored,0.7078,per unit,"Stoichiometric calculation, doi:10.1016/j.apenergy.2022.120016",,,, @@ -86,12 +86,12 @@ CCGT,FOM,2.0,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data- CCGT,FOM,2.0,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced CCGT,FOM,2.0,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate CCGT,FOM,2.0,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -CCGT,VOM,6.94,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -CCGT,VOM,6.94,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -CCGT,VOM,6.94,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -CCGT,VOM,6.94,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -CCGT,VOM,6.94,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -CCGT,VOM,6.94,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +CCGT,VOM,6.0631952689603725,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +CCGT,VOM,6.0631952689603725,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +CCGT,VOM,6.0631952689603725,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +CCGT,VOM,6.0631952689603725,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +CCGT,VOM,6.0631952689603725,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +CCGT,VOM,6.0631952689603725,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative CCGT,c_b,2.1,50oC/100oC,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","05 Gas turb. CC, steam extract.: Cb coefficient",2015.0,, CCGT,c_v,0.15,50oC/100oC,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","05 Gas turb. CC, steam extract.: Cv coefficient",2015.0,, CCGT,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced @@ -101,12 +101,12 @@ CCGT,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of CCGT,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate CCGT,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative CCGT,efficiency,0.59,per unit,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","05 Gas turb. CC, steam extract.: Electricity efficiency, annual average",2015.0,, -CCGT,investment,1172.5241957922008,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -CCGT,investment,1172.5241957922008,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -CCGT,investment,1172.5241957922008,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -CCGT,investment,1172.5241957922008,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -CCGT,investment,1172.5241957922008,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -CCGT,investment,1172.5241957922008,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +CCGT,investment,1024.3866219983915,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +CCGT,investment,1024.3866219983915,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +CCGT,investment,1024.3866219983915,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +CCGT,investment,1024.3866219983915,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +CCGT,investment,1024.3866219983915,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +CCGT,investment,1024.3866219983915,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative CCGT,lifetime,25.0,years,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","05 Gas turb. CC, steam extract.: Technical lifetime",2015.0,, CH4 (g) fill compressor station,FOM,1.7,%/year,Assume same as for H2 (g) fill compressor station.,-,2020.0,, CH4 (g) fill compressor station,investment,1654.96,EUR/MW_CH4,"Guesstimate, based on H2 (g) pipeline and fill compressor station cost.","Assume same ratio as between H2 (g) pipeline and fill compressor station, i.e. 1:19 , due to a lack of reliable numbers.",2020.0,, @@ -157,18 +157,18 @@ CSP - Class 3,FOM,0.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket= CSP - Class 3,FOM,1.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced CSP - Class 3,FOM,1.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate CSP - Class 3,FOM,0.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -CSP - Class 3,VOM,2.91,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -CSP - Class 3,VOM,3.0,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -CSP - Class 3,VOM,3.95766,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -CSP - Class 3,VOM,2.91,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -CSP - Class 3,VOM,3.0,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -CSP - Class 3,VOM,3.95766,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -CSP - Class 3,investment,3657.8072631911486,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -CSP - Class 3,investment,4817.500835817041,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -CSP - Class 3,investment,7912.019603207439,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -CSP - Class 3,investment,3657.8072631911486,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -CSP - Class 3,investment,4817.500835817041,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -CSP - Class 3,investment,7912.019603207439,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +CSP - Class 3,VOM,2.5423484485122025,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +CSP - Class 3,VOM,2.6209777819713427,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +CSP - Class 3,VOM,3.4576463095322345,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +CSP - Class 3,VOM,2.5423484485122025,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +CSP - Class 3,VOM,2.6209777819713427,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +CSP - Class 3,VOM,3.4576463095322345,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +CSP - Class 3,investment,3195.677189185801,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +CSP - Class 3,investment,4208.854218434945,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +CSP - Class 3,investment,6912.409196842806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +CSP - Class 3,investment,3195.677189185801,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +CSP - Class 3,investment,4208.854218434945,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +CSP - Class 3,investment,6912.409196842806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative CSP - Class 8,CF,0.514,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced CSP - Class 8,CF,0.514,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate CSP - Class 8,CF,0.514,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -181,18 +181,18 @@ CSP - Class 8,FOM,0.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket= CSP - Class 8,FOM,1.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced CSP - Class 8,FOM,1.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate CSP - Class 8,FOM,0.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -CSP - Class 8,VOM,2.91,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -CSP - Class 8,VOM,3.0,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -CSP - Class 8,VOM,3.95766,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -CSP - Class 8,VOM,2.91,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -CSP - Class 8,VOM,3.0,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -CSP - Class 8,VOM,3.95766,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -CSP - Class 8,investment,3657.8072631911486,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -CSP - Class 8,investment,4817.500835817041,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -CSP - Class 8,investment,7912.019603207439,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -CSP - Class 8,investment,3657.8072631911486,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -CSP - Class 8,investment,4817.500835817041,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -CSP - Class 8,investment,7912.019603207439,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +CSP - Class 8,VOM,2.5423484485122025,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +CSP - Class 8,VOM,2.6209777819713427,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +CSP - Class 8,VOM,3.4576463095322345,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +CSP - Class 8,VOM,2.5423484485122025,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +CSP - Class 8,VOM,2.6209777819713427,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +CSP - Class 8,VOM,3.4576463095322345,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +CSP - Class 8,investment,3195.677189185801,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +CSP - Class 8,investment,4208.854218434945,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +CSP - Class 8,investment,6912.409196842806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +CSP - Class 8,investment,3195.677189185801,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +CSP - Class 8,investment,4208.854218434945,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +CSP - Class 8,investment,6912.409196842806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Charging infrastructure fast (purely) battery electric vehicles passenger cars,FOM,1.6,%,PATHS TO A CLIMATE-NEUTRAL ENERGY SYSTEM The German energy transformation in its social context. https://www.ise.fraunhofer.de/en/publications/studies/paths-to-a-climate-neutral-energy-system.html,Charging infrastructure fast (purely) battery electric vehicles passenger cars,2020.0,, Charging infrastructure fast (purely) battery electric vehicles passenger cars,investment,448894.0,EUR/Lades�ule,PATHS TO A CLIMATE-NEUTRAL ENERGY SYSTEM The German energy transformation in its social context. https://www.ise.fraunhofer.de/en/publications/studies/paths-to-a-climate-neutral-energy-system.html,Charging infrastructure fast (purely) battery electric vehicles passenger cars,2020.0,, Charging infrastructure fast (purely) battery electric vehicles passenger cars,lifetime,30.0,years,PATHS TO A CLIMATE-NEUTRAL ENERGY SYSTEM The German energy transformation in its social context. https://www.ise.fraunhofer.de/en/publications/studies/paths-to-a-climate-neutral-energy-system.html,Charging infrastructure fast (purely) battery electric vehicles passenger cars,2020.0,, @@ -211,25 +211,25 @@ Coal - IGCC,FOM,2.38,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oe Coal - IGCC,FOM,2.39,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Coal - IGCC,FOM,2.39,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal - IGCC,FOM,2.38,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Coal - IGCC,VOM,14.96,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal - IGCC,VOM,15.47,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal - IGCC,VOM,15.98,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal - IGCC,VOM,14.96,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal - IGCC,VOM,15.47,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal - IGCC,VOM,15.98,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Coal - IGCC,investment,6349.867236805089,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal - IGCC,investment,6575.5892276534605,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal - IGCC,investment,6801.187670614119,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal - IGCC,investment,6349.867236805089,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal - IGCC,investment,6575.5892276534605,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal - IGCC,investment,6801.187670614119,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal - IGCC,VOM,13.069942539430428,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal - IGCC,VOM,13.515508762365558,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal - IGCC,VOM,13.961074985300685,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal - IGCC,VOM,13.069942539430428,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal - IGCC,VOM,13.515508762365558,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal - IGCC,VOM,13.961074985300685,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal - IGCC,investment,5547.620315377967,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal - IGCC,investment,5744.8244230166065,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal - IGCC,investment,5941.920591899012,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal - IGCC,investment,5547.620315377967,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal - IGCC,investment,5744.8244230166065,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal - IGCC,investment,5941.920591899012,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal gasification,FOM,0.06,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, -Coal gasification,efficiency,0.7113,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Coal gasification,investment,399.2305,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Coal gasification,efficiency,0.7113333333333334,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, +Coal gasification,investment,538.2432903364873,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Coal gasification,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Coal gasification CC,FOM,0.07,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Coal gasification CC,efficiency,0.609,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Coal gasification CC,investment,649.5969,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Coal gasification CC,investment,875.7882332041481,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Coal gasification CC,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Coal integrated retrofit 90%-CCS,FOM,9.74,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal integrated retrofit 90%-CCS,FOM,8.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -237,52 +237,52 @@ Coal integrated retrofit 90%-CCS,FOM,8.09,%/year,NREL/ATB-https://data.openei.or Coal integrated retrofit 90%-CCS,FOM,9.74,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Coal integrated retrofit 90%-CCS,FOM,8.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal integrated retrofit 90%-CCS,FOM,8.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Coal integrated retrofit 90%-CCS,VOM,14.7,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal integrated retrofit 90%-CCS,VOM,15.96,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal integrated retrofit 90%-CCS,VOM,17.21,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal integrated retrofit 90%-CCS,VOM,14.7,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal integrated retrofit 90%-CCS,VOM,15.96,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal integrated retrofit 90%-CCS,VOM,17.21,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal integrated retrofit 90%-CCS,VOM,12.842791131659578,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal integrated retrofit 90%-CCS,VOM,13.943601800087544,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal integrated retrofit 90%-CCS,VOM,15.035675875908936,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal integrated retrofit 90%-CCS,VOM,12.842791131659578,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal integrated retrofit 90%-CCS,VOM,13.943601800087544,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal integrated retrofit 90%-CCS,VOM,15.035675875908936,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal integrated retrofit 90%-CCS,capture_rate,0.9,per unit,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, Coal integrated retrofit 90%-CCS,efficiency,0.386,p.u.,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, -Coal integrated retrofit 90%-CCS,investment,1290.9,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal integrated retrofit 90%-CCS,investment,1582.5,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal integrated retrofit 90%-CCS,investment,1874.1,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal integrated retrofit 90%-CCS,investment,1290.9,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal integrated retrofit 90%-CCS,investment,1582.5,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal integrated retrofit 90%-CCS,investment,1874.1,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal integrated retrofit 90%-CCS,investment,1127.8067395822688,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal integrated retrofit 90%-CCS,investment,1382.5657799898831,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal integrated retrofit 90%-CCS,investment,1637.3248203974977,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal integrated retrofit 90%-CCS,investment,1127.8067395822688,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal integrated retrofit 90%-CCS,investment,1382.5657799898831,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal integrated retrofit 90%-CCS,investment,1637.3248203974977,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal integrated retrofit 95%-CCS,FOM,9.53,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal integrated retrofit 95%-CCS,FOM,8.58,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Coal integrated retrofit 95%-CCS,FOM,7.93,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Coal integrated retrofit 95%-CCS,FOM,9.53,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Coal integrated retrofit 95%-CCS,FOM,8.58,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal integrated retrofit 95%-CCS,FOM,7.93,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Coal integrated retrofit 95%-CCS,VOM,14.96,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal integrated retrofit 95%-CCS,VOM,16.29,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal integrated retrofit 95%-CCS,VOM,17.61,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal integrated retrofit 95%-CCS,VOM,14.96,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal integrated retrofit 95%-CCS,VOM,16.29,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal integrated retrofit 95%-CCS,VOM,17.61,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal integrated retrofit 95%-CCS,VOM,13.069942539430428,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal integrated retrofit 95%-CCS,VOM,14.231909356104389,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal integrated retrofit 95%-CCS,VOM,15.38513958017178,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal integrated retrofit 95%-CCS,VOM,13.069942539430428,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal integrated retrofit 95%-CCS,VOM,14.231909356104389,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal integrated retrofit 95%-CCS,VOM,15.38513958017178,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal integrated retrofit 95%-CCS,capture_rate,0.95,per unit,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, Coal integrated retrofit 95%-CCS,efficiency,0.386,p.u.,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, -Coal integrated retrofit 95%-CCS,investment,1342.6,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal integrated retrofit 95%-CCS,investment,1650.6,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal integrated retrofit 95%-CCS,investment,1958.6,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal integrated retrofit 95%-CCS,investment,1342.6,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal integrated retrofit 95%-CCS,investment,1650.6,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal integrated retrofit 95%-CCS,investment,1958.6,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal integrated retrofit 95%-CCS,investment,1172.9749233582415,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal integrated retrofit 95%-CCS,investment,1442.0619756406327,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal integrated retrofit 95%-CCS,investment,1711.1490279230238,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal integrated retrofit 95%-CCS,investment,1172.9749233582415,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal integrated retrofit 95%-CCS,investment,1442.0619756406327,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal integrated retrofit 95%-CCS,investment,1711.1490279230238,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-95%-CCS,FOM,2.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal-95%-CCS,FOM,2.1,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Coal-95%-CCS,FOM,2.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Coal-95%-CCS,FOM,2.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Coal-95%-CCS,FOM,2.1,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal-95%-CCS,FOM,2.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Coal-95%-CCS,VOM,12.73,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal-95%-CCS,VOM,13.95,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal-95%-CCS,VOM,15.18,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal-95%-CCS,VOM,12.73,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal-95%-CCS,VOM,13.95,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal-95%-CCS,VOM,15.18,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal-95%-CCS,VOM,11.121682388165064,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal-95%-CCS,VOM,12.187546686166742,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal-95%-CCS,VOM,13.262147576774993,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal-95%-CCS,VOM,11.121682388165064,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal-95%-CCS,VOM,12.187546686166742,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal-95%-CCS,VOM,13.262147576774993,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-95%-CCS,capture_rate,0.95,per unit,"NREL, NREL ATB 2024",,,, Coal-95%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal-95%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -291,12 +291,12 @@ Coal-95%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Mea Coal-95%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal-95%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-95%-CCS,efficiency,0.403,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Coal-95%-CCS,investment,5161.089461247874,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal-95%-CCS,investment,5378.533743619595,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal-95%-CCS,investment,5595.978025991316,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal-95%-CCS,investment,5161.089461247874,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal-95%-CCS,investment,5378.533743619595,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal-95%-CCS,investment,5595.978025991316,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal-95%-CCS,investment,4509.033602899041,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal-95%-CCS,investment,4699.005813870036,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal-95%-CCS,investment,4888.978024841031,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal-95%-CCS,investment,4509.033602899041,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal-95%-CCS,investment,4699.005813870036,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal-95%-CCS,investment,4888.978024841031,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-95%-CCS,lifetime,40.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Coal-99%-CCS,FOM,2.1,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal-99%-CCS,FOM,2.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -304,12 +304,12 @@ Coal-99%-CCS,FOM,2.08,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=o Coal-99%-CCS,FOM,2.1,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Coal-99%-CCS,FOM,2.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal-99%-CCS,FOM,2.08,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Coal-99%-CCS,VOM,12.95,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal-99%-CCS,VOM,14.25,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal-99%-CCS,VOM,15.55,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal-99%-CCS,VOM,12.95,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal-99%-CCS,VOM,14.25,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal-99%-CCS,VOM,15.55,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal-99%-CCS,VOM,11.313887425509629,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal-99%-CCS,VOM,12.449644464363876,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal-99%-CCS,VOM,13.585401503218126,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal-99%-CCS,VOM,11.313887425509629,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal-99%-CCS,VOM,12.449644464363876,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal-99%-CCS,VOM,13.585401503218126,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-99%-CCS,capture_rate,0.99,per unit,"NREL, NREL ATB 2024",,,, Coal-99%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal-99%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -318,12 +318,12 @@ Coal-99%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Mea Coal-99%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal-99%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-99%-CCS,efficiency,0.403,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Coal-99%-CCS,investment,5235.835933313153,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal-99%-CCS,investment,5479.101724216516,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal-99%-CCS,investment,5722.49106300759,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal-99%-CCS,investment,5235.835933313153,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal-99%-CCS,investment,5479.101724216516,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal-99%-CCS,investment,5722.49106300759,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal-99%-CCS,investment,4574.33655042032,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal-99%-CCS,investment,4786.867961444121,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal-99%-CCS,investment,4999.507311224154,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal-99%-CCS,investment,4574.33655042032,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal-99%-CCS,investment,4786.867961444121,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal-99%-CCS,investment,4999.507311224154,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-99%-CCS,lifetime,40.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Coal-IGCC,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal-IGCC,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -339,12 +339,12 @@ Coal-IGCC-90%-CCS,FOM,2.37,%/year,NREL/ATB-https://data.openei.org/s3_viewer?buc Coal-IGCC-90%-CCS,FOM,2.38,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Coal-IGCC-90%-CCS,FOM,2.37,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal-IGCC-90%-CCS,FOM,2.37,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Coal-IGCC-90%-CCS,VOM,22.26,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal-IGCC-90%-CCS,VOM,23.01,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal-IGCC-90%-CCS,VOM,23.75,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal-IGCC-90%-CCS,VOM,22.26,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal-IGCC-90%-CCS,VOM,23.01,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal-IGCC-90%-CCS,VOM,23.75,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal-IGCC-90%-CCS,VOM,19.44765514222736,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal-IGCC-90%-CCS,VOM,20.1028995877202,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal-IGCC-90%-CCS,VOM,20.74940744060646,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal-IGCC-90%-CCS,VOM,19.44765514222736,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal-IGCC-90%-CCS,VOM,20.1028995877202,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal-IGCC-90%-CCS,VOM,20.74940744060646,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-IGCC-90%-CCS,capture_rate,0.9,per unit,"NREL, NREL ATB 2024",,,, Coal-IGCC-90%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal-IGCC-90%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -353,12 +353,12 @@ Coal-IGCC-90%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024 Coal-IGCC-90%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal-IGCC-90%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-IGCC-90%-CCS,efficiency,0.403,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Coal-IGCC-90%-CCS,investment,9021.09611700905,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal-IGCC-90%-CCS,investment,9339.84966730396,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal-IGCC-90%-CCS,investment,9658.479669711158,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal-IGCC-90%-CCS,investment,9021.09611700905,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal-IGCC-90%-CCS,investment,9339.84966730396,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal-IGCC-90%-CCS,investment,9658.479669711158,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal-IGCC-90%-CCS,investment,7881.364163902891,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal-IGCC-90%-CCS,investment,8159.846154985373,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal-IGCC-90%-CCS,investment,8438.220207311619,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal-IGCC-90%-CCS,investment,7881.364163902891,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal-IGCC-90%-CCS,investment,8159.846154985373,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal-IGCC-90%-CCS,investment,8438.220207311619,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-IGCC-90%-CCS,lifetime,40.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Commercial Battery Storage 1Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial Battery Storage 1Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -366,60 +366,60 @@ Commercial Battery Storage 1Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/ Commercial Battery Storage 1Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial Battery Storage 1Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial Battery Storage 1Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial Battery Storage 1Hr,investment,645.1648191294237,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial Battery Storage 1Hr,investment,927.3192975215544,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial Battery Storage 1Hr,investment,1222.8416343019223,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial Battery Storage 1Hr,investment,645.1648191294237,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial Battery Storage 1Hr,investment,927.3192975215544,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial Battery Storage 1Hr,investment,1222.8416343019223,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial Battery Storage 1Hr,investment,563.6542188825931,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial Battery Storage 1Hr,investment,810.1610918657557,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial Battery Storage 1Hr,investment,1068.3469181249548,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial Battery Storage 1Hr,investment,563.6542188825931,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial Battery Storage 1Hr,investment,810.1610918657557,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial Battery Storage 1Hr,investment,1068.3469181249548,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial Battery Storage 2Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial Battery Storage 2Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial Battery Storage 2Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Commercial Battery Storage 2Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial Battery Storage 2Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial Battery Storage 2Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial Battery Storage 2Hr,investment,772.2237739915228,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial Battery Storage 2Hr,investment,1084.7969888108323,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial Battery Storage 2Hr,investment,1463.6684360886686,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial Battery Storage 2Hr,investment,772.2237739915228,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial Battery Storage 2Hr,investment,1084.7969888108323,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial Battery Storage 2Hr,investment,1463.6684360886686,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial Battery Storage 2Hr,investment,674.6604514472803,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial Battery Storage 2Hr,investment,947.7429352075355,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial Battery Storage 2Hr,investment,1278.7474837203808,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial Battery Storage 2Hr,investment,674.6604514472803,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial Battery Storage 2Hr,investment,947.7429352075355,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial Battery Storage 2Hr,investment,1278.7474837203808,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial Battery Storage 4Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial Battery Storage 4Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial Battery Storage 4Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Commercial Battery Storage 4Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial Battery Storage 4Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial Battery Storage 4Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial Battery Storage 4Hr,investment,1026.3416837157208,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial Battery Storage 4Hr,investment,1399.7523713893884,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial Battery Storage 4Hr,investment,1945.3220396621607,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial Battery Storage 4Hr,investment,1026.3416837157208,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial Battery Storage 4Hr,investment,1399.7523713893884,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial Battery Storage 4Hr,investment,1945.3220396621607,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial Battery Storage 4Hr,investment,896.6729165766544,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial Battery Storage 4Hr,investment,1222.9066218910953,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial Battery Storage 4Hr,investment,1699.5486149112328,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial Battery Storage 4Hr,investment,896.6729165766544,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial Battery Storage 4Hr,investment,1222.9066218910953,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial Battery Storage 4Hr,investment,1699.5486149112328,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial Battery Storage 6Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial Battery Storage 6Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial Battery Storage 6Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Commercial Battery Storage 6Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial Battery Storage 6Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial Battery Storage 6Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial Battery Storage 6Hr,investment,1280.459593439919,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial Battery Storage 6Hr,investment,1714.7077539679449,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial Battery Storage 6Hr,investment,2426.975643235653,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial Battery Storage 6Hr,investment,1280.459593439919,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial Battery Storage 6Hr,investment,1714.7077539679449,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial Battery Storage 6Hr,investment,2426.975643235653,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial Battery Storage 6Hr,investment,1118.6853817060287,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial Battery Storage 6Hr,investment,1498.0703085746557,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial Battery Storage 6Hr,investment,2120.3497461020847,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial Battery Storage 6Hr,investment,1118.6853817060287,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial Battery Storage 6Hr,investment,1498.0703085746557,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial Battery Storage 6Hr,investment,2120.3497461020847,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial Battery Storage 8Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial Battery Storage 8Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial Battery Storage 8Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Commercial Battery Storage 8Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial Battery Storage 8Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial Battery Storage 8Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial Battery Storage 8Hr,investment,1534.5775031641174,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial Battery Storage 8Hr,investment,2029.6631365465005,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial Battery Storage 8Hr,investment,2908.6292468091447,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial Battery Storage 8Hr,investment,1534.5775031641174,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial Battery Storage 8Hr,investment,2029.6631365465005,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial Battery Storage 8Hr,investment,2908.6292468091447,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial Battery Storage 8Hr,investment,1340.6978468354032,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial Battery Storage 8Hr,investment,1773.233995258215,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial Battery Storage 8Hr,investment,2541.1508772929365,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial Battery Storage 8Hr,investment,1340.6978468354032,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial Battery Storage 8Hr,investment,1773.233995258215,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial Battery Storage 8Hr,investment,2541.1508772929365,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 1,CF,0.572448,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 1,CF,0.572448,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 1,CF,0.572448,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -432,12 +432,12 @@ Commercial DW - Class 1,FOM,1.15,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 1,FOM,2.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 1,FOM,1.77,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 1,FOM,1.15,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 1,investment,1420.8701747121177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 1,investment,2074.4704550796914,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 1,investment,3203.8602787841746,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 1,investment,1420.8701747121177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 1,investment,2074.4704550796914,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 1,investment,3203.8602787841746,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 1,investment,1241.3563863287334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 1,investment,1812.3803240399504,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 1,investment,2799.0822024112776,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 1,investment,1241.3563863287334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 1,investment,1812.3803240399504,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 1,investment,2799.0822024112776,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 10,CF,0.221877,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 10,CF,0.221877,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 10,CF,0.221877,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -450,12 +450,12 @@ Commercial DW - Class 10,FOM,1.15,%/year,NREL/ATB-https://data.openei.org/s3_vie Commercial DW - Class 10,FOM,2.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 10,FOM,1.77,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 10,FOM,1.15,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 10,investment,1420.8701747121177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 10,investment,2074.4704550796914,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 10,investment,3203.8602787841746,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 10,investment,1420.8701747121177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 10,investment,2074.4704550796914,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 10,investment,3203.8602787841746,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 10,investment,1241.3563863287334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 10,investment,1812.3803240399504,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 10,investment,2799.0822024112776,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 10,investment,1241.3563863287334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 10,investment,1812.3803240399504,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 10,investment,2799.0822024112776,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 2,CF,0.537382,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 2,CF,0.537382,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 2,CF,0.537382,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -468,12 +468,12 @@ Commercial DW - Class 2,FOM,1.15,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 2,FOM,2.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 2,FOM,1.77,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 2,FOM,1.15,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 2,investment,1420.8701747121177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 2,investment,2074.4704550796914,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 2,investment,3203.8602787841746,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 2,investment,1420.8701747121177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 2,investment,2074.4704550796914,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 2,investment,3203.8602787841746,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 2,investment,1241.3563863287334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 2,investment,1812.3803240399504,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 2,investment,2799.0822024112776,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 2,investment,1241.3563863287334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 2,investment,1812.3803240399504,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 2,investment,2799.0822024112776,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 3,CF,0.524922,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 3,CF,0.524922,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 3,CF,0.524922,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -486,12 +486,12 @@ Commercial DW - Class 3,FOM,1.15,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 3,FOM,2.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 3,FOM,1.77,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 3,FOM,1.15,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 3,investment,1420.8701747121177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 3,investment,2074.4704550796914,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 3,investment,3203.8602787841746,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 3,investment,1420.8701747121177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 3,investment,2074.4704550796914,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 3,investment,3203.8602787841746,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 3,investment,1241.3563863287334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 3,investment,1812.3803240399504,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 3,investment,2799.0822024112776,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 3,investment,1241.3563863287334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 3,investment,1812.3803240399504,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 3,investment,2799.0822024112776,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 4,CF,0.5118389999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 4,CF,0.5118389999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 4,CF,0.5118389999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -504,12 +504,12 @@ Commercial DW - Class 4,FOM,1.33,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 4,FOM,2.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 4,FOM,1.72,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 4,FOM,1.33,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 4,investment,1420.8701747121177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 4,investment,2134.03980107827,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 4,investment,2774.251741401751,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 4,investment,1420.8701747121177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 4,investment,2134.03980107827,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 4,investment,2774.251741401751,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 4,investment,1241.3563863287334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 4,investment,1864.4236348228965,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 4,investment,2423.7507252697656,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 4,investment,1241.3563863287334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 4,investment,1864.4236348228965,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 4,investment,2423.7507252697656,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 5,CF,0.495463,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 5,CF,0.495463,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 5,CF,0.495463,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -522,12 +522,12 @@ Commercial DW - Class 5,FOM,1.15,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 5,FOM,2.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 5,FOM,1.77,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 5,FOM,1.15,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 5,investment,1420.8701747121177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 5,investment,2074.4704550796914,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 5,investment,3203.8602787841746,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 5,investment,1420.8701747121177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 5,investment,2074.4704550796914,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 5,investment,3203.8602787841746,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 5,investment,1241.3563863287334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 5,investment,1812.3803240399504,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 5,investment,2799.0822024112776,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 5,investment,1241.3563863287334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 5,investment,1812.3803240399504,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 5,investment,2799.0822024112776,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 6,CF,0.470365,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 6,CF,0.470365,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 6,CF,0.470365,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -540,12 +540,12 @@ Commercial DW - Class 6,FOM,1.15,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 6,FOM,2.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 6,FOM,1.77,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 6,FOM,1.15,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 6,investment,1420.8701747121177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 6,investment,2074.4704550796914,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 6,investment,3203.8602787841746,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 6,investment,1420.8701747121177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 6,investment,2074.4704550796914,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 6,investment,3203.8602787841746,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 6,investment,1241.3563863287334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 6,investment,1812.3803240399504,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 6,investment,2799.0822024112776,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 6,investment,1241.3563863287334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 6,investment,1812.3803240399504,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 6,investment,2799.0822024112776,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 7,CF,0.433786,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 7,CF,0.433786,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 7,CF,0.433786,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -558,12 +558,12 @@ Commercial DW - Class 7,FOM,1.15,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 7,FOM,2.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 7,FOM,1.77,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 7,FOM,1.15,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 7,investment,1420.8701747121177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 7,investment,2074.4704550796914,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 7,investment,3203.8602787841746,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 7,investment,1420.8701747121177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 7,investment,2074.4704550796914,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 7,investment,3203.8602787841746,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 7,investment,1241.3563863287334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 7,investment,1812.3803240399504,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 7,investment,2799.0822024112776,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 7,investment,1241.3563863287334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 7,investment,1812.3803240399504,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 7,investment,2799.0822024112776,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 8,CF,0.388129,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 8,CF,0.388129,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 8,CF,0.388129,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -576,12 +576,12 @@ Commercial DW - Class 8,FOM,1.15,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 8,FOM,2.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 8,FOM,1.77,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 8,FOM,1.15,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 8,investment,1420.8701747121177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 8,investment,2074.4704550796914,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 8,investment,3203.8602787841746,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 8,investment,1420.8701747121177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 8,investment,2074.4704550796914,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 8,investment,3203.8602787841746,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 8,investment,1241.3563863287334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 8,investment,1812.3803240399504,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 8,investment,2799.0822024112776,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 8,investment,1241.3563863287334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 8,investment,1812.3803240399504,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 8,investment,2799.0822024112776,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 9,CF,0.332237,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 9,CF,0.332237,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 9,CF,0.332237,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -594,12 +594,12 @@ Commercial DW - Class 9,FOM,1.15,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 9,FOM,2.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 9,FOM,1.77,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 9,FOM,1.15,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 9,investment,1420.8701747121177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 9,investment,2074.4704550796914,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 9,investment,3203.8602787841746,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 9,investment,1420.8701747121177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 9,investment,2074.4704550796914,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 9,investment,3203.8602787841746,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 9,investment,1241.3563863287334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 9,investment,1812.3803240399504,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 9,investment,2799.0822024112776,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 9,investment,1241.3563863287334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 9,investment,1812.3803240399504,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 9,investment,2799.0822024112776,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 10,CF,0.1372918597787045,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 10,CF,0.1316872928412728,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 10,CF,0.1230106520640086,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -612,12 +612,12 @@ Commercial PV - Class 10,FOM,1.06,%/year,NREL/ATB-https://data.openei.org/s3_vie Commercial PV - Class 10,FOM,1.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 10,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 10,FOM,1.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 10,investment,877.4402441804747,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 10,investment,1135.9770579257422,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 10,investment,1535.2110750962524,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 10,investment,877.4402441804747,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 10,investment,1135.9770579257422,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 10,investment,1535.2110750962524,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 10,investment,766.5837950015112,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 10,investment,992.4568765508477,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 10,investment,1341.2513728212052,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 10,investment,766.5837950015112,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 10,investment,992.4568765508477,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 10,investment,1341.2513728212052,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 2,CF,0.2058115650041995,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 2,CF,0.19740986737680297,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 2,CF,0.1844028834214075,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -630,12 +630,12 @@ Commercial PV - Class 2,FOM,1.06,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 2,FOM,1.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 2,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 2,FOM,1.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 2,investment,877.4402441804747,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 2,investment,1135.9770579257422,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 2,investment,1535.2110750962524,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 2,investment,877.4402441804747,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 2,investment,1135.9770579257422,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 2,investment,1535.2110750962524,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 2,investment,766.5837950015112,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 2,investment,992.4568765508477,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 2,investment,1341.2513728212052,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 2,investment,766.5837950015112,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 2,investment,992.4568765508477,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 2,investment,1341.2513728212052,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 3,CF,0.19482482734949505,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 3,CF,0.18687163341859625,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 3,CF,0.17455899489706386,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -648,12 +648,12 @@ Commercial PV - Class 3,FOM,1.06,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 3,FOM,1.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 3,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 3,FOM,1.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 3,investment,877.4402441804747,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 3,investment,1135.9770579257422,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 3,investment,1535.2110750962524,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 3,investment,877.4402441804747,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 3,investment,1135.9770579257422,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 3,investment,1535.2110750962524,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 3,investment,766.5837950015112,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 3,investment,992.4568765508477,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 3,investment,1341.2513728212052,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 3,investment,766.5837950015112,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 3,investment,992.4568765508477,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 3,investment,1341.2513728212052,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 4,CF,0.18453023634853535,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 4,CF,0.17699729110864668,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 4,CF,0.16533525538474678,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -666,12 +666,12 @@ Commercial PV - Class 4,FOM,1.06,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 4,FOM,1.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 4,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 4,FOM,1.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 4,investment,877.4402441804747,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 4,investment,1135.9770579257422,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 4,investment,1535.2110750962524,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 4,investment,877.4402441804747,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 4,investment,1135.9770579257422,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 4,investment,1535.2110750962524,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 4,investment,766.5837950015112,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 4,investment,992.4568765508477,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 4,investment,1341.2513728212052,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 4,investment,766.5837950015112,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 4,investment,992.4568765508477,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 4,investment,1341.2513728212052,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 5,CF,0.17609363114912382,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 5,CF,0.1689050873809684,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 5,CF,0.15777623252309278,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -684,12 +684,12 @@ Commercial PV - Class 5,FOM,1.06,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 5,FOM,1.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 5,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 5,FOM,1.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 5,investment,877.4402441804747,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 5,investment,1135.9770579257422,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 5,investment,1535.2110750962524,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 5,investment,877.4402441804747,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 5,investment,1135.9770579257422,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 5,investment,1535.2110750962524,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 5,investment,766.5837950015112,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 5,investment,992.4568765508477,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 5,investment,1341.2513728212052,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 5,investment,766.5837950015112,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 5,investment,992.4568765508477,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 5,investment,1341.2513728212052,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 6,CF,0.1737585174410646,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 6,CF,0.16666529834186214,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 6,CF,0.15568401918768487,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -702,12 +702,12 @@ Commercial PV - Class 6,FOM,1.06,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 6,FOM,1.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 6,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 6,FOM,1.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 6,investment,877.4402441804747,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 6,investment,1135.9770579257422,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 6,investment,1535.2110750962524,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 6,investment,877.4402441804747,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 6,investment,1135.9770579257422,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 6,investment,1535.2110750962524,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 6,investment,766.5837950015112,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 6,investment,992.4568765508477,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 6,investment,1341.2513728212052,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 6,investment,766.5837950015112,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 6,investment,992.4568765508477,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 6,investment,1341.2513728212052,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 7,CF,0.16555712688005514,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 7,CF,0.1587987072544216,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 7,CF,0.14833574375192693,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -720,12 +720,12 @@ Commercial PV - Class 7,FOM,1.06,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 7,FOM,1.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 7,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 7,FOM,1.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 7,investment,877.4402441804747,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 7,investment,1135.9770579257422,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 7,investment,1535.2110750962524,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 7,investment,877.4402441804747,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 7,investment,1135.9770579257422,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 7,investment,1535.2110750962524,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 7,investment,766.5837950015112,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 7,investment,992.4568765508477,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 7,investment,1341.2513728212052,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 7,investment,766.5837950015112,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 7,investment,992.4568765508477,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 7,investment,1341.2513728212052,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 8,CF,0.15723488361698967,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 8,CF,0.15081619694793943,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 8,CF,0.1408791868076544,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -738,12 +738,12 @@ Commercial PV - Class 8,FOM,1.06,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 8,FOM,1.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 8,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 8,FOM,1.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 8,investment,877.4402441804747,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 8,investment,1135.9770579257422,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 8,investment,1535.2110750962524,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 8,investment,877.4402441804747,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 8,investment,1135.9770579257422,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 8,investment,1535.2110750962524,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 8,investment,766.5837950015112,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 8,investment,992.4568765508477,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 8,investment,1341.2513728212052,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 8,investment,766.5837950015112,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 8,investment,992.4568765508477,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 8,investment,1341.2513728212052,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 9,CF,0.15092825272037955,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 9,CF,0.14476701711264278,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 9,CF,0.13522857663914564,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -756,12 +756,12 @@ Commercial PV - Class 9,FOM,1.06,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 9,FOM,1.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 9,FOM,1.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 9,FOM,1.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 9,investment,877.4402441804747,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 9,investment,1135.9770579257422,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 9,investment,1535.2110750962524,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 9,investment,877.4402441804747,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 9,investment,1135.9770579257422,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 9,investment,1535.2110750962524,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 9,investment,766.5837950015112,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 9,investment,992.4568765508477,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 9,investment,1341.2513728212052,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 9,investment,766.5837950015112,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 9,investment,992.4568765508477,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 9,investment,1341.2513728212052,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Compressed-Air-Adiabatic-bicharger,FOM,0.9265,%/year,"Viswanathan_2022, p.64 (p.86) Figure 4.14","{'carrier': ['elec', 'pair', 'elec'], 'technology_type': ['bicharger'], 'type': ['mechanical'], 'note': ['NULL']}",2020.0,, Compressed-Air-Adiabatic-bicharger,efficiency,0.7211,per unit,"Viswanathan_2022, p.59 (p.81)","{'carrier': ['elec', 'pair', 'elec'], 'technology_type': ['bicharger'], 'type': ['mechanical'], 'note': ['AC-AC efficiency at transformer level 0.52^0.5']}",2020.0,, Compressed-Air-Adiabatic-bicharger,investment,946180.9426,EUR/MW,"Viswanathan_2022, p.59 (p.81)","{'carrier': ['elec', 'pair', 'elec'], 'technology_type': ['bicharger'], 'type': ['mechanical'], 'note': ['Turbine Compressor BOP EPC Management']}",2020.0,, @@ -869,7 +869,7 @@ Fischer-Tropsch,carbondioxide-input,0.32,t_CO2/MWh_FT,ICCT IRA e-fuels assumptio Fischer-Tropsch,efficiency,0.7,per unit,ICCT IRA e-fuels assumptions ,,,, Fischer-Tropsch,electricity-input,0.04,MWh_el/MWh_FT,ICCT IRA e-fuels assumptions ,"0.005 MWh_el input per FT output, output increasing from 2020 to 2050 (0.65, 0.7, 0.73, 0.75 MWh liquid FT output).",,, Fischer-Tropsch,hydrogen-input,1.43,MWh_H2/MWh_FT,ICCT IRA e-fuels assumptions ,"0.995 MWh_H2 per output, output increasing from 2020 to 2050 (0.65, 0.7, 0.73, 0.75 MWh liquid FT output).",,, -Fischer-Tropsch,investment,1696429.0,USD/MW_FT,ICCT IRA e-fuels assumptions ,,2022.0,, +Fischer-Tropsch,investment,1482100.9058972877,USD/MW_FT,ICCT IRA e-fuels assumptions ,,2022.0,, Fischer-Tropsch,lifetime,30.0,years,ICCT IRA e-fuels assumptions ,,,, Gasnetz,FOM,2.5,%,"WEGE ZU EINEM KLIMANEUTRALEN ENERGIESYSEM, Anhang zur Studie, Fraunhofer-Institut für Solare Energiesysteme ISE, Freiburg",Gasnetz,2020.0,, Gasnetz,investment,28.0,EUR/kWGas,"WEGE ZU EINEM KLIMANEUTRALEN ENERGIESYSEM, Anhang zur Studie, Fraunhofer-Institut für Solare Energiesysteme ISE, Freiburg",Gasnetz,2020.0,, @@ -892,12 +892,12 @@ Geothermal - Deep EGS / Binary,FOM,1.25,%/year,NREL/ATB-https://data.openei.org/ Geothermal - Deep EGS / Binary,FOM,1.86,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Geothermal - Deep EGS / Binary,FOM,1.52,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Geothermal - Deep EGS / Binary,FOM,1.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Geothermal - Deep EGS / Binary,investment,6397.116324193513,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Geothermal - Deep EGS / Binary,investment,10889.750439565569,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Geothermal - Deep EGS / Binary,investment,18065.356381660426,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Geothermal - Deep EGS / Binary,investment,6397.116324193513,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Geothermal - Deep EGS / Binary,investment,10889.750439565569,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Geothermal - Deep EGS / Binary,investment,18065.356381660426,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Geothermal - Deep EGS / Binary,investment,5588.899918132461,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Geothermal - Deep EGS / Binary,investment,9513.93131777134,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Geothermal - Deep EGS / Binary,investment,15782.965899908728,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Geothermal - Deep EGS / Binary,investment,5588.899918132461,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Geothermal - Deep EGS / Binary,investment,9513.93131777134,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Geothermal - Deep EGS / Binary,investment,15782.965899908728,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Geothermal - Deep EGS / Flash,CF,0.9,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Geothermal - Deep EGS / Flash,CF,0.9,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Geothermal - Deep EGS / Flash,CF,0.9,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -910,12 +910,12 @@ Geothermal - Deep EGS / Flash,FOM,1.43,%/year,NREL/ATB-https://data.openei.org/s Geothermal - Deep EGS / Flash,FOM,2.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Geothermal - Deep EGS / Flash,FOM,1.84,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Geothermal - Deep EGS / Flash,FOM,1.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Geothermal - Deep EGS / Flash,investment,4011.043909182059,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Geothermal - Deep EGS / Flash,investment,6834.115609752928,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Geothermal - Deep EGS / Flash,investment,10267.091129776914,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Geothermal - Deep EGS / Flash,investment,4011.043909182059,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Geothermal - Deep EGS / Flash,investment,6834.115609752928,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Geothermal - Deep EGS / Flash,investment,10267.091129776914,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Geothermal - Deep EGS / Flash,investment,3504.285656159219,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Geothermal - Deep EGS / Flash,investment,5970.688390861987,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Geothermal - Deep EGS / Flash,investment,8969.939245540114,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Geothermal - Deep EGS / Flash,investment,3504.285656159219,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Geothermal - Deep EGS / Flash,investment,5970.688390861987,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Geothermal - Deep EGS / Flash,investment,8969.939245540114,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Geothermal - Hydro / Binary,CF,0.8,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Geothermal - Hydro / Binary,CF,0.8,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Geothermal - Hydro / Binary,CF,0.8,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -928,12 +928,12 @@ Geothermal - Hydro / Binary,FOM,1.84,%/year,NREL/ATB-https://data.openei.org/s3_ Geothermal - Hydro / Binary,FOM,1.99,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Geothermal - Hydro / Binary,FOM,1.73,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Geothermal - Hydro / Binary,FOM,1.84,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Geothermal - Hydro / Binary,investment,6317.311193902883,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Geothermal - Hydro / Binary,investment,7694.0422510574335,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Geothermal - Hydro / Binary,investment,8759.866560335548,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Geothermal - Hydro / Binary,investment,6317.311193902883,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Geothermal - Hydro / Binary,investment,7694.0422510574335,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Geothermal - Hydro / Binary,investment,8759.866560335548,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Geothermal - Hydro / Binary,investment,5519.177427006104,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Geothermal - Hydro / Binary,investment,6721.971264523436,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Geothermal - Hydro / Binary,investment,7653.138542557733,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Geothermal - Hydro / Binary,investment,5519.177427006104,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Geothermal - Hydro / Binary,investment,6721.971264523436,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Geothermal - Hydro / Binary,investment,7653.138542557733,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Geothermal - NF EGS / Binary,CF,0.8,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Geothermal - NF EGS / Binary,CF,0.8,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Geothermal - NF EGS / Binary,CF,0.8,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -946,12 +946,12 @@ Geothermal - NF EGS / Binary,FOM,1.63,%/year,NREL/ATB-https://data.openei.org/s3 Geothermal - NF EGS / Binary,FOM,2.01,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Geothermal - NF EGS / Binary,FOM,1.75,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Geothermal - NF EGS / Binary,FOM,1.63,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Geothermal - NF EGS / Binary,investment,6023.180321385559,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Geothermal - NF EGS / Binary,investment,9228.661687330336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Geothermal - NF EGS / Binary,investment,12270.062346236262,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Geothermal - NF EGS / Binary,investment,6023.180321385559,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Geothermal - NF EGS / Binary,investment,9228.661687330336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Geothermal - NF EGS / Binary,investment,12270.062346236262,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Geothermal - NF EGS / Binary,investment,5262.207266386187,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Geothermal - NF EGS / Binary,investment,8062.705746607657,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Geothermal - NF EGS / Binary,investment,10719.853597629468,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Geothermal - NF EGS / Binary,investment,5262.207266386187,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Geothermal - NF EGS / Binary,investment,8062.705746607657,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Geothermal - NF EGS / Binary,investment,10719.853597629468,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Geothermal - NF EGS / Flash,CF,0.9,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Geothermal - NF EGS / Flash,CF,0.9,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Geothermal - NF EGS / Flash,CF,0.9,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -964,12 +964,12 @@ Geothermal - NF EGS / Flash,FOM,1.75,%/year,NREL/ATB-https://data.openei.org/s3_ Geothermal - NF EGS / Flash,FOM,2.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Geothermal - NF EGS / Flash,FOM,1.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Geothermal - NF EGS / Flash,FOM,1.75,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Geothermal - NF EGS / Flash,investment,4534.1026747401265,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Geothermal - NF EGS / Flash,investment,7178.345949409594,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Geothermal - NF EGS / Flash,investment,8814.78928970979,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Geothermal - NF EGS / Flash,investment,4534.1026747401265,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Geothermal - NF EGS / Flash,investment,7178.345949409594,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Geothermal - NF EGS / Flash,investment,8814.78928970979,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Geothermal - NF EGS / Flash,investment,3961.260790556903,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Geothermal - NF EGS / Flash,investment,6271.428414902177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Geothermal - NF EGS / Flash,investment,7701.122293696104,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Geothermal - NF EGS / Flash,investment,3961.260790556903,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Geothermal - NF EGS / Flash,investment,6271.428414902177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Geothermal - NF EGS / Flash,investment,7701.122293696104,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Gravity-Brick-bicharger,FOM,1.5,%/year,"Viswanathan_2022, p.76 (p.98) Sentence 1 in 4.7.2 Operating Costs","{'carrier': ['elec', 'gravity', 'elec'], 'technology_type': ['bicharger'], 'type': ['mechanical'], 'note': ['1.5 percent of capital cost']}",2020.0,, Gravity-Brick-bicharger,efficiency,0.9274,per unit,"Viswanathan_2022, p.77 (p.99) Table 4.36","{'carrier': ['elec', 'gravity', 'elec'], 'technology_type': ['bicharger'], 'type': ['mechanical'], 'note': ['AC-AC efficiency at transformer level 0.86^0.5']}",2020.0,, Gravity-Brick-bicharger,investment,415570.5177,EUR/MW,"Viswanathan_2022, p.71 (p.94) text at the bottom speaks about 0% cost reduction for 2030 compared to 2021","{'carrier': ['elec', 'gravity', 'elec'], 'technology_type': ['bicharger'], 'type': ['mechanical'], 'note': ['Power Equipment']}",2020.0,, @@ -1051,7 +1051,7 @@ Haber-Bosch,lifetime,30.0,years,"Danish Energy Agency, inputs/data_sheets_for_re Haber-Bosch,nitrogen-input,0.1597,t_N2/MWh_NH3,"DECHEMA 2017: DECHEMA: Low carbon energy and feedstock for the European chemical industry (https://dechema.de/dechema_media/Downloads/Positionspapiere/Technology_study_Low_carbon_energy_and_feedstock_for_the_European_chemical_industry.pdf), pg. 57.",".33 MWh electricity are required for ASU per t_NH3, considering 0.4 MWh are required per t_N2 and LHV of NH3 of 5.1666 Mwh.",,, Heavy oil partial oxidation,FOM,0.05,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Heavy oil partial oxidation,efficiency,0.734,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Heavy oil partial oxidation,investment,491.0535,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Heavy oil partial oxidation,investment,662.0382094364353,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Heavy oil partial oxidation,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, HighT-Molten-Salt-charger,FOM,1.075,%/year,"Viswanathan_2022, NULL","{'carrier': ['elec', 'salthight'], 'technology_type': ['charger'], 'type': ['thermal'], 'note': ['Guesstimate, 50% on charger']}",2020.0,, HighT-Molten-Salt-charger,efficiency,0.99,per unit,"Viswanathan_2022, p.107 (p.129)","{'carrier': ['elec', 'salthight'], 'technology_type': ['charger'], 'type': ['thermal'], 'note': ['RTE assume 99% for charge and other for discharge']}",2020.0,, @@ -1095,12 +1095,12 @@ Hydropower - NPD 2,FOM,2.88,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Hydropower - NPD 2,FOM,3.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NPD 2,FOM,1.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NPD 2,FOM,2.88,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NPD 2,investment,2909.219212335001,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NPD 2,investment,6357.064447883142,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NPD 2,investment,3226.433747745111,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NPD 2,investment,2909.219212335001,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NPD 2,investment,6357.064447883142,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NPD 2,investment,3226.433747745111,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NPD 2,investment,2541.666306138069,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NPD 2,investment,5553.908225487212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NPD 2,investment,2818.8037226141555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NPD 2,investment,2541.666306138069,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NPD 2,investment,5553.908225487212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NPD 2,investment,2818.8037226141555,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NPD 3,CF,0.32,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NPD 3,CF,0.32,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NPD 3,CF,0.33,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1113,12 +1113,12 @@ Hydropower - NPD 3,FOM,3.18,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Hydropower - NPD 3,FOM,3.34,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NPD 3,FOM,1.74,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NPD 3,FOM,3.18,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NPD 3,investment,3203.0152249967136,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NPD 3,investment,6487.995279612818,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NPD 3,investment,3555.3575445294196,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NPD 3,investment,3203.0152249967136,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NPD 3,investment,6487.995279612818,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NPD 3,investment,3555.3575445294196,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NPD 3,investment,2798.3439133441093,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NPD 3,investment,5668.297159133382,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NPD 3,investment,3106.1710437252655,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NPD 3,investment,2798.3439133441093,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NPD 3,investment,5668.297159133382,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NPD 3,investment,3106.1710437252655,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NPD 4,CF,0.38,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NPD 4,CF,0.38,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NPD 4,CF,0.38,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1131,12 +1131,12 @@ Hydropower - NPD 4,FOM,2.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?buc Hydropower - NPD 4,FOM,2.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NPD 4,FOM,1.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NPD 4,FOM,2.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NPD 4,investment,7704.693984222736,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NPD 4,investment,14239.526309332348,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NPD 4,investment,8554.147673005513,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NPD 4,investment,7704.693984222736,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NPD 4,investment,14239.526309332348,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NPD 4,investment,8554.147673005513,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NPD 4,investment,6731.2772498453505,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NPD 4,investment,12440.494027518826,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NPD 4,investment,7473.4103315497705,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NPD 4,investment,6731.2772498453505,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NPD 4,investment,12440.494027518826,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NPD 4,investment,7473.4103315497705,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NPD 5,CF,0.56,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NPD 5,CF,0.56,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NPD 5,CF,0.42,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1149,12 +1149,12 @@ Hydropower - NPD 5,FOM,0.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Hydropower - NPD 5,FOM,0.64,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NPD 5,FOM,0.65,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NPD 5,FOM,0.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NPD 5,investment,5163.784266021621,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NPD 5,investment,5220.201616279123,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NPD 5,investment,5733.280160130375,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NPD 5,investment,5163.784266021621,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NPD 5,investment,5220.201616279123,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NPD 5,investment,5733.280160130375,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NPD 5,investment,4511.387944045288,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NPD 5,investment,4560.677484559491,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NPD 5,investment,5008.933305839605,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NPD 5,investment,4511.387944045288,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NPD 5,investment,4560.677484559491,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NPD 5,investment,5008.933305839605,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NPD 6,CF,0.59,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NPD 6,CF,0.59,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NPD 6,CF,0.44,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1167,12 +1167,12 @@ Hydropower - NPD 6,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Hydropower - NPD 6,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NPD 6,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NPD 6,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NPD 6,investment,7771.756117547692,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NPD 6,investment,7859.04333870081,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NPD 6,investment,8630.790111091177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NPD 6,investment,7771.756117547692,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NPD 6,investment,7859.04333870081,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NPD 6,investment,8630.790111091177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NPD 6,investment,6789.866703664121,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NPD 6,investment,6866.125992761567,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NPD 6,investment,7540.36970734265,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NPD 6,investment,6789.866703664121,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NPD 6,investment,6866.125992761567,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NPD 6,investment,7540.36970734265,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NPD 7,CF,0.64,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NPD 7,CF,0.64,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NPD 7,CF,0.62,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1185,12 +1185,12 @@ Hydropower - NPD 7,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?buc Hydropower - NPD 7,FOM,0.53,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NPD 7,FOM,0.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NPD 7,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NPD 7,investment,11959.41377628384,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NPD 7,investment,15796.858072100777,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NPD 7,investment,13283.624789875035,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NPD 7,investment,11959.41377628384,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NPD 7,investment,15796.858072100777,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NPD 7,investment,13283.624789875035,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NPD 7,investment,10448.452597680645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NPD 7,investment,13801.071343976932,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NPD 7,investment,11605.361812768737,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NPD 7,investment,10448.452597680645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NPD 7,investment,13801.071343976932,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NPD 7,investment,11605.361812768737,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NPD 8,CF,0.49,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NPD 8,CF,0.49,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NPD 8,CF,0.4,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1203,12 +1203,12 @@ Hydropower - NPD 8,FOM,1.01,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Hydropower - NPD 8,FOM,1.07,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NPD 8,FOM,0.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NPD 8,FOM,1.01,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NPD 8,investment,18146.16169508773,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NPD 8,investment,21498.20388302879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NPD 8,investment,20153.76778160943,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NPD 8,investment,18146.16169508773,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NPD 8,investment,21498.20388302879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NPD 8,investment,20153.76778160943,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NPD 8,investment,15853.562210294791,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NPD 8,investment,18782.104909902835,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NPD 8,investment,17607.52585953606,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NPD 8,investment,15853.562210294791,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NPD 8,investment,18782.104909902835,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NPD 8,investment,17607.52585953606,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NSD 2,CF,0.66,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NSD 2,CF,0.66,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NSD 2,CF,0.66,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1221,12 +1221,12 @@ Hydropower - NSD 2,FOM,0.6,%/year,NREL/ATB-https://data.openei.org/s3_viewer?buc Hydropower - NSD 2,FOM,0.31,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NSD 2,FOM,0.61,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NSD 2,FOM,0.6,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NSD 2,investment,8051.713912221715,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NSD 2,investment,8256.09374711682,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NSD 2,investment,8297.608401079888,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NSD 2,investment,8051.713912221715,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NSD 2,investment,8256.09374711682,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NSD 2,investment,8297.608401079888,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NSD 2,investment,7034.454423574224,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NSD 2,investment,7213.0127590219045,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NSD 2,investment,7249.282420909714,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NSD 2,investment,7034.454423574224,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NSD 2,investment,7213.0127590219045,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NSD 2,investment,7249.282420909714,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NSD 3,CF,0.62,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NSD 3,CF,0.62,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NSD 3,CF,0.62,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1239,12 +1239,12 @@ Hydropower - NSD 3,FOM,1.78,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Hydropower - NSD 3,FOM,0.9,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NSD 3,FOM,1.79,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NSD 3,FOM,1.78,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NSD 3,investment,7888.848731289679,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NSD 3,investment,8087.906174651057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NSD 3,investment,8129.420828614125,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NSD 3,investment,7888.848731289679,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NSD 3,investment,8087.906174651057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NSD 3,investment,8129.420828614125,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NSD 3,investment,6892.165750014354,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NSD 3,investment,7066.0741288097515,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NSD 3,investment,7102.3437906975605,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NSD 3,investment,6892.165750014354,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NSD 3,investment,7066.0741288097515,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NSD 3,investment,7102.3437906975605,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NSD 4,CF,0.66,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NSD 4,CF,0.66,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NSD 4,CF,0.66,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1257,12 +1257,12 @@ Hydropower - NSD 4,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Hydropower - NSD 4,FOM,0.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NSD 4,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NSD 4,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NSD 4,investment,7112.844045672329,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NSD 4,investment,7292.740879512291,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NSD 4,investment,7329.997620248378,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NSD 4,investment,7112.844045672329,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NSD 4,investment,7292.740879512291,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NSD 4,investment,7329.997620248378,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NSD 4,investment,6214.202070111444,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NSD 4,investment,6371.370604958621,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NSD 4,investment,6403.920301524604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NSD 4,investment,6214.202070111444,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NSD 4,investment,6371.370604958621,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NSD 4,investment,6403.920301524604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative LNG storage tank,FOM,2.0,%/year,"Guesstimate, based on H2 (l) storage tank with comparable requirements.",Currency year and technology year assumed based on publication date.,2019.0,, LNG storage tank,investment,666.634,EUR/m^3,"Hurskainen 2019, https://cris.vtt.fi/en/publications/liquid-organic-hydrogen-carriers-lohc-concept-evaluation-and-tech pg. 46 (59).",Currency year and technology year assumed based on publication date.,2019.0,, LNG storage tank,lifetime,20.0,years,"Guesstimate, based on H2 (l) storage tank with comparable requirements.",Currency year and technology year assumed based on publication date.,2019.0,, @@ -1302,12 +1302,12 @@ Land-Based Wind - Class 1 - Technology 1,FOM,2.02,%/year,NREL/ATB-https://data.o Land-Based Wind - Class 1 - Technology 1,FOM,1.82,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 1 - Technology 1,FOM,2.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 1 - Technology 1,FOM,2.02,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 1 - Technology 1,investment,1175.9261842460237,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 1 - Technology 1,investment,1261.4307119191492,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 1 - Technology 1,investment,1466.9112509291103,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 1 - Technology 1,investment,1175.9261842460237,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 1 - Technology 1,investment,1261.4307119191492,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 1 - Technology 1,investment,1466.9112509291103,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 1 - Technology 1,investment,1027.3588007157225,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 1 - Technology 1,investment,1102.060623145461,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 1 - Technology 1,investment,1281.5805989363291,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 1 - Technology 1,investment,1027.3588007157225,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 1 - Technology 1,investment,1102.060623145461,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 1 - Technology 1,investment,1281.5805989363291,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 10 - Technology 4,CF,0.304761,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 10 - Technology 4,CF,0.278487,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 10 - Technology 4,CF,0.26477,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1320,12 +1320,12 @@ Land-Based Wind - Class 10 - Technology 4,FOM,1.47,%/year,NREL/ATB-https://data. Land-Based Wind - Class 10 - Technology 4,FOM,1.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 10 - Technology 4,FOM,1.65,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 10 - Technology 4,FOM,1.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 10 - Technology 4,investment,1483.907723536053,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 10 - Technology 4,investment,1653.822939156992,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 10 - Technology 4,investment,2016.9555316226356,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 10 - Technology 4,investment,1483.907723536053,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 10 - Technology 4,investment,1653.822939156992,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 10 - Technology 4,investment,2016.9555316226356,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 10 - Technology 4,investment,1296.4297246278895,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 10 - Technology 4,investment,1444.8777262816732,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 10 - Technology 4,investment,1762.1318785357084,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 10 - Technology 4,investment,1296.4297246278895,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 10 - Technology 4,investment,1444.8777262816732,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 10 - Technology 4,investment,1762.1318785357084,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 2 - Technology 1,CF,0.537161506375227,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 2 - Technology 1,CF,0.503721,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 2 - Technology 1,CF,0.47891,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1338,12 +1338,12 @@ Land-Based Wind - Class 2 - Technology 1,FOM,2.02,%/year,NREL/ATB-https://data.o Land-Based Wind - Class 2 - Technology 1,FOM,1.82,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 2 - Technology 1,FOM,2.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 2 - Technology 1,FOM,2.02,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 2 - Technology 1,investment,1175.9261842460237,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 2 - Technology 1,investment,1261.4307119191492,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 2 - Technology 1,investment,1466.9112509291103,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 2 - Technology 1,investment,1175.9261842460237,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 2 - Technology 1,investment,1261.4307119191492,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 2 - Technology 1,investment,1466.9112509291103,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 2 - Technology 1,investment,1027.3588007157225,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 2 - Technology 1,investment,1102.060623145461,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 2 - Technology 1,investment,1281.5805989363291,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 2 - Technology 1,investment,1027.3588007157225,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 2 - Technology 1,investment,1102.060623145461,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 2 - Technology 1,investment,1281.5805989363291,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 3 - Technology 1,CF,0.5252616284153,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 3 - Technology 1,CF,0.492372,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 3 - Technology 1,CF,0.468119999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1356,12 +1356,12 @@ Land-Based Wind - Class 3 - Technology 1,FOM,2.02,%/year,NREL/ATB-https://data.o Land-Based Wind - Class 3 - Technology 1,FOM,1.82,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 3 - Technology 1,FOM,2.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 3 - Technology 1,FOM,2.02,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 3 - Technology 1,investment,1175.9261842460237,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 3 - Technology 1,investment,1261.4307119191492,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 3 - Technology 1,investment,1466.9112509291103,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 3 - Technology 1,investment,1175.9261842460237,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 3 - Technology 1,investment,1261.4307119191492,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 3 - Technology 1,investment,1466.9112509291103,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 3 - Technology 1,investment,1027.3588007157225,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 3 - Technology 1,investment,1102.060623145461,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 3 - Technology 1,investment,1281.5805989363291,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 3 - Technology 1,investment,1027.3588007157225,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 3 - Technology 1,investment,1102.060623145461,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 3 - Technology 1,investment,1281.5805989363291,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 5 - Technology 1,CF,0.495054245901639,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 5 - Technology 1,CF,0.463563,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 5 - Technology 1,CF,0.440729999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1374,12 +1374,12 @@ Land-Based Wind - Class 5 - Technology 1,FOM,2.02,%/year,NREL/ATB-https://data.o Land-Based Wind - Class 5 - Technology 1,FOM,1.82,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 5 - Technology 1,FOM,2.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 5 - Technology 1,FOM,2.02,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 5 - Technology 1,investment,1175.9261842460237,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 5 - Technology 1,investment,1261.4307119191492,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 5 - Technology 1,investment,1466.9112509291103,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 5 - Technology 1,investment,1175.9261842460237,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 5 - Technology 1,investment,1261.4307119191492,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 5 - Technology 1,investment,1466.9112509291103,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 5 - Technology 1,investment,1027.3588007157225,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 5 - Technology 1,investment,1102.060623145461,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 5 - Technology 1,investment,1281.5805989363291,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 5 - Technology 1,investment,1027.3588007157225,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 5 - Technology 1,investment,1102.060623145461,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 5 - Technology 1,investment,1281.5805989363291,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 6 - Technology 1,CF,0.469423739526411,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 6 - Technology 1,CF,0.439119,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 6 - Technology 1,CF,0.417489999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1392,12 +1392,12 @@ Land-Based Wind - Class 6 - Technology 1,FOM,2.02,%/year,NREL/ATB-https://data.o Land-Based Wind - Class 6 - Technology 1,FOM,1.82,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 6 - Technology 1,FOM,2.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 6 - Technology 1,FOM,2.02,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 6 - Technology 1,investment,1175.9261842460237,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 6 - Technology 1,investment,1261.4307119191492,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 6 - Technology 1,investment,1466.9112509291103,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 6 - Technology 1,investment,1175.9261842460237,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 6 - Technology 1,investment,1261.4307119191492,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 6 - Technology 1,investment,1466.9112509291103,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 6 - Technology 1,investment,1027.3588007157225,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 6 - Technology 1,investment,1102.060623145461,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 6 - Technology 1,investment,1281.5805989363291,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 6 - Technology 1,investment,1027.3588007157225,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 6 - Technology 1,investment,1102.060623145461,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 6 - Technology 1,investment,1281.5805989363291,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 7 - Technology 1,CF,0.43372410564663,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 7 - Technology 1,CF,0.405072,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 7 - Technology 1,CF,0.38512,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1410,12 +1410,12 @@ Land-Based Wind - Class 7 - Technology 1,FOM,2.02,%/year,NREL/ATB-https://data.o Land-Based Wind - Class 7 - Technology 1,FOM,1.82,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 7 - Technology 1,FOM,2.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 7 - Technology 1,FOM,2.02,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 7 - Technology 1,investment,1175.9261842460237,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 7 - Technology 1,investment,1293.879798920084,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 7 - Technology 1,investment,1466.9112509291103,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 7 - Technology 1,investment,1175.9261842460237,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 7 - Technology 1,investment,1293.879798920084,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 7 - Technology 1,investment,1466.9112509291103,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 7 - Technology 1,investment,1027.3588007157225,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 7 - Technology 1,investment,1130.4100685036963,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 7 - Technology 1,investment,1281.5805989363291,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 7 - Technology 1,investment,1027.3588007157225,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 7 - Technology 1,investment,1130.4100685036963,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 7 - Technology 1,investment,1281.5805989363291,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 8 - Technology 2,CF,0.394661,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 8 - Technology 2,CF,0.365787,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 8 - Technology 2,CF,0.34777,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1428,12 +1428,12 @@ Land-Based Wind - Class 8 - Technology 2,FOM,1.77,%/year,NREL/ATB-https://data.o Land-Based Wind - Class 8 - Technology 2,FOM,1.65,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 8 - Technology 2,FOM,1.81,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 8 - Technology 2,FOM,1.77,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 8 - Technology 2,investment,1212.9537937623966,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 8 - Technology 2,investment,1378.0035504834707,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 8 - Technology 2,investment,1573.8284673300957,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 8 - Technology 2,investment,1212.9537937623966,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 8 - Technology 2,investment,1378.0035504834707,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 8 - Technology 2,investment,1573.8284673300957,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 8 - Technology 2,investment,1059.708314669697,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 8 - Technology 2,investment,1203.9055630982673,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 8 - Technology 2,investment,1374.9898151687305,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 8 - Technology 2,investment,1059.708314669697,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 8 - Technology 2,investment,1203.9055630982673,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 8 - Technology 2,investment,1374.9898151687305,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 9 - Technology 3,CF,0.382075,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 9 - Technology 3,CF,0.353565,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 9 - Technology 3,CF,0.33615,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1446,12 +1446,12 @@ Land-Based Wind - Class 9 - Technology 3,FOM,2.43,%/year,NREL/ATB-https://data.o Land-Based Wind - Class 9 - Technology 3,FOM,2.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 9 - Technology 3,FOM,2.54,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 9 - Technology 3,FOM,2.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 9 - Technology 3,investment,1319.281301065036,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 9 - Technology 3,investment,1377.8709588950885,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 9 - Technology 3,investment,1553.2978698356635,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 9 - Technology 3,investment,1319.281301065036,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 9 - Technology 3,investment,1377.8709588950885,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 9 - Technology 3,investment,1553.2978698356635,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 9 - Technology 3,investment,1152.602326087235,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 9 - Technology 3,investment,1203.789723229192,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 9 - Technology 3,investment,1357.0530685408962,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 9 - Technology 3,investment,1152.602326087235,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 9 - Technology 3,investment,1203.789723229192,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 9 - Technology 3,investment,1357.0530685408962,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 1,CF,0.6035980000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 1,CF,0.6035980000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 1,CF,0.6035980000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1464,12 +1464,12 @@ Large DW - Class 1,FOM,1.69,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 1,FOM,2.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 1,FOM,2.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 1,FOM,1.69,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 1,investment,1370.9554604988132,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 1,investment,1809.6612078584333,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 1,investment,2171.5934494301196,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 1,investment,1370.9554604988132,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 1,investment,1809.6612078584333,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 1,investment,2171.5934494301196,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 1,investment,1197.7479340132265,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 1,investment,1581.027272897459,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 1,investment,1897.2327274769505,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 1,investment,1197.7479340132265,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 1,investment,1581.027272897459,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 1,investment,1897.2327274769505,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 10,CF,0.261838,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 10,CF,0.261838,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 10,CF,0.261838,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1482,12 +1482,12 @@ Large DW - Class 10,FOM,1.69,%/year,NREL/ATB-https://data.openei.org/s3_viewer?b Large DW - Class 10,FOM,2.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 10,FOM,2.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 10,FOM,1.69,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 10,investment,1370.9554604988132,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 10,investment,1809.6612078584333,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 10,investment,2171.5934494301196,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 10,investment,1370.9554604988132,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 10,investment,1809.6612078584333,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 10,investment,2171.5934494301196,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 10,investment,1197.7479340132265,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 10,investment,1581.027272897459,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 10,investment,1897.2327274769505,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 10,investment,1197.7479340132265,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 10,investment,1581.027272897459,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 10,investment,1897.2327274769505,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 2,CF,0.572181,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 2,CF,0.572181,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 2,CF,0.572181,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1500,12 +1500,12 @@ Large DW - Class 2,FOM,1.69,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 2,FOM,2.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 2,FOM,2.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 2,FOM,1.69,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 2,investment,1370.9554604988132,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 2,investment,1809.6612078584333,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 2,investment,2171.5934494301196,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 2,investment,1370.9554604988132,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 2,investment,1809.6612078584333,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 2,investment,2171.5934494301196,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 2,investment,1197.7479340132265,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 2,investment,1581.027272897459,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 2,investment,1897.2327274769505,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 2,investment,1197.7479340132265,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 2,investment,1581.027272897459,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 2,investment,1897.2327274769505,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 3,CF,0.560611,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 3,CF,0.560611,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 3,CF,0.560611,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1518,12 +1518,12 @@ Large DW - Class 3,FOM,1.69,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 3,FOM,2.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 3,FOM,2.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 3,FOM,1.69,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 3,investment,1370.9554604988132,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 3,investment,1809.6612078584333,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 3,investment,2171.5934494301196,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 3,investment,1370.9554604988132,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 3,investment,1809.6612078584333,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 3,investment,2171.5934494301196,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 3,investment,1197.7479340132265,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 3,investment,1581.027272897459,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 3,investment,1897.2327274769505,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 3,investment,1197.7479340132265,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 3,investment,1581.027272897459,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 3,investment,1897.2327274769505,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 4,CF,0.548507,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 4,CF,0.548507,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 4,CF,0.548507,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1536,12 +1536,12 @@ Large DW - Class 4,FOM,1.69,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 4,FOM,2.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 4,FOM,2.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 4,FOM,1.69,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 4,investment,1370.9554604988132,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 4,investment,1809.6612078584333,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 4,investment,2171.5934494301196,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 4,investment,1370.9554604988132,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 4,investment,1809.6612078584333,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 4,investment,2171.5934494301196,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 4,investment,1197.7479340132265,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 4,investment,1581.027272897459,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 4,investment,1897.2327274769505,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 4,investment,1197.7479340132265,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 4,investment,1581.027272897459,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 4,investment,1897.2327274769505,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 5,CF,0.533199,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 5,CF,0.533199,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 5,CF,0.533199,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1554,12 +1554,12 @@ Large DW - Class 5,FOM,1.69,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 5,FOM,2.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 5,FOM,2.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 5,FOM,1.69,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 5,investment,1370.9554604988132,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 5,investment,1809.6612078584333,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 5,investment,2171.5934494301196,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 5,investment,1370.9554604988132,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 5,investment,1809.6612078584333,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 5,investment,2171.5934494301196,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 5,investment,1197.7479340132265,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 5,investment,1581.027272897459,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 5,investment,1897.2327274769505,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 5,investment,1197.7479340132265,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 5,investment,1581.027272897459,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 5,investment,1897.2327274769505,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 6,CF,0.509525,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 6,CF,0.509525,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 6,CF,0.509525,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1572,12 +1572,12 @@ Large DW - Class 6,FOM,1.69,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 6,FOM,2.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 6,FOM,2.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 6,FOM,1.69,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 6,investment,1370.9554604988132,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 6,investment,1809.6612078584333,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 6,investment,2171.5934494301196,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 6,investment,1370.9554604988132,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 6,investment,1809.6612078584333,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 6,investment,2171.5934494301196,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 6,investment,1197.7479340132265,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 6,investment,1581.027272897459,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 6,investment,1897.2327274769505,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 6,investment,1197.7479340132265,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 6,investment,1581.027272897459,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 6,investment,1897.2327274769505,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 7,CF,0.474637,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 7,CF,0.474637,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 7,CF,0.474637,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1590,12 +1590,12 @@ Large DW - Class 7,FOM,1.69,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 7,FOM,2.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 7,FOM,2.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 7,FOM,1.69,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 7,investment,1370.9554604988132,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 7,investment,1809.6612078584333,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 7,investment,2171.5934494301196,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 7,investment,1370.9554604988132,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 7,investment,1809.6612078584333,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 7,investment,2171.5934494301196,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 7,investment,1197.7479340132265,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 7,investment,1581.027272897459,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 7,investment,1897.2327274769505,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 7,investment,1197.7479340132265,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 7,investment,1581.027272897459,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 7,investment,1897.2327274769505,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 8,CF,0.42898,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 8,CF,0.42898,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 8,CF,0.42898,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1608,12 +1608,12 @@ Large DW - Class 8,FOM,1.69,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 8,FOM,2.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 8,FOM,2.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 8,FOM,1.69,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 8,investment,1370.9554604988132,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 8,investment,1809.6612078584333,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 8,investment,2171.5934494301196,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 8,investment,1370.9554604988132,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 8,investment,1809.6612078584333,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 8,investment,2171.5934494301196,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 8,investment,1197.7479340132265,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 8,investment,1581.027272897459,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 8,investment,1897.2327274769505,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 8,investment,1197.7479340132265,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 8,investment,1581.027272897459,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 8,investment,1897.2327274769505,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 9,CF,0.374957,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 9,CF,0.374957,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 9,CF,0.374957,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1626,12 +1626,12 @@ Large DW - Class 9,FOM,1.69,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 9,FOM,2.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 9,FOM,2.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 9,FOM,1.69,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 9,investment,1370.9554604988132,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 9,investment,1809.6612078584333,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 9,investment,2171.5934494301196,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 9,investment,1370.9554604988132,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 9,investment,1809.6612078584333,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 9,investment,2171.5934494301196,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 9,investment,1197.7479340132265,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 9,investment,1581.027272897459,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 9,investment,1897.2327274769505,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 9,investment,1197.7479340132265,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 9,investment,1581.027272897459,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 9,investment,1897.2327274769505,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Lead-Acid-bicharger,FOM,2.4427,%/year,"Viswanathan_2022, p.28 (p.50)","{'carrier': ['elec', 'lead', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['30% assumed of power components every 10 years']}",2020.0,, Lead-Acid-bicharger,efficiency,0.8832,per unit,"Viswanathan_2022, p.33 (p.55)","{'carrier': ['elec', 'lead', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['AC-AC efficiency at transformer level 0.78^0.5']}",2020.0,, Lead-Acid-bicharger,investment,128853.6139,EUR/MW,"Viswanathan_2022, p.33 (p.55)","{'carrier': ['elec', 'lead', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['Power Equipment']}",2020.0,, @@ -1703,12 +1703,12 @@ Midsize DW - Class 1,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 1,FOM,2.83,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 1,FOM,1.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 1,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 1,investment,1299.0119752538562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 1,investment,1964.99696329207,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 1,investment,2357.996355950484,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 1,investment,1299.0119752538562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 1,investment,1964.99696329207,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 1,investment,2357.996355950484,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 1,investment,1134.8938418850216,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 1,investment,1716.7377941432244,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 1,investment,2060.0853529718693,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 1,investment,1134.8938418850216,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 1,investment,1716.7377941432244,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 1,investment,2060.0853529718693,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 10,CF,0.236829,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 10,CF,0.236829,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 10,CF,0.236829,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1721,12 +1721,12 @@ Midsize DW - Class 10,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer Midsize DW - Class 10,FOM,2.83,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 10,FOM,1.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 10,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 10,investment,1299.0119752538562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 10,investment,1964.99696329207,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 10,investment,2357.996355950484,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 10,investment,1299.0119752538562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 10,investment,1964.99696329207,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 10,investment,2357.996355950484,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 10,investment,1134.8938418850216,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 10,investment,1716.7377941432244,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 10,investment,2060.0853529718693,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 10,investment,1134.8938418850216,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 10,investment,1716.7377941432244,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 10,investment,2060.0853529718693,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 2,CF,0.550198,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 2,CF,0.550198,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 2,CF,0.550198,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1739,12 +1739,12 @@ Midsize DW - Class 2,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 2,FOM,2.83,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 2,FOM,1.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 2,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 2,investment,1299.0119752538562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 2,investment,1964.99696329207,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 2,investment,2357.996355950484,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 2,investment,1299.0119752538562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 2,investment,1964.99696329207,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 2,investment,2357.996355950484,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 2,investment,1134.8938418850216,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 2,investment,1716.7377941432244,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 2,investment,2060.0853529718693,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 2,investment,1134.8938418850216,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 2,investment,1716.7377941432244,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 2,investment,2060.0853529718693,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 3,CF,0.5380940000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 3,CF,0.5380940000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 3,CF,0.5380940000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1757,12 +1757,12 @@ Midsize DW - Class 3,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 3,FOM,2.83,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 3,FOM,1.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 3,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 3,investment,1299.0119752538562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 3,investment,1964.99696329207,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 3,investment,2357.996355950484,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 3,investment,1299.0119752538562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 3,investment,1964.99696329207,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 3,investment,2357.996355950484,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 3,investment,1134.8938418850216,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 3,investment,1716.7377941432244,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 3,investment,2060.0853529718693,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 3,investment,1134.8938418850216,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 3,investment,1716.7377941432244,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 3,investment,2060.0853529718693,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 4,CF,0.525456,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 4,CF,0.525456,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 4,CF,0.525456,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1775,12 +1775,12 @@ Midsize DW - Class 4,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 4,FOM,2.83,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 4,FOM,1.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 4,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 4,investment,1299.0119752538562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 4,investment,1964.99696329207,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 4,investment,2357.996355950484,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 4,investment,1299.0119752538562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 4,investment,1964.99696329207,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 4,investment,2357.996355950484,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 4,investment,1134.8938418850216,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 4,investment,1716.7377941432244,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 4,investment,2060.0853529718693,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 4,investment,1134.8938418850216,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 4,investment,1716.7377941432244,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 4,investment,2060.0853529718693,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 5,CF,0.509436,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 5,CF,0.509436,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 5,CF,0.509436,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1793,12 +1793,12 @@ Midsize DW - Class 5,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 5,FOM,2.83,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 5,FOM,1.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 5,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 5,investment,1299.0119752538562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 5,investment,1964.99696329207,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 5,investment,2357.996355950484,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 5,investment,1299.0119752538562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 5,investment,1964.99696329207,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 5,investment,2357.996355950484,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 5,investment,1134.8938418850216,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 5,investment,1716.7377941432244,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 5,investment,2060.0853529718693,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 5,investment,1134.8938418850216,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 5,investment,1716.7377941432244,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 5,investment,2060.0853529718693,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 6,CF,0.484872,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 6,CF,0.484872,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 6,CF,0.484872,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1811,12 +1811,12 @@ Midsize DW - Class 6,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 6,FOM,2.83,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 6,FOM,1.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 6,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 6,investment,1299.0119752538562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 6,investment,1964.99696329207,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 6,investment,2357.996355950484,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 6,investment,1299.0119752538562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 6,investment,1964.99696329207,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 6,investment,2357.996355950484,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 6,investment,1134.8938418850216,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 6,investment,1716.7377941432244,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 6,investment,2060.0853529718693,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 6,investment,1134.8938418850216,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 6,investment,1716.7377941432244,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 6,investment,2060.0853529718693,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 7,CF,0.448916,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 7,CF,0.448916,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 7,CF,0.448916,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1829,12 +1829,12 @@ Midsize DW - Class 7,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 7,FOM,2.83,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 7,FOM,1.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 7,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 7,investment,1299.0119752538562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 7,investment,1964.99696329207,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 7,investment,2357.996355950484,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 7,investment,1299.0119752538562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 7,investment,1964.99696329207,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 7,investment,2357.996355950484,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 7,investment,1134.8938418850216,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 7,investment,1716.7377941432244,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 7,investment,2060.0853529718693,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 7,investment,1134.8938418850216,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 7,investment,1716.7377941432244,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 7,investment,2060.0853529718693,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 8,CF,0.402458,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 8,CF,0.402458,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 8,CF,0.402458,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1847,12 +1847,12 @@ Midsize DW - Class 8,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 8,FOM,2.83,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 8,FOM,1.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 8,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 8,investment,1299.0119752538562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 8,investment,1964.99696329207,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 8,investment,2357.996355950484,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 8,investment,1299.0119752538562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 8,investment,1964.99696329207,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 8,investment,2357.996355950484,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 8,investment,1134.8938418850216,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 8,investment,1716.7377941432244,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 8,investment,2060.0853529718693,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 8,investment,1134.8938418850216,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 8,investment,1716.7377941432244,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 8,investment,2060.0853529718693,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 9,CF,0.348079,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 9,CF,0.348079,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 9,CF,0.348079,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1865,78 +1865,78 @@ Midsize DW - Class 9,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 9,FOM,2.83,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 9,FOM,1.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 9,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 9,investment,1299.0119752538562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 9,investment,1964.99696329207,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 9,investment,2357.996355950484,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 9,investment,1299.0119752538562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 9,investment,1964.99696329207,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 9,investment,2357.996355950484,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 9,investment,1134.8938418850216,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 9,investment,1716.7377941432244,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 9,investment,2060.0853529718693,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 9,investment,1134.8938418850216,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 9,investment,1716.7377941432244,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 9,investment,2060.0853529718693,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 1-on-1 Combined Cycle (H-Frame),FOM,2.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 1-on-1 Combined Cycle (H-Frame),FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG 1-on-1 Combined Cycle (H-Frame),FOM,2.3,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG 1-on-1 Combined Cycle (H-Frame),FOM,2.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 1-on-1 Combined Cycle (H-Frame),FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 1-on-1 Combined Cycle (H-Frame),FOM,2.3,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 1-on-1 Combined Cycle (H-Frame),VOM,2.24,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 1-on-1 Combined Cycle (H-Frame),VOM,2.27,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 1-on-1 Combined Cycle (H-Frame),VOM,2.31,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 1-on-1 Combined Cycle (H-Frame),VOM,2.24,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 1-on-1 Combined Cycle (H-Frame),VOM,2.27,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 1-on-1 Combined Cycle (H-Frame),VOM,2.31,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 1-on-1 Combined Cycle (H-Frame),investment,1531.1235934408703,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 1-on-1 Combined Cycle (H-Frame),investment,1547.838916513369,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 1-on-1 Combined Cycle (H-Frame),investment,1565.6685944573674,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 1-on-1 Combined Cycle (H-Frame),investment,1531.1235934408703,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 1-on-1 Combined Cycle (H-Frame),investment,1547.838916513369,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 1-on-1 Combined Cycle (H-Frame),investment,1565.6685944573674,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 1-on-1 Combined Cycle (H-Frame),VOM,1.956996743871936,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 1-on-1 Combined Cycle (H-Frame),VOM,1.9832065216916492,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 1-on-1 Combined Cycle (H-Frame),VOM,2.018152892117934,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 1-on-1 Combined Cycle (H-Frame),VOM,1.956996743871936,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 1-on-1 Combined Cycle (H-Frame),VOM,1.9832065216916492,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 1-on-1 Combined Cycle (H-Frame),VOM,2.018152892117934,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 1-on-1 Combined Cycle (H-Frame),investment,1337.6803066202147,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 1-on-1 Combined Cycle (H-Frame),investment,1352.2838034173787,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 1-on-1 Combined Cycle (H-Frame),investment,1367.8608666676867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 1-on-1 Combined Cycle (H-Frame),investment,1337.6803066202147,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 1-on-1 Combined Cycle (H-Frame),investment,1352.2838034173787,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 1-on-1 Combined Cycle (H-Frame),investment,1367.8608666676867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.23,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.23,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.83,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.24,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.65,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.83,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.24,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.65,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2376.9189409092987,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2613.1621736672787,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2848.2910515537587,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2376.9189409092987,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2613.1621736672787,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2848.2910515537587,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.3461149683167473,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.7043152651861644,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.062515562055581,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.3461149683167473,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.7043152651861644,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.062515562055581,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2076.617244556709,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2283.013332623292,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2488.4358542367313,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2076.617244556709,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2283.013332623292,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2488.4358542367313,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.21,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.29,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.21,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.29,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.88,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.3,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.73,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.88,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.3,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.73,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2399.206038339297,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2643.2497551977763,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2887.2934720562557,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2399.206038339297,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2643.2497551977763,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2887.2934720562557,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.389797931349603,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.756734820825591,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.132408302908151,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.389797931349603,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.756734820825591,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.132408302908151,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2096.088573619594,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2309.2996268581874,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2522.5106800967806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2096.088573619594,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2309.2996268581874,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2522.5106800967806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame),FOM,2.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (F-Frame),FOM,2.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG 2-on-1 Combined Cycle (F-Frame),FOM,2.31,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG 2-on-1 Combined Cycle (F-Frame),FOM,2.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 2-on-1 Combined Cycle (F-Frame),FOM,2.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (F-Frame),FOM,2.31,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (F-Frame),VOM,1.83,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (F-Frame),VOM,1.9,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (F-Frame),VOM,1.98,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (F-Frame),VOM,1.83,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (F-Frame),VOM,1.9,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (F-Frame),VOM,1.98,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (F-Frame),VOM,1.598796447002519,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (F-Frame),VOM,1.6599525952485168,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (F-Frame),VOM,1.7298453361010862,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (F-Frame),VOM,1.598796447002519,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (F-Frame),VOM,1.6599525952485168,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (F-Frame),VOM,1.7298453361010862,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame),discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (F-Frame),discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG 2-on-1 Combined Cycle (F-Frame),discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1944,12 +1944,12 @@ NG 2-on-1 Combined Cycle (F-Frame),discount rate,0.0535847804878049,per unit,"NR NG 2-on-1 Combined Cycle (F-Frame),discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (F-Frame),discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame),efficiency,0.573,p.u.,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, -NG 2-on-1 Combined Cycle (F-Frame),investment,1251.977698130144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (F-Frame),investment,1292.5402154527408,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (F-Frame),investment,1333.2141682624872,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (F-Frame),investment,1251.977698130144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (F-Frame),investment,1292.5402154527408,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (F-Frame),investment,1333.2141682624872,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (F-Frame),investment,1093.8019101075774,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (F-Frame),investment,1129.2397290020285,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (F-Frame),investment,1164.774904541794,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (F-Frame),investment,1093.8019101075774,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (F-Frame),investment,1129.2397290020285,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (F-Frame),investment,1164.774904541794,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame),lifetime,30.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,FOM,2.18,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -1957,12 +1957,12 @@ NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,FOM,2.32,%/year,NREL/ATB-https://data NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,FOM,2.18,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,FOM,2.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,3.37,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,3.95,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,4.53,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,3.37,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,3.95,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,4.53,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,2.944231708414475,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,3.450954079595601,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,3.9576764507767277,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,2.944231708414475,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,3.450954079595601,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,3.9576764507767277,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,capture_rate,0.95,per unit,"NREL, NREL ATB 2024",,,, NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -1971,12 +1971,12 @@ NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,discount rate,0.0535847804878049,per NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,efficiency,0.527,p.u.,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,1859.1896676104427,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,2210.100016645763,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,2561.010365681083,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,1859.1896676104427,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,2210.100016645763,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,2561.010365681083,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,1624.2982704258852,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,1930.874346521013,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,2237.4504226161407,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,1624.2982704258852,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,1930.874346521013,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,2237.4504226161407,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,lifetime,30.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,FOM,2.18,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -1984,12 +1984,12 @@ NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,FOM,2.32,%/year,NREL/ATB-https://data NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,FOM,2.18,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,FOM,2.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,3.41,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,4.02,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,4.62,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,3.41,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,4.02,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,4.62,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,2.9791780788407594,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,3.5121102278415988,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,4.036305784235868,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,2.9791780788407594,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,3.5121102278415988,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,4.036305784235868,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,capture_rate,0.97,per unit,"NREL, NREL ATB 2024",,,, NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -1998,12 +1998,12 @@ NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,discount rate,0.0535847804878049,per NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,efficiency,0.525,p.u.,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,1874.9020712985912,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,2236.6216625874604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,2598.45268936348,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,1874.9020712985912,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,2236.6216625874604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,2598.45268936348,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,1638.025557415219,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,1954.0452281058463,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,2270.162255441788,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,1638.025557415219,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,1954.0452281058463,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,2270.162255441788,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,lifetime,30.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, NG 2-on-1 Combined Cycle (H-Frame),FOM,2.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (H-Frame),FOM,2.19,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -2011,154 +2011,154 @@ NG 2-on-1 Combined Cycle (H-Frame),FOM,2.23,%/year,NREL/ATB-https://data.openei. NG 2-on-1 Combined Cycle (H-Frame),FOM,2.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 2-on-1 Combined Cycle (H-Frame),FOM,2.19,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (H-Frame),FOM,2.23,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (H-Frame),VOM,1.83,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (H-Frame),VOM,1.9,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (H-Frame),VOM,1.97,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (H-Frame),VOM,1.83,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (H-Frame),VOM,1.9,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (H-Frame),VOM,1.97,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (H-Frame),investment,1251.977698130144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (H-Frame),investment,1308.6983610894893,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (H-Frame),investment,1365.4190240488344,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (H-Frame),investment,1251.977698130144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (H-Frame),investment,1308.6983610894893,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (H-Frame),investment,1365.4190240488344,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (H-Frame),VOM,1.598796447002519,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (H-Frame),VOM,1.6599525952485168,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (H-Frame),VOM,1.721108743494515,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (H-Frame),VOM,1.598796447002519,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (H-Frame),VOM,1.6599525952485168,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (H-Frame),VOM,1.721108743494515,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (H-Frame),investment,1093.8019101075774,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (H-Frame),investment,1143.3564425726202,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (H-Frame),investment,1192.910975037663,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (H-Frame),investment,1093.8019101075774,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (H-Frame),investment,1143.3564425726202,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (H-Frame),investment,1192.910975037663,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.18,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.18,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.37,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.84,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.31,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.37,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.84,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.31,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,1859.1896676104427,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2148.921934200418,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2438.7656362775433,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,1859.1896676104427,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2148.921934200418,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2438.7656362775433,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,2.944231708414475,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.3548515609233185,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.7654714134321616,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,2.944231708414475,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.3548515609233185,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.7654714134321616,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,1624.2982704258852,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,1877.425548243393,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2130.650182706215,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,1624.2982704258852,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,1877.425548243393,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2130.650182706215,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.19,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.21,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.19,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.21,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.41,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.9,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.39,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.41,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.9,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.39,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,1875.4592487343411,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2172.991999424816,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2471.6391049867907,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,1875.4592487343411,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2172.991999424816,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2471.6391049867907,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,2.9791780788407594,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.4072711165627454,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.835364154284731,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,2.9791780788407594,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.4072711165627454,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.835364154284731,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,1638.5123406417913,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,1898.454583631309,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2159.370393073971,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,1638.5123406417913,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,1898.454583631309,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2159.370393073971,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG Combined Cycle F-Class integrated retrofit 90%-CCS,FOM,7.05,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG Combined Cycle F-Class integrated retrofit 90%-CCS,FOM,6.05,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG Combined Cycle F-Class integrated retrofit 90%-CCS,FOM,5.38,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG Combined Cycle F-Class integrated retrofit 90%-CCS,FOM,7.05,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG Combined Cycle F-Class integrated retrofit 90%-CCS,FOM,6.05,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG Combined Cycle F-Class integrated retrofit 90%-CCS,FOM,5.38,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,4.0,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,4.31,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,4.62,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,4.0,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,4.31,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,4.62,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,3.4946370426284568,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,3.7654714134321616,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,4.036305784235868,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,3.4946370426284568,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,3.7654714134321616,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,4.036305784235868,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG Combined Cycle F-Class integrated retrofit 90%-CCS,capture_rate,0.9,per unit,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, NG Combined Cycle F-Class integrated retrofit 90%-CCS,efficiency,0.536,p.u.,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, -NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,768.9,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,960.8,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,1152.8,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,768.9,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,960.8,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,1152.8,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,671.7566055192551,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,839.4118176393553,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,1007.1543956855212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,671.7566055192551,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,839.4118176393553,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,1007.1543956855212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG Combined Cycle F-Class integrated retrofit 95%-CCS,FOM,6.88,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG Combined Cycle F-Class integrated retrofit 95%-CCS,FOM,5.91,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG Combined Cycle F-Class integrated retrofit 95%-CCS,FOM,5.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG Combined Cycle F-Class integrated retrofit 95%-CCS,FOM,6.88,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG Combined Cycle F-Class integrated retrofit 95%-CCS,FOM,5.91,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG Combined Cycle F-Class integrated retrofit 95%-CCS,FOM,5.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,4.08,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,4.42,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,4.75,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,4.08,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,4.42,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,4.75,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,3.564529783481026,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,3.8615739321044447,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,4.149881488121292,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,3.564529783481026,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,3.8615739321044447,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,4.149881488121292,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG Combined Cycle F-Class integrated retrofit 95%-CCS,capture_rate,0.95,per unit,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, NG Combined Cycle F-Class integrated retrofit 95%-CCS,efficiency,0.536,p.u.,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, -NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,799.1,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,1001.6,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,1204.1,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,799.1,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,1001.6,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,1204.1,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,698.1411151911,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,875.0571154741656,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,1051.9731157572312,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,698.1411151911,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,875.0571154741656,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,1051.9731157572312,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG Combined Cycle H-Class integrated retrofit 90%-CCS,FOM,7.63,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG Combined Cycle H-Class integrated retrofit 90%-CCS,FOM,6.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG Combined Cycle H-Class integrated retrofit 90%-CCS,FOM,5.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG Combined Cycle H-Class integrated retrofit 90%-CCS,FOM,7.63,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG Combined Cycle H-Class integrated retrofit 90%-CCS,FOM,6.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG Combined Cycle H-Class integrated retrofit 90%-CCS,FOM,5.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,3.85,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,4.12,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,4.4,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,3.85,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,4.12,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,4.4,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,670.0,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,836.2,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,1002.3,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,670.0,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,836.2,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,1002.3,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,3.3635881535298897,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,3.5994761539073106,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,3.8441007468913027,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,3.3635881535298897,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,3.5994761539073106,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,3.8441007468913027,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,585.3517046402665,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,730.5538737614789,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,875.6686769566255,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,585.3517046402665,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,730.5538737614789,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,875.6686769566255,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG Combined Cycle H-Class integrated retrofit 95%-CCS,FOM,7.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG Combined Cycle H-Class integrated retrofit 95%-CCS,FOM,6.35,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG Combined Cycle H-Class integrated retrofit 95%-CCS,FOM,5.63,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG Combined Cycle H-Class integrated retrofit 95%-CCS,FOM,7.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG Combined Cycle H-Class integrated retrofit 95%-CCS,FOM,6.35,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG Combined Cycle H-Class integrated retrofit 95%-CCS,FOM,5.63,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,3.92,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,4.22,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,4.51,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,3.92,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,4.22,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,4.51,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,696.4,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,871.8,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,1047.2,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,696.4,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,871.8,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,1047.2,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,3.4247443017758874,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,3.6868420799730215,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,3.940203265563585,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,3.4247443017758874,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,3.6868420799730215,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,3.940203265563585,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,608.4163091216143,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,761.6561434408721,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,914.89597776013,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,608.4163091216143,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,761.6561434408721,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,914.89597776013,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG Fuel Cell,FOM,2.37,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG Fuel Cell,FOM,2.36,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG Fuel Cell,FOM,2.37,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG Fuel Cell,FOM,2.36,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Fuel Cell,VOM,7.35,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Fuel Cell,VOM,7.64,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Fuel Cell,VOM,7.35,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Fuel Cell,VOM,7.64,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Fuel Cell,investment,1644.8992258210103,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Fuel Cell,investment,1714.5464052897548,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Fuel Cell,investment,1644.8992258210103,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Fuel Cell,investment,1714.5464052897548,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Fuel Cell,VOM,6.421395565829789,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Fuel Cell,VOM,6.674756751420352,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Fuel Cell,VOM,6.421395565829789,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Fuel Cell,VOM,6.674756751420352,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Fuel Cell,investment,1437.0814414862434,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Fuel Cell,investment,1497.9293448077601,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Fuel Cell,investment,1437.0814414862434,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Fuel Cell,investment,1497.9293448077601,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG Fuel Cell 98% CCS,FOM,2.37,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG Fuel Cell 98% CCS,FOM,2.36,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG Fuel Cell 98% CCS,FOM,2.37,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG Fuel Cell 98% CCS,FOM,2.36,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Fuel Cell 98% CCS,VOM,8.1,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Fuel Cell 98% CCS,VOM,8.41,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Fuel Cell 98% CCS,VOM,8.1,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Fuel Cell 98% CCS,VOM,8.41,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Fuel Cell 98% CCS,investment,2343.265423790002,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Fuel Cell 98% CCS,investment,2451.0235398640425,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Fuel Cell 98% CCS,investment,2343.265423790002,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Fuel Cell 98% CCS,investment,2451.0235398640425,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Fuel Cell 98% CCS,VOM,7.076640011322625,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Fuel Cell 98% CCS,VOM,7.347474382126331,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Fuel Cell 98% CCS,VOM,7.076640011322625,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Fuel Cell 98% CCS,VOM,7.347474382126331,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Fuel Cell 98% CCS,investment,2047.2155376717524,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Fuel Cell 98% CCS,investment,2141.3594136908023,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Fuel Cell 98% CCS,investment,2047.2155376717524,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Fuel Cell 98% CCS,investment,2141.3594136908023,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NH3 (l) storage tank incl. liquefaction,FOM,2.0,%/year,"Guesstimate, based on H2 (l) storage tank.",,2010.0,, NH3 (l) storage tank incl. liquefaction,investment,166.8201,EUR/MWh_NH3,"Calculated based on Morgan E. 2013: doi:10.7275/11KT-3F59 , Fig. 55, Fig 58.","Based on estimated for a double-wall liquid ammonia tank (~ambient pressure, -33°C), inner tank from stainless steel, outer tank from concrete including installations for liquefaction/condensation, boil-off gas recovery and safety installations; the necessary installations make only a small fraction of the total cost. The total cost are driven by material and working time on the tanks. While the costs do not scale strictly linearly, we here assume they do (good approximation c.f. ref. Fig 55.) and take the costs for a 9 kt NH3 (l) tank = 8 M$2010, which is smaller 4-5x smaller than the largest deployed tanks today. @@ -2170,12 +2170,12 @@ NH3 (l) transport ship,capacity,53000.0,t_NH3,"Cihlar et al 2020 based on IEA 20 NH3 (l) transport ship,investment,81164200.0,EUR,"Cihlar et al 2020 based on IEA 2019, Table 3-B",,2019.0,, NH3 (l) transport ship,lifetime,20.0,years,"Guess estimated based on H2 (l) tanker, but more mature technology",,2019.0,, Natural gas steam reforming,FOM,0.05,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, -Natural gas steam reforming,efficiency,0.7747,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Natural gas steam reforming,investment,180.0632,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Natural gas steam reforming,efficiency,0.7746666666666667,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, +Natural gas steam reforming,investment,242.75887320940691,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Natural gas steam reforming,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Natural gas steam reforming CC,FOM,0.05,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Natural gas steam reforming CC,efficiency,0.666,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Natural gas steam reforming CC,investment,323.8999,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Natural gas steam reforming CC,investment,436.6777280424164,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Natural gas steam reforming CC,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Ni-Zn-bicharger,FOM,2.1198,%/year,"Viswanathan_2022, p.51-52 in section 4.4.2","{'carrier': ['elec', 'nizn', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['Guesstimate 30% assumed of power components every 10 years ']}",2020.0,, Ni-Zn-bicharger,efficiency,0.9,per unit,"Viswanathan_2022, p.59 (p.81)","{'carrier': ['elec', 'nizn', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['((0.75-0.87)/2)^0.5 mean value of range efficiency is not RTE but single way AC-store conversion']}",2020.0,, @@ -2196,24 +2196,24 @@ Nuclear - Small,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucke Nuclear - Small,FOM,3.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Nuclear - Small,FOM,2.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Nuclear - Small,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Nuclear - Small,VOM,2.2,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Nuclear - Small,VOM,2.6,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Nuclear - Small,VOM,2.8,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Nuclear - Small,VOM,2.2,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Nuclear - Small,VOM,2.6,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Nuclear - Small,VOM,2.8,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Nuclear - Small,fuel,10.0062,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Nuclear - Small,fuel,11.016,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Nuclear - Small,fuel,12.1176,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Nuclear - Small,fuel,10.0062,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Nuclear - Small,fuel,11.016,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Nuclear - Small,fuel,12.1176,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Nuclear - Small,investment,2979.200839396273,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Nuclear - Small,investment,6373.765879286903,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Nuclear - Small,investment,10170.012620697247,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Nuclear - Small,investment,2979.200839396273,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Nuclear - Small,investment,6373.765879286903,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Nuclear - Small,investment,10170.012620697247,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Nuclear - Small,VOM,1.9220503734456513,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Nuclear - Small,VOM,2.271514077708497,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Nuclear - Small,VOM,2.4462459298399195,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Nuclear - Small,VOM,1.9220503734456513,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Nuclear - Small,VOM,2.271514077708497,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Nuclear - Small,VOM,2.4462459298399195,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Nuclear - Small,fuel,8.742009293987216,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Nuclear - Small,fuel,9.62423041539877,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Nuclear - Small,fuel,10.586653456938647,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Nuclear - Small,fuel,8.742009293987216,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Nuclear - Small,fuel,9.62423041539877,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Nuclear - Small,fuel,10.586653456938647,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Nuclear - Small,investment,2602.806402696002,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Nuclear - Small,investment,5568.499585699337,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Nuclear - Small,investment,8885.125707071877,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Nuclear - Small,investment,2602.806402696002,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Nuclear - Small,investment,5568.499585699337,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Nuclear - Small,investment,8885.125707071877,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative OCGT,FOM,1.7906,%/year,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",52 OCGT - Natural gas: Fixed O&M,2015.0,, OCGT,VOM,4.762,EUR/MWh,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",52 OCGT - Natural gas: Variable O&M,2015.0,, OCGT,efficiency,0.42,per unit,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","52 OCGT - Natural gas: Electricity efficiency, annual average",2015.0,, @@ -2231,12 +2231,12 @@ Offshore Wind - Class 1,FOM,2.13,%/year,NREL/ATB-https://data.openei.org/s3_view Offshore Wind - Class 1,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 1,FOM,2.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 1,FOM,2.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 1,investment,2744.84036843788,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 1,investment,3259.167825953445,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 1,investment,3896.1161811018264,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 1,investment,2744.84036843788,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 1,investment,3259.167825953445,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 1,investment,3896.1161811018264,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 1,investment,2398.055206911239,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 1,investment,2847.4021531799413,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 1,investment,3403.8779822156407,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 1,investment,2398.055206911239,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 1,investment,2847.4021531799413,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 1,investment,3403.8779822156407,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 10,CF,0.5189,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 10,CF,0.4911,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 10,CF,0.471,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2249,12 +2249,12 @@ Offshore Wind - Class 10,FOM,0.95,%/year,NREL/ATB-https://data.openei.org/s3_vie Offshore Wind - Class 10,FOM,1.71,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 10,FOM,1.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 10,FOM,0.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 10,investment,3205.919250391961,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 10,investment,4722.908898730972,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 10,investment,7083.951526294981,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 10,investment,3205.919250391961,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 10,investment,4722.908898730972,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 10,investment,7083.951526294981,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 10,investment,2800.8810420238506,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 10,investment,4126.213096616207,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 10,investment,6188.959852993708,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 10,investment,2800.8810420238506,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 10,investment,4126.213096616207,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 10,investment,6188.959852993708,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 11,CF,0.5162,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 11,CF,0.4885,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 11,CF,0.4685,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2267,12 +2267,12 @@ Offshore Wind - Class 11,FOM,0.94,%/year,NREL/ATB-https://data.openei.org/s3_vie Offshore Wind - Class 11,FOM,1.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 11,FOM,1.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 11,FOM,0.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 11,investment,3304.8369734260127,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 11,investment,4868.633060404523,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 11,investment,7302.525074338685,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 11,investment,3304.8369734260127,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 11,investment,4868.633060404523,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 11,investment,7302.525074338685,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 11,investment,2887.301426795665,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 11,investment,4253.526359963799,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 11,investment,6379.918657376774,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 11,investment,2887.301426795665,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 11,investment,4253.526359963799,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 11,investment,6379.918657376774,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 12,CF,0.5061,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 12,CF,0.479,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 12,CF,0.4594,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2285,12 +2285,12 @@ Offshore Wind - Class 12,FOM,0.94,%/year,NREL/ATB-https://data.openei.org/s3_vie Offshore Wind - Class 12,FOM,1.69,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 12,FOM,1.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 12,FOM,0.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 12,investment,3441.7961879574204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 12,investment,5070.399245508735,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 12,investment,7605.15661300234,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 12,investment,3441.7961879574204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 12,investment,5070.399245508735,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 12,investment,7605.15661300234,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 12,investment,3006.957112903354,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 12,investment,4429.801256067551,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 12,investment,6644.3155036971875,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 12,investment,3006.957112903354,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 12,investment,4429.801256067551,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 12,investment,6644.3155036971875,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 13,CF,0.3983,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 13,CF,0.3769,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 13,CF,0.3615,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2303,12 +2303,12 @@ Offshore Wind - Class 13,FOM,0.81,%/year,NREL/ATB-https://data.openei.org/s3_vie Offshore Wind - Class 13,FOM,1.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 13,FOM,1.08,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 13,FOM,0.81,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 13,investment,3834.446683987104,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 13,investment,5648.845511550589,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 13,investment,8472.775622239096,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 13,investment,3834.446683987104,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 13,investment,5648.845511550589,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 13,investment,8472.775622239096,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 13,investment,3349.9998549612965,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 13,investment,4935.166193187546,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 13,investment,7402.3188858390295,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 13,investment,3349.9998549612965,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 13,investment,4935.166193187546,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 13,investment,7402.3188858390295,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 14,CF,0.3046,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 14,CF,0.2883,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 14,CF,0.2765,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2321,12 +2321,12 @@ Offshore Wind - Class 14,FOM,0.76,%/year,NREL/ATB-https://data.openei.org/s3_vie Offshore Wind - Class 14,FOM,1.36,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 14,FOM,1.01,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 14,FOM,0.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 14,investment,4166.757331270657,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 14,investment,6138.400244078679,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 14,investment,9207.065036580145,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 14,investment,4166.757331270657,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 14,investment,6138.400244078679,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 14,investment,9207.065036580145,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 14,investment,3640.3261293755327,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 14,investment,5362.870218859228,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 14,investment,8043.837632680576,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 14,investment,3640.3261293755327,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 14,investment,5362.870218859228,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 14,investment,8043.837632680576,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 2,CF,0.5044,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 2,CF,0.4774,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 2,CF,0.4578,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2339,12 +2339,12 @@ Offshore Wind - Class 2,FOM,2.18,%/year,NREL/ATB-https://data.openei.org/s3_view Offshore Wind - Class 2,FOM,2.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 2,FOM,2.28,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 2,FOM,2.18,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 2,investment,2668.3953991241947,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 2,investment,3168.3987309352965,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 2,investment,3787.607760817296,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 2,investment,2668.3953991241947,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 2,investment,3168.3987309352965,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 2,investment,3787.607760817296,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 2,investment,2331.268351539689,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 2,investment,2768.10089273587,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 2,investment,3309.0785959747864,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 2,investment,2331.268351539689,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 2,investment,2768.10089273587,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 2,investment,3309.0785959747864,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 4,CF,0.5115,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 4,CF,0.4842,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 4,CF,0.4643,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2357,12 +2357,12 @@ Offshore Wind - Class 4,FOM,1.95,%/year,NREL/ATB-https://data.openei.org/s3_view Offshore Wind - Class 4,FOM,2.21,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 4,FOM,2.04,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 4,FOM,1.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 4,investment,2985.286316169104,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 4,investment,3544.6683759302628,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 4,investment,4237.412958592255,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 4,investment,2985.286316169104,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 4,investment,3544.6683759302628,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 4,investment,4237.412958592255,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 4,investment,2608.1230358340995,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 4,investment,3096.8323525898873,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 4,investment,3702.055072502584,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 4,investment,2608.1230358340995,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 4,investment,3096.8323525898873,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 4,investment,3702.055072502584,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 5,CF,0.4989,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 5,CF,0.4722,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 5,CF,0.4529,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2375,12 +2375,12 @@ Offshore Wind - Class 5,FOM,1.88,%/year,NREL/ATB-https://data.openei.org/s3_view Offshore Wind - Class 5,FOM,2.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 5,FOM,1.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 5,FOM,1.88,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 5,investment,3140.310033876098,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 5,investment,3728.740470199376,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 5,investment,4457.4587321580575,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 5,investment,3140.310033876098,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 5,investment,3728.740470199376,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 5,investment,4457.4587321580575,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 5,investment,2743.560942430309,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 5,investment,3257.6486423766473,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 5,investment,3894.300100346806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 5,investment,2743.560942430309,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 5,investment,3257.6486423766473,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 5,investment,3894.300100346806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 6,CF,0.3905,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 6,CF,0.3696,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 6,CF,0.3545,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2393,12 +2393,12 @@ Offshore Wind - Class 6,FOM,1.93,%/year,NREL/ATB-https://data.openei.org/s3_view Offshore Wind - Class 6,FOM,2.19,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 6,FOM,2.01,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 6,FOM,1.93,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 6,investment,3029.5280290760406,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 6,investment,3597.2000744508637,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 6,investment,4300.211209983691,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 6,investment,3029.5280290760406,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 6,investment,3597.2000744508637,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 6,investment,4300.211209983691,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 6,investment,2646.775218022578,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 6,investment,3142.7271574804577,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 6,investment,3756.919346383786,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 6,investment,2646.775218022578,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 6,investment,3142.7271574804577,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 6,investment,3756.919346383786,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 7,CF,0.2988,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 7,CF,0.2828,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 7,CF,0.2712,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2411,12 +2411,12 @@ Offshore Wind - Class 7,FOM,1.83,%/year,NREL/ATB-https://data.openei.org/s3_view Offshore Wind - Class 7,FOM,2.08,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 7,FOM,1.91,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 7,FOM,1.83,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 7,investment,3203.468054212424,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 7,investment,3803.733059489002,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 7,investment,4547.1074989210065,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 7,investment,3203.468054212424,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 7,investment,3803.733059489002,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 7,investment,4547.1074989210065,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 7,investment,2798.7395317819105,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 7,investment,3323.1666124901844,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 7,investment,3972.622575635746,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 7,investment,2798.7395317819105,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 7,investment,3323.1666124901844,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 7,investment,3972.622575635746,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 8,CF,0.5146,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 8,CF,0.487,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 8,CF,0.4671,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2429,12 +2429,12 @@ Offshore Wind - Class 8,FOM,1.02,%/year,NREL/ATB-https://data.openei.org/s3_view Offshore Wind - Class 8,FOM,1.82,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 8,FOM,1.36,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 8,FOM,1.02,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 8,investment,2928.604358578225,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 8,investment,4314.373134774018,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 8,investment,6471.183635516628,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 8,investment,2928.604358578225,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 8,investment,4314.373134774018,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 8,investment,6471.183635516628,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 8,investment,2558.6023186726543,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 8,investment,3769.2920431255843,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 8,investment,5653.609510581873,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 8,investment,2558.6023186726543,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 8,investment,3769.2920431255843,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 8,investment,5653.609510581873,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 9,CF,0.5179,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 9,CF,0.4902,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 9,CF,0.4701,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2447,12 +2447,12 @@ Offshore Wind - Class 9,FOM,0.99,%/year,NREL/ATB-https://data.openei.org/s3_view Offshore Wind - Class 9,FOM,1.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 9,FOM,1.31,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 9,FOM,0.99,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 9,investment,3116.0001857283514,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 9,investment,4590.441640615961,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 9,investment,6885.262169467693,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 9,investment,3116.0001857283514,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 9,investment,4590.441640615961,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 9,investment,6885.262169467693,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 9,investment,2722.322418470862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 9,investment,4010.4818498301706,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 9,investment,6015.373056407542,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 9,investment,2722.322418470862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 9,investment,4010.4818498301706,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 9,investment,6015.373056407542,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PEM electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PEM electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PEM electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative @@ -2460,12 +2460,12 @@ PEM electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenar PEM electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PEM electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PEM electrolyzer,efficiency,0.71,p.u.,ICCT IRA e-fuels assumptions ,,,, -PEM electrolyzer,investment,1602.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PEM electrolyzer,investment,1602.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PEM electrolyzer,investment,1446.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PEM electrolyzer,investment,1446.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PEM electrolyzer,investment,404.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PEM electrolyzer,investment,404.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PEM electrolyzer,investment,1399.6021355726969,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PEM electrolyzer,investment,1399.6021355726969,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PEM electrolyzer,investment,1263.3112909101872,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PEM electrolyzer,investment,1263.3112909101872,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PEM electrolyzer,investment,352.9583413054741,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PEM electrolyzer,investment,352.9583413054741,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PEM electrolyzer,lifetime,30.0,years,ICCT IRA e-fuels assumptions ,,,, PHS,FOM,0.69,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PHS,FOM,0.62,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -2473,12 +2473,12 @@ PHS,FOM,0.62,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data- PHS,FOM,0.69,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PHS,FOM,0.62,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PHS,FOM,0.62,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PHS,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PHS,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PHS,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PHS,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PHS,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PHS,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PHS,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PHS,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PHS,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PHS,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PHS,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PHS,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PHS,discount rate,0.0481937880466246,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PHS,discount rate,0.0481937880466246,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PHS,discount rate,0.0481937880466246,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2486,12 +2486,12 @@ PHS,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of s PHS,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PHS,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PHS,efficiency,0.75,per unit,DIW DataDoc http://hdl.handle.net/10419/80348, from old pypsa cost assumptions,2015.0,, -PHS,investment,2931.125870075474,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PHS,investment,3224.2384570830204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PHS,investment,3224.2384570830204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PHS,investment,2931.125870075474,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PHS,investment,3224.2384570830204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PHS,investment,3224.2384570830204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PHS,investment,2560.805260543079,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PHS,investment,2816.8857865973864,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PHS,investment,2816.8857865973864,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PHS,investment,2560.805260543079,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PHS,investment,2816.8857865973864,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PHS,investment,2816.8857865973864,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PHS,lifetime,80.0,years,IEA2010, from old pypsa cost assumptions,2015.0,, PV+Storage - Class 1,CF,0.3769822812289528,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 1,CF,0.35807894357114045,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -2505,12 +2505,12 @@ PV+Storage - Class 1,FOM,3.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer? PV+Storage - Class 1,FOM,3.7,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 1,FOM,3.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 1,FOM,3.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 1,investment,1059.7945697554126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 1,investment,1399.531180521806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 1,investment,1880.415531014501,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 1,investment,1059.7945697554126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 1,investment,1399.531180521806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 1,investment,1880.415531014501,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 1,investment,925.8993402609382,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 1,investment,1222.7133764412592,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 1,investment,1642.8424425542837,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 1,investment,925.8993402609382,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 1,investment,1222.7133764412592,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 1,investment,1642.8424425542837,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 10,CF,0.24583934770152793,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 10,CF,0.23453685821404532,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 10,CF,0.21709001607228604,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2523,12 +2523,12 @@ PV+Storage - Class 10,FOM,3.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer PV+Storage - Class 10,FOM,3.7,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 10,FOM,3.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 10,FOM,3.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 10,investment,1059.7945697554126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 10,investment,1399.531180521806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 10,investment,1880.415531014501,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 10,investment,1059.7945697554126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 10,investment,1399.531180521806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 10,investment,1880.415531014501,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 10,investment,925.8993402609382,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 10,investment,1222.7133764412592,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 10,investment,1642.8424425542837,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 10,investment,925.8993402609382,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 10,investment,1222.7133764412592,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 10,investment,1642.8424425542837,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 2,CF,0.36487779319455255,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 2,CF,0.34652344083612946,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 2,CF,0.3246713822213178,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2541,12 +2541,12 @@ PV+Storage - Class 2,FOM,3.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer? PV+Storage - Class 2,FOM,3.7,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 2,FOM,3.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 2,FOM,3.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 2,investment,1059.7945697554126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 2,investment,1399.531180521806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 2,investment,1880.415531014501,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 2,investment,1059.7945697554126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 2,investment,1399.531180521806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 2,investment,1880.415531014501,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 2,investment,925.8993402609382,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 2,investment,1222.7133764412592,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 2,investment,1642.8424425542837,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 2,investment,925.8993402609382,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 2,investment,1222.7133764412592,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 2,investment,1642.8424425542837,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 3,CF,0.3494325395529277,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 3,CF,0.3321863781368444,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 3,CF,0.31029307508571535,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2559,12 +2559,12 @@ PV+Storage - Class 3,FOM,3.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer? PV+Storage - Class 3,FOM,3.7,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 3,FOM,3.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 3,FOM,3.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 3,investment,1059.7945697554126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 3,investment,1399.531180521806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 3,investment,1880.415531014501,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 3,investment,1059.7945697554126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 3,investment,1399.531180521806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 3,investment,1880.415531014501,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 3,investment,925.8993402609382,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 3,investment,1222.7133764412592,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 3,investment,1642.8424425542837,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 3,investment,925.8993402609382,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 3,investment,1222.7133764412592,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 3,investment,1642.8424425542837,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 4,CF,0.33433639428558976,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 4,CF,0.31808588330851134,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 4,CF,0.29641270605381764,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2577,12 +2577,12 @@ PV+Storage - Class 4,FOM,3.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer? PV+Storage - Class 4,FOM,3.7,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 4,FOM,3.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 4,FOM,3.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 4,investment,1059.7945697554126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 4,investment,1399.531180521806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 4,investment,1880.415531014501,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 4,investment,1059.7945697554126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 4,investment,1399.531180521806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 4,investment,1880.415531014501,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 4,investment,925.8993402609382,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 4,investment,1222.7133764412592,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 4,investment,1642.8424425542837,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 4,investment,925.8993402609382,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 4,investment,1222.7133764412592,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 4,investment,1642.8424425542837,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 5,CF,0.31889121052295055,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 5,CF,0.3035112288612238,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 5,CF,0.28243159916866534,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2595,12 +2595,12 @@ PV+Storage - Class 5,FOM,3.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer? PV+Storage - Class 5,FOM,3.7,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 5,FOM,3.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 5,FOM,3.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 5,investment,1059.7945697554126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 5,investment,1399.531180521806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 5,investment,1880.415531014501,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 5,investment,1059.7945697554126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 5,investment,1399.531180521806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 5,investment,1880.415531014501,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 5,investment,925.8993402609382,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 5,investment,1222.7133764412592,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 5,investment,1642.8424425542837,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 5,investment,925.8993402609382,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 5,investment,1222.7133764412592,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 5,investment,1642.8424425542837,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 6,CF,0.3036783647139206,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 6,CF,0.28915232212379055,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 6,CF,0.2686601152701096,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2613,12 +2613,12 @@ PV+Storage - Class 6,FOM,3.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer? PV+Storage - Class 6,FOM,3.7,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 6,FOM,3.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 6,FOM,3.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 6,investment,1059.7945697554126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 6,investment,1399.531180521806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 6,investment,1880.415531014501,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 6,investment,1059.7945697554126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 6,investment,1399.531180521806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 6,investment,1880.415531014501,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 6,investment,925.8993402609382,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 6,investment,1222.7133764412592,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 6,investment,1642.8424425542837,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 6,investment,925.8993402609382,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 6,investment,1222.7133764412592,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 6,investment,1642.8424425542837,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 7,CF,0.28930219008604197,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 7,CF,0.2756379572897639,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 7,CF,0.255715421246646,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2631,12 +2631,12 @@ PV+Storage - Class 7,FOM,3.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer? PV+Storage - Class 7,FOM,3.7,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 7,FOM,3.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 7,FOM,3.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 7,investment,1059.7945697554126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 7,investment,1399.531180521806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 7,investment,1880.415531014501,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 7,investment,1059.7945697554126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 7,investment,1399.531180521806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 7,investment,1880.415531014501,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 7,investment,925.8993402609382,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 7,investment,1222.7133764412592,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 7,investment,1642.8424425542837,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 7,investment,925.8993402609382,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 7,investment,1222.7133764412592,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 7,investment,1642.8424425542837,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 8,CF,0.27869520931304403,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 8,CF,0.26563716489342687,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 8,CF,0.2464345803515088,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2649,12 +2649,12 @@ PV+Storage - Class 8,FOM,3.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer? PV+Storage - Class 8,FOM,3.7,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 8,FOM,3.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 8,FOM,3.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 8,investment,1059.7945697554126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 8,investment,1399.531180521806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 8,investment,1880.415531014501,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 8,investment,1059.7945697554126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 8,investment,1399.531180521806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 8,investment,1880.415531014501,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 8,investment,925.8993402609382,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 8,investment,1222.7133764412592,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 8,investment,1642.8424425542837,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 8,investment,925.8993402609382,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 8,investment,1222.7133764412592,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 8,investment,1642.8424425542837,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 9,CF,0.26612737211220505,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 9,CF,0.2537742942589657,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 9,CF,0.23524524252404147,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2667,336 +2667,336 @@ PV+Storage - Class 9,FOM,3.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer? PV+Storage - Class 9,FOM,3.7,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 9,FOM,3.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 9,FOM,3.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 9,investment,1059.7945697554126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 9,investment,1399.531180521806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 9,investment,1880.415531014501,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 9,investment,1059.7945697554126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 9,investment,1399.531180521806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 9,investment,1880.415531014501,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 9,investment,925.8993402609382,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 9,investment,1222.7133764412592,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 9,investment,1642.8424425542837,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 9,investment,925.8993402609382,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 9,investment,1222.7133764412592,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 9,investment,1642.8424425542837,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 10,FOM,0.49,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 10,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 10,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 10,FOM,0.49,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 10,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 10,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 10,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 10,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 10,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 10,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 10,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 10,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 10,investment,4097.107740379106,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 10,investment,4506.818514417017,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 10,investment,4506.818514417017,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 10,investment,4097.107740379106,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 10,investment,4506.818514417017,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 10,investment,4506.818514417017,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 10,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 10,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 10,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 10,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 10,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 10,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 10,investment,3579.4761192921496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 10,investment,3937.4237312213645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 10,investment,3937.4237312213645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 10,investment,3579.4761192921496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 10,investment,3937.4237312213645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 10,investment,3937.4237312213645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 11,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 11,FOM,0.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 11,FOM,0.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 11,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 11,FOM,0.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 11,FOM,0.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 11,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 11,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 11,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 11,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 11,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 11,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 11,investment,4157.888276095387,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 11,investment,4573.677103704925,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 11,investment,4573.677103704925,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 11,investment,4157.888276095387,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 11,investment,4573.677103704925,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 11,investment,4573.677103704925,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 11,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 11,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 11,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 11,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 11,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 11,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 11,investment,3632.5775971883786,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 11,investment,3995.835356907216,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 11,investment,3995.835356907216,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 11,investment,3632.5775971883786,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 11,investment,3995.835356907216,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 11,investment,3995.835356907216,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 12,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 12,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 12,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 12,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 12,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 12,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 12,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 12,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 12,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 12,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 12,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 12,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 12,investment,4212.493950638025,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 12,investment,4633.743345701827,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 12,investment,4633.743345701827,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 12,investment,4212.493950638025,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 12,investment,4633.743345701827,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 12,investment,4633.743345701827,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 12,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 12,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 12,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 12,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 12,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 12,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 12,investment,3680.284350436983,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 12,investment,4048.3127854806808,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 12,investment,4048.3127854806808,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 12,investment,3680.284350436983,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 12,investment,4048.3127854806808,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 12,investment,4048.3127854806808,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 13,FOM,0.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 13,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 13,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 13,FOM,0.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 13,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 13,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 13,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 13,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 13,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 13,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 13,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 13,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 13,investment,4262.687265330515,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 13,investment,4688.955991863566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 13,investment,4688.955991863566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 13,investment,4262.687265330515,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 13,investment,4688.955991863566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 13,investment,4688.955991863566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 13,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 13,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 13,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 13,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 13,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 13,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 13,investment,3724.136204641154,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 13,investment,4096.549825105269,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 13,investment,4096.549825105269,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 13,investment,3724.136204641154,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 13,investment,4096.549825105269,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 13,investment,4096.549825105269,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 14,FOM,0.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 14,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 14,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 14,FOM,0.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 14,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 14,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 14,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 14,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 14,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 14,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 14,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 14,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 14,investment,4309.930567319084,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 14,investment,4740.923624050991,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 14,investment,4740.923624050991,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 14,investment,4309.930567319084,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 14,investment,4740.923624050991,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 14,investment,4740.923624050991,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 14,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 14,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 14,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 14,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 14,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 14,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 14,investment,3765.4107529274875,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 14,investment,4141.951828220235,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 14,investment,4141.951828220235,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 14,investment,3765.4107529274875,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 14,investment,4141.951828220235,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 14,investment,4141.951828220235,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 15,FOM,0.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 15,FOM,0.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 15,FOM,0.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 15,FOM,0.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 15,FOM,0.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 15,FOM,0.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 15,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 15,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 15,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 15,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 15,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 15,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 15,investment,4355.234758163855,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 15,investment,4790.75823398024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 15,investment,4790.75823398024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 15,investment,4355.234758163855,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 15,investment,4790.75823398024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 15,investment,4790.75823398024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 15,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 15,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 15,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 15,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 15,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 15,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 15,investment,3804.9911788055992,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 15,investment,4185.490296686159,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 15,investment,4185.490296686159,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 15,investment,3804.9911788055992,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 15,investment,4185.490296686159,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 15,investment,4185.490296686159,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 2,FOM,0.62,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 2,FOM,0.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 2,FOM,0.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 2,FOM,0.62,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 2,FOM,0.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 2,FOM,0.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 2,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 2,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 2,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 2,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 2,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 2,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 2,investment,3268.27929703678,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 2,investment,3595.107226740458,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 2,investment,3595.107226740458,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 2,investment,3268.27929703678,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 2,investment,3595.107226740458,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 2,investment,3595.107226740458,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 2,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 2,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 2,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 2,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 2,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 2,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 2,investment,2855.3624742701063,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 2,investment,3140.898721697117,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 2,investment,3140.898721697117,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 2,investment,2855.3624742701063,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 2,investment,3140.898721697117,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 2,investment,3140.898721697117,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 3,FOM,0.58,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 3,FOM,0.53,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 3,FOM,0.53,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 3,FOM,0.58,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 3,FOM,0.53,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 3,FOM,0.53,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 3,investment,3449.096370250915,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 3,investment,3794.0060072760057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 3,investment,3794.0060072760057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 3,investment,3449.096370250915,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 3,investment,3794.0060072760057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 3,investment,3794.0060072760057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 3,investment,3013.3349847685504,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 3,investment,3314.668483245405,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 3,investment,3314.668483245405,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 3,investment,3013.3349847685504,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 3,investment,3314.668483245405,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 3,investment,3314.668483245405,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 4,FOM,0.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 4,FOM,0.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 4,FOM,0.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 4,FOM,0.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 4,FOM,0.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 4,FOM,0.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 4,investment,3586.9176972689884,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 4,investment,3945.609466995887,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 4,investment,3945.609466995887,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 4,investment,3586.9176972689884,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 4,investment,3945.609466995887,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 4,investment,3945.609466995887,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 4,investment,3133.743863433943,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 4,investment,3447.118249777337,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 4,investment,3447.118249777337,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 4,investment,3133.743863433943,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 4,investment,3447.118249777337,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 4,investment,3447.118249777337,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 5,FOM,0.54,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 5,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 5,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 5,FOM,0.54,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 5,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 5,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 5,investment,3697.402730484461,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 5,investment,4067.1430035329063,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 5,investment,4067.1430035329063,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 5,investment,3697.402730484461,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 5,investment,4067.1430035329063,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 5,investment,4067.1430035329063,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 5,investment,3230.270135866649,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 5,investment,3553.2971494533135,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 5,investment,3553.2971494533135,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 5,investment,3230.270135866649,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 5,investment,3553.2971494533135,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 5,investment,3553.2971494533135,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 6,FOM,0.53,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 6,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 6,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 6,FOM,0.53,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 6,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 6,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 6,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 6,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 6,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 6,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 6,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 6,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 6,investment,3794.5785381370288,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 6,investment,4174.036391950732,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 6,investment,4174.036391950732,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 6,investment,3794.5785381370288,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 6,investment,4174.036391950732,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 6,investment,4174.036391950732,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 6,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 6,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 6,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 6,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 6,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 6,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 6,investment,3315.16868013415,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 6,investment,3646.685548147565,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 6,investment,3646.685548147565,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 6,investment,3315.16868013415,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 6,investment,3646.685548147565,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 6,investment,3646.685548147565,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 7,FOM,0.52,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 7,FOM,0.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 7,FOM,0.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 7,FOM,0.52,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 7,FOM,0.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 7,FOM,0.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 7,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 7,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 7,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 7,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 7,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 7,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 7,investment,3882.119176214804,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 7,investment,4270.331093836284,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 7,investment,4270.331093836284,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 7,investment,3882.119176214804,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 7,investment,4270.331093836284,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 7,investment,4270.331093836284,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 7,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 7,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 7,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 7,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 7,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 7,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 7,investment,3391.6493692746308,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 7,investment,3730.8143062020936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 7,investment,3730.8143062020936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 7,investment,3391.6493692746308,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 7,investment,3730.8143062020936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 7,investment,3730.8143062020936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 8,FOM,0.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 8,FOM,0.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 8,FOM,0.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 8,FOM,0.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 8,FOM,0.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 8,FOM,0.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 8,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 8,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 8,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 8,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 8,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 8,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 8,investment,3961.335055108817,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 8,investment,4357.468560619698,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 8,investment,4357.468560619698,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 8,investment,3961.335055108817,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 8,investment,4357.468560619698,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 8,investment,4357.468560619698,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 8,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 8,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 8,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 8,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 8,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 8,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 8,investment,3460.8570554614776,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 8,investment,3806.942761007625,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 8,investment,3806.942761007625,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 8,investment,3460.8570554614776,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 8,investment,3806.942761007625,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 8,investment,3806.942761007625,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 9,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 9,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 9,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 9,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 9,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 9,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 9,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 9,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 9,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 9,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 9,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 9,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 9,investment,4030.3850717442374,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 9,investment,4433.423578918661,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 9,investment,4433.423578918661,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 9,investment,4030.3850717442374,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 9,investment,4433.423578918661,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 9,investment,4433.423578918661,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 9,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 9,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 9,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 9,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 9,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 9,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 9,investment,3521.1832419435405,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 9,investment,3873.301566137895,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 9,investment,3873.301566137895,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 9,investment,3521.1832419435405,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 9,investment,3873.301566137895,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 9,investment,3873.301566137895,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower One New Reservoir - National Class 1,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower One New Reservoir - National Class 1,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower One New Reservoir - National Class 1,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower One New Reservoir - National Class 1,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower One New Reservoir - National Class 1,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower One New Reservoir - National Class 1,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1673.6854449492262,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1841.0539894441488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1841.0539894441488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1673.6854449492262,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1841.0539894441488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1841.0539894441488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1462.2307884069141,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1608.4538672476056,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1608.4538672476056,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1462.2307884069141,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1608.4538672476056,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1608.4538672476056,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower One New Reservoir - National Class 3,FOM,0.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower One New Reservoir - National Class 3,FOM,0.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower One New Reservoir - National Class 3,FOM,0.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower One New Reservoir - National Class 3,FOM,0.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower One New Reservoir - National Class 3,FOM,0.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower One New Reservoir - National Class 3,FOM,0.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2111.8650371535823,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2323.0515408689403,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2323.0515408689403,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2111.8650371535823,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2323.0515408689403,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2323.0515408689403,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 3,investment,1845.0504469672078,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2029.5554916639283,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2029.5554916639283,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 3,investment,1845.0504469672078,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2029.5554916639283,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2029.5554916639283,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower One New Reservoir - National Class 4,FOM,0.83,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower One New Reservoir - National Class 4,FOM,0.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower One New Reservoir - National Class 4,FOM,0.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower One New Reservoir - National Class 4,FOM,0.83,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower One New Reservoir - National Class 4,FOM,0.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower One New Reservoir - National Class 4,FOM,0.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2420.2328645661323,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2662.256151022745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2662.256151022745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2420.2328645661323,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2662.256151022745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2662.256151022745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2114.4588550748967,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2325.9047405823862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2325.9047405823862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2114.4588550748967,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2325.9047405823862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2325.9047405823862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower One New Reservoir - National Class 5,FOM,0.64,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower One New Reservoir - National Class 5,FOM,0.58,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower One New Reservoir - National Class 5,FOM,0.58,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower One New Reservoir - National Class 5,FOM,0.64,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower One New Reservoir - National Class 5,FOM,0.58,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower One New Reservoir - National Class 5,FOM,0.58,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3144.580464630588,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3459.038511093646,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3459.038511093646,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3144.580464630588,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3459.038511093646,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3459.038511093646,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 5,investment,2747.291843805964,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3022.0210281865598,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3022.0210281865598,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 5,investment,2747.291843805964,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3022.0210281865598,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3022.0210281865598,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped-Heat-charger,FOM,0.366,%/year,"Viswanathan_2022, NULL","{'carrier': ['elec', 'phes'], 'technology_type': ['charger'], 'type': ['thermal'], 'note': ['Guesstimate, 50% on charger']}",2020.0,, Pumped-Heat-charger,efficiency,0.99,per unit,"Viswanathan_2022, NULL","{'carrier': ['elec', 'phes'], 'technology_type': ['charger'], 'type': ['thermal'], 'note': ['Charger']}",2020.0,, Pumped-Heat-charger,investment,761782.6727,EUR/MW,"Georgiou_2018, Figure 9 of reference roughly 80% of capital cost are power related 47%/80% of costs are required for liquefaction (charging)","{'carrier': ['elec', 'phes'], 'technology_type': ['charger'], 'type': ['thermal'], 'note': ['Power Equipment Charge']}",2020.0,, @@ -3021,24 +3021,24 @@ Residential Battery Storage - 5 kW - 12.5 kWh,FOM,2.41,%/year,NREL/ATB-https://d Residential Battery Storage - 5 kW - 12.5 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential Battery Storage - 5 kW - 12.5 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential Battery Storage - 5 kW - 12.5 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential Battery Storage - 5 kW - 12.5 kWh,investment,1717.4527878014512,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential Battery Storage - 5 kW - 12.5 kWh,investment,2604.1710379640913,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential Battery Storage - 5 kW - 12.5 kWh,investment,3255.2499944207493,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential Battery Storage - 5 kW - 12.5 kWh,investment,1717.4527878014512,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential Battery Storage - 5 kW - 12.5 kWh,investment,2604.1710379640913,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential Battery Storage - 5 kW - 12.5 kWh,investment,3255.2499944207493,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential Battery Storage - 5 kW - 12.5 kWh,investment,1500.4685328041155,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential Battery Storage - 5 kW - 12.5 kWh,investment,2275.1581436523775,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential Battery Storage - 5 kW - 12.5 kWh,investment,2843.979303379707,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential Battery Storage - 5 kW - 12.5 kWh,investment,1500.4685328041155,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential Battery Storage - 5 kW - 12.5 kWh,investment,2275.1581436523775,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential Battery Storage - 5 kW - 12.5 kWh,investment,2843.979303379707,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential Battery Storage - 5 kW - 20 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential Battery Storage - 5 kW - 20 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential Battery Storage - 5 kW - 20 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Residential Battery Storage - 5 kW - 20 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential Battery Storage - 5 kW - 20 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential Battery Storage - 5 kW - 20 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential Battery Storage - 5 kW - 20 kWh,investment,2132.602367195309,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential Battery Storage - 5 kW - 20 kWh,investment,3122.4379951944507,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential Battery Storage - 5 kW - 20 kWh,investment,4042.122085231239,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential Battery Storage - 5 kW - 20 kWh,investment,2132.602367195309,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential Battery Storage - 5 kW - 20 kWh,investment,3122.4379951944507,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential Battery Storage - 5 kW - 20 kWh,investment,4042.122085231239,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential Battery Storage - 5 kW - 20 kWh,investment,1863.1678073994651,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential Battery Storage - 5 kW - 20 kWh,investment,2727.9468703292655,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential Battery Storage - 5 kW - 20 kWh,investment,3531.437392468917,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential Battery Storage - 5 kW - 20 kWh,investment,1863.1678073994651,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential Battery Storage - 5 kW - 20 kWh,investment,2727.9468703292655,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential Battery Storage - 5 kW - 20 kWh,investment,3531.437392468917,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 1,CF,0.49395000000000006,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 1,CF,0.49395000000000006,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 1,CF,0.49395000000000006,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3051,12 +3051,12 @@ Residential DW - Class 1,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential DW - Class 1,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 1,FOM,1.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 1,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 1,investment,1628.2447064166147,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 1,investment,2605.1915302665834,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 1,investment,3386.748989346559,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 1,investment,1628.2447064166147,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 1,investment,2605.1915302665834,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 1,investment,3386.748989346559,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 1,investment,1422.5310663767996,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 1,investment,2276.0497062028794,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 1,investment,2958.8646180637434,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 1,investment,1422.5310663767996,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 1,investment,2276.0497062028794,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 1,investment,2958.8646180637434,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 10,CF,0.196957,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 10,CF,0.196957,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 10,CF,0.196957,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3069,12 +3069,12 @@ Residential DW - Class 10,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_vi Residential DW - Class 10,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 10,FOM,1.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 10,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 10,investment,1628.2447064166147,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 10,investment,2605.1915302665834,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 10,investment,3386.748989346559,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 10,investment,1628.2447064166147,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 10,investment,2605.1915302665834,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 10,investment,3386.748989346559,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 10,investment,1422.5310663767996,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 10,investment,2276.0497062028794,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 10,investment,2958.8646180637434,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 10,investment,1422.5310663767996,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 10,investment,2276.0497062028794,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 10,investment,2958.8646180637434,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 2,CF,0.462355,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 2,CF,0.462355,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 2,CF,0.462355,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3087,12 +3087,12 @@ Residential DW - Class 2,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential DW - Class 2,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 2,FOM,1.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 2,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 2,investment,1628.2447064166147,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 2,investment,2605.1915302665834,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 2,investment,3386.748989346559,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 2,investment,1628.2447064166147,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 2,investment,2605.1915302665834,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 2,investment,3386.748989346559,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 2,investment,1422.5310663767996,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 2,investment,2276.0497062028794,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 2,investment,2958.8646180637434,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 2,investment,1422.5310663767996,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 2,investment,2276.0497062028794,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 2,investment,2958.8646180637434,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 3,CF,0.45185300000000006,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 3,CF,0.45185300000000006,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 3,CF,0.45185300000000006,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3105,12 +3105,12 @@ Residential DW - Class 3,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential DW - Class 3,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 3,FOM,1.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 3,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 3,investment,1628.2447064166147,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 3,investment,2605.1915302665834,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 3,investment,3386.748989346559,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 3,investment,1628.2447064166147,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 3,investment,2605.1915302665834,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 3,investment,3386.748989346559,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 3,investment,1422.5310663767996,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 3,investment,2276.0497062028794,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 3,investment,2958.8646180637434,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 3,investment,1422.5310663767996,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 3,investment,2276.0497062028794,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 3,investment,2958.8646180637434,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 4,CF,0.440728,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 4,CF,0.440728,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 4,CF,0.440728,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3123,12 +3123,12 @@ Residential DW - Class 4,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential DW - Class 4,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 4,FOM,1.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 4,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 4,investment,1628.2447064166147,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 4,investment,2605.1915302665834,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 4,investment,3386.748989346559,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 4,investment,1628.2447064166147,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 4,investment,2605.1915302665834,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 4,investment,3386.748989346559,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 4,investment,1422.5310663767996,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 4,investment,2276.0497062028794,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 4,investment,2958.8646180637434,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 4,investment,1422.5310663767996,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 4,investment,2276.0497062028794,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 4,investment,2958.8646180637434,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 5,CF,0.426488,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 5,CF,0.426488,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 5,CF,0.426488,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3141,12 +3141,12 @@ Residential DW - Class 5,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential DW - Class 5,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 5,FOM,1.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 5,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 5,investment,1628.2447064166147,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 5,investment,2605.1915302665834,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 5,investment,3386.748989346559,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 5,investment,1628.2447064166147,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 5,investment,2605.1915302665834,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 5,investment,3386.748989346559,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 5,investment,1422.5310663767996,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 5,investment,2276.0497062028794,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 5,investment,2958.8646180637434,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 5,investment,1422.5310663767996,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 5,investment,2276.0497062028794,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 5,investment,2958.8646180637434,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 6,CF,0.404505,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 6,CF,0.404505,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 6,CF,0.404505,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3159,12 +3159,12 @@ Residential DW - Class 6,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential DW - Class 6,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 6,FOM,1.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 6,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 6,investment,1628.2447064166147,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 6,investment,2605.1915302665834,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 6,investment,3386.748989346559,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 6,investment,1628.2447064166147,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 6,investment,2605.1915302665834,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 6,investment,3386.748989346559,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 6,investment,1422.5310663767996,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 6,investment,2276.0497062028794,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 6,investment,2958.8646180637434,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 6,investment,1422.5310663767996,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 6,investment,2276.0497062028794,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 6,investment,2958.8646180637434,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 7,CF,0.372376,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 7,CF,0.372376,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 7,CF,0.372376,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3177,12 +3177,12 @@ Residential DW - Class 7,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential DW - Class 7,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 7,FOM,1.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 7,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 7,investment,1628.2447064166147,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 7,investment,2605.1915302665834,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 7,investment,3386.748989346559,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 7,investment,1628.2447064166147,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 7,investment,2605.1915302665834,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 7,investment,3386.748989346559,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 7,investment,1422.5310663767996,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 7,investment,2276.0497062028794,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 7,investment,2958.8646180637434,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 7,investment,1422.5310663767996,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 7,investment,2276.0497062028794,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 7,investment,2958.8646180637434,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 8,CF,0.331525,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 8,CF,0.331525,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 8,CF,0.331525,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3195,12 +3195,12 @@ Residential DW - Class 8,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential DW - Class 8,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 8,FOM,1.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 8,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 8,investment,1628.2447064166147,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 8,investment,2605.1915302665834,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 8,investment,3386.748989346559,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 8,investment,1628.2447064166147,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 8,investment,2605.1915302665834,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 8,investment,3386.748989346559,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 8,investment,1422.5310663767996,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 8,investment,2276.0497062028794,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 8,investment,2958.8646180637434,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 8,investment,1422.5310663767996,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 8,investment,2276.0497062028794,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 8,investment,2958.8646180637434,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 9,CF,0.285334,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 9,CF,0.285334,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 9,CF,0.285334,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3213,12 +3213,12 @@ Residential DW - Class 9,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential DW - Class 9,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 9,FOM,1.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 9,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 9,investment,1628.2447064166147,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 9,investment,2605.1915302665834,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 9,investment,3386.748989346559,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 9,investment,1628.2447064166147,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 9,investment,2605.1915302665834,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 9,investment,3386.748989346559,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 9,investment,1422.5310663767996,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 9,investment,2276.0497062028794,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 9,investment,2958.8646180637434,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 9,investment,1422.5310663767996,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 9,investment,2276.0497062028794,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 9,investment,2958.8646180637434,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 1,CF,0.19262941265204728,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 1,CF,0.18939658692404393,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 1,CF,0.18568528753757504,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3231,12 +3231,12 @@ Residential PV - Class 1,FOM,1.16,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential PV - Class 1,FOM,1.29,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 1,FOM,1.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 1,FOM,1.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 1,investment,1119.4785444540885,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 1,investment,1537.947924704698,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 1,investment,2171.9663933001157,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 1,investment,1119.4785444540885,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 1,investment,1537.947924704698,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 1,investment,2171.9663933001157,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 1,investment,978.0427974692612,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 1,investment,1343.6424468266496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 1,investment,1897.558553342678,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 1,investment,978.0427974692612,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 1,investment,1343.6424468266496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 1,investment,1897.558553342678,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 10,CF,0.12483975330012692,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 10,CF,0.1227446154871116,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 10,CF,0.12033938726442785,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3249,12 +3249,12 @@ Residential PV - Class 10,FOM,1.16,%/year,NREL/ATB-https://data.openei.org/s3_vi Residential PV - Class 10,FOM,1.29,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 10,FOM,1.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 10,FOM,1.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 10,investment,1119.4785444540885,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 10,investment,1537.947924704698,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 10,investment,2171.9663933001157,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 10,investment,1119.4785444540885,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 10,investment,1537.947924704698,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 10,investment,2171.9663933001157,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 10,investment,978.0427974692612,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 10,investment,1343.6424468266496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 10,investment,1897.558553342678,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 10,investment,978.0427974692612,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 10,investment,1343.6424468266496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 10,investment,1897.558553342678,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 2,CF,0.1896493378001759,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 2,CF,0.18646652552816495,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 2,CF,0.18281264182820572,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3267,12 +3267,12 @@ Residential PV - Class 2,FOM,1.16,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential PV - Class 2,FOM,1.29,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 2,FOM,1.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 2,FOM,1.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 2,investment,1119.4785444540885,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 2,investment,1537.947924704698,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 2,investment,2171.9663933001157,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 2,investment,1119.4785444540885,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 2,investment,1537.947924704698,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 2,investment,2171.9663933001157,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 2,investment,978.0427974692612,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 2,investment,1343.6424468266496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 2,investment,1897.558553342678,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 2,investment,978.0427974692612,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 2,investment,1343.6424468266496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 2,investment,1897.558553342678,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 3,CF,0.17692612853862053,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 3,CF,0.17395684501944764,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 3,CF,0.1705480933482696,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3285,12 +3285,12 @@ Residential PV - Class 3,FOM,1.16,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential PV - Class 3,FOM,1.29,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 3,FOM,1.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 3,FOM,1.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 3,investment,1119.4785444540885,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 3,investment,1537.947924704698,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 3,investment,2171.9663933001157,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 3,investment,1119.4785444540885,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 3,investment,1537.947924704698,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 3,investment,2171.9663933001157,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 3,investment,978.0427974692612,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 3,investment,1343.6424468266496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 3,investment,1897.558553342678,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 3,investment,978.0427974692612,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 3,investment,1343.6424468266496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 3,investment,1897.558553342678,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 4,CF,0.16719068008616828,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 4,CF,0.16438478287336175,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 4,CF,0.16116359946276831,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3303,12 +3303,12 @@ Residential PV - Class 4,FOM,1.16,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential PV - Class 4,FOM,1.29,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 4,FOM,1.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 4,FOM,1.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 4,investment,1119.4785444540885,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 4,investment,1537.947924704698,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 4,investment,2171.9663933001157,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 4,investment,1119.4785444540885,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 4,investment,1537.947924704698,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 4,investment,2171.9663933001157,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 4,investment,978.0427974692612,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 4,investment,1343.6424468266496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 4,investment,1897.558553342678,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 4,investment,978.0427974692612,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 4,investment,1343.6424468266496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 4,investment,1897.558553342678,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 5,CF,0.15835652646896928,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 5,CF,0.1556988894761656,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 5,CF,0.15264790950671914,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3321,12 +3321,12 @@ Residential PV - Class 5,FOM,1.16,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential PV - Class 5,FOM,1.29,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 5,FOM,1.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 5,FOM,1.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 5,investment,1119.4785444540885,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 5,investment,1537.947924704698,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 5,investment,2171.9663933001157,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 5,investment,1119.4785444540885,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 5,investment,1537.947924704698,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 5,investment,2171.9663933001157,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 5,investment,978.0427974692612,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 5,investment,1343.6424468266496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 5,investment,1897.558553342678,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 5,investment,978.0427974692612,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 5,investment,1343.6424468266496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 5,investment,1897.558553342678,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 6,CF,0.15639145748147906,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 6,CF,0.15376679948961097,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 6,CF,0.15075367957085573,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3339,12 +3339,12 @@ Residential PV - Class 6,FOM,1.16,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential PV - Class 6,FOM,1.29,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 6,FOM,1.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 6,FOM,1.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 6,investment,1119.4785444540885,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 6,investment,1537.947924704698,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 6,investment,2171.9663933001157,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 6,investment,1119.4785444540885,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 6,investment,1537.947924704698,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 6,investment,2171.9663933001157,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 6,investment,978.0427974692612,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 6,investment,1343.6424468266496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 6,investment,1897.558553342678,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 6,investment,978.0427974692612,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 6,investment,1343.6424468266496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 6,investment,1897.558553342678,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 7,CF,0.1494966780048899,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 7,CF,0.1469877324588728,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 7,CF,0.14410745098098188,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3357,12 +3357,12 @@ Residential PV - Class 7,FOM,1.16,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential PV - Class 7,FOM,1.29,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 7,FOM,1.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 7,FOM,1.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 7,investment,1119.4785444540885,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 7,investment,1537.947924704698,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 7,investment,2171.9663933001157,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 7,investment,1119.4785444540885,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 7,investment,1537.947924704698,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 7,investment,2171.9663933001157,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 7,investment,978.0427974692612,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 7,investment,1343.6424468266496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 7,investment,1897.558553342678,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 7,investment,978.0427974692612,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 7,investment,1343.6424468266496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 7,investment,1897.558553342678,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 8,CF,0.1424107632833385,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 8,CF,0.14002073793285597,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 8,CF,0.13727697740779668,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3375,12 +3375,12 @@ Residential PV - Class 8,FOM,1.16,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential PV - Class 8,FOM,1.29,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 8,FOM,1.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 8,FOM,1.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 8,investment,1119.4785444540885,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 8,investment,1537.947924704698,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 8,investment,2171.9663933001157,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 8,investment,1119.4785444540885,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 8,investment,1537.947924704698,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 8,investment,2171.9663933001157,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 8,investment,978.0427974692612,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 8,investment,1343.6424468266496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 8,investment,1897.558553342678,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 8,investment,978.0427974692612,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 8,investment,1343.6424468266496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 8,investment,1897.558553342678,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 9,CF,0.13674203686793523,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 9,CF,0.1344471475838946,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 9,CF,0.13181260371779668,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3393,12 +3393,12 @@ Residential PV - Class 9,FOM,1.16,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential PV - Class 9,FOM,1.29,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 9,FOM,1.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 9,FOM,1.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 9,investment,1119.4785444540885,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 9,investment,1537.947924704698,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 9,investment,2171.9663933001157,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 9,investment,1119.4785444540885,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 9,investment,1537.947924704698,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 9,investment,2171.9663933001157,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 9,investment,978.0427974692612,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 9,investment,1343.6424468266496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 9,investment,1897.558553342678,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 9,investment,978.0427974692612,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 9,investment,1343.6424468266496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 9,investment,1897.558553342678,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative SMR,FOM,5.0,%/year,Danish Energy Agency,"Technology data for renewable fuels, in pdf on table 3 p.311",2015.0,, SMR,efficiency,0.76,per unit (in LHV),"IEA Global average levelised cost of hydrogen production by energy source and technology, 2019 and 2050 (2020), https://www.iea.org/data-and-statistics/charts/global-average-levelised-cost-of-hydrogen-production-by-energy-source-and-technology-2019-and-2050",,,, SMR,investment,522201.0492,EUR/MW_CH4,Danish Energy Agency,"Technology data for renewable fuels, in pdf on table 3 p.311",2015.0,, @@ -3415,12 +3415,12 @@ SOEC,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and finan SOEC,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced SOEC,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced SOEC,efficiency,0.87,p.u.,ICCT IRA e-fuels assumptions ,,,, -SOEC,investment,1770.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -SOEC,investment,1770.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -SOEC,investment,1597.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -SOEC,investment,1597.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -SOEC,investment,710.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -SOEC,investment,710.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +SOEC,investment,1546.3768913630922,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +SOEC,investment,1546.3768913630922,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +SOEC,investment,1395.2338392694114,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +SOEC,investment,1395.2338392694114,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +SOEC,investment,620.2980750665511,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +SOEC,investment,620.2980750665511,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced SOEC,lifetime,30.0,years,ICCT IRA e-fuels assumptions ,,,, Sand-charger,FOM,1.075,%/year,"Viswanathan_2022, NULL","{'carrier': ['elec', 'sand'], 'technology_type': ['charger'], 'type': ['thermal'], 'note': ['Guesstimate, 50% on charger']}",2020.0,, Sand-charger,efficiency,0.99,per unit,"Viswanathan_2022, p.107 (p.129)","{'carrier': ['elec', 'sand'], 'technology_type': ['charger'], 'type': ['thermal'], 'note': ['RTE assume 99% for charge and other for discharge']}",2020.0,, @@ -3435,7 +3435,7 @@ Sand-store,investment,6700.8517,EUR/MWh,"Viswanathan_2022, p.100 (p.122)","{'car Sand-store,lifetime,35.0,years,"Viswanathan_2022, p.107 (p.129)","{'carrier': ['sand'], 'technology_type': ['store'], 'type': ['thermal'], 'note': ['NULL']}",2020.0,, Solid biomass steam reforming,FOM,0.05,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Solid biomass steam reforming,efficiency,0.712,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Solid biomass steam reforming,investment,590.7702,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Solid biomass steam reforming,investment,796.4750872147151,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Solid biomass steam reforming,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Steam methane reforming,FOM,3.0,%/year,"International Energy Agency (2015): Technology Roadmap Hydrogen and Fuel Cells , table 15.",Large scale SMR facility (150-300 MW).,2015.0,, Steam methane reforming,investment,497454.611,EUR/MW_H2,"International Energy Agency (2015): Technology Roadmap Hydrogen and Fuel Cells , table 15.",Large scale SMR facility (150-300 MW). Currency conversion 1.17 USD = 1 EUR.,2015.0,, @@ -3462,12 +3462,12 @@ Utility PV - Class 1,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Utility PV - Class 1,FOM,1.91,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 1,FOM,1.73,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 1,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 1,investment,642.7871536832729,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 1,investment,824.5128809765989,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 1,investment,1091.2717747262031,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 1,investment,642.7871536832729,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 1,investment,824.5128809765989,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 1,investment,1091.2717747262031,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 1,investment,561.5769494468191,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 1,investment,720.3433139962826,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 1,investment,953.3996918832715,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 1,investment,561.5769494468191,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 1,investment,720.3433139962826,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 1,investment,953.3996918832715,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 10,CF,0.23204624425325207,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 10,CF,0.22074375476576943,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 10,CF,0.20329691262401017,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3480,12 +3480,12 @@ Utility PV - Class 10,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer Utility PV - Class 10,FOM,1.91,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 10,FOM,1.73,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 10,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 10,investment,642.7871536832729,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 10,investment,824.5128809765989,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 10,investment,1091.2717747262031,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 10,investment,642.7871536832729,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 10,investment,824.5128809765989,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 10,investment,1091.2717747262031,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 10,investment,561.5769494468191,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 10,investment,720.3433139962826,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 10,investment,953.3996918832715,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 10,investment,561.5769494468191,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 10,investment,720.3433139962826,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 10,investment,953.3996918832715,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 2,CF,0.3510846897462767,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 2,CF,0.3327303373878536,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 2,CF,0.31087827877304197,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3498,12 +3498,12 @@ Utility PV - Class 2,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Utility PV - Class 2,FOM,1.91,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 2,FOM,1.73,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 2,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 2,investment,642.7871536832729,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 2,investment,824.5128809765989,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 2,investment,1091.2717747262031,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 2,investment,642.7871536832729,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 2,investment,824.5128809765989,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 2,investment,1091.2717747262031,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 2,investment,561.5769494468191,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 2,investment,720.3433139962826,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 2,investment,953.3996918832715,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 2,investment,561.5769494468191,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 2,investment,720.3433139962826,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 2,investment,953.3996918832715,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 3,CF,0.33563943610465186,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 3,CF,0.31839327468856854,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 3,CF,0.2964999716374395,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3516,12 +3516,12 @@ Utility PV - Class 3,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Utility PV - Class 3,FOM,1.91,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 3,FOM,1.73,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 3,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 3,investment,642.7871536832729,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 3,investment,824.5128809765989,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 3,investment,1091.2717747262031,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 3,investment,642.7871536832729,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 3,investment,824.5128809765989,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 3,investment,1091.2717747262031,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 3,investment,561.5769494468191,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 3,investment,720.3433139962826,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 3,investment,953.3996918832715,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 3,investment,561.5769494468191,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 3,investment,720.3433139962826,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 3,investment,953.3996918832715,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 4,CF,0.3205432908373139,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 4,CF,0.3042927798602355,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 4,CF,0.2826196026055418,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3534,12 +3534,12 @@ Utility PV - Class 4,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Utility PV - Class 4,FOM,1.91,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 4,FOM,1.73,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 4,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 4,investment,642.7871536832729,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 4,investment,824.5128809765989,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 4,investment,1091.2717747262031,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 4,investment,642.7871536832729,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 4,investment,824.5128809765989,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 4,investment,1091.2717747262031,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 4,investment,561.5769494468191,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 4,investment,720.3433139962826,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 4,investment,953.3996918832715,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 4,investment,561.5769494468191,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 4,investment,720.3433139962826,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 4,investment,953.3996918832715,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 6,CF,0.2898852612656448,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 6,CF,0.2753592186755147,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 6,CF,0.25486701182183374,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3552,12 +3552,12 @@ Utility PV - Class 6,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Utility PV - Class 6,FOM,1.91,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 6,FOM,1.73,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 6,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 6,investment,642.7871536832729,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 6,investment,824.5128809765989,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 6,investment,1091.2717747262031,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 6,investment,642.7871536832729,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 6,investment,824.5128809765989,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 6,investment,1091.2717747262031,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 6,investment,561.5769494468191,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 6,investment,720.3433139962826,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 6,investment,953.3996918832715,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 6,investment,561.5769494468191,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 6,investment,720.3433139962826,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 6,investment,953.3996918832715,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 7,CF,0.27550908663776613,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 7,CF,0.2618448538414881,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 7,CF,0.24192231779837017,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3570,12 +3570,12 @@ Utility PV - Class 7,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Utility PV - Class 7,FOM,1.91,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 7,FOM,1.73,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 7,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 7,investment,642.7871536832729,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 7,investment,824.5128809765989,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 7,investment,1091.2717747262031,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 7,investment,642.7871536832729,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 7,investment,824.5128809765989,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 7,investment,1091.2717747262031,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 7,investment,561.5769494468191,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 7,investment,720.3433139962826,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 7,investment,953.3996918832715,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 7,investment,561.5769494468191,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 7,investment,720.3433139962826,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 7,investment,953.3996918832715,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 8,CF,0.2649021058647682,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 8,CF,0.25184406144515104,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 8,CF,0.23264147690323295,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3588,12 +3588,12 @@ Utility PV - Class 8,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Utility PV - Class 8,FOM,1.91,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 8,FOM,1.73,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 8,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 8,investment,642.7871536832729,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 8,investment,824.5128809765989,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 8,investment,1091.2717747262031,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 8,investment,642.7871536832729,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 8,investment,824.5128809765989,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 8,investment,1091.2717747262031,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 8,investment,561.5769494468191,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 8,investment,720.3433139962826,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 8,investment,953.3996918832715,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 8,investment,561.5769494468191,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 8,investment,720.3433139962826,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 8,investment,953.3996918832715,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 9,CF,0.2523342686639292,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 9,CF,0.23998119081068983,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 9,CF,0.2214521390757656,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3606,60 +3606,60 @@ Utility PV - Class 9,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Utility PV - Class 9,FOM,1.91,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 9,FOM,1.73,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 9,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 9,investment,642.7871536832729,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 9,investment,824.5128809765989,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 9,investment,1091.2717747262031,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 9,investment,642.7871536832729,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 9,investment,824.5128809765989,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 9,investment,1091.2717747262031,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 9,investment,561.5769494468191,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 9,investment,720.3433139962826,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 9,investment,953.3996918832715,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 9,investment,561.5769494468191,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 9,investment,720.3433139962826,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 9,investment,953.3996918832715,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility-Scale Battery Storage - 10Hr,FOM,2.28,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility-Scale Battery Storage - 10Hr,FOM,2.31,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility-Scale Battery Storage - 10Hr,FOM,2.34,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Utility-Scale Battery Storage - 10Hr,FOM,2.28,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility-Scale Battery Storage - 10Hr,FOM,2.31,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility-Scale Battery Storage - 10Hr,FOM,2.34,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility-Scale Battery Storage - 10Hr,investment,1956.5053836229545,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility-Scale Battery Storage - 10Hr,investment,2494.5497094364155,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility-Scale Battery Storage - 10Hr,investment,3506.183707851397,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility-Scale Battery Storage - 10Hr,investment,1956.5053836229545,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility-Scale Battery Storage - 10Hr,investment,2494.5497094364155,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility-Scale Battery Storage - 10Hr,investment,3506.183707851397,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility-Scale Battery Storage - 10Hr,investment,1709.319046927694,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility-Scale Battery Storage - 10Hr,investment,2179.386454818638,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility-Scale Battery Storage - 10Hr,investment,3063.2098659294707,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility-Scale Battery Storage - 10Hr,investment,1709.319046927694,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility-Scale Battery Storage - 10Hr,investment,2179.386454818638,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility-Scale Battery Storage - 10Hr,investment,3063.2098659294707,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility-Scale Battery Storage - 2Hr,FOM,2.0,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility-Scale Battery Storage - 2Hr,FOM,2.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility-Scale Battery Storage - 2Hr,FOM,2.17,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Utility-Scale Battery Storage - 2Hr,FOM,2.0,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility-Scale Battery Storage - 2Hr,FOM,2.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility-Scale Battery Storage - 2Hr,FOM,2.17,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility-Scale Battery Storage - 2Hr,investment,600.8816890667231,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility-Scale Battery Storage - 2Hr,investment,826.4783432865884,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility-Scale Battery Storage - 2Hr,investment,1045.2550570423389,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility-Scale Battery Storage - 2Hr,investment,600.8816890667231,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility-Scale Battery Storage - 2Hr,investment,826.4783432865884,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility-Scale Battery Storage - 2Hr,investment,1045.2550570423389,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility-Scale Battery Storage - 2Hr,investment,524.9658522124313,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility-Scale Battery Storage - 2Hr,investment,722.0604583448774,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility-Scale Battery Storage - 2Hr,investment,913.1967603337195,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility-Scale Battery Storage - 2Hr,investment,524.9658522124313,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility-Scale Battery Storage - 2Hr,investment,722.0604583448774,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility-Scale Battery Storage - 2Hr,investment,913.1967603337195,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility-Scale Battery Storage - 4Hr,FOM,2.15,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility-Scale Battery Storage - 4Hr,FOM,2.21,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility-Scale Battery Storage - 4Hr,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Utility-Scale Battery Storage - 4Hr,FOM,2.15,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility-Scale Battery Storage - 4Hr,FOM,2.21,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility-Scale Battery Storage - 4Hr,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility-Scale Battery Storage - 4Hr,investment,939.7876127057808,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility-Scale Battery Storage - 4Hr,investment,1243.496184824045,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility-Scale Battery Storage - 4Hr,investment,1660.4872197446034,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility-Scale Battery Storage - 4Hr,investment,939.7876127057808,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility-Scale Battery Storage - 4Hr,investment,1243.496184824045,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility-Scale Battery Storage - 4Hr,investment,1660.4872197446034,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility-Scale Battery Storage - 4Hr,investment,821.0541508912469,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility-Scale Battery Storage - 4Hr,investment,1086.3919574633173,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility-Scale Battery Storage - 4Hr,investment,1450.7000367326573,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility-Scale Battery Storage - 4Hr,investment,821.0541508912469,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility-Scale Battery Storage - 4Hr,investment,1086.3919574633173,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility-Scale Battery Storage - 4Hr,investment,1450.7000367326573,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility-Scale Battery Storage - 8Hr,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility-Scale Battery Storage - 8Hr,FOM,2.29,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility-Scale Battery Storage - 8Hr,FOM,2.33,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Utility-Scale Battery Storage - 8Hr,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility-Scale Battery Storage - 8Hr,FOM,2.29,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility-Scale Battery Storage - 8Hr,FOM,2.33,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility-Scale Battery Storage - 8Hr,investment,1617.5994599838964,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility-Scale Battery Storage - 8Hr,investment,2077.5318678989584,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility-Scale Battery Storage - 8Hr,investment,2890.951545149132,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility-Scale Battery Storage - 8Hr,investment,1617.5994599838964,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility-Scale Battery Storage - 8Hr,investment,2077.5318678989584,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility-Scale Battery Storage - 8Hr,investment,2890.951545149132,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility-Scale Battery Storage - 8Hr,investment,1413.2307482488782,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility-Scale Battery Storage - 8Hr,investment,1815.0549557001973,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility-Scale Battery Storage - 8Hr,investment,2525.7065895305327,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility-Scale Battery Storage - 8Hr,investment,1413.2307482488782,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility-Scale Battery Storage - 8Hr,investment,1815.0549557001973,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility-Scale Battery Storage - 8Hr,investment,2525.7065895305327,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Vanadium-Redox-Flow-bicharger,FOM,2.4395,%/year,"Viswanathan_2022, p.28 (p.50)","{'carrier': ['elec', 'vanadium', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['30% assumed of power components every 10 years']}",2020.0,, Vanadium-Redox-Flow-bicharger,efficiency,0.8062,per unit,"Viswanathan_2022, p.42 (p.64)","{'carrier': ['elec', 'vanadium', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['AC-AC efficiency at transformer level 0.65^0.5']}",2020.0,, Vanadium-Redox-Flow-bicharger,investment,129023.0526,EUR/MW,"Viswanathan_2022, p.42 (p.64)","{'carrier': ['elec', 'vanadium', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['Power Equipment']}",2020.0,, @@ -3706,12 +3706,12 @@ battery storage,FOM,2.3,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket battery storage,FOM,2.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced battery storage,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate battery storage,FOM,2.3,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -battery storage,investment,1278.6935363448383,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -battery storage,investment,1660.514026361502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -battery storage,investment,2275.7193824468677,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -battery storage,investment,1278.6935363448383,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -battery storage,investment,1660.514026361502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -battery storage,investment,2275.7193824468677,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +battery storage,investment,1117.1424495700621,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +battery storage,investment,1450.7234565817575,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +battery storage,investment,1988.203313131595,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +battery storage,investment,1117.1424495700621,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +battery storage,investment,1450.7234565817575,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +battery storage,investment,1988.203313131595,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative battery storage,lifetime,30.0,years,"Danish Energy Agency, inputs/technology_data_catalogue_for_energy_storage.xlsx",: Technical lifetime,2015.0,, biochar pyrolysis,FOM,3.3636,%/year,"Danish Energy Agency, inputs/data_sheets_for_renewable_fuels.xlsx","105 Slow pyrolysis, Straw: Fixed O&M",2020.0,, biochar pyrolysis,VOM,823.497,EUR/MWh_biochar,"Danish Energy Agency, inputs/data_sheets_for_renewable_fuels.xlsx","105 Slow pyrolysis, Straw: Variable O&M",2020.0,, @@ -3756,12 +3756,12 @@ biomass,FOM,3.67,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-d biomass,FOM,3.67,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced biomass,FOM,3.67,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate biomass,FOM,3.67,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -biomass,VOM,5.246639999999999,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -biomass,VOM,5.246639999999999,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -biomass,VOM,5.246639999999999,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -biomass,VOM,5.246639999999999,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -biomass,VOM,5.246639999999999,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -biomass,VOM,5.246639999999999,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +biomass,VOM,4.583775623334041,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +biomass,VOM,4.583775623334041,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +biomass,VOM,4.583775623334041,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +biomass,VOM,4.583775623334041,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +biomass,VOM,4.583775623334041,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +biomass,VOM,4.583775623334041,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative biomass,discount rate,0.0542800248204645,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced biomass,discount rate,0.0542800248204645,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate biomass,discount rate,0.0542800248204645,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3769,18 +3769,18 @@ biomass,discount rate,0.0471698161746512,per unit,"NREL, NREL ATB 2024",Meaning biomass,discount rate,0.0471698161746512,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate biomass,discount rate,0.0471698161746512,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative biomass,efficiency,0.468,per unit,DIW DataDoc http://hdl.handle.net/10419/80348, from old pypsa cost assumptions,2015.0,, -biomass,fuel,73.57007249999998,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -biomass,fuel,73.57007249999998,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -biomass,fuel,73.57007249999998,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -biomass,fuel,73.57007249999998,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -biomass,fuel,73.57007249999998,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -biomass,fuel,73.57007249999998,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -biomass,investment,4463.248081168639,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -biomass,investment,4463.248081168639,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -biomass,investment,4463.248081168639,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -biomass,investment,4463.248081168639,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -biomass,investment,4463.248081168639,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -biomass,investment,4463.248081168639,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +biomass,fuel,64.27517514684027,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +biomass,fuel,64.27517514684027,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +biomass,fuel,64.27517514684027,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +biomass,fuel,64.27517514684027,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +biomass,fuel,64.27517514684027,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +biomass,fuel,64.27517514684027,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +biomass,investment,3899.358018723077,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +biomass,investment,3899.358018723077,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +biomass,investment,3899.358018723077,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +biomass,investment,3899.358018723077,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +biomass,investment,3899.358018723077,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +biomass,investment,3899.358018723077,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative biomass,lifetime,30.0,years,ECF2010 in DIW DataDoc http://hdl.handle.net/10419/80348, from old pypsa cost assumptions,2015.0,, biomass CHP,FOM,3.5606,%/year,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","09c Straw, Large, 40 degree: Fixed O&M",2015.0,, biomass CHP,VOM,2.222,EUR/MWh_e,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","09c Straw, Large, 40 degree: Variable O&M ",2015.0,, @@ -3946,12 +3946,12 @@ coal,FOM,2.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data coal,FOM,2.15,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced coal,FOM,2.15,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate coal,FOM,2.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -coal,VOM,8.48,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -coal,VOM,8.64,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -coal,VOM,8.8,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -coal,VOM,8.48,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -coal,VOM,8.64,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -coal,VOM,8.8,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +coal,VOM,7.408630530372329,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +coal,VOM,7.5484160120774675,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +coal,VOM,7.688201493782605,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +coal,VOM,7.408630530372329,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +coal,VOM,7.5484160120774675,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +coal,VOM,7.688201493782605,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative coal,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced coal,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate coal,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3959,13 +3959,13 @@ coal,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of coal,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate coal,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative coal,efficiency,0.356,p.u.,"Lazard's levelized cost of energy analysis - version 16.0 (2023): https://www.lazard.com/media/typdgxmm/lazards-lcoeplus-april-2023.pdf , pg. 49 (Levelized Cost of Energy - Key Assumptions), accessed: 2023-12-14.","Calculated based on average of listed range, i.e. 1 / ((8.75+12) MMbtu/MWh_th /2 / (3.4095 MMbtu/MWh_th)), rounded up.",2023.0,, -coal,fuel,8.12,USD/MWh_th,"EIA, https://www.eia.gov/coal/annual/",46.97 USD/short ton of bituminous coal with energy content = 19.73 million BTU/short ton,2023.0,, -coal,investment,3737.3236032639497,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -coal,investment,3621.0650409277055,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -coal,investment,3504.9300264791727,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -coal,investment,3737.3236032639497,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -coal,investment,3621.0650409277055,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -coal,investment,3504.9300264791727,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +coal,fuel,6.887488540325987,USD/MWh_th,"EIA, https://www.eia.gov/coal/annual/",46.97 USD/short ton of bituminous coal with energy content = 19.73 million BTU/short ton,2023.0,, +coal,investment,3265.147376063964,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +coal,investment,3163.577006448222,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +coal,investment,3062.1145755887137,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +coal,investment,3265.147376063964,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +coal,investment,3163.577006448222,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +coal,investment,3062.1145755887137,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative coal,lifetime,40.0,years,"Lazard's levelized cost of energy analysis - version 16.0 (2023): https://www.lazard.com/media/typdgxmm/lazards-lcoeplus-april-2023.pdf , pg. 49 (Levelized Cost of Energy - Key Assumptions), accessed: 2023-12-14.",,2023.0,, csp-tower,CF,0.666,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced csp-tower,CF,0.666,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -3979,24 +3979,24 @@ csp-tower,FOM,0.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi csp-tower,FOM,1.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced csp-tower,FOM,1.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate csp-tower,FOM,0.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -csp-tower,VOM,2.91,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -csp-tower,VOM,3.0,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -csp-tower,VOM,3.95766,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -csp-tower,VOM,2.91,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -csp-tower,VOM,3.0,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -csp-tower,VOM,3.95766,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +csp-tower,VOM,2.5423484485122025,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +csp-tower,VOM,2.6209777819713427,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +csp-tower,VOM,3.4576463095322345,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +csp-tower,VOM,2.5423484485122025,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +csp-tower,VOM,2.6209777819713427,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +csp-tower,VOM,3.4576463095322345,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative csp-tower,discount rate,0.0525787153461754,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced csp-tower,discount rate,0.0525787153461754,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate csp-tower,discount rate,0.0525787153461754,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative csp-tower,discount rate,0.0416031281240576,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced csp-tower,discount rate,0.0416031281240576,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate csp-tower,discount rate,0.0416031281240576,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -csp-tower,investment,3657.8072631911486,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -csp-tower,investment,4817.500835817041,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -csp-tower,investment,7912.019603207439,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -csp-tower,investment,3657.8072631911486,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -csp-tower,investment,4817.500835817041,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -csp-tower,investment,7912.019603207439,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +csp-tower,investment,3195.677189185801,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +csp-tower,investment,4208.854218434945,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +csp-tower,investment,6912.409196842806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +csp-tower,investment,3195.677189185801,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +csp-tower,investment,4208.854218434945,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +csp-tower,investment,6912.409196842806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative csp-tower,lifetime,30.0,years,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),-,2020.0,, csp-tower TES,FOM,1.3,%/year,see solar-tower.,-,2020.0,, csp-tower TES,investment,13.39,EUR/kWh_th,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,"Based on NREL’s SAM (v2021.12.2) numbers for a CSP power plant, 2020 numbers. CAPEX degression (=learning) taken from ATB database (“moderate”) scenario. Costs include the TES incl. EPC cost for the default installation size (104 MWe plant, 2.791 MW_th TES). Total costs (69390776.7 USD) are divided by TES size to obtain EUR/kW_th. Exchange rate: 1.16 USD to 1 EUR.",2020.0,, @@ -4062,12 +4062,12 @@ direct air capture,compression-heat-output,0.2,MWh/tCO2,"Danish Energy Agency, i direct air capture,electricity-input,0.24,MWh_el/t_CO2,ICCT IRA e-fuels assumptions ,,,, direct air capture,heat-input,1.17,MWh_th/t_CO2,ICCT IRA e-fuels assumptions ,,,, direct air capture,heat-output,0.75,MWh/tCO2,"Danish Energy Agency, inputs/technology_data_for_carbon_capture_transport_storage.xlsx",403.a Direct air capture,2020.0,, -direct air capture,investment,12398844.91,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -direct air capture,investment,12398844.91,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -direct air capture,investment,19180739.93,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -direct air capture,investment,19180739.93,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -direct air capture,investment,7103597.31,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -direct air capture,investment,7103597.31,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +direct air capture,investment,10832365.677072823,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +direct air capture,investment,10832365.677072823,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +direct air capture,investment,16757431.066100188,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +direct air capture,investment,16757431.066100188,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +direct air capture,investment,6206123.573860465,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +direct air capture,investment,6206123.573860465,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced direct air capture,lifetime,20.0,years,"Danish Energy Agency, inputs/technology_data_for_carbon_capture_transport_storage.xlsx",403.a Direct air capture,2020.0,, direct air capture,years,30.0,years,ICCT IRA e-fuels assumptions ,,,, direct firing gas,FOM,1.1515,%/year,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",312.a Direct firing Natural Gas: Fixed O&M,2019.0,, @@ -4148,7 +4148,7 @@ fuel cell,investment,1005.3105,EUR/kW_e,"Danish Energy Agency, inputs/technology fuel cell,lifetime,10.0,years,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",12 LT-PEMFC CHP: Technical lifetime,2015.0,, fuelwood,fuel,13.193,EUR/MWhth,"JRC ENSPRESO ca avg for MINBIOWOO (FuelwoodRW), ENS_BaU_GFTM",,2010.0,, gas,CO2 intensity,0.198,tCO2/MWh_th,Stoichiometric calculation with 50 GJ/t CH4,,,, -gas,fuel,14.05,USD/MWh_th,World Bank https://www.worldbank.org/en/research/commodity-markets,,2010.0,, +gas,fuel,16.199297879801314,USD/MWh_th,World Bank https://www.worldbank.org/en/research/commodity-markets,,2010.0,, gas boiler steam,FOM,3.96,%/year,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",311.1c Steam boiler Gas: Fixed O&M,2019.0,, gas boiler steam,VOM,1.007,EUR/MWh,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",311.1c Steam boiler Gas: Variable O&M,2019.0,, gas boiler steam,efficiency,0.93,per unit,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx","311.1c Steam boiler Gas: Total efficiency, net, annual average",2019.0,, @@ -4180,12 +4180,12 @@ geothermal,discount rate,0.0400999293962161,per unit,"NREL, NREL ATB 2024",Meani geothermal,discount rate,0.0400999293962161,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative geothermal,district heat surcharge,25.0,%,Frey et al. 2022: Techno-Economic Assessment of Geothermal Resources in the Variscan Basement of the Northern Upper Rhine Graben,"If capital cost of electric generation from EGS is 100%, district heating adds additional 25%. Costs incurred by piping.",2020.0,, geothermal,district heat-input,0.8,MWh_thdh/MWh_th,"Aghahosseini, Breyer 2020: From hot rock to useful energy: A global estimate of enhanced geothermal systems potential, https://www.sciencedirect.com/science/article/pii/S0306261920312551; Breede et al. 2015: Overcoming challenges in the classification of deep geothermal potential, https://eprints.gla.ac.uk/169585/","Heat-input, District Heat-output. This is an assessment of typical heat losses when heat is transmitted from the EGS plant to the DH network, This is a rough estimate, depends on local conditions",2020.0,, -geothermal,investment,5114.638916306447,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -geothermal,investment,6022.64219326185,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -geothermal,investment,6603.936645976356,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -geothermal,investment,5114.638916306447,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -geothermal,investment,6022.64219326185,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -geothermal,investment,6603.936645976356,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +geothermal,investment,4468.4516541483945,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +geothermal,investment,5261.737125767489,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +geothermal,investment,5769.590407550126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +geothermal,investment,4468.4516541483945,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +geothermal,investment,5261.737125767489,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +geothermal,investment,5769.590407550126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative geothermal,lifetime,30.0,years,"Aghahosseini, Breyer 2020: From hot rock to useful energy: A global estimate of enhanced geothermal systems potential, https://www.sciencedirect.com/science/article/pii/S0306261920312551",,2020.0,, helmeth,FOM,3.0,%/year,no source, from old pypsa cost assumptions,2015.0,, helmeth,efficiency,0.8,per unit,HELMETH press release, from old pypsa cost assumptions,2015.0,, @@ -4216,19 +4216,19 @@ hydro,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of hydro,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate hydro,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative hydro,efficiency,0.9,per unit,DIW DataDoc http://hdl.handle.net/10419/80348, from old pypsa cost assumptions,2015.0,, -hydro,investment,2800.6424250469768,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -hydro,investment,3241.3364440395458,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -hydro,investment,3111.4700906166145,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -hydro,investment,2800.6424250469768,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -hydro,investment,3241.3364440395458,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -hydro,investment,3111.4700906166145,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +hydro,investment,2446.8071904314893,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +hydro,investment,2831.823601240549,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +hydro,investment,2718.3646589248356,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +hydro,investment,2446.8071904314893,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +hydro,investment,2831.823601240549,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +hydro,investment,2718.3646589248356,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative hydro,lifetime,80.0,years,IEA2010, from old pypsa cost assumptions,2015.0,, hydrogen storage compressor,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,,2022.0,, hydrogen storage compressor,compression-electricity-input,0.05,MWh_el/MWh_H2,"Based on Stöckl et al (2021): https://doi.org/10.48550/arXiv.2005.03464, table SI.4.",1.707 kWh/kg.,,, -hydrogen storage compressor,investment,2.28,USD/kWh_H2,ICCT IRA e-fuels assumptions ,,2022.0,, +hydrogen storage compressor,investment,1.9919431142982202,USD/kWh_H2,ICCT IRA e-fuels assumptions ,,2022.0,, hydrogen storage compressor,lifetime,30.0,years,ICCT IRA e-fuels assumptions ,,,, hydrogen storage tank type 1,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,,2022.0,, -hydrogen storage tank type 1,investment,16.87,USD/kWh_H2,ICCT IRA e-fuels assumptions ,,2022.0,, +hydrogen storage tank type 1,investment,14.738631727285517,USD/kWh_H2,ICCT IRA e-fuels assumptions ,,2022.0,, hydrogen storage tank type 1,lifetime,30.0,years,ICCT IRA e-fuels assumptions ,,,, hydrogen storage tank type 1,min_fill_level,6.0,%,"Based on Stöckl et al (2021): https://doi.org/10.48550/arXiv.2005.03464, table SI.9.",,,, hydrogen storage tank type 1 including compressor,FOM,1.8484,%/year,"Danish Energy Agency, inputs/technology_data_catalogue_for_energy_storage.xlsx",151a Hydrogen Storage - Tanks: Fixed O&M,2015.0,, @@ -4309,12 +4309,12 @@ nuclear,FOM,1.78,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-d nuclear,FOM,3.36,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced nuclear,FOM,2.77,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate nuclear,FOM,1.78,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -nuclear,VOM,1.9,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -nuclear,VOM,2.8,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -nuclear,VOM,3.4,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -nuclear,VOM,1.9,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -nuclear,VOM,2.8,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -nuclear,VOM,3.4,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +nuclear,VOM,1.6599525952485168,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +nuclear,VOM,2.4462459298399195,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +nuclear,VOM,2.970441486234188,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +nuclear,VOM,1.6599525952485168,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +nuclear,VOM,2.4462459298399195,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +nuclear,VOM,2.970441486234188,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative nuclear,discount rate,0.0564691134062745,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced nuclear,discount rate,0.0564691134062745,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate nuclear,discount rate,0.0564691134062745,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -4322,18 +4322,18 @@ nuclear,discount rate,0.0471844359305569,per unit,"NREL, NREL ATB 2024",Meaning nuclear,discount rate,0.0471844359305569,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate nuclear,discount rate,0.0471844359305569,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative nuclear,efficiency,0.326,p.u.,"Lazard's levelized cost of energy analysis - version 16.0 (2023): https://www.lazard.com/media/typdgxmm/lazards-lcoeplus-april-2023.pdf , pg. 49 (Levelized Cost of Energy - Key Assumptions), accessed: 2023-12-14.","Based on heat rate of 10.45 MMBtu/MWh_e and 3.4095 MMBtu/MWh_th, i.e. 1/(10.45/3.4095) = 0.3260.",2023.0,, -nuclear,fuel,9.13239,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -nuclear,fuel,10.18209,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -nuclear,fuel,11.33676,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -nuclear,fuel,9.13239,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -nuclear,fuel,10.18209,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -nuclear,fuel,11.33676,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -nuclear,investment,3749.746835491951,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -nuclear,investment,6314.417265688359,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -nuclear,investment,11459.171266793855,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -nuclear,investment,3749.746835491951,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -nuclear,investment,6314.417265688359,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -nuclear,investment,11459.171266793855,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +nuclear,fuel,7.978597095432423,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +nuclear,fuel,8.895677221344195,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +nuclear,fuel,9.904465359847146,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +nuclear,fuel,7.978597095432423,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +nuclear,fuel,8.895677221344195,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +nuclear,fuel,9.904465359847146,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +nuclear,investment,3276.0010479472517,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +nuclear,investment,5516.649119821808,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +nuclear,investment,10011.411096690366,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +nuclear,investment,3276.0010479472517,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +nuclear,investment,5516.649119821808,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +nuclear,investment,10011.411096690366,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative nuclear,lifetime,40.0,years,"Lazard's levelized cost of energy analysis - version 16.0 (2023): https://www.lazard.com/media/typdgxmm/lazards-lcoeplus-april-2023.pdf , pg. 49 (Levelized Cost of Energy - Key Assumptions), accessed: 2023-12-14.",,2023.0,, offwind,CF,0.509,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced offwind,CF,0.4817,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -4353,12 +4353,12 @@ offwind,discount rate,0.051516962814727,per unit,"NREL, NREL ATB 2024",Meaning o offwind,discount rate,0.0401070465062936,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced offwind,discount rate,0.0401070465062936,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate offwind,discount rate,0.0401070465062936,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -offwind,investment,2784.130795887223,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -offwind,investment,3305.82048970032,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -offwind,investment,3951.886465338672,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -offwind,investment,2784.130795887223,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -offwind,investment,3305.82048970032,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -offwind,investment,3951.886465338672,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +offwind,investment,2432.381652707534,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +offwind,investment,2888.160684896721,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +offwind,investment,3452.6022075086407,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +offwind,investment,2432.381652707534,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +offwind,investment,2888.160684896721,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +offwind,investment,3452.6022075086407,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative offwind,lifetime,30.0,years,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",21 Offshore turbines: Technical lifetime [years],2020.0,, offwind-ac-connection-submarine,investment,2841.3251,EUR/MW/km,DEA https://ens.dk/en/our-services/projections-and-models/technology-data, from old pypsa cost assumptions,2015.0,, offwind-ac-connection-underground,investment,1420.1334,EUR/MW/km,DEA https://ens.dk/en/our-services/projections-and-models/technology-data, from old pypsa cost assumptions,2015.0,, @@ -4376,7 +4376,7 @@ oil,CO2 intensity,0.2571,tCO2/MWh_th,Stoichiometric calculation with 44 GJ/t die oil,FOM,2.4365,%/year,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",50 Diesel engine farm: Fixed O&M,2015.0,, oil,VOM,6.3493,EUR/MWh,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",50 Diesel engine farm: Variable O&M,2015.0,, oil,efficiency,0.35,per unit,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","50 Diesel engine farm: Electricity efficiency, annual average",2015.0,, -oil,fuel,44.22,USD/MWh_th,World Bank https://www.worldbank.org/en/research/commodity-markets,,2010.0,, +oil,fuel,50.984551761196734,USD/MWh_th,World Bank https://www.worldbank.org/en/research/commodity-markets,,2010.0,, oil,investment,359.2662,EUR/kW,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",50 Diesel engine farm: Specific investment,2015.0,, oil,lifetime,25.0,years,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",50 Diesel engine farm: Technical lifetime,2015.0,, onwind,CF,0.511531,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced @@ -4397,12 +4397,12 @@ onwind,discount rate,0.053580857975507,per unit,"NREL, NREL ATB 2024",Meaning of onwind,discount rate,0.0365777183152598,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced onwind,discount rate,0.0365777183152598,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate onwind,discount rate,0.0365777183152598,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -onwind,investment,1175.9261842460237,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -onwind,investment,1261.4307119191492,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -onwind,investment,1466.9112509291103,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -onwind,investment,1175.9261842460237,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -onwind,investment,1261.4307119191492,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -onwind,investment,1466.9112509291103,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +onwind,investment,1027.3588007157225,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +onwind,investment,1102.060623145461,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +onwind,investment,1281.5805989363291,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +onwind,investment,1027.3588007157225,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +onwind,investment,1102.060623145461,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +onwind,investment,1281.5805989363291,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative onwind,lifetime,30.0,years,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",20 Onshore turbines: Technical lifetime,2015.0,, organic rankine cycle,FOM,2.0,%/year,"Aghahosseini, Breyer 2020: From hot rock to useful energy: A global estimate of enhanced geothermal systems potential, https://www.sciencedirect.com/science/article/pii/S0306261920312551","Both for flash, binary and ORC plants. See Supplemental Material for details",2020.0,, organic rankine cycle,electricity-input,0.12,MWh_el/MWh_th,"Aghahosseini, Breyer 2020: From hot rock to useful energy: A global estimate of enhanced geothermal systems potential, https://www.sciencedirect.com/science/article/pii/S0306261920312551; Breede et al. 2015: Overcoming challenges in the classification of deep geothermal potential, https://eprints.gla.ac.uk/169585/","Heat-input, Electricity-output. This is a rough estimate, depends on input temperature, implies ~150 C.",2020.0,, @@ -4427,12 +4427,12 @@ ror,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of s ror,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate ror,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative ror,efficiency,0.9,per unit,DIW DataDoc http://hdl.handle.net/10419/80348, from old pypsa cost assumptions,2015.0,, -ror,investment,9005.486475065536,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -ror,investment,9234.349311015783,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -ror,investment,9281.186356512577,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -ror,investment,9005.486475065536,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -ror,investment,9234.349311015783,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -ror,investment,9281.186356512577,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +ror,investment,7867.726655663398,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +ror,investment,8067.674791711581,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +ror,investment,8108.594410251673,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +ror,investment,7867.726655663398,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +ror,investment,8067.674791711581,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +ror,investment,8108.594410251673,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative ror,lifetime,80.0,years,IEA2010, from old pypsa cost assumptions,2015.0,, seawater RO desalination,electricity-input,0.003,MWHh_el/t_H2O,"Caldera et al. (2016): Local cost of seawater RO desalination based on solar PV and windenergy: A global estimate. (https://doi.org/10.1016/j.desal.2016.02.004), Fig. 4.",Desalination using SWRO. Assume medium salinity of 35 Practical Salinity Units (PSUs) = 35 kg/m^3.,,, seawater desalination,FOM,4.0,%/year,"Caldera et al 2016: Local cost of seawater RO desalination based on solar PV and windenergy: A global estimate. (https://doi.org/10.1016/j.desal.2016.02.004), Table 1.",,2015.0,, @@ -4463,12 +4463,12 @@ solar-rooftop,discount rate,0.0461586681402786,per unit,"NREL, NREL ATB 2024",Me solar-rooftop,discount rate,0.0364480268090299,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced solar-rooftop,discount rate,0.0364480268090299,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate solar-rooftop,discount rate,0.0364480268090299,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -solar-rooftop,investment,877.4402441804747,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -solar-rooftop,investment,1135.9770579257422,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -solar-rooftop,investment,1535.2110750962524,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -solar-rooftop,investment,877.4402441804747,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -solar-rooftop,investment,1135.9770579257422,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -solar-rooftop,investment,1535.2110750962524,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +solar-rooftop,investment,766.5837950015112,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +solar-rooftop,investment,992.4568765508477,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +solar-rooftop,investment,1341.2513728212052,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +solar-rooftop,investment,766.5837950015112,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +solar-rooftop,investment,992.4568765508477,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +solar-rooftop,investment,1341.2513728212052,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative solar-rooftop,lifetime,40.0,years,Calculated. See 'further description'.,Mixed investment costs based on average of 50% 'solar-rooftop commercial' and 50% 'solar-rooftop residential',2020.0,, solar-rooftop commercial,FOM,1.7372,%/year,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",22 Rooftop PV commercial: Fixed O&M [2020-EUR/MW_e/y],2020.0,, solar-rooftop commercial,investment,460.516,EUR/kW_e,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",22 Rooftop PV commercial: Nominal investment [2020-MEUR/MW_e],2020.0,, @@ -4494,12 +4494,12 @@ solar-utility,discount rate,0.0478889864560654,per unit,"NREL, NREL ATB 2024",Me solar-utility,discount rate,0.0342774493840203,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced solar-utility,discount rate,0.0342774493840203,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate solar-utility,discount rate,0.0342774493840203,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -solar-utility,investment,642.7871536832729,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -solar-utility,investment,824.5128809765989,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -solar-utility,investment,1091.2717747262031,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -solar-utility,investment,642.7871536832729,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -solar-utility,investment,824.5128809765989,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -solar-utility,investment,1091.2717747262031,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +solar-utility,investment,561.5769494468191,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +solar-utility,investment,720.3433139962826,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +solar-utility,investment,953.3996918832715,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +solar-utility,investment,561.5769494468191,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +solar-utility,investment,720.3433139962826,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +solar-utility,investment,953.3996918832715,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative solar-utility,lifetime,40.0,years,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",22 Utility-scale PV: Technical lifetime [years],2020.0,, solar-utility single-axis tracking,FOM,2.4459,%/year,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",22 Utility-scale PV tracker: Fixed O&M [2020-EUR/MW_e/y],2020.0,, solar-utility single-axis tracking,investment,384.3112,EUR/kW_e,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",22 Utility-scale PV tracker: Nominal investment [2020-MEUR/MW_e],2020.0,, diff --git a/outputs/US/costs_2045.csv b/outputs/US/costs_2045.csv index 5ef396cf..a338149a 100644 --- a/outputs/US/costs_2045.csv +++ b/outputs/US/costs_2045.csv @@ -6,12 +6,12 @@ Alkaline electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of s Alkaline electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Alkaline electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Alkaline electrolyzer,efficiency,0.76,p.u.,ICCT IRA e-fuels assumptions ,,,, -Alkaline electrolyzer,investment,892.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Alkaline electrolyzer,investment,892.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Alkaline electrolyzer,investment,787.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Alkaline electrolyzer,investment,787.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Alkaline electrolyzer,investment,584.5,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Alkaline electrolyzer,investment,584.5,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Alkaline electrolyzer,investment,779.3040605061459,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Alkaline electrolyzer,investment,779.3040605061459,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Alkaline electrolyzer,investment,687.5698381371488,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Alkaline electrolyzer,investment,687.5698381371488,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Alkaline electrolyzer,investment,510.65383785408324,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Alkaline electrolyzer,investment,510.65383785408324,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Alkaline electrolyzer,lifetime,30.0,years,ICCT IRA e-fuels assumptions ,,,, Ammonia cracker,FOM,4.3,%/year,"Ishimoto et al. (2020): 10.1016/j.ijhydene.2020.09.017 , table 7.","Estimated based on Labour cost rate, Maintenance cost rate, Insurance rate, Admin. cost rate and Chemical & other consumables cost rate.",2015.0,, Ammonia cracker,ammonia-input,1.46,MWh_NH3/MWh_H2,"ENGIE et al (2020): Ammonia to Green Hydrogen Feasibility Study (https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/880826/HS420_-_Ecuity_-_Ammonia_to_Green_Hydrogen.pdf), Fig. 10.",Assuming a integrated 200t/d cracking and purification facility. Electricity demand (316 MWh per 2186 MWh_LHV H2 output) is assumed to also be ammonia LHV input which seems a fair assumption as the facility has options for a higher degree of integration according to the report).,,, @@ -64,12 +64,12 @@ BioSNG,capture rate,0.9,per unit,Assumption based on doi:10.1016/j.biombioe.2015 BioSNG,efficiency,0.6825,per unit,"Danish Energy Agency, inputs/data_sheets_for_renewable_fuels.xlsx","84 Gasif. CFB, Bio-SNG: Bio SNG Output",2020.0,, BioSNG,investment,1621.685,EUR/kW_th,"Danish Energy Agency, inputs/data_sheets_for_renewable_fuels.xlsx","84 Gasif. CFB, Bio-SNG: Specific investment",2020.0,, BioSNG,lifetime,25.0,years,TODO,"84 Gasif. CFB, Bio-SNG: Technical lifetime",2020.0,, -Biomass gasification,efficiency,0.4958,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Biomass gasification,investment,1467.7693,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Biomass gasification,efficiency,0.49583333333333335,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, +Biomass gasification,investment,1978.8508861995015,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Biomass gasification,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Biomass gasification CC,FOM,0.02,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Biomass gasification CC,efficiency,0.514,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Biomass gasification CC,investment,3015.5325,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Biomass gasification CC,investment,4065.5510481055235,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Biomass gasification CC,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, BtL,C in fuel,0.3039,per unit,"Stoichiometric calculation, doi:10.1016/j.apenergy.2022.120016",,,, BtL,C stored,0.6961,per unit,"Stoichiometric calculation, doi:10.1016/j.apenergy.2022.120016",,,, @@ -86,12 +86,12 @@ CCGT,FOM,2.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data CCGT,FOM,2.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced CCGT,FOM,2.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate CCGT,FOM,2.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -CCGT,VOM,6.94,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -CCGT,VOM,6.94,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -CCGT,VOM,6.94,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -CCGT,VOM,6.94,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -CCGT,VOM,6.94,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -CCGT,VOM,6.94,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +CCGT,VOM,6.0631952689603725,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +CCGT,VOM,6.0631952689603725,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +CCGT,VOM,6.0631952689603725,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +CCGT,VOM,6.0631952689603725,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +CCGT,VOM,6.0631952689603725,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +CCGT,VOM,6.0631952689603725,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative CCGT,c_b,2.15,50oC/100oC,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","05 Gas turb. CC, steam extract.: Cb coefficient",2015.0,, CCGT,c_v,0.15,50oC/100oC,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","05 Gas turb. CC, steam extract.: Cv coefficient",2015.0,, CCGT,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced @@ -101,12 +101,12 @@ CCGT,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of CCGT,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate CCGT,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative CCGT,efficiency,0.595,per unit,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","05 Gas turb. CC, steam extract.: Electricity efficiency, annual average",2015.0,, -CCGT,investment,1123.6040169333548,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -CCGT,investment,1123.6040169333548,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -CCGT,investment,1123.6040169333548,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -CCGT,investment,1123.6040169333548,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -CCGT,investment,1123.6040169333548,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -CCGT,investment,1123.6040169333548,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +CCGT,investment,981.6470547053584,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +CCGT,investment,981.6470547053584,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +CCGT,investment,981.6470547053584,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +CCGT,investment,981.6470547053584,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +CCGT,investment,981.6470547053584,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +CCGT,investment,981.6470547053584,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative CCGT,lifetime,25.0,years,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","05 Gas turb. CC, steam extract.: Technical lifetime",2015.0,, CH4 (g) fill compressor station,FOM,1.7,%/year,Assume same as for H2 (g) fill compressor station.,-,2020.0,, CH4 (g) fill compressor station,investment,1654.96,EUR/MW_CH4,"Guesstimate, based on H2 (g) pipeline and fill compressor station cost.","Assume same ratio as between H2 (g) pipeline and fill compressor station, i.e. 1:19 , due to a lack of reliable numbers.",2020.0,, @@ -157,18 +157,18 @@ CSP - Class 3,FOM,0.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket= CSP - Class 3,FOM,1.21,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced CSP - Class 3,FOM,1.14,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate CSP - Class 3,FOM,0.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -CSP - Class 3,VOM,2.91,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -CSP - Class 3,VOM,3.0,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -CSP - Class 3,VOM,3.95766,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -CSP - Class 3,VOM,2.91,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -CSP - Class 3,VOM,3.0,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -CSP - Class 3,VOM,3.95766,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -CSP - Class 3,investment,3404.1242941792343,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -CSP - Class 3,investment,4636.298715094243,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -CSP - Class 3,investment,7912.019603207439,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -CSP - Class 3,investment,3404.1242941792343,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -CSP - Class 3,investment,4636.298715094243,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -CSP - Class 3,investment,7912.019603207439,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +CSP - Class 3,VOM,2.5423484485122025,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +CSP - Class 3,VOM,2.6209777819713427,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +CSP - Class 3,VOM,3.4576463095322345,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +CSP - Class 3,VOM,2.5423484485122025,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +CSP - Class 3,VOM,2.6209777819713427,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +CSP - Class 3,VOM,3.4576463095322345,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +CSP - Class 3,investment,2974.0447140375504,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +CSP - Class 3,investment,4050.5453076147646,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +CSP - Class 3,investment,6912.409196842806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +CSP - Class 3,investment,2974.0447140375504,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +CSP - Class 3,investment,4050.5453076147646,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +CSP - Class 3,investment,6912.409196842806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative CSP - Class 8,CF,0.514,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced CSP - Class 8,CF,0.514,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate CSP - Class 8,CF,0.514,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -181,18 +181,18 @@ CSP - Class 8,FOM,0.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket= CSP - Class 8,FOM,1.21,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced CSP - Class 8,FOM,1.14,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate CSP - Class 8,FOM,0.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -CSP - Class 8,VOM,2.91,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -CSP - Class 8,VOM,3.0,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -CSP - Class 8,VOM,3.95766,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -CSP - Class 8,VOM,2.91,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -CSP - Class 8,VOM,3.0,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -CSP - Class 8,VOM,3.95766,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -CSP - Class 8,investment,3404.1242941792343,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -CSP - Class 8,investment,4636.298715094243,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -CSP - Class 8,investment,7912.019603207439,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -CSP - Class 8,investment,3404.1242941792343,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -CSP - Class 8,investment,4636.298715094243,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -CSP - Class 8,investment,7912.019603207439,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +CSP - Class 8,VOM,2.5423484485122025,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +CSP - Class 8,VOM,2.6209777819713427,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +CSP - Class 8,VOM,3.4576463095322345,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +CSP - Class 8,VOM,2.5423484485122025,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +CSP - Class 8,VOM,2.6209777819713427,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +CSP - Class 8,VOM,3.4576463095322345,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +CSP - Class 8,investment,2974.0447140375504,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +CSP - Class 8,investment,4050.5453076147646,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +CSP - Class 8,investment,6912.409196842806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +CSP - Class 8,investment,2974.0447140375504,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +CSP - Class 8,investment,4050.5453076147646,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +CSP - Class 8,investment,6912.409196842806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Charging infrastructure fast (purely) battery electric vehicles passenger cars,FOM,1.6,%,PATHS TO A CLIMATE-NEUTRAL ENERGY SYSTEM The German energy transformation in its social context. https://www.ise.fraunhofer.de/en/publications/studies/paths-to-a-climate-neutral-energy-system.html,Charging infrastructure fast (purely) battery electric vehicles passenger cars,2020.0,, Charging infrastructure fast (purely) battery electric vehicles passenger cars,investment,448894.0,EUR/Lades�ule,PATHS TO A CLIMATE-NEUTRAL ENERGY SYSTEM The German energy transformation in its social context. https://www.ise.fraunhofer.de/en/publications/studies/paths-to-a-climate-neutral-energy-system.html,Charging infrastructure fast (purely) battery electric vehicles passenger cars,2020.0,, Charging infrastructure fast (purely) battery electric vehicles passenger cars,lifetime,30.0,years,PATHS TO A CLIMATE-NEUTRAL ENERGY SYSTEM The German energy transformation in its social context. https://www.ise.fraunhofer.de/en/publications/studies/paths-to-a-climate-neutral-energy-system.html,Charging infrastructure fast (purely) battery electric vehicles passenger cars,2020.0,, @@ -211,25 +211,25 @@ Coal - IGCC,FOM,2.39,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oe Coal - IGCC,FOM,2.39,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Coal - IGCC,FOM,2.39,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal - IGCC,FOM,2.39,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Coal - IGCC,VOM,14.55,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal - IGCC,VOM,15.2,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal - IGCC,VOM,15.86,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal - IGCC,VOM,14.55,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal - IGCC,VOM,15.2,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal - IGCC,VOM,15.86,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Coal - IGCC,investment,6156.514792537053,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal - IGCC,investment,6444.875562455005,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal - IGCC,investment,6733.236332372957,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal - IGCC,investment,6156.514792537053,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal - IGCC,investment,6444.875562455005,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal - IGCC,investment,6733.236332372957,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal - IGCC,VOM,12.711742242561012,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal - IGCC,VOM,13.279620761988134,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal - IGCC,VOM,13.85623587402183,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal - IGCC,VOM,12.711742242561012,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal - IGCC,VOM,13.279620761988134,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal - IGCC,VOM,13.85623587402183,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal - IGCC,investment,5378.696161872508,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal - IGCC,investment,5630.625218921543,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal - IGCC,investment,5882.554275970577,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal - IGCC,investment,5378.696161872508,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal - IGCC,investment,5630.625218921543,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal - IGCC,investment,5882.554275970577,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal gasification,FOM,0.06,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, -Coal gasification,efficiency,0.7492,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Coal gasification,investment,399.2305,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Coal gasification,efficiency,0.7491666666666668,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, +Coal gasification,investment,538.2432903364873,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Coal gasification,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Coal gasification CC,FOM,0.07,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Coal gasification CC,efficiency,0.609,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Coal gasification CC,investment,649.5969,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Coal gasification CC,investment,875.7882332041481,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Coal gasification CC,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Coal integrated retrofit 90%-CCS,FOM,9.69,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal integrated retrofit 90%-CCS,FOM,8.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -237,52 +237,52 @@ Coal integrated retrofit 90%-CCS,FOM,8.45,%/year,NREL/ATB-https://data.openei.or Coal integrated retrofit 90%-CCS,FOM,9.69,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Coal integrated retrofit 90%-CCS,FOM,8.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal integrated retrofit 90%-CCS,FOM,8.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Coal integrated retrofit 90%-CCS,VOM,14.32,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal integrated retrofit 90%-CCS,VOM,15.72,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal integrated retrofit 90%-CCS,VOM,17.11,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal integrated retrofit 90%-CCS,VOM,14.32,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal integrated retrofit 90%-CCS,VOM,15.72,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal integrated retrofit 90%-CCS,VOM,17.11,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal integrated retrofit 90%-CCS,VOM,12.510800612609875,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal integrated retrofit 90%-CCS,VOM,13.733923577529836,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal integrated retrofit 90%-CCS,VOM,14.948309949843223,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal integrated retrofit 90%-CCS,VOM,12.510800612609875,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal integrated retrofit 90%-CCS,VOM,13.733923577529836,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal integrated retrofit 90%-CCS,VOM,14.948309949843223,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal integrated retrofit 90%-CCS,capture_rate,0.9,per unit,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, Coal integrated retrofit 90%-CCS,efficiency,0.386,p.u.,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, -Coal integrated retrofit 90%-CCS,investment,1212.1,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal integrated retrofit 90%-CCS,investment,1490.5,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal integrated retrofit 90%-CCS,investment,1768.9,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal integrated retrofit 90%-CCS,investment,1212.1,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal integrated retrofit 90%-CCS,investment,1490.5,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal integrated retrofit 90%-CCS,investment,1768.9,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal integrated retrofit 90%-CCS,investment,1058.962389842488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal integrated retrofit 90%-CCS,investment,1302.1891280094287,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal integrated retrofit 90%-CCS,investment,1545.4158661763693,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal integrated retrofit 90%-CCS,investment,1058.962389842488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal integrated retrofit 90%-CCS,investment,1302.1891280094287,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal integrated retrofit 90%-CCS,investment,1545.4158661763693,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal integrated retrofit 95%-CCS,FOM,9.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal integrated retrofit 95%-CCS,FOM,8.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Coal integrated retrofit 95%-CCS,FOM,8.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Coal integrated retrofit 95%-CCS,FOM,9.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Coal integrated retrofit 95%-CCS,FOM,8.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal integrated retrofit 95%-CCS,FOM,8.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Coal integrated retrofit 95%-CCS,VOM,14.57,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal integrated retrofit 95%-CCS,VOM,16.04,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal integrated retrofit 95%-CCS,VOM,17.51,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal integrated retrofit 95%-CCS,VOM,14.57,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal integrated retrofit 95%-CCS,VOM,16.04,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal integrated retrofit 95%-CCS,VOM,17.51,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal integrated retrofit 95%-CCS,VOM,12.729215427774154,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal integrated retrofit 95%-CCS,VOM,14.01349454094011,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal integrated retrofit 95%-CCS,VOM,15.29777365410607,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal integrated retrofit 95%-CCS,VOM,12.729215427774154,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal integrated retrofit 95%-CCS,VOM,14.01349454094011,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal integrated retrofit 95%-CCS,VOM,15.29777365410607,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal integrated retrofit 95%-CCS,capture_rate,0.95,per unit,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, Coal integrated retrofit 95%-CCS,efficiency,0.386,p.u.,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, -Coal integrated retrofit 95%-CCS,investment,1260.7,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal integrated retrofit 95%-CCS,investment,1554.7,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal integrated retrofit 95%-CCS,investment,1848.7,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal integrated retrofit 95%-CCS,investment,1260.7,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal integrated retrofit 95%-CCS,investment,1554.7,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal integrated retrofit 95%-CCS,investment,1848.7,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal integrated retrofit 95%-CCS,investment,1101.422229910424,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal integrated retrofit 95%-CCS,investment,1358.2780525436156,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal integrated retrofit 95%-CCS,investment,1615.1338751768071,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal integrated retrofit 95%-CCS,investment,1101.422229910424,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal integrated retrofit 95%-CCS,investment,1358.2780525436156,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal integrated retrofit 95%-CCS,investment,1615.1338751768071,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-95%-CCS,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal-95%-CCS,FOM,2.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Coal-95%-CCS,FOM,2.1,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Coal-95%-CCS,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Coal-95%-CCS,FOM,2.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal-95%-CCS,FOM,2.1,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Coal-95%-CCS,VOM,12.47,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal-95%-CCS,VOM,13.69,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal-95%-CCS,VOM,14.91,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal-95%-CCS,VOM,12.47,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal-95%-CCS,VOM,13.69,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal-95%-CCS,VOM,14.91,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal-95%-CCS,VOM,10.894530980394215,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal-95%-CCS,VOM,11.960395278395893,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal-95%-CCS,VOM,13.026259576397573,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal-95%-CCS,VOM,10.894530980394215,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal-95%-CCS,VOM,11.960395278395893,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal-95%-CCS,VOM,13.026259576397573,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-95%-CCS,capture_rate,0.95,per unit,"NREL, NREL ATB 2024",,,, Coal-95%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal-95%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -291,12 +291,12 @@ Coal-95%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Mea Coal-95%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal-95%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-95%-CCS,efficiency,0.403,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Coal-95%-CCS,investment,4857.161657478311,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal-95%-CCS,investment,5075.100131400876,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal-95%-CCS,investment,5292.915057435731,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal-95%-CCS,investment,4857.161657478311,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal-95%-CCS,investment,5075.100131400876,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal-95%-CCS,investment,5292.915057435731,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal-95%-CCS,investment,4243.504262564585,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal-95%-CCS,investment,4433.908228560513,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal-95%-CCS,investment,4624.204255800208,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal-95%-CCS,investment,4243.504262564585,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal-95%-CCS,investment,4433.908228560513,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal-95%-CCS,investment,4624.204255800208,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-95%-CCS,lifetime,40.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Coal-99%-CCS,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal-99%-CCS,FOM,2.1,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -304,12 +304,12 @@ Coal-99%-CCS,FOM,2.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=o Coal-99%-CCS,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Coal-99%-CCS,FOM,2.1,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal-99%-CCS,FOM,2.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Coal-99%-CCS,VOM,12.69,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal-99%-CCS,VOM,13.98,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal-99%-CCS,VOM,15.28,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal-99%-CCS,VOM,12.69,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal-99%-CCS,VOM,13.98,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal-99%-CCS,VOM,15.28,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal-99%-CCS,VOM,11.08673601773878,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal-99%-CCS,VOM,12.213756463986456,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal-99%-CCS,VOM,13.349513502840704,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal-99%-CCS,VOM,11.08673601773878,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal-99%-CCS,VOM,12.213756463986456,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal-99%-CCS,VOM,13.349513502840704,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-99%-CCS,capture_rate,0.99,per unit,"NREL, NREL ATB 2024",,,, Coal-99%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal-99%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -318,12 +318,12 @@ Coal-99%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Mea Coal-99%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal-99%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-99%-CCS,efficiency,0.403,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Coal-99%-CCS,investment,4927.336857698275,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal-99%-CCS,investment,5169.861361275371,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal-99%-CCS,investment,5412.385864852466,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal-99%-CCS,investment,4927.336857698275,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal-99%-CCS,investment,5169.861361275371,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal-99%-CCS,investment,5412.385864852466,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal-99%-CCS,investment,4304.813476105223,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal-99%-CCS,investment,4516.697254591622,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal-99%-CCS,investment,4728.5810330780205,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal-99%-CCS,investment,4304.813476105223,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal-99%-CCS,investment,4516.697254591622,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal-99%-CCS,investment,4728.5810330780205,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-99%-CCS,lifetime,40.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Coal-IGCC,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal-IGCC,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -339,12 +339,12 @@ Coal-IGCC-90%-CCS,FOM,2.37,%/year,NREL/ATB-https://data.openei.org/s3_viewer?buc Coal-IGCC-90%-CCS,FOM,2.38,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Coal-IGCC-90%-CCS,FOM,2.38,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal-IGCC-90%-CCS,FOM,2.37,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Coal-IGCC-90%-CCS,VOM,21.66,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal-IGCC-90%-CCS,VOM,22.61,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal-IGCC-90%-CCS,VOM,23.57,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal-IGCC-90%-CCS,VOM,21.66,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal-IGCC-90%-CCS,VOM,22.61,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal-IGCC-90%-CCS,VOM,23.57,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal-IGCC-90%-CCS,VOM,18.923459585833093,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal-IGCC-90%-CCS,VOM,19.75343588345735,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal-IGCC-90%-CCS,VOM,20.59214877368818,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal-IGCC-90%-CCS,VOM,18.923459585833093,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal-IGCC-90%-CCS,VOM,19.75343588345735,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal-IGCC-90%-CCS,VOM,20.59214877368818,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-IGCC-90%-CCS,capture_rate,0.9,per unit,"NREL, NREL ATB 2024",,,, Coal-IGCC-90%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal-IGCC-90%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -353,12 +353,12 @@ Coal-IGCC-90%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024 Coal-IGCC-90%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal-IGCC-90%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-IGCC-90%-CCS,efficiency,0.403,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Coal-IGCC-90%-CCS,investment,8743.360465434262,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal-IGCC-90%-CCS,investment,9150.574303330392,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal-IGCC-90%-CCS,investment,9557.788141226523,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal-IGCC-90%-CCS,investment,8743.360465434262,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal-IGCC-90%-CCS,investment,9150.574303330392,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal-IGCC-90%-CCS,investment,9557.788141226523,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal-IGCC-90%-CCS,investment,7638.717839889939,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal-IGCC-90%-CCS,investment,7994.483980435618,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal-IGCC-90%-CCS,investment,8350.250120981298,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal-IGCC-90%-CCS,investment,7638.717839889939,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal-IGCC-90%-CCS,investment,7994.483980435618,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal-IGCC-90%-CCS,investment,8350.250120981298,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-IGCC-90%-CCS,lifetime,40.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Commercial Battery Storage 1Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial Battery Storage 1Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -366,60 +366,60 @@ Commercial Battery Storage 1Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/ Commercial Battery Storage 1Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial Battery Storage 1Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial Battery Storage 1Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial Battery Storage 1Hr,investment,570.453346463275,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial Battery Storage 1Hr,investment,861.0822048414435,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial Battery Storage 1Hr,investment,1204.8686670615832,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial Battery Storage 1Hr,investment,570.453346463275,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial Battery Storage 1Hr,investment,861.0822048414435,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial Battery Storage 1Hr,investment,1204.8686670615832,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial Battery Storage 1Hr,investment,498.38184891048144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial Battery Storage 1Hr,investment,752.2924424467733,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial Battery Storage 1Hr,investment,1052.6446688539454,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial Battery Storage 1Hr,investment,498.38184891048144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial Battery Storage 1Hr,investment,752.2924424467733,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial Battery Storage 1Hr,investment,1052.6446688539454,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial Battery Storage 2Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial Battery Storage 2Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial Battery Storage 2Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Commercial Battery Storage 2Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial Battery Storage 2Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial Battery Storage 2Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial Battery Storage 2Hr,investment,682.7986012727605,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial Battery Storage 2Hr,investment,1007.311489610059,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial Battery Storage 2Hr,investment,1442.1558672370545,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial Battery Storage 2Hr,investment,682.7986012727605,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial Battery Storage 2Hr,investment,1007.311489610059,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial Battery Storage 2Hr,investment,1442.1558672370545,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial Battery Storage 2Hr,investment,596.5333211656716,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial Battery Storage 2Hr,investment,880.0470112641405,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial Battery Storage 2Hr,investment,1259.9528287226444,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial Battery Storage 2Hr,investment,596.5333211656716,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial Battery Storage 2Hr,investment,880.0470112641405,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial Battery Storage 2Hr,investment,1259.9528287226444,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial Battery Storage 4Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial Battery Storage 4Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial Battery Storage 4Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Commercial Battery Storage 4Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial Battery Storage 4Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial Battery Storage 4Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial Battery Storage 4Hr,investment,907.4891108917312,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial Battery Storage 4Hr,investment,1299.77005914729,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial Battery Storage 4Hr,investment,1916.730267587997,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial Battery Storage 4Hr,investment,907.4891108917312,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial Battery Storage 4Hr,investment,1299.77005914729,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial Battery Storage 4Hr,investment,1916.730267587997,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial Battery Storage 4Hr,investment,792.8362656760518,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial Battery Storage 4Hr,investment,1135.556148898875,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial Battery Storage 4Hr,investment,1674.5691484600422,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial Battery Storage 4Hr,investment,792.8362656760518,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial Battery Storage 4Hr,investment,1135.556148898875,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial Battery Storage 4Hr,investment,1674.5691484600422,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial Battery Storage 6Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial Battery Storage 6Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial Battery Storage 6Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Commercial Battery Storage 6Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial Battery Storage 6Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial Battery Storage 6Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial Battery Storage 6Hr,investment,1132.1796205107023,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial Battery Storage 6Hr,investment,1592.2286286845206,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial Battery Storage 6Hr,investment,2391.30466793894,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial Battery Storage 6Hr,investment,1132.1796205107023,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial Battery Storage 6Hr,investment,1592.2286286845206,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial Battery Storage 6Hr,investment,2391.30466793894,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial Battery Storage 6Hr,investment,989.1392101864323,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial Battery Storage 6Hr,investment,1391.065286533609,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial Battery Storage 6Hr,investment,2089.18546819744,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial Battery Storage 6Hr,investment,989.1392101864323,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial Battery Storage 6Hr,investment,1391.065286533609,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial Battery Storage 6Hr,investment,2089.18546819744,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial Battery Storage 8Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial Battery Storage 8Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial Battery Storage 8Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Commercial Battery Storage 8Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial Battery Storage 8Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial Battery Storage 8Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial Battery Storage 8Hr,investment,1356.870130129673,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial Battery Storage 8Hr,investment,1884.687198221751,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial Battery Storage 8Hr,investment,2865.8790682898816,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial Battery Storage 8Hr,investment,1356.870130129673,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial Battery Storage 8Hr,investment,1884.687198221751,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial Battery Storage 8Hr,investment,2865.8790682898816,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial Battery Storage 8Hr,investment,1185.4421546968124,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial Battery Storage 8Hr,investment,1646.574424168343,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial Battery Storage 8Hr,investment,2503.801787934837,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial Battery Storage 8Hr,investment,1185.4421546968124,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial Battery Storage 8Hr,investment,1646.574424168343,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial Battery Storage 8Hr,investment,2503.801787934837,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 1,CF,0.572448,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 1,CF,0.572448,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 1,CF,0.572448,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -432,12 +432,12 @@ Commercial DW - Class 1,FOM,1.31,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 1,FOM,3.04,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 1,FOM,1.93,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 1,FOM,1.31,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 1,investment,1192.8330340958212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 1,investment,1878.4300534058348,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 1,investment,2761.369086434612,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 1,investment,1192.8330340958212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 1,investment,1878.4300534058348,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 1,investment,2761.369086434612,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 1,investment,1042.1296266555373,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 1,investment,1641.107811654645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 1,investment,2412.495674455874,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 1,investment,1042.1296266555373,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 1,investment,1641.107811654645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 1,investment,2412.495674455874,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 10,CF,0.221877,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 10,CF,0.221877,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 10,CF,0.221877,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -450,12 +450,12 @@ Commercial DW - Class 10,FOM,1.31,%/year,NREL/ATB-https://data.openei.org/s3_vie Commercial DW - Class 10,FOM,3.04,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 10,FOM,1.93,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 10,FOM,1.31,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 10,investment,1192.8330340958212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 10,investment,1878.4300534058348,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 10,investment,2761.369086434612,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 10,investment,1192.8330340958212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 10,investment,1878.4300534058348,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 10,investment,2761.369086434612,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 10,investment,1042.1296266555373,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 10,investment,1641.107811654645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 10,investment,2412.495674455874,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 10,investment,1042.1296266555373,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 10,investment,1641.107811654645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 10,investment,2412.495674455874,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 2,CF,0.537382,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 2,CF,0.537382,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 2,CF,0.537382,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -468,12 +468,12 @@ Commercial DW - Class 2,FOM,1.31,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 2,FOM,3.04,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 2,FOM,1.93,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 2,FOM,1.31,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 2,investment,1192.8330340958212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 2,investment,1878.4300534058348,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 2,investment,2761.369086434612,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 2,investment,1192.8330340958212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 2,investment,1878.4300534058348,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 2,investment,2761.369086434612,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 2,investment,1042.1296266555373,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 2,investment,1641.107811654645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 2,investment,2412.495674455874,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 2,investment,1042.1296266555373,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 2,investment,1641.107811654645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 2,investment,2412.495674455874,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 3,CF,0.524922,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 3,CF,0.524922,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 3,CF,0.524922,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -486,12 +486,12 @@ Commercial DW - Class 3,FOM,1.31,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 3,FOM,3.04,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 3,FOM,1.93,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 3,FOM,1.31,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 3,investment,1192.8330340958212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 3,investment,1878.4300534058348,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 3,investment,2761.369086434612,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 3,investment,1192.8330340958212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 3,investment,1878.4300534058348,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 3,investment,2761.369086434612,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 3,investment,1042.1296266555373,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 3,investment,1641.107811654645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 3,investment,2412.495674455874,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 3,investment,1042.1296266555373,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 3,investment,1641.107811654645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 3,investment,2412.495674455874,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 4,CF,0.5118389999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 4,CF,0.5118389999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 4,CF,0.5118389999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -504,12 +504,12 @@ Commercial DW - Class 4,FOM,1.44,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 4,FOM,3.04,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 4,FOM,1.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 4,FOM,1.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 4,investment,1192.8330340958212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 4,investment,1937.9993994044132,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 4,investment,2519.399219225737,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 4,investment,1192.8330340958212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 4,investment,1937.9993994044132,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 4,investment,2519.399219225737,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 4,investment,1042.1296266555373,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 4,investment,1693.151122437591,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 4,investment,2201.096459168868,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 4,investment,1042.1296266555373,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 4,investment,1693.151122437591,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 4,investment,2201.096459168868,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 5,CF,0.495463,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 5,CF,0.495463,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 5,CF,0.495463,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -522,12 +522,12 @@ Commercial DW - Class 5,FOM,1.31,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 5,FOM,3.04,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 5,FOM,1.93,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 5,FOM,1.31,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 5,investment,1192.8330340958212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 5,investment,1878.4300534058348,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 5,investment,2761.369086434612,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 5,investment,1192.8330340958212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 5,investment,1878.4300534058348,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 5,investment,2761.369086434612,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 5,investment,1042.1296266555373,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 5,investment,1641.107811654645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 5,investment,2412.495674455874,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 5,investment,1042.1296266555373,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 5,investment,1641.107811654645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 5,investment,2412.495674455874,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 6,CF,0.470365,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 6,CF,0.470365,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 6,CF,0.470365,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -540,12 +540,12 @@ Commercial DW - Class 6,FOM,1.31,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 6,FOM,3.04,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 6,FOM,1.93,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 6,FOM,1.31,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 6,investment,1192.8330340958212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 6,investment,1878.4300534058348,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 6,investment,2761.369086434612,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 6,investment,1192.8330340958212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 6,investment,1878.4300534058348,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 6,investment,2761.369086434612,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 6,investment,1042.1296266555373,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 6,investment,1641.107811654645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 6,investment,2412.495674455874,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 6,investment,1042.1296266555373,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 6,investment,1641.107811654645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 6,investment,2412.495674455874,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 7,CF,0.433786,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 7,CF,0.433786,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 7,CF,0.433786,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -558,12 +558,12 @@ Commercial DW - Class 7,FOM,1.31,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 7,FOM,3.04,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 7,FOM,1.93,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 7,FOM,1.31,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 7,investment,1192.8330340958212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 7,investment,1878.4300534058348,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 7,investment,2761.369086434612,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 7,investment,1192.8330340958212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 7,investment,1878.4300534058348,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 7,investment,2761.369086434612,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 7,investment,1042.1296266555373,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 7,investment,1641.107811654645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 7,investment,2412.495674455874,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 7,investment,1042.1296266555373,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 7,investment,1641.107811654645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 7,investment,2412.495674455874,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 8,CF,0.388129,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 8,CF,0.388129,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 8,CF,0.388129,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -576,12 +576,12 @@ Commercial DW - Class 8,FOM,1.31,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 8,FOM,3.04,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 8,FOM,1.93,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 8,FOM,1.31,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 8,investment,1192.8330340958212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 8,investment,1878.4300534058348,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 8,investment,2761.369086434612,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 8,investment,1192.8330340958212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 8,investment,1878.4300534058348,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 8,investment,2761.369086434612,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 8,investment,1042.1296266555373,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 8,investment,1641.107811654645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 8,investment,2412.495674455874,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 8,investment,1042.1296266555373,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 8,investment,1641.107811654645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 8,investment,2412.495674455874,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 9,CF,0.332237,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 9,CF,0.332237,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 9,CF,0.332237,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -594,12 +594,12 @@ Commercial DW - Class 9,FOM,1.31,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 9,FOM,3.04,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 9,FOM,1.93,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 9,FOM,1.31,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 9,investment,1192.8330340958212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 9,investment,1878.4300534058348,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 9,investment,2761.369086434612,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 9,investment,1192.8330340958212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 9,investment,1878.4300534058348,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 9,investment,2761.369086434612,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 9,investment,1042.1296266555373,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 9,investment,1641.107811654645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 9,investment,2412.495674455874,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 9,investment,1042.1296266555373,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 9,investment,1641.107811654645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 9,investment,2412.495674455874,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 10,CF,0.13860555516176398,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 10,CF,0.13383272861845885,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 10,CF,0.12627625456404767,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -612,12 +612,12 @@ Commercial PV - Class 10,FOM,1.08,%/year,NREL/ATB-https://data.openei.org/s3_vie Commercial PV - Class 10,FOM,1.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 10,FOM,1.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 10,FOM,1.08,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 10,investment,825.6682539860877,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 10,investment,1032.5946461503024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 10,investment,1387.285272398717,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 10,investment,825.6682539860877,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 10,investment,1032.5946461503024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 10,investment,1387.285272398717,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 10,investment,721.3527163255358,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 10,investment,902.1358751141677,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 10,investment,1212.0146254043664,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 10,investment,721.3527163255358,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 10,investment,902.1358751141677,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 10,investment,1212.0146254043664,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 2,CF,0.20778090028133875,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 2,CF,0.20062604855193167,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 2,CF,0.1892982848115409,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -630,12 +630,12 @@ Commercial PV - Class 2,FOM,1.08,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 2,FOM,1.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 2,FOM,1.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 2,FOM,1.08,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 2,investment,825.6682539860877,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 2,investment,1032.5946461503024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 2,investment,1387.285272398717,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 2,investment,825.6682539860877,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 2,investment,1032.5946461503024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 2,investment,1387.285272398717,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 2,investment,721.3527163255358,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 2,investment,902.1358751141677,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 2,investment,1212.0146254043664,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 2,investment,721.3527163255358,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 2,investment,902.1358751141677,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 2,investment,1212.0146254043664,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 3,CF,0.19668903456911405,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 3,CF,0.18991612677423617,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 3,CF,0.17919306748001007,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -648,12 +648,12 @@ Commercial PV - Class 3,FOM,1.08,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 3,FOM,1.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 3,FOM,1.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 3,FOM,1.08,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 3,investment,825.6682539860877,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 3,investment,1032.5946461503024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 3,investment,1387.285272398717,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 3,investment,825.6682539860877,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 3,investment,1032.5946461503024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 3,investment,1387.285272398717,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 3,investment,721.3527163255358,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 3,investment,902.1358751141677,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 3,investment,1212.0146254043664,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 3,investment,721.3527163255358,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 3,investment,902.1358751141677,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 3,investment,1212.0146254043664,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 4,CF,0.1862959384077593,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 4,CF,0.179880912698979,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 4,CF,0.16972446245153056,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -666,12 +666,12 @@ Commercial PV - Class 4,FOM,1.08,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 4,FOM,1.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 4,FOM,1.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 4,FOM,1.08,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 4,investment,825.6682539860877,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 4,investment,1032.5946461503024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 4,investment,1387.285272398717,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 4,investment,825.6682539860877,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 4,investment,1032.5946461503024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 4,investment,1387.285272398717,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 4,investment,721.3527163255358,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 4,investment,902.1358751141677,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 4,investment,1212.0146254043664,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 4,investment,721.3527163255358,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 4,investment,902.1358751141677,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 4,investment,1212.0146254043664,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 5,CF,0.17777860643170543,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 5,CF,0.17165687162375523,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 5,CF,0.16196476783063715,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -684,12 +684,12 @@ Commercial PV - Class 5,FOM,1.08,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 5,FOM,1.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 5,FOM,1.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 5,FOM,1.08,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 5,investment,825.6682539860877,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 5,investment,1032.5946461503024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 5,investment,1387.285272398717,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 5,investment,825.6682539860877,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 5,investment,1032.5946461503024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 5,investment,1387.285272398717,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 5,investment,721.3527163255358,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 5,investment,902.1358751141677,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 5,investment,1212.0146254043664,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 5,investment,721.3527163255358,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 5,investment,902.1358751141677,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 5,investment,1212.0146254043664,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 6,CF,0.1754211488781907,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 6,CF,0.16938059217290033,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 6,CF,0.1598170118492545,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -702,12 +702,12 @@ Commercial PV - Class 6,FOM,1.08,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 6,FOM,1.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 6,FOM,1.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 6,FOM,1.08,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 6,investment,825.6682539860877,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 6,investment,1032.5946461503024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 6,investment,1387.285272398717,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 6,investment,825.6682539860877,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 6,investment,1032.5946461503024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 6,investment,1387.285272398717,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 6,investment,721.3527163255358,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 6,investment,902.1358751141677,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 6,investment,1212.0146254043664,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 6,investment,721.3527163255358,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 6,investment,902.1358751141677,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 6,investment,1212.0146254043664,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 7,CF,0.16714128222302643,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 7,CF,0.16138583939575268,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 7,CF,0.15227365943250867,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -720,12 +720,12 @@ Commercial PV - Class 7,FOM,1.08,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 7,FOM,1.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 7,FOM,1.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 7,FOM,1.08,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 7,investment,825.6682539860877,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 7,investment,1032.5946461503024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 7,investment,1387.285272398717,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 7,investment,825.6682539860877,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 7,investment,1032.5946461503024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 7,investment,1387.285272398717,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 7,investment,721.3527163255358,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 7,investment,902.1358751141677,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 7,investment,1212.0146254043664,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 7,investment,721.3527163255358,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 7,investment,902.1358751141677,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 7,investment,1212.0146254043664,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 8,CF,0.1587394064706859,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 8,CF,0.15327327885561648,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 8,CF,0.14461915092395838,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -738,12 +738,12 @@ Commercial PV - Class 8,FOM,1.08,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 8,FOM,1.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 8,FOM,1.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 8,FOM,1.08,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 8,investment,825.6682539860877,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 8,investment,1032.5946461503024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 8,investment,1387.285272398717,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 8,investment,825.6682539860877,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 8,investment,1032.5946461503024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 8,investment,1387.285272398717,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 8,investment,721.3527163255358,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 8,investment,902.1358751141677,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 8,investment,1212.0146254043664,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 8,investment,721.3527163255358,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 8,investment,902.1358751141677,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 8,investment,1212.0146254043664,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 9,CF,0.15237242973926163,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 9,CF,0.14712554640707018,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 9,CF,0.1388185322286806,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -756,12 +756,12 @@ Commercial PV - Class 9,FOM,1.08,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 9,FOM,1.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 9,FOM,1.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 9,FOM,1.08,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 9,investment,825.6682539860877,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 9,investment,1032.5946461503024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 9,investment,1387.285272398717,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 9,investment,825.6682539860877,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 9,investment,1032.5946461503024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 9,investment,1387.285272398717,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 9,investment,721.3527163255358,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 9,investment,902.1358751141677,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 9,investment,1212.0146254043664,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 9,investment,721.3527163255358,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 9,investment,902.1358751141677,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 9,investment,1212.0146254043664,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Compressed-Air-Adiabatic-bicharger,FOM,0.9265,%/year,"Viswanathan_2022, p.64 (p.86) Figure 4.14","{'carrier': ['elec', 'pair', 'elec'], 'technology_type': ['bicharger'], 'type': ['mechanical'], 'note': ['NULL']}",2020.0,, Compressed-Air-Adiabatic-bicharger,efficiency,0.7211,per unit,"Viswanathan_2022, p.59 (p.81)","{'carrier': ['elec', 'pair', 'elec'], 'technology_type': ['bicharger'], 'type': ['mechanical'], 'note': ['AC-AC efficiency at transformer level 0.52^0.5']}",2020.0,, Compressed-Air-Adiabatic-bicharger,investment,946180.9426,EUR/MW,"Viswanathan_2022, p.59 (p.81)","{'carrier': ['elec', 'pair', 'elec'], 'technology_type': ['bicharger'], 'type': ['mechanical'], 'note': ['Turbine Compressor BOP EPC Management']}",2020.0,, @@ -869,7 +869,7 @@ Fischer-Tropsch,carbondioxide-input,0.32,t_CO2/MWh_FT,ICCT IRA e-fuels assumptio Fischer-Tropsch,efficiency,0.7,per unit,ICCT IRA e-fuels assumptions ,,,, Fischer-Tropsch,electricity-input,0.04,MWh_el/MWh_FT,ICCT IRA e-fuels assumptions ,"0.005 MWh_el input per FT output, output increasing from 2020 to 2050 (0.65, 0.7, 0.73, 0.75 MWh liquid FT output).",,, Fischer-Tropsch,hydrogen-input,1.43,MWh_H2/MWh_FT,ICCT IRA e-fuels assumptions ,"0.995 MWh_H2 per output, output increasing from 2020 to 2050 (0.65, 0.7, 0.73, 0.75 MWh liquid FT output).",,, -Fischer-Tropsch,investment,1696429.0,USD/MW_FT,ICCT IRA e-fuels assumptions ,,2022.0,, +Fischer-Tropsch,investment,1482100.9058972877,USD/MW_FT,ICCT IRA e-fuels assumptions ,,2022.0,, Fischer-Tropsch,lifetime,30.0,years,ICCT IRA e-fuels assumptions ,,,, Gasnetz,FOM,2.5,%,"WEGE ZU EINEM KLIMANEUTRALEN ENERGIESYSEM, Anhang zur Studie, Fraunhofer-Institut für Solare Energiesysteme ISE, Freiburg",Gasnetz,2020.0,, Gasnetz,investment,28.0,EUR/kWGas,"WEGE ZU EINEM KLIMANEUTRALEN ENERGIESYSEM, Anhang zur Studie, Fraunhofer-Institut für Solare Energiesysteme ISE, Freiburg",Gasnetz,2020.0,, @@ -892,12 +892,12 @@ Geothermal - Deep EGS / Binary,FOM,1.28,%/year,NREL/ATB-https://data.openei.org/ Geothermal - Deep EGS / Binary,FOM,1.91,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Geothermal - Deep EGS / Binary,FOM,1.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Geothermal - Deep EGS / Binary,FOM,1.28,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Geothermal - Deep EGS / Binary,investment,6242.081346771521,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Geothermal - Deep EGS / Binary,investment,10623.622074965337,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Geothermal - Deep EGS / Binary,investment,17621.80978933961,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Geothermal - Deep EGS / Binary,investment,6242.081346771521,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Geothermal - Deep EGS / Binary,investment,10623.622074965337,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Geothermal - Deep EGS / Binary,investment,17621.80978933961,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Geothermal - Deep EGS / Binary,investment,5453.4521743819705,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Geothermal - Deep EGS / Binary,investment,9281.425807514814,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Geothermal - Deep EGS / Binary,investment,15395.457311994742,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Geothermal - Deep EGS / Binary,investment,5453.4521743819705,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Geothermal - Deep EGS / Binary,investment,9281.425807514814,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Geothermal - Deep EGS / Binary,investment,15395.457311994742,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Geothermal - Deep EGS / Flash,CF,0.9,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Geothermal - Deep EGS / Flash,CF,0.9,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Geothermal - Deep EGS / Flash,CF,0.9,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -910,12 +910,12 @@ Geothermal - Deep EGS / Flash,FOM,1.47,%/year,NREL/ATB-https://data.openei.org/s Geothermal - Deep EGS / Flash,FOM,2.53,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Geothermal - Deep EGS / Flash,FOM,1.89,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Geothermal - Deep EGS / Flash,FOM,1.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Geothermal - Deep EGS / Flash,investment,3915.0671991730983,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Geothermal - Deep EGS / Flash,investment,6668.369264072911,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Geothermal - Deep EGS / Flash,investment,10016.561325926576,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Geothermal - Deep EGS / Flash,investment,3915.0671991730983,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Geothermal - Deep EGS / Flash,investment,6668.369264072911,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Geothermal - Deep EGS / Flash,investment,10016.561325926576,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Geothermal - Deep EGS / Flash,investment,3420.434714652488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Geothermal - Deep EGS / Flash,investment,5825.882561038565,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Geothermal - Deep EGS / Flash,investment,8751.061562335655,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Geothermal - Deep EGS / Flash,investment,3420.434714652488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Geothermal - Deep EGS / Flash,investment,5825.882561038565,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Geothermal - Deep EGS / Flash,investment,8751.061562335655,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Geothermal - Hydro / Binary,CF,0.8,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Geothermal - Hydro / Binary,CF,0.8,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Geothermal - Hydro / Binary,CF,0.8,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -928,12 +928,12 @@ Geothermal - Hydro / Binary,FOM,1.89,%/year,NREL/ATB-https://data.openei.org/s3_ Geothermal - Hydro / Binary,FOM,2.04,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Geothermal - Hydro / Binary,FOM,1.78,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Geothermal - Hydro / Binary,FOM,1.89,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Geothermal - Hydro / Binary,investment,6164.296361504746,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Geothermal - Hydro / Binary,investment,7507.219048201893,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Geothermal - Hydro / Binary,investment,8546.723290969005,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Geothermal - Hydro / Binary,investment,6164.296361504746,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Geothermal - Hydro / Binary,investment,7507.219048201893,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Geothermal - Hydro / Binary,investment,8546.723290969005,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Geothermal - Hydro / Binary,investment,5385.494601663575,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Geothermal - Hydro / Binary,investment,6558.751443243071,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Geothermal - Hydro / Binary,investment,7466.923951428918,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Geothermal - Hydro / Binary,investment,5385.494601663575,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Geothermal - Hydro / Binary,investment,6558.751443243071,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Geothermal - Hydro / Binary,investment,7466.923951428918,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Geothermal - NF EGS / Binary,CF,0.8,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Geothermal - NF EGS / Binary,CF,0.8,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Geothermal - NF EGS / Binary,CF,0.8,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -946,12 +946,12 @@ Geothermal - NF EGS / Binary,FOM,1.67,%/year,NREL/ATB-https://data.openei.org/s3 Geothermal - NF EGS / Binary,FOM,2.05,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Geothermal - NF EGS / Binary,FOM,1.8,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Geothermal - NF EGS / Binary,FOM,1.67,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Geothermal - NF EGS / Binary,investment,5877.400726285687,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Geothermal - NF EGS / Binary,investment,9003.647340523155,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Geothermal - NF EGS / Binary,investment,11969.956507317558,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Geothermal - NF EGS / Binary,investment,5877.400726285687,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Geothermal - NF EGS / Binary,investment,9003.647340523155,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Geothermal - NF EGS / Binary,investment,11969.956507317558,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Geothermal - NF EGS / Binary,investment,5134.845573112339,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Geothermal - NF EGS / Binary,investment,7866.119878738852,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Geothermal - NF EGS / Binary,investment,10457.663352280872,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Geothermal - NF EGS / Binary,investment,5134.845573112339,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Geothermal - NF EGS / Binary,investment,7866.119878738852,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Geothermal - NF EGS / Binary,investment,10457.663352280872,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Geothermal - NF EGS / Flash,CF,0.9,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Geothermal - NF EGS / Flash,CF,0.9,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Geothermal - NF EGS / Flash,CF,0.9,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -964,12 +964,12 @@ Geothermal - NF EGS / Flash,FOM,1.79,%/year,NREL/ATB-https://data.openei.org/s3_ Geothermal - NF EGS / Flash,FOM,2.53,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Geothermal - NF EGS / Flash,FOM,1.99,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Geothermal - NF EGS / Flash,FOM,1.79,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Geothermal - NF EGS / Flash,investment,4425.179608093072,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Geothermal - NF EGS / Flash,investment,7004.079473609793,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Geothermal - NF EGS / Flash,investment,8600.205767244508,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Geothermal - NF EGS / Flash,investment,4425.179608093072,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Geothermal - NF EGS / Flash,investment,7004.079473609793,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Geothermal - NF EGS / Flash,investment,8600.205767244508,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Geothermal - NF EGS / Flash,investment,3866.0991446815315,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Geothermal - NF EGS / Flash,investment,6119.1788944976015,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Geothermal - NF EGS / Flash,investment,7513.649412109887,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Geothermal - NF EGS / Flash,investment,3866.0991446815315,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Geothermal - NF EGS / Flash,investment,6119.1788944976015,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Geothermal - NF EGS / Flash,investment,7513.649412109887,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Gravity-Brick-bicharger,FOM,1.5,%/year,"Viswanathan_2022, p.76 (p.98) Sentence 1 in 4.7.2 Operating Costs","{'carrier': ['elec', 'gravity', 'elec'], 'technology_type': ['bicharger'], 'type': ['mechanical'], 'note': ['1.5 percent of capital cost']}",2020.0,, Gravity-Brick-bicharger,efficiency,0.9274,per unit,"Viswanathan_2022, p.77 (p.99) Table 4.36","{'carrier': ['elec', 'gravity', 'elec'], 'technology_type': ['bicharger'], 'type': ['mechanical'], 'note': ['AC-AC efficiency at transformer level 0.86^0.5']}",2020.0,, Gravity-Brick-bicharger,investment,415570.5177,EUR/MW,"Viswanathan_2022, p.71 (p.94) text at the bottom speaks about 0% cost reduction for 2030 compared to 2021","{'carrier': ['elec', 'gravity', 'elec'], 'technology_type': ['bicharger'], 'type': ['mechanical'], 'note': ['Power Equipment']}",2020.0,, @@ -1051,7 +1051,7 @@ Haber-Bosch,lifetime,30.0,years,"Danish Energy Agency, inputs/data_sheets_for_re Haber-Bosch,nitrogen-input,0.1597,t_N2/MWh_NH3,"DECHEMA 2017: DECHEMA: Low carbon energy and feedstock for the European chemical industry (https://dechema.de/dechema_media/Downloads/Positionspapiere/Technology_study_Low_carbon_energy_and_feedstock_for_the_European_chemical_industry.pdf), pg. 57.",".33 MWh electricity are required for ASU per t_NH3, considering 0.4 MWh are required per t_N2 and LHV of NH3 of 5.1666 Mwh.",,, Heavy oil partial oxidation,FOM,0.05,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Heavy oil partial oxidation,efficiency,0.734,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Heavy oil partial oxidation,investment,491.0535,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Heavy oil partial oxidation,investment,662.0382094364353,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Heavy oil partial oxidation,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, HighT-Molten-Salt-charger,FOM,1.075,%/year,"Viswanathan_2022, NULL","{'carrier': ['elec', 'salthight'], 'technology_type': ['charger'], 'type': ['thermal'], 'note': ['Guesstimate, 50% on charger']}",2020.0,, HighT-Molten-Salt-charger,efficiency,0.99,per unit,"Viswanathan_2022, p.107 (p.129)","{'carrier': ['elec', 'salthight'], 'technology_type': ['charger'], 'type': ['thermal'], 'note': ['RTE assume 99% for charge and other for discharge']}",2020.0,, @@ -1095,12 +1095,12 @@ Hydropower - NPD 2,FOM,2.89,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Hydropower - NPD 2,FOM,2.79,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NPD 2,FOM,1.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NPD 2,FOM,2.89,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NPD 2,investment,2899.638907574293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NPD 2,investment,6357.064447883142,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NPD 2,investment,3222.1758345181297,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NPD 2,investment,2899.638907574293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NPD 2,investment,6357.064447883142,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NPD 2,investment,3222.1758345181297,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NPD 2,investment,2533.2963841639594,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NPD 2,investment,5553.908225487212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NPD 2,investment,2815.083757292329,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NPD 2,investment,2533.2963841639594,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NPD 2,investment,5553.908225487212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NPD 2,investment,2815.083757292329,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NPD 3,CF,0.32,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NPD 3,CF,0.32,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NPD 3,CF,0.33,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1113,12 +1113,12 @@ Hydropower - NPD 3,FOM,3.18,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Hydropower - NPD 3,FOM,3.04,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NPD 3,FOM,1.66,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NPD 3,FOM,3.18,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NPD 3,investment,3195.563876849496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NPD 3,investment,6487.995279612818,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NPD 3,investment,3551.099631302438,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NPD 3,investment,3195.563876849496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NPD 3,investment,6487.995279612818,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NPD 3,investment,3551.099631302438,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NPD 3,investment,2791.833974030912,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NPD 3,investment,5668.297159133382,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NPD 3,investment,3102.4510784034387,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NPD 3,investment,2791.833974030912,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NPD 3,investment,5668.297159133382,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NPD 3,investment,3102.4510784034387,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NPD 4,CF,0.38,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NPD 4,CF,0.38,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NPD 4,CF,0.38,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1131,12 +1131,12 @@ Hydropower - NPD 4,FOM,2.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?buc Hydropower - NPD 4,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NPD 4,FOM,1.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NPD 4,FOM,2.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NPD 4,investment,7692.984722848537,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NPD 4,investment,14239.526309332348,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NPD 4,investment,8548.825281471787,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NPD 4,investment,7692.984722848537,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NPD 4,investment,14239.526309332348,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NPD 4,investment,8548.825281471787,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NPD 4,investment,6721.047345210327,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NPD 4,investment,12440.494027518826,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NPD 4,investment,7468.760374897488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NPD 4,investment,6721.047345210327,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NPD 4,investment,12440.494027518826,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NPD 4,investment,7468.760374897488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NPD 5,CF,0.56,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NPD 5,CF,0.56,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NPD 5,CF,0.42,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1149,12 +1149,12 @@ Hydropower - NPD 5,FOM,0.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Hydropower - NPD 5,FOM,0.58,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NPD 5,FOM,0.63,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NPD 5,FOM,0.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NPD 5,investment,5157.397396181149,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NPD 5,investment,5220.201616279123,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NPD 5,investment,5730.086725210139,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NPD 5,investment,5157.397396181149,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NPD 5,investment,5220.201616279123,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NPD 5,investment,5730.086725210139,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NPD 5,investment,4505.807996062548,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NPD 5,investment,4560.677484559491,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NPD 5,investment,5006.143331848235,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NPD 5,investment,4505.807996062548,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NPD 5,investment,4560.677484559491,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NPD 5,investment,5006.143331848235,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NPD 6,CF,0.59,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NPD 6,CF,0.59,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NPD 6,CF,0.44,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1167,12 +1167,12 @@ Hydropower - NPD 6,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Hydropower - NPD 6,FOM,0.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NPD 6,FOM,0.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NPD 6,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NPD 6,investment,7765.36924770722,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NPD 6,investment,7859.04333870081,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NPD 6,investment,8627.596676170942,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NPD 6,investment,7765.36924770722,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NPD 6,investment,7859.04333870081,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NPD 6,investment,8627.596676170942,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NPD 6,investment,6784.286755681381,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NPD 6,investment,6866.125992761567,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NPD 6,investment,7537.579733351281,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NPD 6,investment,6784.286755681381,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NPD 6,investment,6866.125992761567,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NPD 6,investment,7537.579733351281,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NPD 7,CF,0.64,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NPD 7,CF,0.64,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NPD 7,CF,0.62,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1185,12 +1185,12 @@ Hydropower - NPD 7,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?buc Hydropower - NPD 7,FOM,0.49,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NPD 7,FOM,0.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NPD 7,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NPD 7,investment,11951.962428136623,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NPD 7,investment,15796.858072100777,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NPD 7,investment,13280.431354954802,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NPD 7,investment,11951.962428136623,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NPD 7,investment,15796.858072100777,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NPD 7,investment,13280.431354954802,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NPD 7,investment,10441.94265836745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NPD 7,investment,13801.071343976932,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NPD 7,investment,11602.57183877737,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NPD 7,investment,10441.94265836745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NPD 7,investment,13801.071343976932,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NPD 7,investment,11602.57183877737,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NPD 8,CF,0.49,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NPD 8,CF,0.49,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NPD 8,CF,0.4,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1203,12 +1203,12 @@ Hydropower - NPD 8,FOM,1.01,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Hydropower - NPD 8,FOM,0.97,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NPD 8,FOM,0.91,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NPD 8,FOM,1.01,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NPD 8,investment,18132.32347710004,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NPD 8,investment,21498.20388302879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NPD 8,investment,20147.38091176896,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NPD 8,investment,18132.32347710004,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NPD 8,investment,21498.20388302879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NPD 8,investment,20147.38091176896,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NPD 8,investment,15841.472322998854,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NPD 8,investment,18782.104909902835,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NPD 8,investment,17601.945911553325,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NPD 8,investment,15841.472322998854,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NPD 8,investment,18782.104909902835,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NPD 8,investment,17601.945911553325,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NSD 2,CF,0.66,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NSD 2,CF,0.66,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NSD 2,CF,0.66,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1221,12 +1221,12 @@ Hydropower - NSD 2,FOM,0.6,%/year,NREL/ATB-https://data.openei.org/s3_viewer?buc Hydropower - NSD 2,FOM,0.3,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NSD 2,FOM,0.61,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NSD 2,FOM,0.6,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NSD 2,investment,8051.713912221715,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NSD 2,investment,8256.09374711682,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NSD 2,investment,8297.608401079888,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NSD 2,investment,8051.713912221715,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NSD 2,investment,8256.09374711682,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NSD 2,investment,8297.608401079888,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NSD 2,investment,7034.454423574224,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NSD 2,investment,7213.0127590219045,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NSD 2,investment,7249.282420909714,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NSD 2,investment,7034.454423574224,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NSD 2,investment,7213.0127590219045,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NSD 2,investment,7249.282420909714,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NSD 3,CF,0.62,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NSD 3,CF,0.62,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NSD 3,CF,0.62,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1239,12 +1239,12 @@ Hydropower - NSD 3,FOM,1.78,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Hydropower - NSD 3,FOM,0.89,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NSD 3,FOM,1.79,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NSD 3,FOM,1.78,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NSD 3,investment,7888.848731289679,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NSD 3,investment,8087.906174651057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NSD 3,investment,8129.420828614125,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NSD 3,investment,7888.848731289679,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NSD 3,investment,8087.906174651057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NSD 3,investment,8129.420828614125,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NSD 3,investment,6892.165750014354,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NSD 3,investment,7066.0741288097515,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NSD 3,investment,7102.3437906975605,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NSD 3,investment,6892.165750014354,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NSD 3,investment,7066.0741288097515,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NSD 3,investment,7102.3437906975605,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NSD 4,CF,0.66,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NSD 4,CF,0.66,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NSD 4,CF,0.66,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1257,12 +1257,12 @@ Hydropower - NSD 4,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Hydropower - NSD 4,FOM,0.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NSD 4,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NSD 4,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NSD 4,investment,7112.844045672329,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NSD 4,investment,7292.740879512291,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NSD 4,investment,7329.997620248378,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NSD 4,investment,7112.844045672329,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NSD 4,investment,7292.740879512291,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NSD 4,investment,7329.997620248378,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NSD 4,investment,6214.202070111444,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NSD 4,investment,6371.370604958621,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NSD 4,investment,6403.920301524604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NSD 4,investment,6214.202070111444,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NSD 4,investment,6371.370604958621,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NSD 4,investment,6403.920301524604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative LNG storage tank,FOM,2.0,%/year,"Guesstimate, based on H2 (l) storage tank with comparable requirements.",Currency year and technology year assumed based on publication date.,2019.0,, LNG storage tank,investment,666.634,EUR/m^3,"Hurskainen 2019, https://cris.vtt.fi/en/publications/liquid-organic-hydrogen-carriers-lohc-concept-evaluation-and-tech pg. 46 (59).",Currency year and technology year assumed based on publication date.,2019.0,, LNG storage tank,lifetime,20.0,years,"Guesstimate, based on H2 (l) storage tank with comparable requirements.",Currency year and technology year assumed based on publication date.,2019.0,, @@ -1302,12 +1302,12 @@ Land-Based Wind - Class 1 - Technology 1,FOM,2.06,%/year,NREL/ATB-https://data.o Land-Based Wind - Class 1 - Technology 1,FOM,1.73,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 1 - Technology 1,FOM,2.21,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 1 - Technology 1,FOM,2.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 1 - Technology 1,investment,1093.0531153812144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 1 - Technology 1,investment,1188.1694560853446,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 1 - Technology 1,investment,1411.6709839852829,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 1 - Technology 1,investment,1093.0531153812144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 1 - Technology 1,investment,1188.1694560853446,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 1 - Technology 1,investment,1411.6709839852829,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 1 - Technology 1,investment,954.9559766429071,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 1 - Technology 1,investment,1038.0552485388876,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 1 - Technology 1,investment,1233.3194281596832,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 1 - Technology 1,investment,954.9559766429071,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 1 - Technology 1,investment,1038.0552485388876,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 1 - Technology 1,investment,1233.3194281596832,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 10 - Technology 4,CF,0.305778,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 10 - Technology 4,CF,0.2796035,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 10 - Technology 4,CF,0.266365,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1320,12 +1320,12 @@ Land-Based Wind - Class 10 - Technology 4,FOM,1.5,%/year,NREL/ATB-https://data.o Land-Based Wind - Class 10 - Technology 4,FOM,1.37,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 10 - Technology 4,FOM,1.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 10 - Technology 4,FOM,1.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 10 - Technology 4,investment,1374.2376974147485,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 10 - Technology 4,investment,1558.6000889512527,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 10 - Technology 4,investment,1942.2454457788144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 10 - Technology 4,investment,1374.2376974147485,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 10 - Technology 4,investment,1558.6000889512527,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 10 - Technology 4,investment,1942.2454457788144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 10 - Technology 4,investment,1200.6154906905042,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 10 - Technology 4,investment,1361.6854013732639,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 10 - Technology 4,investment,1696.8607201737661,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 10 - Technology 4,investment,1200.6154906905042,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 10 - Technology 4,investment,1361.6854013732639,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 10 - Technology 4,investment,1696.8607201737661,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 2 - Technology 1,CF,0.539184054644808,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 2 - Technology 1,CF,0.5057405,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 2 - Technology 1,CF,0.481794999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1338,12 +1338,12 @@ Land-Based Wind - Class 2 - Technology 1,FOM,2.06,%/year,NREL/ATB-https://data.o Land-Based Wind - Class 2 - Technology 1,FOM,1.73,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 2 - Technology 1,FOM,2.21,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 2 - Technology 1,FOM,2.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 2 - Technology 1,investment,1093.0531153812144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 2 - Technology 1,investment,1188.1694560853446,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 2 - Technology 1,investment,1411.6709839852829,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 2 - Technology 1,investment,1093.0531153812144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 2 - Technology 1,investment,1188.1694560853446,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 2 - Technology 1,investment,1411.6709839852829,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 2 - Technology 1,investment,954.9559766429071,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 2 - Technology 1,investment,1038.0552485388876,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 2 - Technology 1,investment,1233.3194281596832,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 2 - Technology 1,investment,954.9559766429071,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 2 - Technology 1,investment,1038.0552485388876,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 2 - Technology 1,investment,1233.3194281596832,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 3 - Technology 1,CF,0.527137672131147,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 3 - Technology 1,CF,0.494346,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 3 - Technology 1,CF,0.470939999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1356,12 +1356,12 @@ Land-Based Wind - Class 3 - Technology 1,FOM,2.06,%/year,NREL/ATB-https://data.o Land-Based Wind - Class 3 - Technology 1,FOM,1.73,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 3 - Technology 1,FOM,2.21,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 3 - Technology 1,FOM,2.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 3 - Technology 1,investment,1093.0531153812144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 3 - Technology 1,investment,1188.1694560853446,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 3 - Technology 1,investment,1411.6709839852829,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 3 - Technology 1,investment,1093.0531153812144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 3 - Technology 1,investment,1188.1694560853446,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 3 - Technology 1,investment,1411.6709839852829,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 3 - Technology 1,investment,954.9559766429071,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 3 - Technology 1,investment,1038.0552485388876,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 3 - Technology 1,investment,1233.3194281596832,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 3 - Technology 1,investment,954.9559766429071,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 3 - Technology 1,investment,1038.0552485388876,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 3 - Technology 1,investment,1233.3194281596832,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 5 - Technology 1,CF,0.496558393442622,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 5 - Technology 1,CF,0.4654215,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 5 - Technology 1,CF,0.443384999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1374,12 +1374,12 @@ Land-Based Wind - Class 5 - Technology 1,FOM,2.06,%/year,NREL/ATB-https://data.o Land-Based Wind - Class 5 - Technology 1,FOM,1.73,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 5 - Technology 1,FOM,2.21,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 5 - Technology 1,FOM,2.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 5 - Technology 1,investment,1093.0531153812144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 5 - Technology 1,investment,1188.1694560853446,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 5 - Technology 1,investment,1411.6709839852829,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 5 - Technology 1,investment,1093.0531153812144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 5 - Technology 1,investment,1188.1694560853446,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 5 - Technology 1,investment,1411.6709839852829,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 5 - Technology 1,investment,954.9559766429071,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 5 - Technology 1,investment,1038.0552485388876,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 5 - Technology 1,investment,1233.3194281596832,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 5 - Technology 1,investment,954.9559766429071,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 5 - Technology 1,investment,1038.0552485388876,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 5 - Technology 1,investment,1233.3194281596832,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 6 - Technology 1,CF,0.470612338797814,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 6 - Technology 1,CF,0.4408795,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 6 - Technology 1,CF,0.420004999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1392,12 +1392,12 @@ Land-Based Wind - Class 6 - Technology 1,FOM,2.06,%/year,NREL/ATB-https://data.o Land-Based Wind - Class 6 - Technology 1,FOM,1.73,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 6 - Technology 1,FOM,2.21,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 6 - Technology 1,FOM,2.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 6 - Technology 1,investment,1093.0531153812144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 6 - Technology 1,investment,1188.1694560853446,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 6 - Technology 1,investment,1411.6709839852829,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 6 - Technology 1,investment,1093.0531153812144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 6 - Technology 1,investment,1188.1694560853446,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 6 - Technology 1,investment,1411.6709839852829,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 6 - Technology 1,investment,954.9559766429071,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 6 - Technology 1,investment,1038.0552485388876,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 6 - Technology 1,investment,1233.3194281596832,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 6 - Technology 1,investment,954.9559766429071,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 6 - Technology 1,investment,1038.0552485388876,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 6 - Technology 1,investment,1233.3194281596832,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 7 - Technology 1,CF,0.43447319125683,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 7 - Technology 1,CF,0.406696,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 7 - Technology 1,CF,0.387439999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1410,12 +1410,12 @@ Land-Based Wind - Class 7 - Technology 1,FOM,2.06,%/year,NREL/ATB-https://data.o Land-Based Wind - Class 7 - Technology 1,FOM,1.73,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 7 - Technology 1,FOM,2.18,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 7 - Technology 1,FOM,2.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 7 - Technology 1,investment,1093.0531153812144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 7 - Technology 1,investment,1204.393999585801,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 7 - Technology 1,investment,1411.6709839852829,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 7 - Technology 1,investment,1093.0531153812144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 7 - Technology 1,investment,1204.393999585801,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 7 - Technology 1,investment,1411.6709839852829,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 7 - Technology 1,investment,954.9559766429071,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 7 - Technology 1,investment,1052.2299712179956,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 7 - Technology 1,investment,1233.3194281596832,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 7 - Technology 1,investment,954.9559766429071,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 7 - Technology 1,investment,1052.2299712179956,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 7 - Technology 1,investment,1233.3194281596832,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 8 - Technology 2,CF,0.395978,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 8 - Technology 2,CF,0.3672535,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 8 - Technology 2,CF,0.349865,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1428,12 +1428,12 @@ Land-Based Wind - Class 8 - Technology 2,FOM,1.8,%/year,NREL/ATB-https://data.op Land-Based Wind - Class 8 - Technology 2,FOM,1.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 8 - Technology 2,FOM,1.85,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 8 - Technology 2,FOM,1.8,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 8 - Technology 2,investment,1126.221702174781,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 8 - Technology 2,investment,1298.629756653061,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 8 - Technology 2,investment,1515.2444490612547,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 8 - Technology 2,investment,1126.221702174781,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 8 - Technology 2,investment,1298.629756653061,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 8 - Technology 2,investment,1515.2444490612547,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 8 - Technology 2,investment,983.9340196580159,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 8 - Technology 2,investment,1134.5599130648413,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 8 - Technology 2,investment,1323.807345081652,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 8 - Technology 2,investment,983.9340196580159,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 8 - Technology 2,investment,1134.5599130648413,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 8 - Technology 2,investment,1323.807345081652,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 9 - Technology 3,CF,0.38335,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 9 - Technology 3,CF,0.3549825,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 9 - Technology 3,CF,0.338175,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1446,12 +1446,12 @@ Land-Based Wind - Class 9 - Technology 3,FOM,2.47,%/year,NREL/ATB-https://data.o Land-Based Wind - Class 9 - Technology 3,FOM,1.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 9 - Technology 3,FOM,2.58,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 9 - Technology 3,FOM,2.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 9 - Technology 3,investment,1226.7006249724311,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 9 - Technology 3,investment,1298.93008599357,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 9 - Technology 3,investment,1493.0871285064673,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 9 - Technology 3,investment,1226.7006249724311,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 9 - Technology 3,investment,1298.93008599357,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 9 - Technology 3,investment,1493.0871285064673,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 9 - Technology 3,investment,1071.718361061034,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 9 - Technology 3,investment,1134.8222985744242,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 9 - Technology 3,investment,1304.4493967876138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 9 - Technology 3,investment,1071.718361061034,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 9 - Technology 3,investment,1134.8222985744242,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 9 - Technology 3,investment,1304.4493967876138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 1,CF,0.6035980000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 1,CF,0.6035980000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 1,CF,0.6035980000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1464,12 +1464,12 @@ Large DW - Class 1,FOM,1.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 1,FOM,2.79,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 1,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 1,FOM,1.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 1,investment,1295.6282373944823,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 1,investment,1710.2292733607171,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 1,investment,2052.2751280328603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 1,investment,1295.6282373944823,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 1,investment,1710.2292733607171,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 1,investment,2052.2751280328603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 1,investment,1131.9376079685435,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 1,investment,1494.1576425184778,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 1,investment,1792.989171022173,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 1,investment,1131.9376079685435,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 1,investment,1494.1576425184778,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 1,investment,1792.989171022173,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 10,CF,0.261838,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 10,CF,0.261838,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 10,CF,0.261838,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1482,12 +1482,12 @@ Large DW - Class 10,FOM,1.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?b Large DW - Class 10,FOM,2.79,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 10,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 10,FOM,1.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 10,investment,1295.6282373944823,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 10,investment,1710.2292733607171,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 10,investment,2052.2751280328603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 10,investment,1295.6282373944823,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 10,investment,1710.2292733607171,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 10,investment,2052.2751280328603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 10,investment,1131.9376079685435,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 10,investment,1494.1576425184778,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 10,investment,1792.989171022173,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 10,investment,1131.9376079685435,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 10,investment,1494.1576425184778,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 10,investment,1792.989171022173,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 2,CF,0.572181,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 2,CF,0.572181,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 2,CF,0.572181,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1500,12 +1500,12 @@ Large DW - Class 2,FOM,1.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 2,FOM,2.79,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 2,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 2,FOM,1.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 2,investment,1295.6282373944823,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 2,investment,1710.2292733607171,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 2,investment,2052.2751280328603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 2,investment,1295.6282373944823,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 2,investment,1710.2292733607171,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 2,investment,2052.2751280328603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 2,investment,1131.9376079685435,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 2,investment,1494.1576425184778,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 2,investment,1792.989171022173,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 2,investment,1131.9376079685435,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 2,investment,1494.1576425184778,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 2,investment,1792.989171022173,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 3,CF,0.560611,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 3,CF,0.560611,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 3,CF,0.560611,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1518,12 +1518,12 @@ Large DW - Class 3,FOM,1.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 3,FOM,2.79,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 3,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 3,FOM,1.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 3,investment,1295.6282373944823,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 3,investment,1710.2292733607171,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 3,investment,2052.2751280328603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 3,investment,1295.6282373944823,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 3,investment,1710.2292733607171,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 3,investment,2052.2751280328603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 3,investment,1131.9376079685435,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 3,investment,1494.1576425184778,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 3,investment,1792.989171022173,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 3,investment,1131.9376079685435,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 3,investment,1494.1576425184778,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 3,investment,1792.989171022173,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 4,CF,0.548507,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 4,CF,0.548507,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 4,CF,0.548507,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1536,12 +1536,12 @@ Large DW - Class 4,FOM,1.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 4,FOM,2.79,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 4,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 4,FOM,1.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 4,investment,1295.6282373944823,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 4,investment,1710.2292733607171,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 4,investment,2052.2751280328603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 4,investment,1295.6282373944823,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 4,investment,1710.2292733607171,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 4,investment,2052.2751280328603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 4,investment,1131.9376079685435,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 4,investment,1494.1576425184778,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 4,investment,1792.989171022173,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 4,investment,1131.9376079685435,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 4,investment,1494.1576425184778,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 4,investment,1792.989171022173,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 5,CF,0.533199,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 5,CF,0.533199,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 5,CF,0.533199,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1554,12 +1554,12 @@ Large DW - Class 5,FOM,1.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 5,FOM,2.79,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 5,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 5,FOM,1.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 5,investment,1295.6282373944823,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 5,investment,1710.2292733607171,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 5,investment,2052.2751280328603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 5,investment,1295.6282373944823,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 5,investment,1710.2292733607171,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 5,investment,2052.2751280328603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 5,investment,1131.9376079685435,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 5,investment,1494.1576425184778,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 5,investment,1792.989171022173,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 5,investment,1131.9376079685435,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 5,investment,1494.1576425184778,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 5,investment,1792.989171022173,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 6,CF,0.509525,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 6,CF,0.509525,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 6,CF,0.509525,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1572,12 +1572,12 @@ Large DW - Class 6,FOM,1.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 6,FOM,2.79,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 6,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 6,FOM,1.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 6,investment,1295.6282373944823,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 6,investment,1710.2292733607171,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 6,investment,2052.2751280328603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 6,investment,1295.6282373944823,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 6,investment,1710.2292733607171,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 6,investment,2052.2751280328603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 6,investment,1131.9376079685435,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 6,investment,1494.1576425184778,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 6,investment,1792.989171022173,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 6,investment,1131.9376079685435,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 6,investment,1494.1576425184778,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 6,investment,1792.989171022173,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 7,CF,0.474637,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 7,CF,0.474637,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 7,CF,0.474637,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1590,12 +1590,12 @@ Large DW - Class 7,FOM,1.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 7,FOM,2.79,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 7,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 7,FOM,1.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 7,investment,1295.6282373944823,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 7,investment,1710.2292733607171,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 7,investment,2052.2751280328603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 7,investment,1295.6282373944823,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 7,investment,1710.2292733607171,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 7,investment,2052.2751280328603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 7,investment,1131.9376079685435,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 7,investment,1494.1576425184778,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 7,investment,1792.989171022173,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 7,investment,1131.9376079685435,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 7,investment,1494.1576425184778,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 7,investment,1792.989171022173,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 8,CF,0.42898,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 8,CF,0.42898,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 8,CF,0.42898,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1608,12 +1608,12 @@ Large DW - Class 8,FOM,1.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 8,FOM,2.79,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 8,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 8,FOM,1.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 8,investment,1295.6282373944823,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 8,investment,1710.2292733607171,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 8,investment,2052.2751280328603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 8,investment,1295.6282373944823,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 8,investment,1710.2292733607171,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 8,investment,2052.2751280328603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 8,investment,1131.9376079685435,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 8,investment,1494.1576425184778,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 8,investment,1792.989171022173,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 8,investment,1131.9376079685435,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 8,investment,1494.1576425184778,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 8,investment,1792.989171022173,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 9,CF,0.374957,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 9,CF,0.374957,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 9,CF,0.374957,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1626,12 +1626,12 @@ Large DW - Class 9,FOM,1.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 9,FOM,2.79,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 9,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 9,FOM,1.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 9,investment,1295.6282373944823,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 9,investment,1710.2292733607171,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 9,investment,2052.2751280328603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 9,investment,1295.6282373944823,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 9,investment,1710.2292733607171,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 9,investment,2052.2751280328603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 9,investment,1131.9376079685435,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 9,investment,1494.1576425184778,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 9,investment,1792.989171022173,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 9,investment,1131.9376079685435,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 9,investment,1494.1576425184778,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 9,investment,1792.989171022173,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Lead-Acid-bicharger,FOM,2.4427,%/year,"Viswanathan_2022, p.28 (p.50)","{'carrier': ['elec', 'lead', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['30% assumed of power components every 10 years']}",2020.0,, Lead-Acid-bicharger,efficiency,0.8832,per unit,"Viswanathan_2022, p.33 (p.55)","{'carrier': ['elec', 'lead', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['AC-AC efficiency at transformer level 0.78^0.5']}",2020.0,, Lead-Acid-bicharger,investment,128853.6139,EUR/MW,"Viswanathan_2022, p.33 (p.55)","{'carrier': ['elec', 'lead', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['Power Equipment']}",2020.0,, @@ -1703,12 +1703,12 @@ Midsize DW - Class 1,FOM,1.71,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 1,FOM,2.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 1,FOM,2.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 1,FOM,1.71,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 1,investment,1226.1744539278163,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 1,investment,1761.6750609846126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 1,investment,2114.0100731815355,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 1,investment,1226.1744539278163,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 1,investment,1761.6750609846126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 1,investment,2114.0100731815355,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 1,investment,1071.2586668552167,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 1,investment,1539.1037312978933,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 1,investment,1846.924477557472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 1,investment,1071.2586668552167,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 1,investment,1539.1037312978933,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 1,investment,1846.924477557472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 10,CF,0.236829,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 10,CF,0.236829,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 10,CF,0.236829,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1721,12 +1721,12 @@ Midsize DW - Class 10,FOM,1.71,%/year,NREL/ATB-https://data.openei.org/s3_viewer Midsize DW - Class 10,FOM,2.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 10,FOM,2.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 10,FOM,1.71,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 10,investment,1226.1744539278163,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 10,investment,1761.6750609846126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 10,investment,2114.0100731815355,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 10,investment,1226.1744539278163,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 10,investment,1761.6750609846126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 10,investment,2114.0100731815355,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 10,investment,1071.2586668552167,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 10,investment,1539.1037312978933,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 10,investment,1846.924477557472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 10,investment,1071.2586668552167,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 10,investment,1539.1037312978933,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 10,investment,1846.924477557472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 2,CF,0.550198,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 2,CF,0.550198,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 2,CF,0.550198,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1739,12 +1739,12 @@ Midsize DW - Class 2,FOM,1.71,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 2,FOM,2.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 2,FOM,2.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 2,FOM,1.71,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 2,investment,1226.1744539278163,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 2,investment,1761.6750609846126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 2,investment,2114.0100731815355,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 2,investment,1226.1744539278163,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 2,investment,1761.6750609846126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 2,investment,2114.0100731815355,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 2,investment,1071.2586668552167,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 2,investment,1539.1037312978933,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 2,investment,1846.924477557472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 2,investment,1071.2586668552167,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 2,investment,1539.1037312978933,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 2,investment,1846.924477557472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 3,CF,0.5380940000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 3,CF,0.5380940000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 3,CF,0.5380940000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1757,12 +1757,12 @@ Midsize DW - Class 3,FOM,1.71,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 3,FOM,2.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 3,FOM,2.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 3,FOM,1.71,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 3,investment,1226.1744539278163,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 3,investment,1761.6750609846126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 3,investment,2114.0100731815355,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 3,investment,1226.1744539278163,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 3,investment,1761.6750609846126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 3,investment,2114.0100731815355,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 3,investment,1071.2586668552167,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 3,investment,1539.1037312978933,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 3,investment,1846.924477557472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 3,investment,1071.2586668552167,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 3,investment,1539.1037312978933,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 3,investment,1846.924477557472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 4,CF,0.525456,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 4,CF,0.525456,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 4,CF,0.525456,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1775,12 +1775,12 @@ Midsize DW - Class 4,FOM,1.71,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 4,FOM,2.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 4,FOM,2.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 4,FOM,1.71,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 4,investment,1226.1744539278163,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 4,investment,1761.6750609846126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 4,investment,2114.0100731815355,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 4,investment,1226.1744539278163,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 4,investment,1761.6750609846126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 4,investment,2114.0100731815355,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 4,investment,1071.2586668552167,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 4,investment,1539.1037312978933,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 4,investment,1846.924477557472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 4,investment,1071.2586668552167,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 4,investment,1539.1037312978933,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 4,investment,1846.924477557472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 5,CF,0.509436,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 5,CF,0.509436,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 5,CF,0.509436,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1793,12 +1793,12 @@ Midsize DW - Class 5,FOM,1.71,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 5,FOM,2.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 5,FOM,2.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 5,FOM,1.71,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 5,investment,1226.1744539278163,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 5,investment,1761.6750609846126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 5,investment,2114.0100731815355,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 5,investment,1226.1744539278163,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 5,investment,1761.6750609846126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 5,investment,2114.0100731815355,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 5,investment,1071.2586668552167,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 5,investment,1539.1037312978933,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 5,investment,1846.924477557472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 5,investment,1071.2586668552167,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 5,investment,1539.1037312978933,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 5,investment,1846.924477557472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 6,CF,0.484872,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 6,CF,0.484872,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 6,CF,0.484872,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1811,12 +1811,12 @@ Midsize DW - Class 6,FOM,1.71,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 6,FOM,2.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 6,FOM,2.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 6,FOM,1.71,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 6,investment,1226.1744539278163,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 6,investment,1761.6750609846126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 6,investment,2114.0100731815355,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 6,investment,1226.1744539278163,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 6,investment,1761.6750609846126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 6,investment,2114.0100731815355,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 6,investment,1071.2586668552167,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 6,investment,1539.1037312978933,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 6,investment,1846.924477557472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 6,investment,1071.2586668552167,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 6,investment,1539.1037312978933,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 6,investment,1846.924477557472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 7,CF,0.448916,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 7,CF,0.448916,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 7,CF,0.448916,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1829,12 +1829,12 @@ Midsize DW - Class 7,FOM,1.71,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 7,FOM,2.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 7,FOM,2.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 7,FOM,1.71,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 7,investment,1226.1744539278163,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 7,investment,1761.6750609846126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 7,investment,2114.0100731815355,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 7,investment,1226.1744539278163,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 7,investment,1761.6750609846126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 7,investment,2114.0100731815355,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 7,investment,1071.2586668552167,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 7,investment,1539.1037312978933,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 7,investment,1846.924477557472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 7,investment,1071.2586668552167,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 7,investment,1539.1037312978933,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 7,investment,1846.924477557472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 8,CF,0.402458,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 8,CF,0.402458,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 8,CF,0.402458,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1847,12 +1847,12 @@ Midsize DW - Class 8,FOM,1.71,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 8,FOM,2.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 8,FOM,2.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 8,FOM,1.71,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 8,investment,1226.1744539278163,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 8,investment,1761.6750609846126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 8,investment,2114.0100731815355,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 8,investment,1226.1744539278163,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 8,investment,1761.6750609846126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 8,investment,2114.0100731815355,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 8,investment,1071.2586668552167,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 8,investment,1539.1037312978933,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 8,investment,1846.924477557472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 8,investment,1071.2586668552167,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 8,investment,1539.1037312978933,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 8,investment,1846.924477557472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 9,CF,0.348079,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 9,CF,0.348079,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 9,CF,0.348079,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1865,78 +1865,78 @@ Midsize DW - Class 9,FOM,1.71,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 9,FOM,2.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 9,FOM,2.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 9,FOM,1.71,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 9,investment,1226.1744539278163,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 9,investment,1761.6750609846126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 9,investment,2114.0100731815355,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 9,investment,1226.1744539278163,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 9,investment,1761.6750609846126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 9,investment,2114.0100731815355,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 9,investment,1071.2586668552167,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 9,investment,1539.1037312978933,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 9,investment,1846.924477557472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 9,investment,1071.2586668552167,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 9,investment,1539.1037312978933,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 9,investment,1846.924477557472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 1-on-1 Combined Cycle (H-Frame),FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 1-on-1 Combined Cycle (H-Frame),FOM,2.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG 1-on-1 Combined Cycle (H-Frame),FOM,2.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG 1-on-1 Combined Cycle (H-Frame),FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 1-on-1 Combined Cycle (H-Frame),FOM,2.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 1-on-1 Combined Cycle (H-Frame),FOM,2.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 1-on-1 Combined Cycle (H-Frame),VOM,2.16,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 1-on-1 Combined Cycle (H-Frame),VOM,2.2,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 1-on-1 Combined Cycle (H-Frame),VOM,2.24,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 1-on-1 Combined Cycle (H-Frame),VOM,2.16,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 1-on-1 Combined Cycle (H-Frame),VOM,2.2,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 1-on-1 Combined Cycle (H-Frame),VOM,2.24,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 1-on-1 Combined Cycle (H-Frame),investment,1462.0335914078762,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 1-on-1 Combined Cycle (H-Frame),investment,1486.549398580874,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 1-on-1 Combined Cycle (H-Frame),investment,1509.9508508823722,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 1-on-1 Combined Cycle (H-Frame),investment,1462.0335914078762,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 1-on-1 Combined Cycle (H-Frame),investment,1486.549398580874,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 1-on-1 Combined Cycle (H-Frame),investment,1509.9508508823722,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 1-on-1 Combined Cycle (H-Frame),VOM,1.8871040030193669,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 1-on-1 Combined Cycle (H-Frame),VOM,1.9220503734456513,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 1-on-1 Combined Cycle (H-Frame),VOM,1.956996743871936,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 1-on-1 Combined Cycle (H-Frame),VOM,1.8871040030193669,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 1-on-1 Combined Cycle (H-Frame),VOM,1.9220503734456513,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 1-on-1 Combined Cycle (H-Frame),VOM,1.956996743871936,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 1-on-1 Combined Cycle (H-Frame),investment,1277.3191865252704,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 1-on-1 Combined Cycle (H-Frame),investment,1298.737648494444,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 1-on-1 Combined Cycle (H-Frame),investment,1319.1825440104737,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 1-on-1 Combined Cycle (H-Frame),investment,1277.3191865252704,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 1-on-1 Combined Cycle (H-Frame),investment,1298.737648494444,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 1-on-1 Combined Cycle (H-Frame),investment,1319.1825440104737,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.28,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.3,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.28,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.3,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.67,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.07,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.47,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.67,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.07,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.47,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2230.938452742811,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2460.495556271791,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2690.0526598007723,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2230.938452742811,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2460.495556271791,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2690.0526598007723,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.206329486611609,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.555793190874455,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.9052568951373003,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.206329486611609,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.555793190874455,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.9052568951373003,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,1949.0800391948105,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2149.6347285425277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2350.189417890246,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,1949.0800391948105,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2149.6347285425277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2350.189417890246,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.29,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.31,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.29,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.31,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.71,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.13,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.55,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.71,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.13,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.55,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2250.9968404298093,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2488.354428059289,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2725.712015688769,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2250.9968404298093,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2488.354428059289,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2725.712015688769,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.2412758570378934,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.6082127465138814,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.9751496359898693,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.2412758570378934,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.6082127465138814,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.9751496359898693,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,1966.6042353514072,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2173.973889871135,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2381.3435443908625,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,1966.6042353514072,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2173.973889871135,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2381.3435443908625,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame),FOM,2.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (F-Frame),FOM,2.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG 2-on-1 Combined Cycle (F-Frame),FOM,2.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG 2-on-1 Combined Cycle (F-Frame),FOM,2.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 2-on-1 Combined Cycle (F-Frame),FOM,2.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (F-Frame),FOM,2.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (F-Frame),VOM,1.76,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (F-Frame),VOM,1.85,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (F-Frame),VOM,1.93,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (F-Frame),VOM,1.76,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (F-Frame),VOM,1.85,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (F-Frame),VOM,1.93,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (F-Frame),VOM,1.537640298756521,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (F-Frame),VOM,1.6162696322156613,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (F-Frame),VOM,1.6861623730682302,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (F-Frame),VOM,1.537640298756521,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (F-Frame),VOM,1.6162696322156613,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (F-Frame),VOM,1.6861623730682302,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame),discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (F-Frame),discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG 2-on-1 Combined Cycle (F-Frame),discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1944,12 +1944,12 @@ NG 2-on-1 Combined Cycle (F-Frame),discount rate,0.0535847804878049,per unit,"NR NG 2-on-1 Combined Cycle (F-Frame),discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (F-Frame),discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame),efficiency,0.573,p.u.,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, -NG 2-on-1 Combined Cycle (F-Frame),investment,1196.5942610165987,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (F-Frame),investment,1241.837068799495,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (F-Frame),investment,1287.079876582391,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (F-Frame),investment,1196.5942610165987,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (F-Frame),investment,1241.837068799495,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (F-Frame),investment,1287.079876582391,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (F-Frame),investment,1045.4156573863074,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (F-Frame),investment,1084.9424553839647,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (F-Frame),investment,1124.4692533816215,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (F-Frame),investment,1045.4156573863074,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (F-Frame),investment,1084.9424553839647,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (F-Frame),investment,1124.4692533816215,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame),lifetime,30.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,FOM,2.18,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -1957,12 +1957,12 @@ NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,FOM,2.33,%/year,NREL/ATB-https://data NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,FOM,2.18,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,FOM,2.33,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,3.24,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,3.81,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,4.37,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,3.24,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,3.81,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,4.37,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,2.8306560045290503,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,3.3286417831036053,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,3.817890969071589,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,2.8306560045290503,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,3.3286417831036053,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,3.817890969071589,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,capture_rate,0.95,per unit,"NREL, NREL ATB 2024",,,, NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -1971,12 +1971,12 @@ NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,discount rate,0.0535847804878049,per NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,efficiency,0.527,p.u.,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,1746.751261076102,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,2082.952125807624,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,2419.1529905391453,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,1746.751261076102,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,2082.952125807624,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,2419.1529905391453,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,1526.0654153036292,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,1819.7904142172529,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,2113.5154131308764,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,1526.0654153036292,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,1819.7904142172529,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,2113.5154131308764,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,lifetime,30.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,FOM,2.17,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -1984,12 +1984,12 @@ NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,FOM,2.33,%/year,NREL/ATB-https://data NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,FOM,2.17,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,FOM,2.33,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,3.28,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,3.87,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,4.45,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,3.28,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,3.87,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,4.45,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,2.8656023749553343,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,3.381061338743032,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,3.8877837099241583,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,2.8656023749553343,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,3.381061338743032,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,3.8877837099241583,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,capture_rate,0.97,per unit,"NREL, NREL ATB 2024",,,, NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -1998,12 +1998,12 @@ NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,discount rate,0.0535847804878049,per NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,efficiency,0.525,p.u.,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,1761.4607453799008,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,2107.9136749292215,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,2454.3666044785423,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,1761.4607453799008,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,2107.9136749292215,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,2454.3666044785423,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,1538.9164924851334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,1841.5983027676843,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,2144.2801130502353,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,1538.9164924851334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,1841.5983027676843,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,2144.2801130502353,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,lifetime,30.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, NG 2-on-1 Combined Cycle (H-Frame),FOM,2.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (H-Frame),FOM,2.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -2011,154 +2011,154 @@ NG 2-on-1 Combined Cycle (H-Frame),FOM,2.23,%/year,NREL/ATB-https://data.openei. NG 2-on-1 Combined Cycle (H-Frame),FOM,2.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 2-on-1 Combined Cycle (H-Frame),FOM,2.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (H-Frame),FOM,2.23,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (H-Frame),VOM,1.76,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (H-Frame),VOM,1.84,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (H-Frame),VOM,1.92,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (H-Frame),VOM,1.76,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (H-Frame),VOM,1.84,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (H-Frame),VOM,1.92,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (H-Frame),investment,1196.5942610165987,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (H-Frame),investment,1257.3266015133436,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (H-Frame),investment,1318.0589420100882,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (H-Frame),investment,1196.5942610165987,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (H-Frame),investment,1257.3266015133436,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (H-Frame),investment,1318.0589420100882,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (H-Frame),VOM,1.537640298756521,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (H-Frame),VOM,1.60753303960909,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (H-Frame),VOM,1.6774257804616592,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (H-Frame),VOM,1.537640298756521,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (H-Frame),VOM,1.60753303960909,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (H-Frame),VOM,1.6774257804616592,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (H-Frame),investment,1045.4156573863074,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (H-Frame),investment,1098.4750290826698,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (H-Frame),investment,1151.5344007790318,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (H-Frame),investment,1045.4156573863074,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (H-Frame),investment,1098.4750290826698,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (H-Frame),investment,1151.5344007790318,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.18,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.23,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.18,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.23,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.24,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.7,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.16,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.24,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.7,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.16,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,1746.751261076102,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2025.3399789510784,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2303.928696826055,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,1746.751261076102,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2025.3399789510784,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2303.928696826055,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,2.8306560045290503,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.2325392644313227,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.634422524333595,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,2.8306560045290503,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.2325392644313227,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.634422524333595,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,1526.0654153036292,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,1769.4570285896943,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2012.8486418757598,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,1526.0654153036292,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,1769.4570285896943,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2012.8486418757598,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.28,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.76,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.23,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.28,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.76,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.23,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,1761.7950518413509,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2048.184253816826,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2335.6878106638023,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,1761.7950518413509,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2048.184253816826,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2335.6878106638023,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,2.8656023749553343,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.284958820070749,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.6955786725795936,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,2.8656023749553343,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.284958820070749,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.6955786725795936,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,1539.2085624210767,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,1789.4151408791515,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2040.5952857903712,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,1539.2085624210767,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,1789.4151408791515,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2040.5952857903712,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG Combined Cycle F-Class integrated retrofit 90%-CCS,FOM,7.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG Combined Cycle F-Class integrated retrofit 90%-CCS,FOM,6.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG Combined Cycle F-Class integrated retrofit 90%-CCS,FOM,5.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG Combined Cycle F-Class integrated retrofit 90%-CCS,FOM,7.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG Combined Cycle F-Class integrated retrofit 90%-CCS,FOM,6.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG Combined Cycle F-Class integrated retrofit 90%-CCS,FOM,5.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,3.83,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,4.16,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,4.49,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,3.83,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,4.16,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,4.49,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,3.3461149683167473,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,3.634422524333595,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,3.922730080350443,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,3.3461149683167473,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,3.634422524333595,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,3.922730080350443,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG Combined Cycle F-Class integrated retrofit 90%-CCS,capture_rate,0.9,per unit,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, NG Combined Cycle F-Class integrated retrofit 90%-CCS,efficiency,0.536,p.u.,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, -NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,719.3,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,902.5,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,1085.7,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,719.3,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,902.5,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,1085.7,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,628.4231061906622,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,788.4774827430456,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,948.531859295429,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,628.4231061906622,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,788.4774827430456,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,948.531859295429,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG Combined Cycle F-Class integrated retrofit 95%-CCS,FOM,6.93,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG Combined Cycle F-Class integrated retrofit 95%-CCS,FOM,5.98,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG Combined Cycle F-Class integrated retrofit 95%-CCS,FOM,5.35,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG Combined Cycle F-Class integrated retrofit 95%-CCS,FOM,6.93,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG Combined Cycle F-Class integrated retrofit 95%-CCS,FOM,5.98,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG Combined Cycle F-Class integrated retrofit 95%-CCS,FOM,5.35,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,3.91,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,4.26,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,4.61,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,3.91,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,4.26,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,4.61,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,3.4160077091693166,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,3.7217884503993064,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,4.027569191629297,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,3.4160077091693166,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,3.7217884503993064,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,4.027569191629297,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG Combined Cycle F-Class integrated retrofit 95%-CCS,capture_rate,0.95,per unit,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, NG Combined Cycle F-Class integrated retrofit 95%-CCS,efficiency,0.536,p.u.,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, -NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,747.6,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,940.8,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,1134.0,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,747.6,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,940.8,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,1134.0,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,653.1476632672586,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,821.938632426213,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,990.7296015851675,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,653.1476632672586,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,821.938632426213,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,990.7296015851675,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG Combined Cycle H-Class integrated retrofit 90%-CCS,FOM,7.66,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG Combined Cycle H-Class integrated retrofit 90%-CCS,FOM,6.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG Combined Cycle H-Class integrated retrofit 90%-CCS,FOM,5.85,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG Combined Cycle H-Class integrated retrofit 90%-CCS,FOM,7.66,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG Combined Cycle H-Class integrated retrofit 90%-CCS,FOM,6.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG Combined Cycle H-Class integrated retrofit 90%-CCS,FOM,5.85,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,3.69,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,3.98,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,4.27,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,3.69,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,3.98,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,4.27,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,626.8,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,785.4,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,944.0,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,626.8,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,785.4,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,944.0,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,3.2238026718247514,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,3.4771638574153143,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,3.730525043005877,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,3.2238026718247514,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,3.4771638574153143,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,3.730525043005877,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,547.6096245798791,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,686.1719833200974,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,824.7343420603158,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,547.6096245798791,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,686.1719833200974,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,824.7343420603158,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG Combined Cycle H-Class integrated retrofit 95%-CCS,FOM,7.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG Combined Cycle H-Class integrated retrofit 95%-CCS,FOM,6.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG Combined Cycle H-Class integrated retrofit 95%-CCS,FOM,5.72,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG Combined Cycle H-Class integrated retrofit 95%-CCS,FOM,7.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG Combined Cycle H-Class integrated retrofit 95%-CCS,FOM,6.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG Combined Cycle H-Class integrated retrofit 95%-CCS,FOM,5.72,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,3.76,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,4.07,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,4.38,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,3.76,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,4.07,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,4.38,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,651.4,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,818.9,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,986.3,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,651.4,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,818.9,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,986.3,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,3.284958820070749,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,3.555793190874455,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,3.82662756167816,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,3.284958820070749,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,3.555793190874455,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,3.82662756167816,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,569.1016423920441,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,715.4395685521108,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,861.6901287861117,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,569.1016423920441,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,715.4395685521108,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,861.6901287861117,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG Fuel Cell,FOM,2.38,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG Fuel Cell,FOM,2.37,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG Fuel Cell,FOM,2.38,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG Fuel Cell,FOM,2.37,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Fuel Cell,VOM,6.9,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Fuel Cell,VOM,7.5,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Fuel Cell,VOM,6.9,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Fuel Cell,VOM,7.5,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Fuel Cell,investment,1568.6773526104173,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Fuel Cell,investment,1707.748840573605,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Fuel Cell,investment,1568.6773526104173,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Fuel Cell,investment,1707.748840573605,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Fuel Cell,VOM,6.0282488985340885,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Fuel Cell,VOM,6.552444454928357,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Fuel Cell,VOM,6.0282488985340885,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Fuel Cell,VOM,6.552444454928357,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Fuel Cell,investment,1370.4894960911763,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Fuel Cell,investment,1491.99058944358,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Fuel Cell,investment,1370.4894960911763,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Fuel Cell,investment,1491.99058944358,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG Fuel Cell 98% CCS,FOM,2.39,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG Fuel Cell 98% CCS,FOM,2.37,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG Fuel Cell 98% CCS,FOM,2.39,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG Fuel Cell 98% CCS,FOM,2.37,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Fuel Cell 98% CCS,VOM,7.61,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Fuel Cell 98% CCS,VOM,8.23,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Fuel Cell 98% CCS,VOM,7.61,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Fuel Cell 98% CCS,VOM,8.23,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Fuel Cell 98% CCS,investment,2209.542839210013,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Fuel Cell 98% CCS,investment,2425.0590713580946,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Fuel Cell 98% CCS,investment,2209.542839210013,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Fuel Cell 98% CCS,investment,2425.0590713580946,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Fuel Cell 98% CCS,VOM,6.648546973600639,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Fuel Cell 98% CCS,VOM,7.19021571520805,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Fuel Cell 98% CCS,VOM,6.648546973600639,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Fuel Cell 98% CCS,VOM,7.19021571520805,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Fuel Cell 98% CCS,investment,1930.387563294441,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Fuel Cell 98% CCS,investment,2118.675315332541,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Fuel Cell 98% CCS,investment,1930.387563294441,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Fuel Cell 98% CCS,investment,2118.675315332541,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NH3 (l) storage tank incl. liquefaction,FOM,2.0,%/year,"Guesstimate, based on H2 (l) storage tank.",,2010.0,, NH3 (l) storage tank incl. liquefaction,investment,166.8201,EUR/MWh_NH3,"Calculated based on Morgan E. 2013: doi:10.7275/11KT-3F59 , Fig. 55, Fig 58.","Based on estimated for a double-wall liquid ammonia tank (~ambient pressure, -33°C), inner tank from stainless steel, outer tank from concrete including installations for liquefaction/condensation, boil-off gas recovery and safety installations; the necessary installations make only a small fraction of the total cost. The total cost are driven by material and working time on the tanks. While the costs do not scale strictly linearly, we here assume they do (good approximation c.f. ref. Fig 55.) and take the costs for a 9 kt NH3 (l) tank = 8 M$2010, which is smaller 4-5x smaller than the largest deployed tanks today. @@ -2170,12 +2170,12 @@ NH3 (l) transport ship,capacity,53000.0,t_NH3,"Cihlar et al 2020 based on IEA 20 NH3 (l) transport ship,investment,81164200.0,EUR,"Cihlar et al 2020 based on IEA 2019, Table 3-B",,2019.0,, NH3 (l) transport ship,lifetime,20.0,years,"Guess estimated based on H2 (l) tanker, but more mature technology",,2019.0,, Natural gas steam reforming,FOM,0.05,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, -Natural gas steam reforming,efficiency,0.7808,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Natural gas steam reforming,investment,180.0632,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Natural gas steam reforming,efficiency,0.7808333333333334,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, +Natural gas steam reforming,investment,242.75887320940691,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Natural gas steam reforming,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Natural gas steam reforming CC,FOM,0.05,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Natural gas steam reforming CC,efficiency,0.6805,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Natural gas steam reforming CC,investment,323.8999,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Natural gas steam reforming CC,investment,436.6777280424164,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Natural gas steam reforming CC,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Ni-Zn-bicharger,FOM,2.1198,%/year,"Viswanathan_2022, p.51-52 in section 4.4.2","{'carrier': ['elec', 'nizn', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['Guesstimate 30% assumed of power components every 10 years ']}",2020.0,, Ni-Zn-bicharger,efficiency,0.9,per unit,"Viswanathan_2022, p.59 (p.81)","{'carrier': ['elec', 'nizn', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['((0.75-0.87)/2)^0.5 mean value of range efficiency is not RTE but single way AC-store conversion']}",2020.0,, @@ -2196,24 +2196,24 @@ Nuclear - Small,FOM,2.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucke Nuclear - Small,FOM,4.38,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Nuclear - Small,FOM,2.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Nuclear - Small,FOM,2.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Nuclear - Small,VOM,2.2,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Nuclear - Small,VOM,2.6,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Nuclear - Small,VOM,2.8,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Nuclear - Small,VOM,2.2,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Nuclear - Small,VOM,2.6,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Nuclear - Small,VOM,2.8,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Nuclear - Small,fuel,10.0062,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Nuclear - Small,fuel,11.016,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Nuclear - Small,fuel,12.1176,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Nuclear - Small,fuel,10.0062,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Nuclear - Small,fuel,11.016,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Nuclear - Small,fuel,12.1176,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Nuclear - Small,investment,2692.739220223554,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Nuclear - Small,investment,5480.247298078459,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Nuclear - Small,investment,8914.45550703092,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Nuclear - Small,investment,2692.739220223554,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Nuclear - Small,investment,5480.247298078459,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Nuclear - Small,investment,8914.45550703092,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Nuclear - Small,VOM,1.9220503734456513,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Nuclear - Small,VOM,2.271514077708497,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Nuclear - Small,VOM,2.4462459298399195,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Nuclear - Small,VOM,1.9220503734456513,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Nuclear - Small,VOM,2.271514077708497,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Nuclear - Small,VOM,2.4462459298399195,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Nuclear - Small,fuel,8.742009293987216,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Nuclear - Small,fuel,9.62423041539877,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Nuclear - Small,fuel,10.586653456938647,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Nuclear - Small,fuel,8.742009293987216,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Nuclear - Small,fuel,9.62423041539877,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Nuclear - Small,fuel,10.586653456938647,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Nuclear - Small,investment,2352.5365562829247,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Nuclear - Small,investment,4787.868802657374,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Nuclear - Small,investment,7788.196607433373,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Nuclear - Small,investment,2352.5365562829247,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Nuclear - Small,investment,4787.868802657374,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Nuclear - Small,investment,7788.196607433373,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative OCGT,FOM,1.7964,%/year,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",52 OCGT - Natural gas: Fixed O&M,2015.0,, OCGT,VOM,4.762,EUR/MWh,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",52 OCGT - Natural gas: Variable O&M,2015.0,, OCGT,efficiency,0.425,per unit,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","52 OCGT - Natural gas: Electricity efficiency, annual average",2015.0,, @@ -2231,12 +2231,12 @@ Offshore Wind - Class 1,FOM,2.15,%/year,NREL/ATB-https://data.openei.org/s3_view Offshore Wind - Class 1,FOM,2.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 1,FOM,2.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 1,FOM,2.15,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 1,investment,2641.4625083055157,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 1,investment,3163.568624971313,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 1,investment,3815.032908682297,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 1,investment,2641.4625083055157,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 1,investment,3163.568624971313,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 1,investment,3815.032908682297,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 1,investment,2307.7381820596834,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 1,investment,2763.8810259304805,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 1,investment,3333.0388303819354,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 1,investment,2307.7381820596834,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 1,investment,2763.8810259304805,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 1,investment,3333.0388303819354,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 10,CF,0.5224,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 10,CF,0.4935,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 10,CF,0.4723,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2249,12 +2249,12 @@ Offshore Wind - Class 10,FOM,1.01,%/year,NREL/ATB-https://data.openei.org/s3_vie Offshore Wind - Class 10,FOM,1.89,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 10,FOM,1.37,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 10,FOM,1.01,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 10,investment,2845.979678565222,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 10,investment,4294.892173034509,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 10,investment,6599.899983633626,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 10,investment,2845.979678565222,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 10,investment,4294.892173034509,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 10,investment,6599.899983633626,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 10,investment,2486.4165018204635,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 10,investment,3752.272320495356,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 10,investment,5766.063740112254,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 10,investment,2486.4165018204635,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 10,investment,3752.272320495356,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 10,investment,5766.063740112254,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 11,CF,0.5196,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 11,CF,0.4908,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 11,CF,0.4698,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2267,12 +2267,12 @@ Offshore Wind - Class 11,FOM,0.99,%/year,NREL/ATB-https://data.openei.org/s3_vie Offshore Wind - Class 11,FOM,1.86,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 11,FOM,1.35,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 11,FOM,0.99,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 11,investment,2933.7916835069036,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 11,investment,4427.409876409898,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 11,investment,6803.538297675719,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 11,investment,2933.7916835069036,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 11,investment,4427.409876409898,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 11,investment,6803.538297675719,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 11,investment,2563.1342731346317,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 11,investment,3868.047639250277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 11,investment,5943.97423899973,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 11,investment,2563.1342731346317,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 11,investment,3868.047639250277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 11,investment,5943.97423899973,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 12,CF,0.5094,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 12,CF,0.4813,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 12,CF,0.4606,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2285,12 +2285,12 @@ Offshore Wind - Class 12,FOM,1.0,%/year,NREL/ATB-https://data.openei.org/s3_view Offshore Wind - Class 12,FOM,1.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 12,FOM,1.36,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 12,FOM,1.0,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 12,investment,3055.373963119461,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 12,investment,4610.890818748608,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 12,investment,7085.490827383075,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 12,investment,3055.373963119461,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 12,investment,4610.890818748608,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 12,investment,7085.490827383075,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 12,investment,2669.355757649945,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 12,investment,4028.3474636785845,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 12,investment,6190.304677644262,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 12,investment,2669.355757649945,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 12,investment,4028.3474636785845,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 12,investment,6190.304677644262,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 13,CF,0.4009,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 13,CF,0.3787,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 13,CF,0.3625,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2303,12 +2303,12 @@ Offshore Wind - Class 13,FOM,0.85,%/year,NREL/ATB-https://data.openei.org/s3_vie Offshore Wind - Class 13,FOM,1.6,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 13,FOM,1.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 13,FOM,0.85,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 13,investment,3403.9401798020685,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 13,investment,5136.915035418242,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 13,investment,7893.824792724761,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 13,investment,3403.9401798020685,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 13,investment,5136.915035418242,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 13,investment,7893.824792724761,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 13,investment,2973.8838608069195,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 13,investment,4487.913391901915,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 13,investment,6896.513132168712,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 13,investment,2973.8838608069195,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 13,investment,4487.913391901915,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 13,investment,6896.513132168712,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 14,CF,0.3066,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 14,CF,0.2896,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 14,CF,0.2772,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2321,12 +2321,12 @@ Offshore Wind - Class 14,FOM,0.8,%/year,NREL/ATB-https://data.openei.org/s3_view Offshore Wind - Class 14,FOM,1.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 14,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 14,FOM,0.8,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 14,investment,3698.941069035502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 14,investment,5582.103549484662,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 14,investment,8577.939688063645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 14,investment,3698.941069035502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 14,investment,5582.103549484662,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 14,investment,8577.939688063645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 14,investment,3231.614119587792,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 14,investment,4876.856459954222,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 14,investment,7494.196445835001,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 14,investment,3231.614119587792,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 14,investment,4876.856459954222,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 14,investment,7494.196445835001,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 2,CF,0.5078,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 2,CF,0.4797,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 2,CF,0.4591,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2339,12 +2339,12 @@ Offshore Wind - Class 2,FOM,2.2,%/year,NREL/ATB-https://data.openei.org/s3_viewe Offshore Wind - Class 2,FOM,2.52,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 2,FOM,2.3,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 2,FOM,2.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 2,investment,2567.896577500592,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 2,investment,3075.461931014063,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 2,investment,3708.7827730321233,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 2,investment,2567.896577500592,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 2,investment,3075.461931014063,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 2,investment,3708.7827730321233,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 2,investment,2243.466625343101,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 2,investment,2686.905796828847,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 2,investment,3240.2124154250864,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 2,investment,2243.466625343101,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 2,investment,2686.905796828847,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 2,investment,3240.2124154250864,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 4,CF,0.5149,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 4,CF,0.4865,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 4,CF,0.4656,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2357,12 +2357,12 @@ Offshore Wind - Class 4,FOM,1.97,%/year,NREL/ATB-https://data.openei.org/s3_view Offshore Wind - Class 4,FOM,2.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 4,FOM,2.05,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 4,FOM,1.97,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 4,investment,2872.8524785462646,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 4,investment,3440.6948182506258,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 4,investment,4149.22688264285,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 4,investment,2872.8524785462646,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 4,investment,3440.6948182506258,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 4,investment,4149.22688264285,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 4,investment,2509.8941723836874,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 4,investment,3005.9948910596054,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 4,investment,3625.010490588375,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 4,investment,2509.8941723836874,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 4,investment,3005.9948910596054,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 4,investment,3625.010490588375,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 5,CF,0.5022,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 5,CF,0.4744,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 5,CF,0.4541,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2375,12 +2375,12 @@ Offshore Wind - Class 5,FOM,1.89,%/year,NREL/ATB-https://data.openei.org/s3_view Offshore Wind - Class 5,FOM,2.17,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 5,FOM,1.98,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 5,FOM,1.89,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 5,investment,3022.037628556538,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 5,investment,3619.3676066287694,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 5,investment,4364.6932243846995,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 5,investment,3022.037628556538,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 5,investment,3619.3676066287694,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 5,investment,4364.6932243846995,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 5,investment,2640.2311602426835,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 5,investment,3162.0940272535995,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 5,investment,3813.254655411052,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 5,investment,2640.2311602426835,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 5,investment,3162.0940272535995,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 5,investment,3813.254655411052,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 6,CF,0.3931,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 6,CF,0.3714,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 6,CF,0.3554,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2393,12 +2393,12 @@ Offshore Wind - Class 6,FOM,1.95,%/year,NREL/ATB-https://data.openei.org/s3_view Offshore Wind - Class 6,FOM,2.23,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 6,FOM,2.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 6,FOM,1.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 6,investment,2915.427945698881,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 6,investment,3491.6856635212744,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 6,investment,4210.717992012632,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 6,investment,2915.427945698881,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 6,investment,3491.6856635212744,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 6,investment,4210.717992012632,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 6,investment,2547.0906235383736,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 6,investment,3050.543515239042,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 6,investment,3678.7327677373646,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 6,investment,2547.0906235383736,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 6,investment,3050.543515239042,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 6,investment,3678.7327677373646,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 7,CF,0.3008,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 7,CF,0.2842,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 7,CF,0.272,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2411,12 +2411,12 @@ Offshore Wind - Class 7,FOM,1.85,%/year,NREL/ATB-https://data.openei.org/s3_view Offshore Wind - Class 7,FOM,2.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 7,FOM,1.93,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 7,FOM,1.85,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 7,investment,3082.817071714531,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 7,investment,3692.1605608285217,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 7,investment,4452.4761817259005,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 7,investment,3082.817071714531,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 7,investment,3692.1605608285217,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 7,investment,4452.4761817259005,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 7,investment,2693.3316836152467,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 7,investment,3225.6902658008025,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 7,investment,3889.947049020061,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 7,investment,2693.3316836152467,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 7,investment,3225.6902658008025,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 7,investment,3889.947049020061,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 8,CF,0.518,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 8,CF,0.4893,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 8,CF,0.4684,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2429,12 +2429,12 @@ Offshore Wind - Class 8,FOM,1.07,%/year,NREL/ATB-https://data.openei.org/s3_view Offshore Wind - Class 8,FOM,2.02,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 8,FOM,1.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 8,FOM,1.07,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 8,investment,2599.799934062678,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 8,investment,3923.380236739731,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 8,investment,6029.002989393165,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 8,investment,2599.799934062678,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 8,investment,3923.380236739731,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 8,investment,6029.002989393165,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 8,investment,2271.339288249613,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 8,investment,3427.697476906767,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 8,investment,5267.294294212764,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 8,investment,2271.339288249613,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 8,investment,3427.697476906767,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 8,investment,5267.294294212764,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 9,CF,0.5214,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 9,CF,0.4925,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 9,CF,0.4714,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2447,12 +2447,12 @@ Offshore Wind - Class 9,FOM,1.04,%/year,NREL/ATB-https://data.openei.org/s3_view Offshore Wind - Class 9,FOM,1.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 9,FOM,1.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 9,FOM,1.04,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 9,investment,2766.15609636198,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 9,investment,4174.429667333631,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 9,investment,6414.7871648388755,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 9,investment,2766.15609636198,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 9,investment,4174.429667333631,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 9,investment,6414.7871648388755,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 9,investment,2416.6778900097765,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 9,investment,3647.0291368278235,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 9,investment,5604.338211705877,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 9,investment,2416.6778900097765,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 9,investment,3647.0291368278235,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 9,investment,5604.338211705877,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PEM electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PEM electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PEM electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative @@ -2460,12 +2460,12 @@ PEM electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenar PEM electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PEM electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PEM electrolyzer,efficiency,0.72,p.u.,ICCT IRA e-fuels assumptions ,,,, -PEM electrolyzer,investment,1455.5,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PEM electrolyzer,investment,1455.5,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PEM electrolyzer,investment,1284.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PEM electrolyzer,investment,1284.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PEM electrolyzer,investment,394.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PEM electrolyzer,investment,394.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PEM electrolyzer,investment,1271.6110538864298,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PEM electrolyzer,investment,1271.6110538864298,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PEM electrolyzer,investment,1121.7784906837346,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PEM electrolyzer,investment,1121.7784906837346,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PEM electrolyzer,investment,344.221748698903,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PEM electrolyzer,investment,344.221748698903,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PEM electrolyzer,lifetime,30.0,years,ICCT IRA e-fuels assumptions ,,,, PHS,FOM,0.7,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PHS,FOM,0.62,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -2473,12 +2473,12 @@ PHS,FOM,0.62,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data- PHS,FOM,0.7,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PHS,FOM,0.62,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PHS,FOM,0.62,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PHS,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PHS,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PHS,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PHS,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PHS,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PHS,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PHS,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PHS,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PHS,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PHS,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PHS,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PHS,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PHS,discount rate,0.0481958813505439,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PHS,discount rate,0.0481958813505439,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PHS,discount rate,0.0481958813505439,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2486,12 +2486,12 @@ PHS,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of s PHS,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PHS,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PHS,efficiency,0.75,per unit,DIW DataDoc http://hdl.handle.net/10419/80348, from old pypsa cost assumptions,2015.0,, -PHS,investment,2898.5578048524126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PHS,investment,3224.2384570830204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PHS,investment,3224.2384570830204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PHS,investment,2898.5578048524126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PHS,investment,3224.2384570830204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PHS,investment,3224.2384570830204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PHS,investment,2532.351868759267,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PHS,investment,2816.8857865973864,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PHS,investment,2816.8857865973864,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PHS,investment,2532.351868759267,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PHS,investment,2816.8857865973864,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PHS,investment,2816.8857865973864,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PHS,lifetime,80.0,years,IEA2010, from old pypsa cost assumptions,2015.0,, PV+Storage - Class 1,CF,0.383295650368802,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 1,CF,0.364373927830122,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -2505,12 +2505,12 @@ PV+Storage - Class 1,FOM,3.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer? PV+Storage - Class 1,FOM,3.98,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 1,FOM,3.72,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 1,FOM,3.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 1,investment,973.600452492568,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 1,investment,1276.7143102026153,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 1,investment,1758.3475445923293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 1,investment,973.600452492568,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 1,investment,1276.7143102026153,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 1,investment,1758.3475445923293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 1,investment,850.5950515000889,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 1,investment,1115.4132803219743,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 1,investment,1536.1966157867867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 1,investment,850.5950515000889,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 1,investment,1115.4132803219743,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 1,investment,1536.1966157867867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 10,CF,0.2479405183348972,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 10,CF,0.23913751764110192,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 10,CF,0.2235131074296373,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2523,12 +2523,12 @@ PV+Storage - Class 10,FOM,3.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer PV+Storage - Class 10,FOM,3.98,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 10,FOM,3.72,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 10,FOM,3.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 10,investment,973.600452492568,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 10,investment,1276.7143102026153,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 10,investment,1758.3475445923293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 10,investment,973.600452492568,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 10,investment,1276.7143102026153,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 10,investment,1758.3475445923293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 10,investment,850.5950515000889,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 10,investment,1115.4132803219743,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 10,investment,1536.1966157867867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 10,investment,850.5950515000889,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 10,investment,1115.4132803219743,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 10,investment,1536.1966157867867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 2,CF,0.3711231476815151,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 2,CF,0.35257793977185975,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 2,CF,0.3325701620608583,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2541,12 +2541,12 @@ PV+Storage - Class 2,FOM,3.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer? PV+Storage - Class 2,FOM,3.98,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 2,FOM,3.72,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 2,FOM,3.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 2,investment,973.600452492568,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 2,investment,1276.7143102026153,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 2,investment,1758.3475445923293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 2,investment,973.600452492568,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 2,investment,1276.7143102026153,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 2,investment,1758.3475445923293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 2,investment,850.5950515000889,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 2,investment,1115.4132803219743,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 2,investment,1536.1966157867867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 2,investment,850.5950515000889,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 2,investment,1115.4132803219743,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 2,investment,1536.1966157867867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 3,CF,0.3547361901852855,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 3,CF,0.3381576335287072,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 3,CF,0.31825409891534856,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2559,12 +2559,12 @@ PV+Storage - Class 3,FOM,3.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer? PV+Storage - Class 3,FOM,3.98,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 3,FOM,3.72,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 3,FOM,3.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 3,investment,973.600452492568,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 3,investment,1276.7143102026153,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 3,investment,1758.3475445923293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 3,investment,973.600452492568,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 3,investment,1276.7143102026153,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 3,investment,1758.3475445923293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 3,investment,850.5950515000889,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 3,investment,1115.4132803219743,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 3,investment,1536.1966157867867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 3,investment,850.5950515000889,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 3,investment,1115.4132803219743,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 3,investment,1536.1966157867867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 4,CF,0.33888921134195665,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 4,CF,0.32393473026886704,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 4,CF,0.30432487120098656,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2577,12 +2577,12 @@ PV+Storage - Class 4,FOM,3.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer? PV+Storage - Class 4,FOM,3.98,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 4,FOM,3.72,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 4,FOM,3.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 4,investment,973.600452492568,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 4,investment,1276.7143102026153,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 4,investment,1758.3475445923293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 4,investment,973.600452492568,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 4,investment,1276.7143102026153,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 4,investment,1758.3475445923293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 4,investment,850.5950515000889,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 4,investment,1115.4132803219743,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 4,investment,1536.1966157867867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 4,investment,850.5950515000889,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 4,investment,1115.4132803219743,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 4,investment,1536.1966157867867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 5,CF,0.3229061255111138,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 5,CF,0.3091937621980054,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 5,CF,0.29013014734655385,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2595,12 +2595,12 @@ PV+Storage - Class 5,FOM,3.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer? PV+Storage - Class 5,FOM,3.98,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 5,FOM,3.72,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 5,FOM,3.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 5,investment,973.600452492568,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 5,investment,1276.7143102026153,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 5,investment,1758.3475445923293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 5,investment,973.600452492568,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 5,investment,1276.7143102026153,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 5,investment,1758.3475445923293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 5,investment,850.5950515000889,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 5,investment,1115.4132803219743,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 5,investment,1536.1966157867867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 5,investment,850.5950515000889,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 5,investment,1115.4132803219743,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 5,investment,1536.1966157867867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 6,CF,0.30716429583800153,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 6,CF,0.2946723778568151,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 6,CF,0.27614619083043773,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2613,12 +2613,12 @@ PV+Storage - Class 6,FOM,3.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer? PV+Storage - Class 6,FOM,3.98,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 6,FOM,3.72,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 6,FOM,3.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 6,investment,973.600452492568,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 6,investment,1276.7143102026153,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 6,investment,1758.3475445923293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 6,investment,973.600452492568,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 6,investment,1276.7143102026153,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 6,investment,1758.3475445923293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 6,investment,850.5950515000889,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 6,investment,1115.4132803219743,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 6,investment,1536.1966157867867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 6,investment,850.5950515000889,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 6,investment,1115.4132803219743,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 6,investment,1536.1966157867867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 7,CF,0.29232107831790743,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 7,CF,0.28096062957197004,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 7,CF,0.2630153531271019,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2631,12 +2631,12 @@ PV+Storage - Class 7,FOM,3.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer? PV+Storage - Class 7,FOM,3.98,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 7,FOM,3.72,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 7,FOM,3.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 7,investment,973.600452492568,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 7,investment,1276.7143102026153,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 7,investment,1758.3475445923293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 7,investment,973.600452492568,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 7,investment,1276.7143102026153,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 7,investment,1758.3475445923293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 7,investment,850.5950515000889,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 7,investment,1115.4132803219743,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 7,investment,1536.1966157867867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 7,investment,850.5950515000889,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 7,investment,1115.4132803219743,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 7,investment,1536.1966157867867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 8,CF,0.2815923958434116,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 8,CF,0.2707175938380518,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 8,CF,0.25349565815015535,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2649,12 +2649,12 @@ PV+Storage - Class 8,FOM,3.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer? PV+Storage - Class 8,FOM,3.98,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 8,FOM,3.72,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 8,FOM,3.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 8,investment,973.600452492568,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 8,investment,1276.7143102026153,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 8,investment,1758.3475445923293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 8,investment,973.600452492568,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 8,investment,1276.7143102026153,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 8,investment,1758.3475445923293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 8,investment,850.5950515000889,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 8,investment,1115.4132803219743,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 8,investment,1536.1966157867867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 8,investment,850.5950515000889,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 8,investment,1115.4132803219743,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 8,investment,1536.1966157867867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 9,CF,0.26873467234786,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 9,CF,0.2586471830677579,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 9,CF,0.2420733239871076,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2667,336 +2667,336 @@ PV+Storage - Class 9,FOM,3.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer? PV+Storage - Class 9,FOM,3.98,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 9,FOM,3.72,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 9,FOM,3.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 9,investment,973.600452492568,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 9,investment,1276.7143102026153,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 9,investment,1758.3475445923293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 9,investment,973.600452492568,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 9,investment,1276.7143102026153,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 9,investment,1758.3475445923293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 9,investment,850.5950515000889,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 9,investment,1115.4132803219743,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 9,investment,1536.1966157867867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 9,investment,850.5950515000889,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 9,investment,1115.4132803219743,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 9,investment,1536.1966157867867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 10,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 10,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 10,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 10,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 10,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 10,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 10,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 10,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 10,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 10,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 10,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 10,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 10,investment,4051.584321041561,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 10,investment,4506.818514417017,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 10,investment,4506.818514417017,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 10,investment,4051.584321041561,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 10,investment,4506.818514417017,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 10,investment,4506.818514417017,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 10,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 10,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 10,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 10,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 10,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 10,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 10,investment,3539.704162411126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 10,investment,3937.4237312213645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 10,investment,3937.4237312213645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 10,investment,3539.704162411126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 10,investment,3937.4237312213645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 10,investment,3937.4237312213645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 11,FOM,0.49,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 11,FOM,0.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 11,FOM,0.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 11,FOM,0.49,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 11,FOM,0.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 11,FOM,0.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 11,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 11,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 11,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 11,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 11,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 11,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 11,investment,4111.689517472105,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 11,investment,4573.677103704925,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 11,investment,4573.677103704925,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 11,investment,4111.689517472105,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 11,investment,4573.677103704925,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 11,investment,4573.677103704925,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 11,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 11,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 11,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 11,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 11,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 11,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 11,investment,3592.215623886286,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 11,investment,3995.835356907216,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 11,investment,3995.835356907216,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 11,investment,3592.215623886286,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 11,investment,3995.835356907216,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 11,investment,3995.835356907216,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 12,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 12,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 12,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 12,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 12,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 12,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 12,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 12,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 12,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 12,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 12,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 12,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 12,investment,4165.688462297603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 12,investment,4633.743345701827,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 12,investment,4633.743345701827,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 12,investment,4165.688462297603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 12,investment,4633.743345701827,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 12,investment,4633.743345701827,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 12,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 12,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 12,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 12,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 12,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 12,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 12,investment,3639.392302098795,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 12,investment,4048.3127854806808,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 12,investment,4048.3127854806808,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 12,investment,3639.392302098795,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 12,investment,4048.3127854806808,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 12,investment,4048.3127854806808,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 13,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 13,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 13,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 13,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 13,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 13,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 13,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 13,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 13,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 13,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 13,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 13,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 13,investment,4215.32407349351,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 13,investment,4688.955991863566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 13,investment,4688.955991863566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 13,investment,4215.32407349351,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 13,investment,4688.955991863566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 13,investment,4688.955991863566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 13,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 13,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 13,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 13,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 13,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 13,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 13,investment,3682.7569134784744,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 13,investment,4096.549825105269,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 13,investment,4096.549825105269,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 13,investment,3682.7569134784744,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 13,investment,4096.549825105269,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 13,investment,4096.549825105269,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 14,FOM,0.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 14,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 14,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 14,FOM,0.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 14,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 14,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 14,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 14,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 14,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 14,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 14,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 14,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 14,investment,4262.042449904427,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 14,investment,4740.923624050991,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 14,investment,4740.923624050991,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 14,investment,4262.042449904427,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 14,investment,4740.923624050991,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 14,investment,4740.923624050991,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 14,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 14,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 14,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 14,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 14,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 14,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 14,investment,3723.5728556727368,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 14,investment,4141.951828220235,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 14,investment,4141.951828220235,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 14,investment,3723.5728556727368,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 14,investment,4141.951828220235,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 14,investment,4141.951828220235,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 15,FOM,0.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 15,FOM,0.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 15,FOM,0.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 15,FOM,0.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 15,FOM,0.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 15,FOM,0.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 15,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 15,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 15,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 15,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 15,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 15,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 15,investment,4306.843260850923,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 15,investment,4790.75823398024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 15,investment,4790.75823398024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 15,investment,4306.843260850923,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 15,investment,4790.75823398024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 15,investment,4790.75823398024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 15,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 15,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 15,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 15,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 15,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 15,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 15,investment,3762.7134990410923,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 15,investment,4185.490296686159,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 15,investment,4185.490296686159,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 15,investment,3762.7134990410923,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 15,investment,4185.490296686159,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 15,investment,4185.490296686159,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 2,FOM,0.62,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 2,FOM,0.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 2,FOM,0.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 2,FOM,0.62,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 2,FOM,0.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 2,FOM,0.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 2,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 2,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 2,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 2,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 2,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 2,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 2,investment,3231.9650826252605,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 2,investment,3595.107226740458,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 2,investment,3595.107226740458,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 2,investment,3231.9650826252605,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 2,investment,3595.107226740458,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 2,investment,3595.107226740458,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 2,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 2,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 2,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 2,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 2,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 2,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 2,investment,2823.636224555994,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 2,investment,3140.898721697117,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 2,investment,3140.898721697117,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 2,investment,2823.636224555994,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 2,investment,3140.898721697117,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 2,investment,3140.898721697117,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 3,FOM,0.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 3,FOM,0.53,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 3,FOM,0.53,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 3,FOM,0.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 3,FOM,0.53,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 3,FOM,0.53,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 3,investment,3410.773077248127,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 3,investment,3794.0060072760057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 3,investment,3794.0060072760057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 3,investment,3410.773077248127,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 3,investment,3794.0060072760057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 3,investment,3794.0060072760057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 3,investment,2979.853484937789,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 3,investment,3314.668483245405,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 3,investment,3314.668483245405,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 3,investment,2979.853484937789,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 3,investment,3314.668483245405,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 3,investment,3314.668483245405,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 4,FOM,0.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 4,FOM,0.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 4,FOM,0.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 4,FOM,0.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 4,FOM,0.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 4,FOM,0.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 4,investment,3547.063056188222,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 4,investment,3945.609466995887,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 4,investment,3945.609466995887,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 4,investment,3547.063056188222,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 4,investment,3945.609466995887,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 4,investment,3945.609466995887,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 4,investment,3098.924487173566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 4,investment,3447.118249777337,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 4,investment,3447.118249777337,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 4,investment,3098.924487173566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 4,investment,3447.118249777337,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 4,investment,3447.118249777337,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 5,FOM,0.55,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 5,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 5,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 5,FOM,0.55,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 5,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 5,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 5,investment,3656.320477923523,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 5,investment,4067.1430035329063,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 5,investment,4067.1430035329063,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 5,investment,3656.320477923523,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 5,investment,4067.1430035329063,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 5,investment,4067.1430035329063,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 5,investment,3194.3782454681314,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 5,investment,3553.2971494533135,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 5,investment,3553.2971494533135,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 5,investment,3194.3782454681314,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 5,investment,3553.2971494533135,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 5,investment,3553.2971494533135,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 6,FOM,0.54,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 6,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 6,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 6,FOM,0.54,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 6,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 6,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 6,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 6,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 6,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 6,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 6,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 6,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 6,investment,3752.4165543799513,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 6,investment,4174.036391950732,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 6,investment,4174.036391950732,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 6,investment,3752.4165543799513,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 6,investment,4174.036391950732,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 6,investment,4174.036391950732,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 6,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 6,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 6,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 6,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 6,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 6,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 6,investment,3278.333472577104,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 6,investment,3646.685548147565,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 6,investment,3646.685548147565,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 6,investment,3278.333472577104,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 6,investment,3646.685548147565,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 6,investment,3646.685548147565,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 7,FOM,0.52,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 7,FOM,0.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 7,FOM,0.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 7,FOM,0.52,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 7,FOM,0.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 7,FOM,0.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 7,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 7,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 7,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 7,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 7,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 7,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 7,investment,3838.9845187013066,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 7,investment,4270.331093836284,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 7,investment,4270.331093836284,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 7,investment,3838.9845187013066,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 7,investment,4270.331093836284,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 7,investment,4270.331093836284,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 7,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 7,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 7,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 7,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 7,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 7,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 7,investment,3353.964376282691,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 7,investment,3730.8143062020936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 7,investment,3730.8143062020936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 7,investment,3353.964376282691,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 7,investment,3730.8143062020936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 7,investment,3730.8143062020936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 8,FOM,0.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 8,FOM,0.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 8,FOM,0.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 8,FOM,0.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 8,FOM,0.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 8,FOM,0.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 8,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 8,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 8,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 8,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 8,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 8,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 8,investment,3917.320221163164,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 8,investment,4357.468560619698,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 8,investment,4357.468560619698,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 8,investment,3917.320221163164,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 8,investment,4357.468560619698,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 8,investment,4357.468560619698,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 8,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 8,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 8,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 8,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 8,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 8,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 8,investment,3422.403088178573,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 8,investment,3806.942761007625,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 8,investment,3806.942761007625,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 8,investment,3422.403088178573,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 8,investment,3806.942761007625,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 8,investment,3806.942761007625,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 9,FOM,0.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 9,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 9,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 9,FOM,0.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 9,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 9,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 9,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 9,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 9,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 9,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 9,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 9,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 9,investment,3985.603015391525,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 9,investment,4433.423578918661,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 9,investment,4433.423578918661,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 9,investment,3985.603015391525,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 9,investment,4433.423578918661,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 9,investment,4433.423578918661,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 9,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 9,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 9,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 9,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 9,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 9,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 9,investment,3482.0589836997246,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 9,investment,3873.301566137895,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 9,investment,3873.301566137895,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 9,investment,3482.0589836997246,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 9,investment,3873.301566137895,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 9,investment,3873.301566137895,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower One New Reservoir - National Class 1,FOM,1.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower One New Reservoir - National Class 1,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower One New Reservoir - National Class 1,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower One New Reservoir - National Class 1,FOM,1.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower One New Reservoir - National Class 1,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower One New Reservoir - National Class 1,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1655.088940005346,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1841.0539894441488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1841.0539894441488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1655.088940005346,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1841.0539894441488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1841.0539894441488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1445.9837796468375,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1608.4538672476056,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1608.4538672476056,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1445.9837796468375,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1608.4538672476056,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1608.4538672476056,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower One New Reservoir - National Class 3,FOM,0.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower One New Reservoir - National Class 3,FOM,0.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower One New Reservoir - National Class 3,FOM,0.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower One New Reservoir - National Class 3,FOM,0.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower One New Reservoir - National Class 3,FOM,0.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower One New Reservoir - National Class 3,FOM,0.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2088.399870074098,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2323.0515408689403,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2323.0515408689403,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2088.399870074098,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2323.0515408689403,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2323.0515408689403,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 3,investment,1824.5498864453498,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2029.5554916639283,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2029.5554916639283,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 3,investment,1824.5498864453498,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2029.5554916639283,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2029.5554916639283,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower One New Reservoir - National Class 4,FOM,0.84,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower One New Reservoir - National Class 4,FOM,0.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower One New Reservoir - National Class 4,FOM,0.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower One New Reservoir - National Class 4,FOM,0.84,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower One New Reservoir - National Class 4,FOM,0.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower One New Reservoir - National Class 4,FOM,0.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2393.341388293175,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2662.256151022745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2662.256151022745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2393.341388293175,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2662.256151022745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2662.256151022745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2090.9648677962864,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2325.9047405823862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2325.9047405823862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2090.9648677962864,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2325.9047405823862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2325.9047405823862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower One New Reservoir - National Class 5,FOM,0.65,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower One New Reservoir - National Class 5,FOM,0.58,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower One New Reservoir - National Class 5,FOM,0.58,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower One New Reservoir - National Class 5,FOM,0.65,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower One New Reservoir - National Class 5,FOM,0.58,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower One New Reservoir - National Class 5,FOM,0.58,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3109.6406816902477,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3459.038511093646,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3459.038511093646,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3109.6406816902477,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3459.038511093646,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3459.038511093646,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 5,investment,2716.7663788747864,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3022.0210281865598,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3022.0210281865598,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 5,investment,2716.7663788747864,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3022.0210281865598,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3022.0210281865598,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped-Heat-charger,FOM,0.366,%/year,"Viswanathan_2022, NULL","{'carrier': ['elec', 'phes'], 'technology_type': ['charger'], 'type': ['thermal'], 'note': ['Guesstimate, 50% on charger']}",2020.0,, Pumped-Heat-charger,efficiency,0.99,per unit,"Viswanathan_2022, NULL","{'carrier': ['elec', 'phes'], 'technology_type': ['charger'], 'type': ['thermal'], 'note': ['Charger']}",2020.0,, Pumped-Heat-charger,investment,761782.6727,EUR/MW,"Georgiou_2018, Figure 9 of reference roughly 80% of capital cost are power related 47%/80% of costs are required for liquefaction (charging)","{'carrier': ['elec', 'phes'], 'technology_type': ['charger'], 'type': ['thermal'], 'note': ['Power Equipment Charge']}",2020.0,, @@ -3021,24 +3021,24 @@ Residential Battery Storage - 5 kW - 12.5 kWh,FOM,2.41,%/year,NREL/ATB-https://d Residential Battery Storage - 5 kW - 12.5 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential Battery Storage - 5 kW - 12.5 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential Battery Storage - 5 kW - 12.5 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential Battery Storage - 5 kW - 12.5 kWh,investment,1518.5680637639985,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential Battery Storage - 5 kW - 12.5 kWh,investment,2418.1588209666556,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential Battery Storage - 5 kW - 12.5 kWh,investment,3207.405285942011,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential Battery Storage - 5 kW - 12.5 kWh,investment,1518.5680637639985,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential Battery Storage - 5 kW - 12.5 kWh,investment,2418.1588209666556,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential Battery Storage - 5 kW - 12.5 kWh,investment,3207.405285942011,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential Battery Storage - 5 kW - 12.5 kWh,investment,1326.7110518455604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential Battery Storage - 5 kW - 12.5 kWh,investment,2112.6468476772075,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential Battery Storage - 5 kW - 12.5 kWh,investment,2802.179330743817,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential Battery Storage - 5 kW - 12.5 kWh,investment,1326.7110518455604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential Battery Storage - 5 kW - 12.5 kWh,investment,2112.6468476772075,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential Battery Storage - 5 kW - 12.5 kWh,investment,2802.179330743817,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential Battery Storage - 5 kW - 20 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential Battery Storage - 5 kW - 20 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential Battery Storage - 5 kW - 20 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Residential Battery Storage - 5 kW - 20 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential Battery Storage - 5 kW - 20 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential Battery Storage - 5 kW - 20 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential Battery Storage - 5 kW - 20 kWh,investment,1885.642429609944,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential Battery Storage - 5 kW - 20 kWh,investment,2899.4067098234177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential Battery Storage - 5 kW - 20 kWh,investment,3982.712161835242,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential Battery Storage - 5 kW - 20 kWh,investment,1885.642429609944,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential Battery Storage - 5 kW - 20 kWh,investment,2899.4067098234177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential Battery Storage - 5 kW - 20 kWh,investment,3982.712161835242,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential Battery Storage - 5 kW - 20 kWh,investment,1647.408970916708,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential Battery Storage - 5 kW - 20 kWh,investment,2533.093522448603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential Battery Storage - 5 kW - 20 kWh,investment,3479.5333627190744,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential Battery Storage - 5 kW - 20 kWh,investment,1647.408970916708,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential Battery Storage - 5 kW - 20 kWh,investment,2533.093522448603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential Battery Storage - 5 kW - 20 kWh,investment,3479.5333627190744,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 1,CF,0.49395000000000006,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 1,CF,0.49395000000000006,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 1,CF,0.49395000000000006,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3051,12 +3051,12 @@ Residential DW - Class 1,FOM,1.26,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential DW - Class 1,FOM,2.63,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 1,FOM,1.64,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 1,FOM,1.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 1,investment,1378.8263872676312,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 1,investment,2206.1222196282097,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 1,investment,2867.958885516673,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 1,investment,1378.8263872676312,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 1,investment,2206.1222196282097,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 1,investment,2867.958885516673,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 1,investment,1204.6244420747585,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 1,investment,1927.3991073196134,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 1,investment,2505.6188395154977,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 1,investment,1204.6244420747585,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 1,investment,1927.3991073196134,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 1,investment,2505.6188395154977,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 10,CF,0.196957,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 10,CF,0.196957,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 10,CF,0.196957,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3069,12 +3069,12 @@ Residential DW - Class 10,FOM,1.26,%/year,NREL/ATB-https://data.openei.org/s3_vi Residential DW - Class 10,FOM,2.63,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 10,FOM,1.64,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 10,FOM,1.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 10,investment,1378.8263872676312,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 10,investment,2206.1222196282097,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 10,investment,2867.958885516673,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 10,investment,1378.8263872676312,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 10,investment,2206.1222196282097,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 10,investment,2867.958885516673,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 10,investment,1204.6244420747585,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 10,investment,1927.3991073196134,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 10,investment,2505.6188395154977,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 10,investment,1204.6244420747585,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 10,investment,1927.3991073196134,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 10,investment,2505.6188395154977,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 2,CF,0.462355,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 2,CF,0.462355,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 2,CF,0.462355,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3087,12 +3087,12 @@ Residential DW - Class 2,FOM,1.26,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential DW - Class 2,FOM,2.63,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 2,FOM,1.64,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 2,FOM,1.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 2,investment,1378.8263872676312,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 2,investment,2206.1222196282097,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 2,investment,2867.958885516673,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 2,investment,1378.8263872676312,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 2,investment,2206.1222196282097,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 2,investment,2867.958885516673,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 2,investment,1204.6244420747585,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 2,investment,1927.3991073196134,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 2,investment,2505.6188395154977,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 2,investment,1204.6244420747585,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 2,investment,1927.3991073196134,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 2,investment,2505.6188395154977,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 3,CF,0.45185300000000006,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 3,CF,0.45185300000000006,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 3,CF,0.45185300000000006,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3105,12 +3105,12 @@ Residential DW - Class 3,FOM,1.26,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential DW - Class 3,FOM,2.63,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 3,FOM,1.64,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 3,FOM,1.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 3,investment,1378.8263872676312,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 3,investment,2206.1222196282097,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 3,investment,2867.958885516673,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 3,investment,1378.8263872676312,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 3,investment,2206.1222196282097,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 3,investment,2867.958885516673,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 3,investment,1204.6244420747585,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 3,investment,1927.3991073196134,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 3,investment,2505.6188395154977,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 3,investment,1204.6244420747585,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 3,investment,1927.3991073196134,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 3,investment,2505.6188395154977,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 4,CF,0.440728,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 4,CF,0.440728,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 4,CF,0.440728,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3123,12 +3123,12 @@ Residential DW - Class 4,FOM,1.26,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential DW - Class 4,FOM,2.63,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 4,FOM,1.64,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 4,FOM,1.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 4,investment,1378.8263872676312,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 4,investment,2206.1222196282097,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 4,investment,2867.958885516673,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 4,investment,1378.8263872676312,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 4,investment,2206.1222196282097,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 4,investment,2867.958885516673,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 4,investment,1204.6244420747585,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 4,investment,1927.3991073196134,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 4,investment,2505.6188395154977,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 4,investment,1204.6244420747585,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 4,investment,1927.3991073196134,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 4,investment,2505.6188395154977,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 5,CF,0.426488,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 5,CF,0.426488,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 5,CF,0.426488,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3141,12 +3141,12 @@ Residential DW - Class 5,FOM,1.26,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential DW - Class 5,FOM,2.63,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 5,FOM,1.64,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 5,FOM,1.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 5,investment,1378.8263872676312,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 5,investment,2206.1222196282097,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 5,investment,2867.958885516673,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 5,investment,1378.8263872676312,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 5,investment,2206.1222196282097,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 5,investment,2867.958885516673,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 5,investment,1204.6244420747585,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 5,investment,1927.3991073196134,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 5,investment,2505.6188395154977,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 5,investment,1204.6244420747585,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 5,investment,1927.3991073196134,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 5,investment,2505.6188395154977,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 6,CF,0.404505,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 6,CF,0.404505,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 6,CF,0.404505,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3159,12 +3159,12 @@ Residential DW - Class 6,FOM,1.26,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential DW - Class 6,FOM,2.63,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 6,FOM,1.64,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 6,FOM,1.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 6,investment,1378.8263872676312,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 6,investment,2206.1222196282097,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 6,investment,2867.958885516673,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 6,investment,1378.8263872676312,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 6,investment,2206.1222196282097,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 6,investment,2867.958885516673,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 6,investment,1204.6244420747585,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 6,investment,1927.3991073196134,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 6,investment,2505.6188395154977,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 6,investment,1204.6244420747585,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 6,investment,1927.3991073196134,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 6,investment,2505.6188395154977,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 7,CF,0.372376,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 7,CF,0.372376,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 7,CF,0.372376,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3177,12 +3177,12 @@ Residential DW - Class 7,FOM,1.26,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential DW - Class 7,FOM,2.63,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 7,FOM,1.64,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 7,FOM,1.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 7,investment,1378.8263872676312,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 7,investment,2206.1222196282097,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 7,investment,2867.958885516673,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 7,investment,1378.8263872676312,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 7,investment,2206.1222196282097,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 7,investment,2867.958885516673,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 7,investment,1204.6244420747585,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 7,investment,1927.3991073196134,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 7,investment,2505.6188395154977,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 7,investment,1204.6244420747585,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 7,investment,1927.3991073196134,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 7,investment,2505.6188395154977,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 8,CF,0.331525,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 8,CF,0.331525,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 8,CF,0.331525,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3195,12 +3195,12 @@ Residential DW - Class 8,FOM,1.26,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential DW - Class 8,FOM,2.63,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 8,FOM,1.64,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 8,FOM,1.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 8,investment,1378.8263872676312,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 8,investment,2206.1222196282097,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 8,investment,2867.958885516673,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 8,investment,1378.8263872676312,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 8,investment,2206.1222196282097,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 8,investment,2867.958885516673,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 8,investment,1204.6244420747585,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 8,investment,1927.3991073196134,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 8,investment,2505.6188395154977,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 8,investment,1204.6244420747585,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 8,investment,1927.3991073196134,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 8,investment,2505.6188395154977,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 9,CF,0.285334,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 9,CF,0.285334,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 9,CF,0.285334,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3213,12 +3213,12 @@ Residential DW - Class 9,FOM,1.26,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential DW - Class 9,FOM,2.63,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 9,FOM,1.64,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 9,FOM,1.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 9,investment,1378.8263872676312,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 9,investment,2206.1222196282097,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 9,investment,2867.958885516673,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 9,investment,1378.8263872676312,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 9,investment,2206.1222196282097,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 9,investment,2867.958885516673,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 9,investment,1204.6244420747585,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 9,investment,1927.3991073196134,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 9,investment,2505.6188395154977,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 9,investment,1204.6244420747585,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 9,investment,1927.3991073196134,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 9,investment,2505.6188395154977,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 1,CF,0.19262941265204728,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 1,CF,0.1910129997880455,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 1,CF,0.1867327307988087,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3231,12 +3231,12 @@ Residential PV - Class 1,FOM,1.18,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential PV - Class 1,FOM,1.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 1,FOM,1.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 1,FOM,1.18,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 1,investment,1030.8836650258406,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 1,investment,1373.0106742935166,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 1,investment,1937.4257842079965,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 1,investment,1030.8836650258406,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 1,investment,1373.0106742935166,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 1,investment,1937.4257842079965,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 1,investment,900.6410606099721,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 1,investment,1199.5434905775994,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 1,investment,1692.6499782091878,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 1,investment,900.6410606099721,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 1,investment,1199.5434905775994,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 1,investment,1692.6499782091878,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 10,CF,0.12483975330012692,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 10,CF,0.12379218439361926,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 10,CF,0.1210182169225159,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3249,12 +3249,12 @@ Residential PV - Class 10,FOM,1.18,%/year,NREL/ATB-https://data.openei.org/s3_vi Residential PV - Class 10,FOM,1.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 10,FOM,1.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 10,FOM,1.18,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 10,investment,1030.8836650258406,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 10,investment,1373.0106742935166,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 10,investment,1937.4257842079965,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 10,investment,1030.8836650258406,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 10,investment,1373.0106742935166,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 10,investment,1937.4257842079965,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 10,investment,900.6410606099721,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 10,investment,1199.5434905775994,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 10,investment,1692.6499782091878,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 10,investment,900.6410606099721,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 10,investment,1199.5434905775994,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 10,investment,1692.6499782091878,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 2,CF,0.1896493378001759,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 2,CF,0.18805793166417045,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 2,CF,0.18384388061018264,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3267,12 +3267,12 @@ Residential PV - Class 2,FOM,1.18,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential PV - Class 2,FOM,1.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 2,FOM,1.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 2,FOM,1.18,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 2,investment,1030.8836650258406,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 2,investment,1373.0106742935166,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 2,investment,1937.4257842079965,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 2,investment,1030.8836650258406,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 2,investment,1373.0106742935166,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 2,investment,1937.4257842079965,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 2,investment,900.6410606099721,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 2,investment,1199.5434905775994,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 2,investment,1692.6499782091878,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 2,investment,900.6410606099721,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 2,investment,1199.5434905775994,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 2,investment,1692.6499782091878,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 3,CF,0.17692612853862053,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 3,CF,0.175441486779034,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 3,CF,0.1715101483040654,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3285,12 +3285,12 @@ Residential PV - Class 3,FOM,1.18,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential PV - Class 3,FOM,1.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 3,FOM,1.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 3,FOM,1.18,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 3,investment,1030.8836650258406,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 3,investment,1373.0106742935166,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 3,investment,1937.4257842079965,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 3,investment,1030.8836650258406,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 3,investment,1373.0106742935166,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 3,investment,1937.4257842079965,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 3,investment,900.6410606099721,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 3,investment,1199.5434905775994,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 3,investment,1692.6499782091878,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 3,investment,900.6410606099721,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 3,investment,1199.5434905775994,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 3,investment,1692.6499782091878,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 4,CF,0.16719068008616828,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 4,CF,0.16578773147976497,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 4,CF,0.16207271686486335,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3303,12 +3303,12 @@ Residential PV - Class 4,FOM,1.18,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential PV - Class 4,FOM,1.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 4,FOM,1.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 4,FOM,1.18,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 4,investment,1030.8836650258406,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 4,investment,1373.0106742935166,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 4,investment,1937.4257842079965,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 4,investment,1030.8836650258406,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 4,investment,1373.0106742935166,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 4,investment,1937.4257842079965,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 4,investment,900.6410606099721,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 4,investment,1199.5434905775994,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 4,investment,1692.6499782091878,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 4,investment,900.6410606099721,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 4,investment,1199.5434905775994,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 4,investment,1692.6499782091878,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 5,CF,0.15835652646896928,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 5,CF,0.1570277079725674,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 5,CF,0.15350899024324152,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3321,12 +3321,12 @@ Residential PV - Class 5,FOM,1.18,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential PV - Class 5,FOM,1.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 5,FOM,1.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 5,FOM,1.18,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 5,investment,1030.8836650258406,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 5,investment,1373.0106742935166,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 5,investment,1937.4257842079965,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 5,investment,1030.8836650258406,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 5,investment,1373.0106742935166,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 5,investment,1937.4257842079965,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 5,investment,900.6410606099721,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 5,investment,1199.5434905775994,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 5,investment,1692.6499782091878,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 5,investment,900.6410606099721,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 5,investment,1199.5434905775994,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 5,investment,1692.6499782091878,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 6,CF,0.15639145748147906,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 6,CF,0.15507912848554506,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 6,CF,0.1516040750322663,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3339,12 +3339,12 @@ Residential PV - Class 6,FOM,1.18,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential PV - Class 6,FOM,1.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 6,FOM,1.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 6,FOM,1.18,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 6,investment,1030.8836650258406,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 6,investment,1373.0106742935166,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 6,investment,1937.4257842079965,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 6,investment,1030.8836650258406,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 6,investment,1373.0106742935166,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 6,investment,1937.4257842079965,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 6,investment,900.6410606099721,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 6,investment,1199.5434905775994,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 6,investment,1692.6499782091878,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 6,investment,900.6410606099721,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 6,investment,1199.5434905775994,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 6,investment,1692.6499782091878,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 7,CF,0.1494966780048899,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 7,CF,0.1482422052318813,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 7,CF,0.14492035533342304,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3357,12 +3357,12 @@ Residential PV - Class 7,FOM,1.18,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential PV - Class 7,FOM,1.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 7,FOM,1.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 7,FOM,1.18,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 7,investment,1030.8836650258406,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 7,investment,1373.0106742935166,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 7,investment,1937.4257842079965,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 7,investment,1030.8836650258406,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 7,investment,1373.0106742935166,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 7,investment,1937.4257842079965,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 7,investment,900.6410606099721,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 7,investment,1199.5434905775994,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 7,investment,1692.6499782091878,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 7,investment,900.6410606099721,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 7,investment,1199.5434905775994,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 7,investment,1692.6499782091878,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 8,CF,0.1424107632833385,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 8,CF,0.14121575060809732,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 8,CF,0.13805135133270569,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3375,12 +3375,12 @@ Residential PV - Class 8,FOM,1.18,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential PV - Class 8,FOM,1.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 8,FOM,1.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 8,FOM,1.18,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 8,investment,1030.8836650258406,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 8,investment,1373.0106742935166,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 8,investment,1937.4257842079965,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 8,investment,1030.8836650258406,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 8,investment,1373.0106742935166,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 8,investment,1937.4257842079965,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 8,investment,900.6410606099721,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 8,investment,1199.5434905775994,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 8,investment,1692.6499782091878,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 8,investment,900.6410606099721,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 8,investment,1199.5434905775994,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 8,investment,1692.6499782091878,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 9,CF,0.13674203686793523,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 9,CF,0.13559459222591497,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 9,CF,0.13255615332983547,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3393,12 +3393,12 @@ Residential PV - Class 9,FOM,1.18,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential PV - Class 9,FOM,1.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 9,FOM,1.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 9,FOM,1.18,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 9,investment,1030.8836650258406,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 9,investment,1373.0106742935166,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 9,investment,1937.4257842079965,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 9,investment,1030.8836650258406,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 9,investment,1373.0106742935166,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 9,investment,1937.4257842079965,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 9,investment,900.6410606099721,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 9,investment,1199.5434905775994,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 9,investment,1692.6499782091878,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 9,investment,900.6410606099721,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 9,investment,1199.5434905775994,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 9,investment,1692.6499782091878,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative SMR,FOM,5.0,%/year,Danish Energy Agency,"Technology data for renewable fuels, in pdf on table 3 p.311",2015.0,, SMR,efficiency,0.76,per unit (in LHV),"IEA Global average levelised cost of hydrogen production by energy source and technology, 2019 and 2050 (2020), https://www.iea.org/data-and-statistics/charts/global-average-levelised-cost-of-hydrogen-production-by-energy-source-and-technology-2019-and-2050",,,, SMR,investment,522201.0492,EUR/MW_CH4,Danish Energy Agency,"Technology data for renewable fuels, in pdf on table 3 p.311",2015.0,, @@ -3415,12 +3415,12 @@ SOEC,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and finan SOEC,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced SOEC,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced SOEC,efficiency,0.885,p.u.,ICCT IRA e-fuels assumptions ,,,, -SOEC,investment,1608.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -SOEC,investment,1608.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -SOEC,investment,1418.5,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -SOEC,investment,1418.5,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -SOEC,investment,693.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -SOEC,investment,693.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +SOEC,investment,1404.8440911366397,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +SOEC,investment,1404.8440911366397,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +SOEC,investment,1239.2856612421165,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +SOEC,investment,1239.2856612421165,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +SOEC,investment,605.4458676353802,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +SOEC,investment,605.4458676353802,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced SOEC,lifetime,30.0,years,ICCT IRA e-fuels assumptions ,,,, Sand-charger,FOM,1.075,%/year,"Viswanathan_2022, NULL","{'carrier': ['elec', 'sand'], 'technology_type': ['charger'], 'type': ['thermal'], 'note': ['Guesstimate, 50% on charger']}",2020.0,, Sand-charger,efficiency,0.99,per unit,"Viswanathan_2022, p.107 (p.129)","{'carrier': ['elec', 'sand'], 'technology_type': ['charger'], 'type': ['thermal'], 'note': ['RTE assume 99% for charge and other for discharge']}",2020.0,, @@ -3435,7 +3435,7 @@ Sand-store,investment,6700.8517,EUR/MWh,"Viswanathan_2022, p.100 (p.122)","{'car Sand-store,lifetime,35.0,years,"Viswanathan_2022, p.107 (p.129)","{'carrier': ['sand'], 'technology_type': ['store'], 'type': ['thermal'], 'note': ['NULL']}",2020.0,, Solid biomass steam reforming,FOM,0.05,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Solid biomass steam reforming,efficiency,0.712,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Solid biomass steam reforming,investment,590.7702,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Solid biomass steam reforming,investment,796.4750872147151,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Solid biomass steam reforming,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Steam methane reforming,FOM,3.0,%/year,"International Energy Agency (2015): Technology Roadmap Hydrogen and Fuel Cells , table 15.",Large scale SMR facility (150-300 MW).,2015.0,, Steam methane reforming,investment,497454.611,EUR/MW_H2,"International Energy Agency (2015): Technology Roadmap Hydrogen and Fuel Cells , table 15.",Large scale SMR facility (150-300 MW). Currency conversion 1.17 USD = 1 EUR.,2015.0,, @@ -3462,12 +3462,12 @@ Utility PV - Class 1,FOM,1.61,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Utility PV - Class 1,FOM,1.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 1,FOM,1.79,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 1,FOM,1.61,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 1,investment,602.6779516748321,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 1,investment,753.7046183341562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 1,investment,993.296459172623,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 1,investment,602.6779516748321,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 1,investment,753.7046183341562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 1,investment,993.296459172623,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 1,investment,526.5351736745778,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 1,investment,658.4810196076713,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 1,investment,867.8026501340833,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 1,investment,526.5351736745778,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 1,investment,658.4810196076713,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 1,investment,867.8026501340833,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 10,CF,0.23414741488662136,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 10,CF,0.22534441419282605,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 10,CF,0.20972000398136145,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3480,12 +3480,12 @@ Utility PV - Class 10,FOM,1.61,%/year,NREL/ATB-https://data.openei.org/s3_viewer Utility PV - Class 10,FOM,1.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 10,FOM,1.79,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 10,FOM,1.61,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 10,investment,602.6779516748321,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 10,investment,753.7046183341562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 10,investment,993.296459172623,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 10,investment,602.6779516748321,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 10,investment,753.7046183341562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 10,investment,993.296459172623,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 10,investment,526.5351736745778,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 10,investment,658.4810196076713,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 10,investment,867.8026501340833,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 10,investment,526.5351736745778,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 10,investment,658.4810196076713,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 10,investment,867.8026501340833,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 2,CF,0.3573300442332393,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 2,CF,0.3387848363235839,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 2,CF,0.3187770586125825,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3498,12 +3498,12 @@ Utility PV - Class 2,FOM,1.61,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Utility PV - Class 2,FOM,1.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 2,FOM,1.79,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 2,FOM,1.61,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 2,investment,602.6779516748321,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 2,investment,753.7046183341562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 2,investment,993.296459172623,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 2,investment,602.6779516748321,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 2,investment,753.7046183341562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 2,investment,993.296459172623,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 2,investment,526.5351736745778,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 2,investment,658.4810196076713,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 2,investment,867.8026501340833,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 2,investment,526.5351736745778,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 2,investment,658.4810196076713,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 2,investment,867.8026501340833,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 3,CF,0.3409430867370097,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 3,CF,0.32436453008043137,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 3,CF,0.3044609954670727,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3516,12 +3516,12 @@ Utility PV - Class 3,FOM,1.61,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Utility PV - Class 3,FOM,1.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 3,FOM,1.79,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 3,FOM,1.61,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 3,investment,602.6779516748321,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 3,investment,753.7046183341562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 3,investment,993.296459172623,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 3,investment,602.6779516748321,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 3,investment,753.7046183341562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 3,investment,993.296459172623,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 3,investment,526.5351736745778,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 3,investment,658.4810196076713,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 3,investment,867.8026501340833,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 3,investment,526.5351736745778,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 3,investment,658.4810196076713,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 3,investment,867.8026501340833,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 4,CF,0.3250961078936808,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 4,CF,0.3101416268205912,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 4,CF,0.2905317677527107,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3534,12 +3534,12 @@ Utility PV - Class 4,FOM,1.61,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Utility PV - Class 4,FOM,1.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 4,FOM,1.79,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 4,FOM,1.61,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 4,investment,602.6779516748321,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 4,investment,753.7046183341562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 4,investment,993.296459172623,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 4,investment,602.6779516748321,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 4,investment,753.7046183341562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 4,investment,993.296459172623,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 4,investment,526.5351736745778,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 4,investment,658.4810196076713,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 4,investment,867.8026501340833,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 4,investment,526.5351736745778,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 4,investment,658.4810196076713,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 4,investment,867.8026501340833,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 6,CF,0.2933711923897257,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 6,CF,0.28087927440853927,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 6,CF,0.2623530873821619,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3552,12 +3552,12 @@ Utility PV - Class 6,FOM,1.61,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Utility PV - Class 6,FOM,1.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 6,FOM,1.79,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 6,FOM,1.61,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 6,investment,602.6779516748321,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 6,investment,753.7046183341562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 6,investment,993.296459172623,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 6,investment,602.6779516748321,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 6,investment,753.7046183341562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 6,investment,993.296459172623,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 6,investment,526.5351736745778,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 6,investment,658.4810196076713,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 6,investment,867.8026501340833,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 6,investment,526.5351736745778,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 6,investment,658.4810196076713,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 6,investment,867.8026501340833,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 7,CF,0.2785279748696316,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 7,CF,0.2671675261236942,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 7,CF,0.24922224967882609,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3570,12 +3570,12 @@ Utility PV - Class 7,FOM,1.61,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Utility PV - Class 7,FOM,1.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 7,FOM,1.79,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 7,FOM,1.61,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 7,investment,602.6779516748321,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 7,investment,753.7046183341562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 7,investment,993.296459172623,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 7,investment,602.6779516748321,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 7,investment,753.7046183341562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 7,investment,993.296459172623,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 7,investment,526.5351736745778,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 7,investment,658.4810196076713,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 7,investment,867.8026501340833,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 7,investment,526.5351736745778,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 7,investment,658.4810196076713,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 7,investment,867.8026501340833,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 8,CF,0.2677992923951358,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 8,CF,0.25692449038977594,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 8,CF,0.2397025547018795,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3588,12 +3588,12 @@ Utility PV - Class 8,FOM,1.61,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Utility PV - Class 8,FOM,1.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 8,FOM,1.79,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 8,FOM,1.61,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 8,investment,602.6779516748321,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 8,investment,753.7046183341562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 8,investment,993.296459172623,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 8,investment,602.6779516748321,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 8,investment,753.7046183341562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 8,investment,993.296459172623,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 8,investment,526.5351736745778,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 8,investment,658.4810196076713,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 8,investment,867.8026501340833,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 8,investment,526.5351736745778,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 8,investment,658.4810196076713,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 8,investment,867.8026501340833,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 9,CF,0.2549415688995842,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 9,CF,0.24485407961948205,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 9,CF,0.22828022053883176,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3606,60 +3606,60 @@ Utility PV - Class 9,FOM,1.61,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Utility PV - Class 9,FOM,1.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 9,FOM,1.79,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 9,FOM,1.61,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 9,investment,602.6779516748321,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 9,investment,753.7046183341562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 9,investment,993.296459172623,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 9,investment,602.6779516748321,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 9,investment,753.7046183341562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 9,investment,993.296459172623,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 9,investment,526.5351736745778,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 9,investment,658.4810196076713,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 9,investment,867.8026501340833,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 9,investment,526.5351736745778,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 9,investment,658.4810196076713,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 9,investment,867.8026501340833,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility-Scale Battery Storage - 10Hr,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility-Scale Battery Storage - 10Hr,FOM,2.3,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility-Scale Battery Storage - 10Hr,FOM,2.34,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Utility-Scale Battery Storage - 10Hr,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility-Scale Battery Storage - 10Hr,FOM,2.3,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility-Scale Battery Storage - 10Hr,FOM,2.34,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility-Scale Battery Storage - 10Hr,investment,1760.846386500334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility-Scale Battery Storage - 10Hr,investment,2253.5080629231675,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility-Scale Battery Storage - 10Hr,investment,3381.140359545492,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility-Scale Battery Storage - 10Hr,investment,1760.846386500334,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility-Scale Battery Storage - 10Hr,investment,2253.5080629231675,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility-Scale Battery Storage - 10Hr,investment,3381.140359545492,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility-Scale Battery Storage - 10Hr,investment,1538.3797521606327,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility-Scale Battery Storage - 10Hr,investment,1968.7981881383,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility-Scale Battery Storage - 10Hr,investment,2953.964586698444,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility-Scale Battery Storage - 10Hr,investment,1538.3797521606327,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility-Scale Battery Storage - 10Hr,investment,1968.7981881383,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility-Scale Battery Storage - 10Hr,investment,2953.964586698444,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility-Scale Battery Storage - 2Hr,FOM,1.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility-Scale Battery Storage - 2Hr,FOM,2.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility-Scale Battery Storage - 2Hr,FOM,2.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Utility-Scale Battery Storage - 2Hr,FOM,1.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility-Scale Battery Storage - 2Hr,FOM,2.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility-Scale Battery Storage - 2Hr,FOM,2.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility-Scale Battery Storage - 2Hr,investment,547.584848490055,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility-Scale Battery Storage - 2Hr,investment,768.323108993717,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility-Scale Battery Storage - 2Hr,investment,1010.6511150782223,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility-Scale Battery Storage - 2Hr,investment,547.584848490055,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility-Scale Battery Storage - 2Hr,investment,768.323108993717,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility-Scale Battery Storage - 2Hr,investment,1010.6511150782223,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility-Scale Battery Storage - 2Hr,investment,478.40257387885936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility-Scale Battery Storage - 2Hr,investment,671.2525993492262,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility-Scale Battery Storage - 2Hr,investment,882.9647059815278,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility-Scale Battery Storage - 2Hr,investment,478.40257387885936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility-Scale Battery Storage - 2Hr,investment,671.2525993492262,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility-Scale Battery Storage - 2Hr,investment,882.9647059815278,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility-Scale Battery Storage - 4Hr,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility-Scale Battery Storage - 4Hr,FOM,2.19,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility-Scale Battery Storage - 4Hr,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Utility-Scale Battery Storage - 4Hr,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility-Scale Battery Storage - 4Hr,FOM,2.19,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility-Scale Battery Storage - 4Hr,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility-Scale Battery Storage - 4Hr,investment,850.9002329926248,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility-Scale Battery Storage - 4Hr,investment,1139.6193474760794,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility-Scale Battery Storage - 4Hr,investment,1603.2734261950395,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility-Scale Battery Storage - 4Hr,investment,850.9002329926248,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility-Scale Battery Storage - 4Hr,investment,1139.6193474760794,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility-Scale Battery Storage - 4Hr,investment,1603.2734261950395,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility-Scale Battery Storage - 4Hr,investment,743.3968684493027,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility-Scale Battery Storage - 4Hr,investment,995.6389965464945,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility-Scale Battery Storage - 4Hr,investment,1400.7146761607567,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility-Scale Battery Storage - 4Hr,investment,743.3968684493027,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility-Scale Battery Storage - 4Hr,investment,995.6389965464945,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility-Scale Battery Storage - 4Hr,investment,1400.7146761607567,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility-Scale Battery Storage - 8Hr,FOM,2.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility-Scale Battery Storage - 8Hr,FOM,2.28,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility-Scale Battery Storage - 8Hr,FOM,2.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Utility-Scale Battery Storage - 8Hr,FOM,2.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility-Scale Battery Storage - 8Hr,FOM,2.28,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility-Scale Battery Storage - 8Hr,FOM,2.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility-Scale Battery Storage - 8Hr,investment,1457.5310019977642,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility-Scale Battery Storage - 8Hr,investment,1882.2118244408043,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility-Scale Battery Storage - 8Hr,investment,2788.518048428675,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility-Scale Battery Storage - 8Hr,investment,1457.5310019977642,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility-Scale Battery Storage - 8Hr,investment,1882.2118244408043,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility-Scale Battery Storage - 8Hr,investment,2788.518048428675,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility-Scale Battery Storage - 8Hr,investment,1273.3854575901894,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility-Scale Battery Storage - 8Hr,investment,1644.411790941031,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility-Scale Battery Storage - 8Hr,investment,2436.214616519215,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility-Scale Battery Storage - 8Hr,investment,1273.3854575901894,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility-Scale Battery Storage - 8Hr,investment,1644.411790941031,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility-Scale Battery Storage - 8Hr,investment,2436.214616519215,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Vanadium-Redox-Flow-bicharger,FOM,2.4395,%/year,"Viswanathan_2022, p.28 (p.50)","{'carrier': ['elec', 'vanadium', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['30% assumed of power components every 10 years']}",2020.0,, Vanadium-Redox-Flow-bicharger,efficiency,0.8062,per unit,"Viswanathan_2022, p.42 (p.64)","{'carrier': ['elec', 'vanadium', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['AC-AC efficiency at transformer level 0.65^0.5']}",2020.0,, Vanadium-Redox-Flow-bicharger,investment,129023.0526,EUR/MW,"Viswanathan_2022, p.42 (p.64)","{'carrier': ['elec', 'vanadium', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['Power Equipment']}",2020.0,, @@ -3706,12 +3706,12 @@ battery storage,FOM,2.3,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket battery storage,FOM,2.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced battery storage,FOM,2.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate battery storage,FOM,2.3,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -battery storage,investment,1154.2156174951945,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -battery storage,investment,1510.915585958442,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -battery storage,investment,2195.895737311857,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -battery storage,investment,1154.2156174951945,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -battery storage,investment,1510.915585958442,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -battery storage,investment,2195.895737311857,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +battery storage,investment,1008.3911630197462,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +battery storage,investment,1320.025393743763,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +battery storage,investment,1918.4646463399856,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +battery storage,investment,1008.3911630197462,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +battery storage,investment,1320.025393743763,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +battery storage,investment,1918.4646463399856,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative battery storage,lifetime,30.0,years,"Danish Energy Agency, inputs/technology_data_catalogue_for_energy_storage.xlsx",: Technical lifetime,2015.0,, biochar pyrolysis,FOM,3.381,%/year,"Danish Energy Agency, inputs/data_sheets_for_renewable_fuels.xlsx","105 Slow pyrolysis, Straw: Fixed O&M",2020.0,, biochar pyrolysis,VOM,823.497,EUR/MWh_biochar,"Danish Energy Agency, inputs/data_sheets_for_renewable_fuels.xlsx","105 Slow pyrolysis, Straw: Variable O&M",2020.0,, @@ -3756,12 +3756,12 @@ biomass,FOM,3.79,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-d biomass,FOM,3.79,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced biomass,FOM,3.79,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate biomass,FOM,3.79,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -biomass,VOM,5.246639999999999,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -biomass,VOM,5.246639999999999,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -biomass,VOM,5.246639999999999,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -biomass,VOM,5.246639999999999,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -biomass,VOM,5.246639999999999,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -biomass,VOM,5.246639999999999,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +biomass,VOM,4.583775623334041,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +biomass,VOM,4.583775623334041,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +biomass,VOM,4.583775623334041,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +biomass,VOM,4.583775623334041,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +biomass,VOM,4.583775623334041,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +biomass,VOM,4.583775623334041,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative biomass,discount rate,0.0545150857977472,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced biomass,discount rate,0.0545150857977472,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate biomass,discount rate,0.0545150857977472,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3769,18 +3769,18 @@ biomass,discount rate,0.0471698161746512,per unit,"NREL, NREL ATB 2024",Meaning biomass,discount rate,0.0471698161746512,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate biomass,discount rate,0.0471698161746512,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative biomass,efficiency,0.468,per unit,DIW DataDoc http://hdl.handle.net/10419/80348, from old pypsa cost assumptions,2015.0,, -biomass,fuel,73.57007249999998,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -biomass,fuel,73.57007249999998,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -biomass,fuel,73.57007249999998,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -biomass,fuel,73.57007249999998,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -biomass,fuel,73.57007249999998,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -biomass,fuel,73.57007249999998,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -biomass,investment,4313.669217086782,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -biomass,investment,4313.669217086782,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -biomass,investment,4313.669217086782,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -biomass,investment,4313.669217086782,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -biomass,investment,4313.669217086782,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -biomass,investment,4313.669217086782,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +biomass,fuel,64.27517514684027,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +biomass,fuel,64.27517514684027,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +biomass,fuel,64.27517514684027,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +biomass,fuel,64.27517514684027,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +biomass,fuel,64.27517514684027,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +biomass,fuel,64.27517514684027,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +biomass,investment,3768.67705891939,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +biomass,investment,3768.67705891939,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +biomass,investment,3768.67705891939,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +biomass,investment,3768.67705891939,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +biomass,investment,3768.67705891939,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +biomass,investment,3768.67705891939,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative biomass,lifetime,30.0,years,ECF2010 in DIW DataDoc http://hdl.handle.net/10419/80348, from old pypsa cost assumptions,2015.0,, biomass CHP,FOM,3.549,%/year,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","09c Straw, Large, 40 degree: Fixed O&M",2015.0,, biomass CHP,VOM,2.222,EUR/MWh_e,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","09c Straw, Large, 40 degree: Variable O&M ",2015.0,, @@ -3946,12 +3946,12 @@ coal,FOM,2.17,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data coal,FOM,2.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced coal,FOM,2.17,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate coal,FOM,2.17,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -coal,VOM,8.32,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -coal,VOM,8.49,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -coal,VOM,8.66,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -coal,VOM,8.32,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -coal,VOM,8.49,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -coal,VOM,8.66,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +coal,VOM,7.26884504866719,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +coal,VOM,7.4173671229788996,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +coal,VOM,7.565889197290609,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +coal,VOM,7.26884504866719,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +coal,VOM,7.4173671229788996,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +coal,VOM,7.565889197290609,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative coal,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced coal,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate coal,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3959,13 +3959,13 @@ coal,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of coal,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate coal,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative coal,efficiency,0.356,p.u.,"Lazard's levelized cost of energy analysis - version 16.0 (2023): https://www.lazard.com/media/typdgxmm/lazards-lcoeplus-april-2023.pdf , pg. 49 (Levelized Cost of Energy - Key Assumptions), accessed: 2023-12-14.","Calculated based on average of listed range, i.e. 1 / ((8.75+12) MMbtu/MWh_th /2 / (3.4095 MMbtu/MWh_th)), rounded up.",2023.0,, -coal,fuel,8.12,USD/MWh_th,"EIA, https://www.eia.gov/coal/annual/",46.97 USD/short ton of bituminous coal with energy content = 19.73 million BTU/short ton,2023.0,, -coal,investment,3543.8476111082023,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -coal,investment,3444.6386572761044,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -coal,investment,3345.5532513317185,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -coal,investment,3543.8476111082023,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -coal,investment,3444.6386572761044,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -coal,investment,3345.5532513317185,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +coal,fuel,6.887488540325987,USD/MWh_th,"EIA, https://www.eia.gov/coal/annual/",46.97 USD/short ton of bituminous coal with energy content = 19.73 million BTU/short ton,2023.0,, +coal,investment,3096.115283802272,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +coal,investment,3009.440462546756,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +coal,investment,2922.8735800474738,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +coal,investment,3096.115283802272,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +coal,investment,3009.440462546756,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +coal,investment,2922.8735800474738,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative coal,lifetime,40.0,years,"Lazard's levelized cost of energy analysis - version 16.0 (2023): https://www.lazard.com/media/typdgxmm/lazards-lcoeplus-april-2023.pdf , pg. 49 (Levelized Cost of Energy - Key Assumptions), accessed: 2023-12-14.",,2023.0,, csp-tower,CF,0.666,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced csp-tower,CF,0.666,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -3979,24 +3979,24 @@ csp-tower,FOM,0.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi csp-tower,FOM,1.21,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced csp-tower,FOM,1.14,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate csp-tower,FOM,0.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -csp-tower,VOM,2.91,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -csp-tower,VOM,3.0,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -csp-tower,VOM,3.95766,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -csp-tower,VOM,2.91,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -csp-tower,VOM,3.0,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -csp-tower,VOM,3.95766,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +csp-tower,VOM,2.5423484485122025,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +csp-tower,VOM,2.6209777819713427,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +csp-tower,VOM,3.4576463095322345,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +csp-tower,VOM,2.5423484485122025,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +csp-tower,VOM,2.6209777819713427,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +csp-tower,VOM,3.4576463095322345,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative csp-tower,discount rate,0.0525784893406145,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced csp-tower,discount rate,0.0525784893406145,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate csp-tower,discount rate,0.0525784893406145,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative csp-tower,discount rate,0.0416031281240576,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced csp-tower,discount rate,0.0416031281240576,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate csp-tower,discount rate,0.0416031281240576,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -csp-tower,investment,3404.1242941792343,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -csp-tower,investment,4636.298715094243,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -csp-tower,investment,7912.019603207439,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -csp-tower,investment,3404.1242941792343,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -csp-tower,investment,4636.298715094243,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -csp-tower,investment,7912.019603207439,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +csp-tower,investment,2974.0447140375504,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +csp-tower,investment,4050.5453076147646,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +csp-tower,investment,6912.409196842806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +csp-tower,investment,2974.0447140375504,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +csp-tower,investment,4050.5453076147646,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +csp-tower,investment,6912.409196842806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative csp-tower,lifetime,30.0,years,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),-,2020.0,, csp-tower TES,FOM,1.35,%/year,see solar-tower.,-,2020.0,, csp-tower TES,investment,13.355,EUR/kWh_th,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,"Based on NREL’s SAM (v2021.12.2) numbers for a CSP power plant, 2020 numbers. CAPEX degression (=learning) taken from ATB database (“moderate”) scenario. Costs include the TES incl. EPC cost for the default installation size (104 MWe plant, 2.791 MW_th TES). Total costs (69390776.7 USD) are divided by TES size to obtain EUR/kW_th. Exchange rate: 1.16 USD to 1 EUR.",2020.0,, @@ -4062,12 +4062,12 @@ direct air capture,compression-heat-output,0.2,MWh/tCO2,"Danish Energy Agency, i direct air capture,electricity-input,0.24,MWh_el/t_CO2,ICCT IRA e-fuels assumptions ,,,, direct air capture,heat-input,1.17,MWh_th/t_CO2,ICCT IRA e-fuels assumptions ,,,, direct air capture,heat-output,0.75,MWh/tCO2,"Danish Energy Agency, inputs/technology_data_for_carbon_capture_transport_storage.xlsx",403.a Direct air capture,2020.0,, -direct air capture,investment,12398844.91,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -direct air capture,investment,12398844.91,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -direct air capture,investment,19180739.93,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -direct air capture,investment,19180739.93,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -direct air capture,investment,7103597.31,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -direct air capture,investment,7103597.31,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +direct air capture,investment,10832365.677072823,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +direct air capture,investment,10832365.677072823,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +direct air capture,investment,16757431.066100188,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +direct air capture,investment,16757431.066100188,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +direct air capture,investment,6206123.573860465,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +direct air capture,investment,6206123.573860465,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced direct air capture,lifetime,20.0,years,"Danish Energy Agency, inputs/technology_data_for_carbon_capture_transport_storage.xlsx",403.a Direct air capture,2020.0,, direct air capture,years,30.0,years,ICCT IRA e-fuels assumptions ,,,, direct firing gas,FOM,1.0909,%/year,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",312.a Direct firing Natural Gas: Fixed O&M,2019.0,, @@ -4148,7 +4148,7 @@ fuel cell,investment,925.9439,EUR/kW_e,"Danish Energy Agency, inputs/technology_ fuel cell,lifetime,10.0,years,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",12 LT-PEMFC CHP: Technical lifetime,2015.0,, fuelwood,fuel,12.5949,EUR/MWhth,"JRC ENSPRESO ca avg for MINBIOWOO (FuelwoodRW), ENS_BaU_GFTM",,2010.0,, gas,CO2 intensity,0.198,tCO2/MWh_th,Stoichiometric calculation with 50 GJ/t CH4,,,, -gas,fuel,14.05,USD/MWh_th,World Bank https://www.worldbank.org/en/research/commodity-markets,,2010.0,, +gas,fuel,16.199297879801314,USD/MWh_th,World Bank https://www.worldbank.org/en/research/commodity-markets,,2010.0,, gas boiler steam,FOM,3.85,%/year,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",311.1c Steam boiler Gas: Fixed O&M,2019.0,, gas boiler steam,VOM,1.007,EUR/MWh,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",311.1c Steam boiler Gas: Variable O&M,2019.0,, gas boiler steam,efficiency,0.935,per unit,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx","311.1c Steam boiler Gas: Total efficiency, net, annual average",2019.0,, @@ -4180,12 +4180,12 @@ geothermal,discount rate,0.0400999293962161,per unit,"NREL, NREL ATB 2024",Meani geothermal,discount rate,0.0400999293962161,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative geothermal,district heat surcharge,25.0,%,Frey et al. 2022: Techno-Economic Assessment of Geothermal Resources in the Variscan Basement of the Northern Upper Rhine Graben,"If capital cost of electric generation from EGS is 100%, district heating adds additional 25%. Costs incurred by piping.",2020.0,, geothermal,district heat-input,0.8,MWh_thdh/MWh_th,"Aghahosseini, Breyer 2020: From hot rock to useful energy: A global estimate of enhanced geothermal systems potential, https://www.sciencedirect.com/science/article/pii/S0306261920312551; Breede et al. 2015: Overcoming challenges in the classification of deep geothermal potential, https://eprints.gla.ac.uk/169585/","Heat-input, District Heat-output. This is an assessment of typical heat losses when heat is transmitted from the EGS plant to the DH network, This is a rough estimate, depends on local conditions",2020.0,, -geothermal,investment,4991.391722364574,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -geothermal,investment,5877.188225868921,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -geothermal,investment,6444.155330172052,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -geothermal,investment,4991.391722364574,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -geothermal,investment,5877.188225868921,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -geothermal,investment,6444.155330172052,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +geothermal,investment,4360.775601811073,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +geothermal,investment,5134.659920155338,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +geothermal,investment,5629.9959813177165,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +geothermal,investment,4360.775601811073,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +geothermal,investment,5134.659920155338,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +geothermal,investment,5629.9959813177165,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative geothermal,lifetime,30.0,years,"Aghahosseini, Breyer 2020: From hot rock to useful energy: A global estimate of enhanced geothermal systems potential, https://www.sciencedirect.com/science/article/pii/S0306261920312551",,2020.0,, helmeth,FOM,3.0,%/year,no source, from old pypsa cost assumptions,2015.0,, helmeth,efficiency,0.8,per unit,HELMETH press release, from old pypsa cost assumptions,2015.0,, @@ -4216,19 +4216,19 @@ hydro,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of hydro,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate hydro,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative hydro,efficiency,0.9,per unit,DIW DataDoc http://hdl.handle.net/10419/80348, from old pypsa cost assumptions,2015.0,, -hydro,investment,2800.6424250469768,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -hydro,investment,3241.3364440395458,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -hydro,investment,3111.4700906166145,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -hydro,investment,2800.6424250469768,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -hydro,investment,3241.3364440395458,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -hydro,investment,3111.4700906166145,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +hydro,investment,2446.8071904314893,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +hydro,investment,2831.823601240549,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +hydro,investment,2718.3646589248356,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +hydro,investment,2446.8071904314893,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +hydro,investment,2831.823601240549,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +hydro,investment,2718.3646589248356,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative hydro,lifetime,80.0,years,IEA2010, from old pypsa cost assumptions,2015.0,, hydrogen storage compressor,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,,2022.0,, hydrogen storage compressor,compression-electricity-input,0.05,MWh_el/MWh_H2,"Based on Stöckl et al (2021): https://doi.org/10.48550/arXiv.2005.03464, table SI.4.",1.707 kWh/kg.,,, -hydrogen storage compressor,investment,2.28,USD/kWh_H2,ICCT IRA e-fuels assumptions ,,2022.0,, +hydrogen storage compressor,investment,1.9919431142982202,USD/kWh_H2,ICCT IRA e-fuels assumptions ,,2022.0,, hydrogen storage compressor,lifetime,30.0,years,ICCT IRA e-fuels assumptions ,,,, hydrogen storage tank type 1,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,,2022.0,, -hydrogen storage tank type 1,investment,16.87,USD/kWh_H2,ICCT IRA e-fuels assumptions ,,2022.0,, +hydrogen storage tank type 1,investment,14.738631727285517,USD/kWh_H2,ICCT IRA e-fuels assumptions ,,2022.0,, hydrogen storage tank type 1,lifetime,30.0,years,ICCT IRA e-fuels assumptions ,,,, hydrogen storage tank type 1,min_fill_level,6.0,%,"Based on Stöckl et al (2021): https://doi.org/10.48550/arXiv.2005.03464, table SI.9.",,,, hydrogen storage tank type 1 including compressor,FOM,1.873,%/year,"Danish Energy Agency, inputs/technology_data_catalogue_for_energy_storage.xlsx",151a Hydrogen Storage - Tanks: Fixed O&M,2015.0,, @@ -4309,12 +4309,12 @@ nuclear,FOM,1.98,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-d nuclear,FOM,4.01,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced nuclear,FOM,3.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate nuclear,FOM,1.98,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -nuclear,VOM,1.9,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -nuclear,VOM,2.8,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -nuclear,VOM,3.4,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -nuclear,VOM,1.9,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -nuclear,VOM,2.8,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -nuclear,VOM,3.4,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +nuclear,VOM,1.6599525952485168,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +nuclear,VOM,2.4462459298399195,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +nuclear,VOM,2.970441486234188,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +nuclear,VOM,1.6599525952485168,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +nuclear,VOM,2.4462459298399195,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +nuclear,VOM,2.970441486234188,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative nuclear,discount rate,0.0564664846362073,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced nuclear,discount rate,0.0564664846362073,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate nuclear,discount rate,0.0564664846362073,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -4322,18 +4322,18 @@ nuclear,discount rate,0.0471844359305569,per unit,"NREL, NREL ATB 2024",Meaning nuclear,discount rate,0.0471844359305569,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate nuclear,discount rate,0.0471844359305569,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative nuclear,efficiency,0.326,p.u.,"Lazard's levelized cost of energy analysis - version 16.0 (2023): https://www.lazard.com/media/typdgxmm/lazards-lcoeplus-april-2023.pdf , pg. 49 (Levelized Cost of Energy - Key Assumptions), accessed: 2023-12-14.","Based on heat rate of 10.45 MMBtu/MWh_e and 3.4095 MMBtu/MWh_th, i.e. 1/(10.45/3.4095) = 0.3260.",2023.0,, -nuclear,fuel,9.13239,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -nuclear,fuel,10.18209,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -nuclear,fuel,11.33676,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -nuclear,fuel,9.13239,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -nuclear,fuel,10.18209,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -nuclear,fuel,11.33676,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -nuclear,investment,3144.948958799701,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -nuclear,investment,5663.446413555539,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -nuclear,investment,10328.331997044465,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -nuclear,investment,3144.948958799701,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -nuclear,investment,5663.446413555539,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -nuclear,investment,10328.331997044465,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +nuclear,fuel,7.978597095432423,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +nuclear,fuel,8.895677221344195,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +nuclear,fuel,9.904465359847146,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +nuclear,fuel,7.978597095432423,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +nuclear,fuel,8.895677221344195,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +nuclear,fuel,9.904465359847146,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +nuclear,investment,2747.6137821493076,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +nuclear,investment,4947.922406438117,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +nuclear,investment,9023.442896359082,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +nuclear,investment,2747.6137821493076,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +nuclear,investment,4947.922406438117,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +nuclear,investment,9023.442896359082,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative nuclear,lifetime,40.0,years,"Lazard's levelized cost of energy analysis - version 16.0 (2023): https://www.lazard.com/media/typdgxmm/lazards-lcoeplus-april-2023.pdf , pg. 49 (Levelized Cost of Energy - Key Assumptions), accessed: 2023-12-14.",,2023.0,, offwind,CF,0.5123,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced offwind,CF,0.484,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -4353,12 +4353,12 @@ offwind,discount rate,0.0515169177112711,per unit,"NREL, NREL ATB 2024",Meaning offwind,discount rate,0.0401070465062936,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced offwind,discount rate,0.0401070465062936,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate offwind,discount rate,0.0401070465062936,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -offwind,investment,2679.2730602921756,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -offwind,investment,3208.852947171857,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -offwind,investment,3869.642508455641,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -offwind,investment,2679.2730602921756,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -offwind,investment,3208.852947171857,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -offwind,investment,3869.642508455641,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +offwind,investment,2340.7717209533857,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +offwind,investment,2803.4440933835667,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +offwind,investment,3380.749012944696,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +offwind,investment,2340.7717209533857,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +offwind,investment,2803.4440933835667,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +offwind,investment,3380.749012944696,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative offwind,lifetime,30.0,years,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",21 Offshore turbines: Technical lifetime [years],2020.0,, offwind-ac-connection-submarine,investment,2841.3251,EUR/MW/km,DEA https://ens.dk/en/our-services/projections-and-models/technology-data, from old pypsa cost assumptions,2015.0,, offwind-ac-connection-underground,investment,1420.1334,EUR/MW/km,DEA https://ens.dk/en/our-services/projections-and-models/technology-data, from old pypsa cost assumptions,2015.0,, @@ -4376,7 +4376,7 @@ oil,CO2 intensity,0.2571,tCO2/MWh_th,Stoichiometric calculation with 44 GJ/t die oil,FOM,2.4231,%/year,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",50 Diesel engine farm: Fixed O&M,2015.0,, oil,VOM,6.3493,EUR/MWh,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",50 Diesel engine farm: Variable O&M,2015.0,, oil,efficiency,0.35,per unit,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","50 Diesel engine farm: Electricity efficiency, annual average",2015.0,, -oil,fuel,44.22,USD/MWh_th,World Bank https://www.worldbank.org/en/research/commodity-markets,,2010.0,, +oil,fuel,50.984551761196734,USD/MWh_th,World Bank https://www.worldbank.org/en/research/commodity-markets,,2010.0,, oil,investment,357.4144,EUR/kW,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",50 Diesel engine farm: Specific investment,2015.0,, oil,lifetime,25.0,years,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",50 Diesel engine farm: Technical lifetime,2015.0,, onwind,CF,0.513238,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced @@ -4397,12 +4397,12 @@ onwind,discount rate,0.0545547199294649,per unit,"NREL, NREL ATB 2024",Meaning o onwind,discount rate,0.0365777183152598,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced onwind,discount rate,0.0365777183152598,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate onwind,discount rate,0.0365777183152598,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -onwind,investment,1093.0531153812144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -onwind,investment,1188.1694560853446,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -onwind,investment,1411.6709839852829,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -onwind,investment,1093.0531153812144,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -onwind,investment,1188.1694560853446,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -onwind,investment,1411.6709839852829,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +onwind,investment,954.9559766429071,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +onwind,investment,1038.0552485388876,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +onwind,investment,1233.3194281596832,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +onwind,investment,954.9559766429071,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +onwind,investment,1038.0552485388876,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +onwind,investment,1233.3194281596832,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative onwind,lifetime,30.0,years,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",20 Onshore turbines: Technical lifetime,2015.0,, organic rankine cycle,FOM,2.0,%/year,"Aghahosseini, Breyer 2020: From hot rock to useful energy: A global estimate of enhanced geothermal systems potential, https://www.sciencedirect.com/science/article/pii/S0306261920312551","Both for flash, binary and ORC plants. See Supplemental Material for details",2020.0,, organic rankine cycle,electricity-input,0.12,MWh_el/MWh_th,"Aghahosseini, Breyer 2020: From hot rock to useful energy: A global estimate of enhanced geothermal systems potential, https://www.sciencedirect.com/science/article/pii/S0306261920312551; Breede et al. 2015: Overcoming challenges in the classification of deep geothermal potential, https://eprints.gla.ac.uk/169585/","Heat-input, Electricity-output. This is a rough estimate, depends on input temperature, implies ~150 C.",2020.0,, @@ -4427,12 +4427,12 @@ ror,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of s ror,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate ror,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative ror,efficiency,0.9,per unit,DIW DataDoc http://hdl.handle.net/10419/80348, from old pypsa cost assumptions,2015.0,, -ror,investment,9005.486475065536,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -ror,investment,9234.349311015783,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -ror,investment,9281.186356512577,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -ror,investment,9005.486475065536,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -ror,investment,9234.349311015783,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -ror,investment,9281.186356512577,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +ror,investment,7867.726655663398,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +ror,investment,8067.674791711581,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +ror,investment,8108.594410251673,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +ror,investment,7867.726655663398,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +ror,investment,8067.674791711581,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +ror,investment,8108.594410251673,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative ror,lifetime,80.0,years,IEA2010, from old pypsa cost assumptions,2015.0,, seawater RO desalination,electricity-input,0.003,MWHh_el/t_H2O,"Caldera et al. (2016): Local cost of seawater RO desalination based on solar PV and windenergy: A global estimate. (https://doi.org/10.1016/j.desal.2016.02.004), Fig. 4.",Desalination using SWRO. Assume medium salinity of 35 Practical Salinity Units (PSUs) = 35 kg/m^3.,,, seawater desalination,FOM,4.0,%/year,"Caldera et al 2016: Local cost of seawater RO desalination based on solar PV and windenergy: A global estimate. (https://doi.org/10.1016/j.desal.2016.02.004), Table 1.",,2015.0,, @@ -4463,12 +4463,12 @@ solar-rooftop,discount rate,0.0461585096202741,per unit,"NREL, NREL ATB 2024",Me solar-rooftop,discount rate,0.0364480268090299,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced solar-rooftop,discount rate,0.0364480268090299,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate solar-rooftop,discount rate,0.0364480268090299,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -solar-rooftop,investment,825.6682539860877,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -solar-rooftop,investment,1032.5946461503024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -solar-rooftop,investment,1387.285272398717,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -solar-rooftop,investment,825.6682539860877,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -solar-rooftop,investment,1032.5946461503024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -solar-rooftop,investment,1387.285272398717,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +solar-rooftop,investment,721.3527163255358,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +solar-rooftop,investment,902.1358751141677,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +solar-rooftop,investment,1212.0146254043664,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +solar-rooftop,investment,721.3527163255358,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +solar-rooftop,investment,902.1358751141677,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +solar-rooftop,investment,1212.0146254043664,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative solar-rooftop,lifetime,40.0,years,Calculated. See 'further description'.,Mixed investment costs based on average of 50% 'solar-rooftop commercial' and 50% 'solar-rooftop residential',2020.0,, solar-rooftop commercial,FOM,1.7726,%/year,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",22 Rooftop PV commercial: Fixed O&M [2020-EUR/MW_e/y],2020.0,, solar-rooftop commercial,investment,437.2089,EUR/kW_e,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",22 Rooftop PV commercial: Nominal investment [2020-MEUR/MW_e],2020.0,, @@ -4494,12 +4494,12 @@ solar-utility,discount rate,0.0491950551630065,per unit,"NREL, NREL ATB 2024",Me solar-utility,discount rate,0.0342774493840203,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced solar-utility,discount rate,0.0342774493840203,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate solar-utility,discount rate,0.0342774493840203,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -solar-utility,investment,602.6779516748321,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -solar-utility,investment,753.7046183341562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -solar-utility,investment,993.296459172623,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -solar-utility,investment,602.6779516748321,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -solar-utility,investment,753.7046183341562,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -solar-utility,investment,993.296459172623,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +solar-utility,investment,526.5351736745778,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +solar-utility,investment,658.4810196076713,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +solar-utility,investment,867.8026501340833,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +solar-utility,investment,526.5351736745778,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +solar-utility,investment,658.4810196076713,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +solar-utility,investment,867.8026501340833,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative solar-utility,lifetime,40.0,years,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",22 Utility-scale PV: Technical lifetime [years],2020.0,, solar-utility single-axis tracking,FOM,2.4972,%/year,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",22 Utility-scale PV tracker: Fixed O&M [2020-EUR/MW_e/y],2020.0,, solar-utility single-axis tracking,investment,368.412,EUR/kW_e,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",22 Utility-scale PV tracker: Nominal investment [2020-MEUR/MW_e],2020.0,, diff --git a/outputs/US/costs_2050.csv b/outputs/US/costs_2050.csv index f4f587fa..e375a23d 100644 --- a/outputs/US/costs_2050.csv +++ b/outputs/US/costs_2050.csv @@ -6,12 +6,12 @@ Alkaline electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of s Alkaline electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Alkaline electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Alkaline electrolyzer,efficiency,0.78,p.u.,ICCT IRA e-fuels assumptions ,,,, -Alkaline electrolyzer,investment,802.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Alkaline electrolyzer,investment,802.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Alkaline electrolyzer,investment,688.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Alkaline electrolyzer,investment,688.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Alkaline electrolyzer,investment,570.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Alkaline electrolyzer,investment,570.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Alkaline electrolyzer,investment,700.6747270470056,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Alkaline electrolyzer,investment,700.6747270470056,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Alkaline electrolyzer,investment,601.0775713320945,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Alkaline electrolyzer,investment,601.0775713320945,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Alkaline electrolyzer,investment,497.98577857455507,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Alkaline electrolyzer,investment,497.98577857455507,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Alkaline electrolyzer,lifetime,30.0,years,ICCT IRA e-fuels assumptions ,,,, Ammonia cracker,FOM,4.3,%/year,"Ishimoto et al. (2020): 10.1016/j.ijhydene.2020.09.017 , table 7.","Estimated based on Labour cost rate, Maintenance cost rate, Insurance rate, Admin. cost rate and Chemical & other consumables cost rate.",2015.0,, Ammonia cracker,ammonia-input,1.46,MWh_NH3/MWh_H2,"ENGIE et al (2020): Ammonia to Green Hydrogen Feasibility Study (https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/880826/HS420_-_Ecuity_-_Ammonia_to_Green_Hydrogen.pdf), Fig. 10.",Assuming a integrated 200t/d cracking and purification facility. Electricity demand (316 MWh per 2186 MWh_LHV H2 output) is assumed to also be ammonia LHV input which seems a fair assumption as the facility has options for a higher degree of integration according to the report).,,, @@ -65,11 +65,11 @@ BioSNG,efficiency,0.7,per unit,"Danish Energy Agency, inputs/data_sheets_for_ren BioSNG,investment,1595.1,EUR/kW_th,"Danish Energy Agency, inputs/data_sheets_for_renewable_fuels.xlsx","84 Gasif. CFB, Bio-SNG: Specific investment",2020.0,, BioSNG,lifetime,25.0,years,TODO,"84 Gasif. CFB, Bio-SNG: Technical lifetime",2020.0,, Biomass gasification,efficiency,0.525,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Biomass gasification,investment,1467.7693,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Biomass gasification,investment,1978.8508861995015,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Biomass gasification,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Biomass gasification CC,FOM,0.02,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Biomass gasification CC,efficiency,0.514,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Biomass gasification CC,investment,3015.5325,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Biomass gasification CC,investment,4065.5510481055235,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Biomass gasification CC,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, BtL,C in fuel,0.3156,per unit,"Stoichiometric calculation, doi:10.1016/j.apenergy.2022.120016",,,, BtL,C stored,0.6844,per unit,"Stoichiometric calculation, doi:10.1016/j.apenergy.2022.120016",,,, @@ -86,12 +86,12 @@ CCGT,FOM,2.05,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data CCGT,FOM,2.05,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced CCGT,FOM,2.05,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate CCGT,FOM,2.05,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -CCGT,VOM,6.94,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -CCGT,VOM,6.94,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -CCGT,VOM,6.94,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -CCGT,VOM,6.94,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -CCGT,VOM,6.94,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -CCGT,VOM,6.94,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +CCGT,VOM,6.0631952689603725,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +CCGT,VOM,6.0631952689603725,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +CCGT,VOM,6.0631952689603725,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +CCGT,VOM,6.0631952689603725,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +CCGT,VOM,6.0631952689603725,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +CCGT,VOM,6.0631952689603725,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative CCGT,c_b,2.2,50oC/100oC,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","05 Gas turb. CC, steam extract.: Cb coefficient",2015.0,, CCGT,c_v,0.15,50oC/100oC,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","05 Gas turb. CC, steam extract.: Cv coefficient",2015.0,, CCGT,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced @@ -101,12 +101,12 @@ CCGT,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of CCGT,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate CCGT,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative CCGT,efficiency,0.6,per unit,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","05 Gas turb. CC, steam extract.: Electricity efficiency, annual average",2015.0,, -CCGT,investment,1074.572402587359,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -CCGT,investment,1074.572402587359,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -CCGT,investment,1074.572402587359,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -CCGT,investment,1074.572402587359,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -CCGT,investment,1074.572402587359,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -CCGT,investment,1074.572402587359,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +CCGT,investment,938.810130767011,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +CCGT,investment,938.810130767011,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +CCGT,investment,938.810130767011,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +CCGT,investment,938.810130767011,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +CCGT,investment,938.810130767011,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +CCGT,investment,938.810130767011,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative CCGT,lifetime,25.0,years,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","05 Gas turb. CC, steam extract.: Technical lifetime",2015.0,, CH4 (g) fill compressor station,FOM,1.7,%/year,Assume same as for H2 (g) fill compressor station.,-,2020.0,, CH4 (g) fill compressor station,investment,1654.96,EUR/MW_CH4,"Guesstimate, based on H2 (g) pipeline and fill compressor station cost.","Assume same ratio as between H2 (g) pipeline and fill compressor station, i.e. 1:19 , due to a lack of reliable numbers.",2020.0,, @@ -157,18 +157,18 @@ CSP - Class 3,FOM,0.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket= CSP - Class 3,FOM,1.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced CSP - Class 3,FOM,1.17,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate CSP - Class 3,FOM,0.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -CSP - Class 3,VOM,2.91,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -CSP - Class 3,VOM,3.0,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -CSP - Class 3,VOM,3.95766,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -CSP - Class 3,VOM,2.91,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -CSP - Class 3,VOM,3.0,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -CSP - Class 3,VOM,3.95766,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -CSP - Class 3,investment,3150.4413251673172,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -CSP - Class 3,investment,4455.096594371452,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -CSP - Class 3,investment,7912.019603207439,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -CSP - Class 3,investment,3150.4413251673172,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -CSP - Class 3,investment,4455.096594371452,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -CSP - Class 3,investment,7912.019603207439,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +CSP - Class 3,VOM,2.5423484485122025,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +CSP - Class 3,VOM,2.6209777819713427,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +CSP - Class 3,VOM,3.4576463095322345,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +CSP - Class 3,VOM,2.5423484485122025,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +CSP - Class 3,VOM,2.6209777819713427,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +CSP - Class 3,VOM,3.4576463095322345,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +CSP - Class 3,investment,2752.4122388892974,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +CSP - Class 3,investment,3892.23639679459,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +CSP - Class 3,investment,6912.409196842806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +CSP - Class 3,investment,2752.4122388892974,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +CSP - Class 3,investment,3892.23639679459,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +CSP - Class 3,investment,6912.409196842806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative CSP - Class 8,CF,0.514,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced CSP - Class 8,CF,0.514,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate CSP - Class 8,CF,0.514,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -181,18 +181,18 @@ CSP - Class 8,FOM,0.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket= CSP - Class 8,FOM,1.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced CSP - Class 8,FOM,1.17,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate CSP - Class 8,FOM,0.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -CSP - Class 8,VOM,2.91,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -CSP - Class 8,VOM,3.0,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -CSP - Class 8,VOM,3.95766,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -CSP - Class 8,VOM,2.91,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -CSP - Class 8,VOM,3.0,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -CSP - Class 8,VOM,3.95766,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -CSP - Class 8,investment,3150.4413251673172,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -CSP - Class 8,investment,4455.096594371452,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -CSP - Class 8,investment,7912.019603207439,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -CSP - Class 8,investment,3150.4413251673172,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -CSP - Class 8,investment,4455.096594371452,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -CSP - Class 8,investment,7912.019603207439,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +CSP - Class 8,VOM,2.5423484485122025,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +CSP - Class 8,VOM,2.6209777819713427,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +CSP - Class 8,VOM,3.4576463095322345,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +CSP - Class 8,VOM,2.5423484485122025,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +CSP - Class 8,VOM,2.6209777819713427,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +CSP - Class 8,VOM,3.4576463095322345,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +CSP - Class 8,investment,2752.4122388892974,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +CSP - Class 8,investment,3892.23639679459,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +CSP - Class 8,investment,6912.409196842806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +CSP - Class 8,investment,2752.4122388892974,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +CSP - Class 8,investment,3892.23639679459,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +CSP - Class 8,investment,6912.409196842806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Charging infrastructure fast (purely) battery electric vehicles passenger cars,FOM,1.6,%,PATHS TO A CLIMATE-NEUTRAL ENERGY SYSTEM The German energy transformation in its social context. https://www.ise.fraunhofer.de/en/publications/studies/paths-to-a-climate-neutral-energy-system.html,Charging infrastructure fast (purely) battery electric vehicles passenger cars,2020.0,, Charging infrastructure fast (purely) battery electric vehicles passenger cars,investment,448894.0,EUR/Lades�ule,PATHS TO A CLIMATE-NEUTRAL ENERGY SYSTEM The German energy transformation in its social context. https://www.ise.fraunhofer.de/en/publications/studies/paths-to-a-climate-neutral-energy-system.html,Charging infrastructure fast (purely) battery electric vehicles passenger cars,2020.0,, Charging infrastructure fast (purely) battery electric vehicles passenger cars,lifetime,30.0,years,PATHS TO A CLIMATE-NEUTRAL ENERGY SYSTEM The German energy transformation in its social context. https://www.ise.fraunhofer.de/en/publications/studies/paths-to-a-climate-neutral-energy-system.html,Charging infrastructure fast (purely) battery electric vehicles passenger cars,2020.0,, @@ -211,25 +211,25 @@ Coal - IGCC,FOM,2.39,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oe Coal - IGCC,FOM,2.4,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Coal - IGCC,FOM,2.39,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal - IGCC,FOM,2.39,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Coal - IGCC,VOM,14.14,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal - IGCC,VOM,14.93,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal - IGCC,VOM,15.73,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal - IGCC,VOM,14.14,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal - IGCC,VOM,14.93,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal - IGCC,VOM,15.73,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Coal - IGCC,investment,5963.038800381306,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal - IGCC,investment,6314.16189725655,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal - IGCC,investment,6665.161446244084,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal - IGCC,investment,5963.038800381306,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal - IGCC,investment,6314.16189725655,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal - IGCC,investment,6665.161446244084,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal - IGCC,VOM,12.353541945691594,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal - IGCC,VOM,13.043732761610714,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal - IGCC,VOM,13.742660170136407,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal - IGCC,VOM,12.353541945691594,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal - IGCC,VOM,13.043732761610714,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal - IGCC,VOM,13.742660170136407,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal - IGCC,investment,5209.664069610817,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal - IGCC,investment,5516.426014826479,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal - IGCC,investment,5823.0800212859085,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal - IGCC,investment,5209.664069610817,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal - IGCC,investment,5516.426014826479,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal - IGCC,investment,5823.0800212859085,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal gasification,FOM,0.06,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Coal gasification,efficiency,0.787,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Coal gasification,investment,399.2305,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Coal gasification,investment,538.2432903364873,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Coal gasification,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Coal gasification CC,FOM,0.07,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Coal gasification CC,efficiency,0.609,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Coal gasification CC,investment,649.5969,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Coal gasification CC,investment,875.7882332041481,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Coal gasification CC,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Coal integrated retrofit 90%-CCS,FOM,9.64,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal integrated retrofit 90%-CCS,FOM,9.17,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -237,52 +237,52 @@ Coal integrated retrofit 90%-CCS,FOM,8.85,%/year,NREL/ATB-https://data.openei.or Coal integrated retrofit 90%-CCS,FOM,9.64,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Coal integrated retrofit 90%-CCS,FOM,9.17,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal integrated retrofit 90%-CCS,FOM,8.85,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Coal integrated retrofit 90%-CCS,VOM,13.94,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal integrated retrofit 90%-CCS,VOM,15.47,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal integrated retrofit 90%-CCS,VOM,17.01,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal integrated retrofit 90%-CCS,VOM,13.94,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal integrated retrofit 90%-CCS,VOM,15.47,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal integrated retrofit 90%-CCS,VOM,17.01,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal integrated retrofit 90%-CCS,VOM,12.178810093560172,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal integrated retrofit 90%-CCS,VOM,13.515508762365558,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal integrated retrofit 90%-CCS,VOM,14.860944023777513,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal integrated retrofit 90%-CCS,VOM,12.178810093560172,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal integrated retrofit 90%-CCS,VOM,13.515508762365558,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal integrated retrofit 90%-CCS,VOM,14.860944023777513,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal integrated retrofit 90%-CCS,capture_rate,0.9,per unit,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, Coal integrated retrofit 90%-CCS,efficiency,0.386,p.u.,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, -Coal integrated retrofit 90%-CCS,investment,1133.4,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal integrated retrofit 90%-CCS,investment,1398.6,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal integrated retrofit 90%-CCS,investment,1663.8,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal integrated retrofit 90%-CCS,investment,1133.4,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal integrated retrofit 90%-CCS,investment,1398.6,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal integrated retrofit 90%-CCS,investment,1663.8,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal integrated retrofit 90%-CCS,investment,990.2054060287733,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal integrated retrofit 90%-CCS,investment,1221.8998419550398,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal integrated retrofit 90%-CCS,investment,1453.5942778813067,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal integrated retrofit 90%-CCS,investment,990.2054060287733,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal integrated retrofit 90%-CCS,investment,1221.8998419550398,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal integrated retrofit 90%-CCS,investment,1453.5942778813067,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal integrated retrofit 95%-CCS,FOM,9.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal integrated retrofit 95%-CCS,FOM,8.97,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Coal integrated retrofit 95%-CCS,FOM,8.66,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Coal integrated retrofit 95%-CCS,FOM,9.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Coal integrated retrofit 95%-CCS,FOM,8.97,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal integrated retrofit 95%-CCS,FOM,8.66,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Coal integrated retrofit 95%-CCS,VOM,14.19,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal integrated retrofit 95%-CCS,VOM,15.79,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal integrated retrofit 95%-CCS,VOM,17.4,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal integrated retrofit 95%-CCS,VOM,14.19,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal integrated retrofit 95%-CCS,VOM,15.79,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal integrated retrofit 95%-CCS,VOM,17.4,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal integrated retrofit 95%-CCS,VOM,12.39722490872445,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal integrated retrofit 95%-CCS,VOM,13.795079725775832,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal integrated retrofit 95%-CCS,VOM,15.201671135433786,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal integrated retrofit 95%-CCS,VOM,12.39722490872445,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal integrated retrofit 95%-CCS,VOM,13.795079725775832,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal integrated retrofit 95%-CCS,VOM,15.201671135433786,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal integrated retrofit 95%-CCS,capture_rate,0.95,per unit,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, Coal integrated retrofit 95%-CCS,efficiency,0.386,p.u.,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, -Coal integrated retrofit 95%-CCS,investment,1178.8,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal integrated retrofit 95%-CCS,investment,1458.8,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal integrated retrofit 95%-CCS,investment,1738.8,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal integrated retrofit 95%-CCS,investment,1178.8,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal integrated retrofit 95%-CCS,investment,1458.8,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal integrated retrofit 95%-CCS,investment,1738.8,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal integrated retrofit 95%-CCS,investment,1029.8695364626062,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal integrated retrofit 95%-CCS,investment,1274.4941294465982,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal integrated retrofit 95%-CCS,investment,1519.1187224305902,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal integrated retrofit 95%-CCS,investment,1029.8695364626062,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal integrated retrofit 95%-CCS,investment,1274.4941294465982,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal integrated retrofit 95%-CCS,investment,1519.1187224305902,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-95%-CCS,FOM,2.14,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal-95%-CCS,FOM,2.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Coal-95%-CCS,FOM,2.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Coal-95%-CCS,FOM,2.14,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Coal-95%-CCS,FOM,2.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal-95%-CCS,FOM,2.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Coal-95%-CCS,VOM,12.2,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal-95%-CCS,VOM,13.43,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal-95%-CCS,VOM,14.65,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal-95%-CCS,VOM,12.2,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal-95%-CCS,VOM,13.43,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal-95%-CCS,VOM,14.65,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal-95%-CCS,VOM,10.658642980016792,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal-95%-CCS,VOM,11.733243870625044,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal-95%-CCS,VOM,12.799108168626724,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal-95%-CCS,VOM,10.658642980016792,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal-95%-CCS,VOM,11.733243870625044,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal-95%-CCS,VOM,12.799108168626724,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-95%-CCS,capture_rate,0.95,per unit,"NREL, NREL ATB 2024",,,, Coal-95%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal-95%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -291,12 +291,12 @@ Coal-95%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Mea Coal-95%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal-95%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-95%-CCS,efficiency,0.403,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Coal-95%-CCS,investment,4553.233853708746,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal-95%-CCS,investment,4771.542971294445,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal-95%-CCS,investment,4989.852088880145,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal-95%-CCS,investment,4553.233853708746,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal-95%-CCS,investment,4771.542971294445,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal-95%-CCS,investment,4989.852088880145,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal-95%-CCS,investment,3977.974922230126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal-95%-CCS,investment,4168.7027044947545,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal-95%-CCS,investment,4359.430486759385,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal-95%-CCS,investment,3977.974922230126,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal-95%-CCS,investment,4168.7027044947545,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal-95%-CCS,investment,4359.430486759385,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-95%-CCS,lifetime,40.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Coal-99%-CCS,FOM,2.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal-99%-CCS,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -304,12 +304,12 @@ Coal-99%-CCS,FOM,2.1,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oe Coal-99%-CCS,FOM,2.13,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Coal-99%-CCS,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal-99%-CCS,FOM,2.1,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Coal-99%-CCS,VOM,12.42,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal-99%-CCS,VOM,13.72,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal-99%-CCS,VOM,15.02,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal-99%-CCS,VOM,12.42,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal-99%-CCS,VOM,13.72,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal-99%-CCS,VOM,15.02,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal-99%-CCS,VOM,10.850848017361358,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal-99%-CCS,VOM,11.986605056215607,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal-99%-CCS,VOM,13.122362095069855,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal-99%-CCS,VOM,10.850848017361358,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal-99%-CCS,VOM,11.986605056215607,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal-99%-CCS,VOM,13.122362095069855,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-99%-CCS,capture_rate,0.99,per unit,"NREL, NREL ATB 2024",,,, Coal-99%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal-99%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -318,12 +318,12 @@ Coal-99%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Mea Coal-99%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal-99%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-99%-CCS,efficiency,0.403,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Coal-99%-CCS,investment,4618.961329971107,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal-99%-CCS,investment,4860.620998334224,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal-99%-CCS,investment,5102.280666697341,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal-99%-CCS,investment,4618.961329971107,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal-99%-CCS,investment,4860.620998334224,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal-99%-CCS,investment,5102.280666697341,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal-99%-CCS,investment,4035.398340546358,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal-99%-CCS,investment,4246.526547739122,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal-99%-CCS,investment,4457.654754931887,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal-99%-CCS,investment,4035.398340546358,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal-99%-CCS,investment,4246.526547739122,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal-99%-CCS,investment,4457.654754931887,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-99%-CCS,lifetime,40.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Coal-IGCC,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal-IGCC,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -339,12 +339,12 @@ Coal-IGCC-90%-CCS,FOM,2.37,%/year,NREL/ATB-https://data.openei.org/s3_viewer?buc Coal-IGCC-90%-CCS,FOM,2.38,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Coal-IGCC-90%-CCS,FOM,2.38,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal-IGCC-90%-CCS,FOM,2.37,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Coal-IGCC-90%-CCS,VOM,21.05,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal-IGCC-90%-CCS,VOM,22.22,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal-IGCC-90%-CCS,VOM,23.38,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal-IGCC-90%-CCS,VOM,21.05,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal-IGCC-90%-CCS,VOM,22.22,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal-IGCC-90%-CCS,VOM,23.38,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal-IGCC-90%-CCS,VOM,18.390527436832254,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal-IGCC-90%-CCS,VOM,19.412708771801075,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal-IGCC-90%-CCS,VOM,20.426153514163328,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal-IGCC-90%-CCS,VOM,18.390527436832254,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal-IGCC-90%-CCS,VOM,19.412708771801075,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal-IGCC-90%-CCS,VOM,20.426153514163328,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-IGCC-90%-CCS,capture_rate,0.9,per unit,"NREL, NREL ATB 2024",,,, Coal-IGCC-90%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Coal-IGCC-90%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -353,12 +353,12 @@ Coal-IGCC-90%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024 Coal-IGCC-90%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Coal-IGCC-90%-CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-IGCC-90%-CCS,efficiency,0.403,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Coal-IGCC-90%-CCS,investment,8465.624813859473,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Coal-IGCC-90%-CCS,investment,8961.298939356828,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Coal-IGCC-90%-CCS,investment,9456.97306485418,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Coal-IGCC-90%-CCS,investment,8465.624813859473,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Coal-IGCC-90%-CCS,investment,8961.298939356828,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Coal-IGCC-90%-CCS,investment,9456.97306485418,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Coal-IGCC-90%-CCS,investment,7396.071515876987,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Coal-IGCC-90%-CCS,investment,7829.121805885868,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Coal-IGCC-90%-CCS,investment,8262.172095894746,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Coal-IGCC-90%-CCS,investment,7396.071515876987,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Coal-IGCC-90%-CCS,investment,7829.121805885868,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Coal-IGCC-90%-CCS,investment,8262.172095894746,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Coal-IGCC-90%-CCS,lifetime,40.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Commercial Battery Storage 1Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial Battery Storage 1Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -366,60 +366,60 @@ Commercial Battery Storage 1Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/ Commercial Battery Storage 1Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial Battery Storage 1Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial Battery Storage 1Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial Battery Storage 1Hr,investment,495.7418737971263,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial Battery Storage 1Hr,investment,794.8451121613319,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial Battery Storage 1Hr,investment,1186.8956998212425,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial Battery Storage 1Hr,investment,495.7418737971263,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial Battery Storage 1Hr,investment,794.8451121613319,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial Battery Storage 1Hr,investment,1186.8956998212425,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial Battery Storage 1Hr,investment,433.10947893836976,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial Battery Storage 1Hr,investment,694.4237930277902,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial Battery Storage 1Hr,investment,1036.942419582935,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial Battery Storage 1Hr,investment,433.10947893836976,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial Battery Storage 1Hr,investment,694.4237930277902,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial Battery Storage 1Hr,investment,1036.942419582935,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial Battery Storage 2Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial Battery Storage 2Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial Battery Storage 2Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Commercial Battery Storage 2Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial Battery Storage 2Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial Battery Storage 2Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial Battery Storage 2Hr,investment,593.373428553998,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial Battery Storage 2Hr,investment,929.8259904092844,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial Battery Storage 2Hr,investment,1420.6432983854393,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial Battery Storage 2Hr,investment,593.373428553998,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial Battery Storage 2Hr,investment,929.8259904092844,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial Battery Storage 2Hr,investment,1420.6432983854393,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial Battery Storage 2Hr,investment,518.4061908840629,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial Battery Storage 2Hr,investment,812.3510873207443,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial Battery Storage 2Hr,investment,1241.1581737249069,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial Battery Storage 2Hr,investment,518.4061908840629,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial Battery Storage 2Hr,investment,812.3510873207443,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial Battery Storage 2Hr,investment,1241.1581737249069,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial Battery Storage 4Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial Battery Storage 4Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial Battery Storage 4Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Commercial Battery Storage 4Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial Battery Storage 4Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial Battery Storage 4Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial Battery Storage 4Hr,investment,788.6365380677414,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial Battery Storage 4Hr,investment,1199.7877469051898,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial Battery Storage 4Hr,investment,1888.138495513832,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial Battery Storage 4Hr,investment,788.6365380677414,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial Battery Storage 4Hr,investment,1199.7877469051898,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial Battery Storage 4Hr,investment,1888.138495513832,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial Battery Storage 4Hr,investment,688.999614775449,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial Battery Storage 4Hr,investment,1048.205675906653,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial Battery Storage 4Hr,investment,1649.5896820088503,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial Battery Storage 4Hr,investment,688.999614775449,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial Battery Storage 4Hr,investment,1048.205675906653,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial Battery Storage 4Hr,investment,1649.5896820088503,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial Battery Storage 6Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial Battery Storage 6Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial Battery Storage 6Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Commercial Battery Storage 6Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial Battery Storage 6Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial Battery Storage 6Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial Battery Storage 6Hr,investment,983.8996475814848,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial Battery Storage 6Hr,investment,1469.749503401095,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial Battery Storage 6Hr,investment,2355.6336926422255,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial Battery Storage 6Hr,investment,983.8996475814848,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial Battery Storage 6Hr,investment,1469.749503401095,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial Battery Storage 6Hr,investment,2355.6336926422255,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial Battery Storage 6Hr,investment,859.5930386668352,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial Battery Storage 6Hr,investment,1284.0602644925614,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial Battery Storage 6Hr,investment,2058.0211902927945,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial Battery Storage 6Hr,investment,859.5930386668352,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial Battery Storage 6Hr,investment,1284.0602644925614,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial Battery Storage 6Hr,investment,2058.0211902927945,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial Battery Storage 8Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial Battery Storage 8Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial Battery Storage 8Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Commercial Battery Storage 8Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial Battery Storage 8Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial Battery Storage 8Hr,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial Battery Storage 8Hr,investment,1179.162757095228,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial Battery Storage 8Hr,investment,1739.711259897,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial Battery Storage 8Hr,investment,2823.128889770619,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial Battery Storage 8Hr,investment,1179.162757095228,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial Battery Storage 8Hr,investment,1739.711259897,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial Battery Storage 8Hr,investment,2823.128889770619,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial Battery Storage 8Hr,investment,1030.1864625582211,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial Battery Storage 8Hr,investment,1519.9148530784696,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial Battery Storage 8Hr,investment,2466.452698576739,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial Battery Storage 8Hr,investment,1030.1864625582211,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial Battery Storage 8Hr,investment,1519.9148530784696,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial Battery Storage 8Hr,investment,2466.452698576739,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 1,CF,0.572448,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 1,CF,0.572448,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 1,CF,0.572448,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -432,12 +432,12 @@ Commercial DW - Class 1,FOM,1.54,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 1,FOM,3.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 1,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 1,FOM,1.54,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 1,investment,1043.1809064239292,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 1,investment,1682.389651731978,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 1,investment,2318.87789408505,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 1,investment,1043.1809064239292,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 1,investment,1682.389651731978,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 1,investment,2318.87789408505,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 1,investment,911.3846594379481,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 1,investment,1469.8352992693397,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 1,investment,2025.9091465004706,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 1,investment,911.3846594379481,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 1,investment,1469.8352992693397,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 1,investment,2025.9091465004706,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 10,CF,0.221877,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 10,CF,0.221877,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 10,CF,0.221877,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -450,12 +450,12 @@ Commercial DW - Class 10,FOM,1.54,%/year,NREL/ATB-https://data.openei.org/s3_vie Commercial DW - Class 10,FOM,3.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 10,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 10,FOM,1.54,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 10,investment,1043.1809064239292,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 10,investment,1682.389651731978,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 10,investment,2318.87789408505,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 10,investment,1043.1809064239292,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 10,investment,1682.389651731978,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 10,investment,2318.87789408505,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 10,investment,911.3846594379481,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 10,investment,1469.8352992693397,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 10,investment,2025.9091465004706,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 10,investment,911.3846594379481,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 10,investment,1469.8352992693397,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 10,investment,2025.9091465004706,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 2,CF,0.537382,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 2,CF,0.537382,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 2,CF,0.537382,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -468,12 +468,12 @@ Commercial DW - Class 2,FOM,1.54,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 2,FOM,3.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 2,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 2,FOM,1.54,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 2,investment,1043.1809064239292,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 2,investment,1682.389651731978,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 2,investment,2318.87789408505,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 2,investment,1043.1809064239292,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 2,investment,1682.389651731978,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 2,investment,2318.87789408505,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 2,investment,911.3846594379481,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 2,investment,1469.8352992693397,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 2,investment,2025.9091465004706,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 2,investment,911.3846594379481,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 2,investment,1469.8352992693397,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 2,investment,2025.9091465004706,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 3,CF,0.524922,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 3,CF,0.524922,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 3,CF,0.524922,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -486,12 +486,12 @@ Commercial DW - Class 3,FOM,1.54,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 3,FOM,3.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 3,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 3,FOM,1.54,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 3,investment,1043.1809064239292,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 3,investment,1682.389651731978,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 3,investment,2318.87789408505,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 3,investment,1043.1809064239292,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 3,investment,1682.389651731978,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 3,investment,2318.87789408505,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 3,investment,911.3846594379481,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 3,investment,1469.8352992693397,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 3,investment,2025.9091465004706,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 3,investment,911.3846594379481,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 3,investment,1469.8352992693397,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 3,investment,2025.9091465004706,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 4,CF,0.5118389999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 4,CF,0.5118389999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 4,CF,0.5118389999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -504,12 +504,12 @@ Commercial DW - Class 4,FOM,1.57,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 4,FOM,3.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 4,FOM,2.04,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 4,FOM,1.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 4,investment,1043.1809064239292,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 4,investment,1741.9589977305563,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 4,investment,2264.5466970497237,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 4,investment,1043.1809064239292,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 4,investment,1741.9589977305563,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 4,investment,2264.5466970497237,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 4,investment,911.3846594379481,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 4,investment,1521.8786100522855,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 4,investment,1978.4421930679716,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 4,investment,911.3846594379481,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 4,investment,1521.8786100522855,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 4,investment,1978.4421930679716,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 5,CF,0.495463,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 5,CF,0.495463,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 5,CF,0.495463,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -522,12 +522,12 @@ Commercial DW - Class 5,FOM,1.54,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 5,FOM,3.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 5,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 5,FOM,1.54,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 5,investment,1043.1809064239292,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 5,investment,1682.389651731978,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 5,investment,2318.87789408505,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 5,investment,1043.1809064239292,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 5,investment,1682.389651731978,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 5,investment,2318.87789408505,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 5,investment,911.3846594379481,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 5,investment,1469.8352992693397,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 5,investment,2025.9091465004706,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 5,investment,911.3846594379481,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 5,investment,1469.8352992693397,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 5,investment,2025.9091465004706,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 6,CF,0.470365,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 6,CF,0.470365,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 6,CF,0.470365,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -540,12 +540,12 @@ Commercial DW - Class 6,FOM,1.54,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 6,FOM,3.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 6,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 6,FOM,1.54,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 6,investment,1043.1809064239292,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 6,investment,1682.389651731978,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 6,investment,2318.87789408505,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 6,investment,1043.1809064239292,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 6,investment,1682.389651731978,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 6,investment,2318.87789408505,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 6,investment,911.3846594379481,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 6,investment,1469.8352992693397,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 6,investment,2025.9091465004706,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 6,investment,911.3846594379481,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 6,investment,1469.8352992693397,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 6,investment,2025.9091465004706,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 7,CF,0.433786,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 7,CF,0.433786,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 7,CF,0.433786,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -558,12 +558,12 @@ Commercial DW - Class 7,FOM,1.54,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 7,FOM,3.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 7,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 7,FOM,1.54,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 7,investment,1043.1809064239292,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 7,investment,1682.389651731978,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 7,investment,2318.87789408505,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 7,investment,1043.1809064239292,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 7,investment,1682.389651731978,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 7,investment,2318.87789408505,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 7,investment,911.3846594379481,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 7,investment,1469.8352992693397,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 7,investment,2025.9091465004706,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 7,investment,911.3846594379481,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 7,investment,1469.8352992693397,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 7,investment,2025.9091465004706,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 8,CF,0.388129,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 8,CF,0.388129,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 8,CF,0.388129,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -576,12 +576,12 @@ Commercial DW - Class 8,FOM,1.54,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 8,FOM,3.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 8,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 8,FOM,1.54,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 8,investment,1043.1809064239292,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 8,investment,1682.389651731978,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 8,investment,2318.87789408505,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 8,investment,1043.1809064239292,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 8,investment,1682.389651731978,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 8,investment,2318.87789408505,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 8,investment,911.3846594379481,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 8,investment,1469.8352992693397,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 8,investment,2025.9091465004706,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 8,investment,911.3846594379481,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 8,investment,1469.8352992693397,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 8,investment,2025.9091465004706,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial DW - Class 9,CF,0.332237,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial DW - Class 9,CF,0.332237,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial DW - Class 9,CF,0.332237,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -594,12 +594,12 @@ Commercial DW - Class 9,FOM,1.54,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial DW - Class 9,FOM,3.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial DW - Class 9,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial DW - Class 9,FOM,1.54,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial DW - Class 9,investment,1043.1809064239292,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial DW - Class 9,investment,1682.389651731978,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial DW - Class 9,investment,2318.87789408505,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial DW - Class 9,investment,1043.1809064239292,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial DW - Class 9,investment,1682.389651731978,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial DW - Class 9,investment,2318.87789408505,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial DW - Class 9,investment,911.3846594379481,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial DW - Class 9,investment,1469.8352992693397,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial DW - Class 9,investment,2025.9091465004706,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial DW - Class 9,investment,911.3846594379481,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial DW - Class 9,investment,1469.8352992693397,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial DW - Class 9,investment,2025.9091465004706,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 10,CF,0.13991925054482326,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 10,CF,0.13597816439564503,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 10,CF,0.12954185706408672,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -612,12 +612,12 @@ Commercial PV - Class 10,FOM,1.11,%/year,NREL/ATB-https://data.openei.org/s3_vie Commercial PV - Class 10,FOM,1.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 10,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 10,FOM,1.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 10,investment,773.8962637917009,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 10,investment,929.2122343748616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 10,investment,1239.359469701182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 10,investment,773.8962637917009,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 10,investment,929.2122343748616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 10,investment,1239.359469701182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 10,investment,676.1216376495604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 10,investment,811.8148736774867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 10,investment,1082.7778779875277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 10,investment,676.1216376495604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 10,investment,811.8148736774867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 10,investment,1082.7778779875277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 2,CF,0.2097502355584778,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 2,CF,0.20384222972706023,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 2,CF,0.19419368620167424,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -630,12 +630,12 @@ Commercial PV - Class 2,FOM,1.11,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 2,FOM,1.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 2,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 2,FOM,1.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 2,investment,773.8962637917009,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 2,investment,929.2122343748616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 2,investment,1239.359469701182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 2,investment,773.8962637917009,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 2,investment,929.2122343748616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 2,investment,1239.359469701182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 2,investment,676.1216376495604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 2,investment,811.8148736774867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 2,investment,1082.7778779875277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 2,investment,676.1216376495604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 2,investment,811.8148736774867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 2,investment,1082.7778779875277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 3,CF,0.19855324178873304,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 3,CF,0.19296062012987605,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 3,CF,0.1838271400629563,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -648,12 +648,12 @@ Commercial PV - Class 3,FOM,1.11,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 3,FOM,1.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 3,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 3,FOM,1.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 3,investment,773.8962637917009,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 3,investment,929.2122343748616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 3,investment,1239.359469701182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 3,investment,773.8962637917009,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 3,investment,929.2122343748616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 3,investment,1239.359469701182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 3,investment,676.1216376495604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 3,investment,811.8148736774867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 3,investment,1082.7778779875277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 3,investment,676.1216376495604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 3,investment,811.8148736774867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 3,investment,1082.7778779875277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 4,CF,0.18806164046698304,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 4,CF,0.18276453428931144,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 4,CF,0.17411366951831436,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -666,12 +666,12 @@ Commercial PV - Class 4,FOM,1.11,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 4,FOM,1.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 4,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 4,FOM,1.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 4,investment,773.8962637917009,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 4,investment,929.2122343748616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 4,investment,1239.359469701182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 4,investment,773.8962637917009,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 4,investment,929.2122343748616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 4,investment,1239.359469701182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 4,investment,676.1216376495604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 4,investment,811.8148736774867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 4,investment,1082.7778779875277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 4,investment,676.1216376495604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 4,investment,811.8148736774867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 4,investment,1082.7778779875277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 5,CF,0.1794635817142869,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 5,CF,0.1744086558665422,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 5,CF,0.16615330313818158,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -684,12 +684,12 @@ Commercial PV - Class 5,FOM,1.11,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 5,FOM,1.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 5,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 5,FOM,1.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 5,investment,773.8962637917009,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 5,investment,929.2122343748616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 5,investment,1239.359469701182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 5,investment,773.8962637917009,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 5,investment,929.2122343748616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 5,investment,1239.359469701182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 5,investment,676.1216376495604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 5,investment,811.8148736774867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 5,investment,1082.7778779875277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 5,investment,676.1216376495604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 5,investment,811.8148736774867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 5,investment,1082.7778779875277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 6,CF,0.17708378031531663,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 6,CF,0.1720958860039385,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 6,CF,0.16395000451082395,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -702,12 +702,12 @@ Commercial PV - Class 6,FOM,1.11,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 6,FOM,1.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 6,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 6,FOM,1.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 6,investment,773.8962637917009,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 6,investment,929.2122343748616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 6,investment,1239.359469701182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 6,investment,773.8962637917009,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 6,investment,929.2122343748616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 6,investment,1239.359469701182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 6,investment,676.1216376495604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 6,investment,811.8148736774867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 6,investment,1082.7778779875277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 6,investment,676.1216376495604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 6,investment,811.8148736774867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 6,investment,1082.7778779875277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 7,CF,0.16872543756599792,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 7,CF,0.16397297153708384,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 7,CF,0.15621157511309053,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -720,12 +720,12 @@ Commercial PV - Class 7,FOM,1.11,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 7,FOM,1.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 7,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 7,FOM,1.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 7,investment,773.8962637917009,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 7,investment,929.2122343748616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 7,investment,1239.359469701182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 7,investment,773.8962637917009,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 7,investment,929.2122343748616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 7,investment,1239.359469701182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 7,investment,676.1216376495604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 7,investment,811.8148736774867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 7,investment,1082.7778779875277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 7,investment,676.1216376495604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 7,investment,811.8148736774867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 7,investment,1082.7778779875277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 8,CF,0.1602439293243822,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 8,CF,0.1557303607632934,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 8,CF,0.1483591150402624,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -738,12 +738,12 @@ Commercial PV - Class 8,FOM,1.11,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 8,FOM,1.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 8,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 8,FOM,1.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 8,investment,773.8962637917009,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 8,investment,929.2122343748616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 8,investment,1239.359469701182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 8,investment,773.8962637917009,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 8,investment,929.2122343748616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 8,investment,1239.359469701182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 8,investment,676.1216376495604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 8,investment,811.8148736774867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 8,investment,1082.7778779875277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 8,investment,676.1216376495604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 8,investment,811.8148736774867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 8,investment,1082.7778779875277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Commercial PV - Class 9,CF,0.15381660675814374,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Commercial PV - Class 9,CF,0.1494840757014975,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Commercial PV - Class 9,CF,0.14240848781821538,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -756,12 +756,12 @@ Commercial PV - Class 9,FOM,1.11,%/year,NREL/ATB-https://data.openei.org/s3_view Commercial PV - Class 9,FOM,1.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Commercial PV - Class 9,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Commercial PV - Class 9,FOM,1.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Commercial PV - Class 9,investment,773.8962637917009,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Commercial PV - Class 9,investment,929.2122343748616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Commercial PV - Class 9,investment,1239.359469701182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Commercial PV - Class 9,investment,773.8962637917009,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Commercial PV - Class 9,investment,929.2122343748616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Commercial PV - Class 9,investment,1239.359469701182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Commercial PV - Class 9,investment,676.1216376495604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Commercial PV - Class 9,investment,811.8148736774867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Commercial PV - Class 9,investment,1082.7778779875277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Commercial PV - Class 9,investment,676.1216376495604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Commercial PV - Class 9,investment,811.8148736774867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Commercial PV - Class 9,investment,1082.7778779875277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Compressed-Air-Adiabatic-bicharger,FOM,0.9265,%/year,"Viswanathan_2022, p.64 (p.86) Figure 4.14","{'carrier': ['elec', 'pair', 'elec'], 'technology_type': ['bicharger'], 'type': ['mechanical'], 'note': ['NULL']}",2020.0,, Compressed-Air-Adiabatic-bicharger,efficiency,0.7211,per unit,"Viswanathan_2022, p.59 (p.81)","{'carrier': ['elec', 'pair', 'elec'], 'technology_type': ['bicharger'], 'type': ['mechanical'], 'note': ['AC-AC efficiency at transformer level 0.52^0.5']}",2020.0,, Compressed-Air-Adiabatic-bicharger,investment,946180.9426,EUR/MW,"Viswanathan_2022, p.59 (p.81)","{'carrier': ['elec', 'pair', 'elec'], 'technology_type': ['bicharger'], 'type': ['mechanical'], 'note': ['Turbine Compressor BOP EPC Management']}",2020.0,, @@ -869,7 +869,7 @@ Fischer-Tropsch,carbondioxide-input,0.32,t_CO2/MWh_FT,ICCT IRA e-fuels assumptio Fischer-Tropsch,efficiency,0.7,per unit,ICCT IRA e-fuels assumptions ,,,, Fischer-Tropsch,electricity-input,0.04,MWh_el/MWh_FT,ICCT IRA e-fuels assumptions ,"0.005 MWh_el input per FT output, output increasing from 2020 to 2050 (0.65, 0.7, 0.73, 0.75 MWh liquid FT output).",,, Fischer-Tropsch,hydrogen-input,1.43,MWh_H2/MWh_FT,ICCT IRA e-fuels assumptions ,"0.995 MWh_H2 per output, output increasing from 2020 to 2050 (0.65, 0.7, 0.73, 0.75 MWh liquid FT output).",,, -Fischer-Tropsch,investment,1696429.0,USD/MW_FT,ICCT IRA e-fuels assumptions ,,2022.0,, +Fischer-Tropsch,investment,1482100.9058972877,USD/MW_FT,ICCT IRA e-fuels assumptions ,,2022.0,, Fischer-Tropsch,lifetime,30.0,years,ICCT IRA e-fuels assumptions ,,,, Gasnetz,FOM,2.5,%,"WEGE ZU EINEM KLIMANEUTRALEN ENERGIESYSEM, Anhang zur Studie, Fraunhofer-Institut für Solare Energiesysteme ISE, Freiburg",Gasnetz,2020.0,, Gasnetz,investment,28.0,EUR/kWGas,"WEGE ZU EINEM KLIMANEUTRALEN ENERGIESYSEM, Anhang zur Studie, Fraunhofer-Institut für Solare Energiesysteme ISE, Freiburg",Gasnetz,2020.0,, @@ -892,12 +892,12 @@ Geothermal - Deep EGS / Binary,FOM,1.32,%/year,NREL/ATB-https://data.openei.org/ Geothermal - Deep EGS / Binary,FOM,1.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Geothermal - Deep EGS / Binary,FOM,1.6,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Geothermal - Deep EGS / Binary,FOM,1.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Geothermal - Deep EGS / Binary,investment,6090.883678350443,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Geothermal - Deep EGS / Binary,investment,10364.080719218597,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Geothermal - Deep EGS / Binary,investment,17189.24152822728,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Geothermal - Deep EGS / Binary,investment,6090.883678350443,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Geothermal - Deep EGS / Binary,investment,10364.080719218597,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Geothermal - Deep EGS / Binary,investment,17189.24152822728,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Geothermal - Deep EGS / Binary,investment,5321.356931176132,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Geothermal - Deep EGS / Binary,investment,9054.675098543172,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Geothermal - Deep EGS / Binary,investment,15017.54004480761,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Geothermal - Deep EGS / Binary,investment,5321.356931176132,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Geothermal - Deep EGS / Binary,investment,9054.675098543172,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Geothermal - Deep EGS / Binary,investment,15017.54004480761,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Geothermal - Deep EGS / Flash,CF,0.9,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Geothermal - Deep EGS / Flash,CF,0.9,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Geothermal - Deep EGS / Flash,CF,0.9,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -910,12 +910,12 @@ Geothermal - Deep EGS / Flash,FOM,1.5,%/year,NREL/ATB-https://data.openei.org/s3 Geothermal - Deep EGS / Flash,FOM,2.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Geothermal - Deep EGS / Flash,FOM,1.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Geothermal - Deep EGS / Flash,FOM,1.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Geothermal - Deep EGS / Flash,investment,3821.466032408119,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Geothermal - Deep EGS / Flash,investment,6506.725347113967,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Geothermal - Deep EGS / Flash,investment,9772.232447101664,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Geothermal - Deep EGS / Flash,investment,3821.466032408119,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Geothermal - Deep EGS / Flash,investment,6506.725347113967,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Geothermal - Deep EGS / Flash,investment,9772.232447101664,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Geothermal - Deep EGS / Flash,investment,3338.659188499953,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Geothermal - Deep EGS / Flash,investment,5684.660856058493,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Geothermal - Deep EGS / Flash,investment,8537.601374704302,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Geothermal - Deep EGS / Flash,investment,3338.659188499953,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Geothermal - Deep EGS / Flash,investment,5684.660856058493,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Geothermal - Deep EGS / Flash,investment,8537.601374704302,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Geothermal - Hydro / Binary,CF,0.8,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Geothermal - Hydro / Binary,CF,0.8,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Geothermal - Hydro / Binary,CF,0.8,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -928,12 +928,12 @@ Geothermal - Hydro / Binary,FOM,1.93,%/year,NREL/ATB-https://data.openei.org/s3_ Geothermal - Hydro / Binary,FOM,2.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Geothermal - Hydro / Binary,FOM,1.82,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Geothermal - Hydro / Binary,FOM,1.93,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Geothermal - Hydro / Binary,investment,6015.068836999308,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Geothermal - Hydro / Binary,investment,7325.019952562791,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Geothermal - Hydro / Binary,investment,8338.855583282964,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Geothermal - Hydro / Binary,investment,6015.068836999308,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Geothermal - Hydro / Binary,investment,7325.019952562791,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Geothermal - Hydro / Binary,investment,8338.855583282964,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Geothermal - Hydro / Binary,investment,5255.120592934463,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Geothermal - Hydro / Binary,investment,6399.571516054618,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Geothermal - Hydro / Binary,investment,7285.318403617443,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Geothermal - Hydro / Binary,investment,5255.120592934463,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Geothermal - Hydro / Binary,investment,6399.571516054618,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Geothermal - Hydro / Binary,investment,7285.318403617443,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Geothermal - NF EGS / Binary,CF,0.8,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Geothermal - NF EGS / Binary,CF,0.8,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Geothermal - NF EGS / Binary,CF,0.8,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -946,12 +946,12 @@ Geothermal - NF EGS / Binary,FOM,1.71,%/year,NREL/ATB-https://data.openei.org/s3 Geothermal - NF EGS / Binary,FOM,2.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Geothermal - NF EGS / Binary,FOM,1.84,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Geothermal - NF EGS / Binary,FOM,1.71,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Geothermal - NF EGS / Binary,investment,5735.229357933924,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Geothermal - NF EGS / Binary,investment,8784.202379364919,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Geothermal - NF EGS / Binary,investment,11677.2786621075,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Geothermal - NF EGS / Binary,investment,5735.229357933924,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Geothermal - NF EGS / Binary,investment,8784.202379364919,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Geothermal - NF EGS / Binary,investment,11677.2786621075,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Geothermal - NF EGS / Binary,investment,5010.636240551527,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Geothermal - NF EGS / Binary,investment,7674.399756218419,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Geothermal - NF EGS / Binary,investment,10201.962642423934,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Geothermal - NF EGS / Binary,investment,5010.636240551527,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Geothermal - NF EGS / Binary,investment,7674.399756218419,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Geothermal - NF EGS / Binary,investment,10201.962642423934,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Geothermal - NF EGS / Flash,CF,0.9,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Geothermal - NF EGS / Flash,CF,0.9,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Geothermal - NF EGS / Flash,CF,0.9,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -964,12 +964,12 @@ Geothermal - NF EGS / Flash,FOM,1.84,%/year,NREL/ATB-https://data.openei.org/s3_ Geothermal - NF EGS / Flash,FOM,2.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Geothermal - NF EGS / Flash,FOM,2.04,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Geothermal - NF EGS / Flash,FOM,1.84,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Geothermal - NF EGS / Flash,investment,4318.95252315932,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Geothermal - NF EGS / Flash,investment,6834.126310375094,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Geothermal - NF EGS / Flash,investment,8390.933454519742,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Geothermal - NF EGS / Flash,investment,4318.95252315932,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Geothermal - NF EGS / Flash,investment,6834.126310375094,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Geothermal - NF EGS / Flash,investment,8390.933454519742,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Geothermal - NF EGS / Flash,investment,3773.292868196549,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Geothermal - NF EGS / Flash,investment,5970.697739559637,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Geothermal - NF EGS / Flash,investment,7330.816718098763,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Geothermal - NF EGS / Flash,investment,3773.292868196549,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Geothermal - NF EGS / Flash,investment,5970.697739559637,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Geothermal - NF EGS / Flash,investment,7330.816718098763,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Gravity-Brick-bicharger,FOM,1.5,%/year,"Viswanathan_2022, p.76 (p.98) Sentence 1 in 4.7.2 Operating Costs","{'carrier': ['elec', 'gravity', 'elec'], 'technology_type': ['bicharger'], 'type': ['mechanical'], 'note': ['1.5 percent of capital cost']}",2020.0,, Gravity-Brick-bicharger,efficiency,0.9274,per unit,"Viswanathan_2022, p.77 (p.99) Table 4.36","{'carrier': ['elec', 'gravity', 'elec'], 'technology_type': ['bicharger'], 'type': ['mechanical'], 'note': ['AC-AC efficiency at transformer level 0.86^0.5']}",2020.0,, Gravity-Brick-bicharger,investment,415570.5177,EUR/MW,"Viswanathan_2022, p.71 (p.94) text at the bottom speaks about 0% cost reduction for 2030 compared to 2021","{'carrier': ['elec', 'gravity', 'elec'], 'technology_type': ['bicharger'], 'type': ['mechanical'], 'note': ['Power Equipment']}",2020.0,, @@ -1051,7 +1051,7 @@ Haber-Bosch,lifetime,30.0,years,"Danish Energy Agency, inputs/data_sheets_for_re Haber-Bosch,nitrogen-input,0.1597,t_N2/MWh_NH3,"DECHEMA 2017: DECHEMA: Low carbon energy and feedstock for the European chemical industry (https://dechema.de/dechema_media/Downloads/Positionspapiere/Technology_study_Low_carbon_energy_and_feedstock_for_the_European_chemical_industry.pdf), pg. 57.",".33 MWh electricity are required for ASU per t_NH3, considering 0.4 MWh are required per t_N2 and LHV of NH3 of 5.1666 Mwh.",,, Heavy oil partial oxidation,FOM,0.05,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Heavy oil partial oxidation,efficiency,0.734,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Heavy oil partial oxidation,investment,491.0535,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Heavy oil partial oxidation,investment,662.0382094364353,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Heavy oil partial oxidation,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, HighT-Molten-Salt-charger,FOM,1.075,%/year,"Viswanathan_2022, NULL","{'carrier': ['elec', 'salthight'], 'technology_type': ['charger'], 'type': ['thermal'], 'note': ['Guesstimate, 50% on charger']}",2020.0,, HighT-Molten-Salt-charger,efficiency,0.99,per unit,"Viswanathan_2022, p.107 (p.129)","{'carrier': ['elec', 'salthight'], 'technology_type': ['charger'], 'type': ['thermal'], 'note': ['RTE assume 99% for charge and other for discharge']}",2020.0,, @@ -1095,12 +1095,12 @@ Hydropower - NPD 2,FOM,2.89,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Hydropower - NPD 2,FOM,2.79,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NPD 2,FOM,1.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NPD 2,FOM,2.89,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NPD 2,investment,2899.638907574293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NPD 2,investment,6357.064447883142,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NPD 2,investment,3222.1758345181297,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NPD 2,investment,2899.638907574293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NPD 2,investment,6357.064447883142,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NPD 2,investment,3222.1758345181297,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NPD 2,investment,2533.2963841639594,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NPD 2,investment,5553.908225487212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NPD 2,investment,2815.083757292329,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NPD 2,investment,2533.2963841639594,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NPD 2,investment,5553.908225487212,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NPD 2,investment,2815.083757292329,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NPD 3,CF,0.32,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NPD 3,CF,0.32,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NPD 3,CF,0.33,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1113,12 +1113,12 @@ Hydropower - NPD 3,FOM,3.18,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Hydropower - NPD 3,FOM,3.04,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NPD 3,FOM,1.66,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NPD 3,FOM,3.18,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NPD 3,investment,3195.563876849496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NPD 3,investment,6487.995279612818,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NPD 3,investment,3551.099631302438,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NPD 3,investment,3195.563876849496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NPD 3,investment,6487.995279612818,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NPD 3,investment,3551.099631302438,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NPD 3,investment,2791.833974030912,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NPD 3,investment,5668.297159133382,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NPD 3,investment,3102.4510784034387,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NPD 3,investment,2791.833974030912,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NPD 3,investment,5668.297159133382,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NPD 3,investment,3102.4510784034387,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NPD 4,CF,0.38,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NPD 4,CF,0.38,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NPD 4,CF,0.38,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1131,12 +1131,12 @@ Hydropower - NPD 4,FOM,2.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?buc Hydropower - NPD 4,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NPD 4,FOM,1.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NPD 4,FOM,2.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NPD 4,investment,7692.984722848537,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NPD 4,investment,14239.526309332348,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NPD 4,investment,8548.825281471787,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NPD 4,investment,7692.984722848537,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NPD 4,investment,14239.526309332348,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NPD 4,investment,8548.825281471787,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NPD 4,investment,6721.047345210327,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NPD 4,investment,12440.494027518826,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NPD 4,investment,7468.760374897488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NPD 4,investment,6721.047345210327,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NPD 4,investment,12440.494027518826,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NPD 4,investment,7468.760374897488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NPD 5,CF,0.56,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NPD 5,CF,0.56,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NPD 5,CF,0.42,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1149,12 +1149,12 @@ Hydropower - NPD 5,FOM,0.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Hydropower - NPD 5,FOM,0.58,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NPD 5,FOM,0.63,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NPD 5,FOM,0.59,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NPD 5,investment,5157.397396181149,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NPD 5,investment,5220.201616279123,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NPD 5,investment,5730.086725210139,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NPD 5,investment,5157.397396181149,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NPD 5,investment,5220.201616279123,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NPD 5,investment,5730.086725210139,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NPD 5,investment,4505.807996062548,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NPD 5,investment,4560.677484559491,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NPD 5,investment,5006.143331848235,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NPD 5,investment,4505.807996062548,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NPD 5,investment,4560.677484559491,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NPD 5,investment,5006.143331848235,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NPD 6,CF,0.59,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NPD 6,CF,0.59,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NPD 6,CF,0.44,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1167,12 +1167,12 @@ Hydropower - NPD 6,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Hydropower - NPD 6,FOM,0.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NPD 6,FOM,0.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NPD 6,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NPD 6,investment,7765.36924770722,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NPD 6,investment,7859.04333870081,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NPD 6,investment,8627.596676170942,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NPD 6,investment,7765.36924770722,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NPD 6,investment,7859.04333870081,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NPD 6,investment,8627.596676170942,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NPD 6,investment,6784.286755681381,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NPD 6,investment,6866.125992761567,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NPD 6,investment,7537.579733351281,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NPD 6,investment,6784.286755681381,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NPD 6,investment,6866.125992761567,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NPD 6,investment,7537.579733351281,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NPD 7,CF,0.64,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NPD 7,CF,0.64,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NPD 7,CF,0.62,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1185,12 +1185,12 @@ Hydropower - NPD 7,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?buc Hydropower - NPD 7,FOM,0.49,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NPD 7,FOM,0.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NPD 7,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NPD 7,investment,11951.962428136623,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NPD 7,investment,15796.858072100777,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NPD 7,investment,13280.431354954802,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NPD 7,investment,11951.962428136623,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NPD 7,investment,15796.858072100777,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NPD 7,investment,13280.431354954802,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NPD 7,investment,10441.94265836745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NPD 7,investment,13801.071343976932,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NPD 7,investment,11602.57183877737,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NPD 7,investment,10441.94265836745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NPD 7,investment,13801.071343976932,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NPD 7,investment,11602.57183877737,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NPD 8,CF,0.49,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NPD 8,CF,0.49,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NPD 8,CF,0.4,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1203,12 +1203,12 @@ Hydropower - NPD 8,FOM,1.01,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Hydropower - NPD 8,FOM,0.97,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NPD 8,FOM,0.91,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NPD 8,FOM,1.01,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NPD 8,investment,18132.32347710004,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NPD 8,investment,21498.20388302879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NPD 8,investment,20147.38091176896,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NPD 8,investment,18132.32347710004,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NPD 8,investment,21498.20388302879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NPD 8,investment,20147.38091176896,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NPD 8,investment,15841.472322998854,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NPD 8,investment,18782.104909902835,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NPD 8,investment,17601.945911553325,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NPD 8,investment,15841.472322998854,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NPD 8,investment,18782.104909902835,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NPD 8,investment,17601.945911553325,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NSD 2,CF,0.66,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NSD 2,CF,0.66,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NSD 2,CF,0.66,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1221,12 +1221,12 @@ Hydropower - NSD 2,FOM,0.6,%/year,NREL/ATB-https://data.openei.org/s3_viewer?buc Hydropower - NSD 2,FOM,0.29,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NSD 2,FOM,0.61,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NSD 2,FOM,0.6,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NSD 2,investment,8051.713912221715,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NSD 2,investment,8256.09374711682,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NSD 2,investment,8297.608401079888,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NSD 2,investment,8051.713912221715,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NSD 2,investment,8256.09374711682,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NSD 2,investment,8297.608401079888,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NSD 2,investment,7034.454423574224,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NSD 2,investment,7213.0127590219045,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NSD 2,investment,7249.282420909714,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NSD 2,investment,7034.454423574224,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NSD 2,investment,7213.0127590219045,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NSD 2,investment,7249.282420909714,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NSD 3,CF,0.62,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NSD 3,CF,0.62,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NSD 3,CF,0.62,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1239,12 +1239,12 @@ Hydropower - NSD 3,FOM,1.78,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Hydropower - NSD 3,FOM,0.86,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NSD 3,FOM,1.79,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NSD 3,FOM,1.78,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NSD 3,investment,7888.848731289679,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NSD 3,investment,8087.906174651057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NSD 3,investment,8129.420828614125,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NSD 3,investment,7888.848731289679,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NSD 3,investment,8087.906174651057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NSD 3,investment,8129.420828614125,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NSD 3,investment,6892.165750014354,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NSD 3,investment,7066.0741288097515,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NSD 3,investment,7102.3437906975605,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NSD 3,investment,6892.165750014354,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NSD 3,investment,7066.0741288097515,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NSD 3,investment,7102.3437906975605,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Hydropower - NSD 4,CF,0.66,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Hydropower - NSD 4,CF,0.66,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Hydropower - NSD 4,CF,0.66,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1257,12 +1257,12 @@ Hydropower - NSD 4,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Hydropower - NSD 4,FOM,0.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Hydropower - NSD 4,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Hydropower - NSD 4,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Hydropower - NSD 4,investment,7112.844045672329,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Hydropower - NSD 4,investment,7292.740879512291,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Hydropower - NSD 4,investment,7329.997620248378,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Hydropower - NSD 4,investment,7112.844045672329,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Hydropower - NSD 4,investment,7292.740879512291,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Hydropower - NSD 4,investment,7329.997620248378,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Hydropower - NSD 4,investment,6214.202070111444,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Hydropower - NSD 4,investment,6371.370604958621,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Hydropower - NSD 4,investment,6403.920301524604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Hydropower - NSD 4,investment,6214.202070111444,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Hydropower - NSD 4,investment,6371.370604958621,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Hydropower - NSD 4,investment,6403.920301524604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative LNG storage tank,FOM,2.0,%/year,"Guesstimate, based on H2 (l) storage tank with comparable requirements.",Currency year and technology year assumed based on publication date.,2019.0,, LNG storage tank,investment,666.634,EUR/m^3,"Hurskainen 2019, https://cris.vtt.fi/en/publications/liquid-organic-hydrogen-carriers-lohc-concept-evaluation-and-tech pg. 46 (59).",Currency year and technology year assumed based on publication date.,2019.0,, LNG storage tank,lifetime,20.0,years,"Guesstimate, based on H2 (l) storage tank with comparable requirements.",Currency year and technology year assumed based on publication date.,2019.0,, @@ -1302,12 +1302,12 @@ Land-Based Wind - Class 1 - Technology 1,FOM,2.1,%/year,NREL/ATB-https://data.op Land-Based Wind - Class 1 - Technology 1,FOM,1.62,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 1 - Technology 1,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 1 - Technology 1,FOM,2.1,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 1 - Technology 1,investment,1010.1800465163968,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 1 - Technology 1,investment,1114.9082002515315,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 1 - Technology 1,investment,1356.4307170414445,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 1 - Technology 1,investment,1010.1800465163968,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 1 - Technology 1,investment,1114.9082002515315,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 1 - Technology 1,investment,1356.4307170414445,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 1 - Technology 1,investment,882.5531525700844,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 1 - Technology 1,investment,974.0498739323068,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 1 - Technology 1,investment,1185.0582573830277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 1 - Technology 1,investment,882.5531525700844,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 1 - Technology 1,investment,974.0498739323068,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 1 - Technology 1,investment,1185.0582573830277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 10 - Technology 4,CF,0.306795,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 10 - Technology 4,CF,0.28072,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 10 - Technology 4,CF,0.26796,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1320,12 +1320,12 @@ Land-Based Wind - Class 10 - Technology 4,FOM,1.52,%/year,NREL/ATB-https://data. Land-Based Wind - Class 10 - Technology 4,FOM,1.3,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 10 - Technology 4,FOM,1.73,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 10 - Technology 4,FOM,1.52,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 10 - Technology 4,investment,1264.5676712934332,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 10 - Technology 4,investment,1463.3772387455244,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 10 - Technology 4,investment,1867.535359934983,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 10 - Technology 4,investment,1264.5676712934332,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 10 - Technology 4,investment,1463.3772387455244,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 10 - Technology 4,investment,1867.535359934983,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 10 - Technology 4,investment,1104.8012567531096,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 10 - Technology 4,investment,1278.493076464864,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 10 - Technology 4,investment,1631.589561811815,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 10 - Technology 4,investment,1104.8012567531096,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 10 - Technology 4,investment,1278.493076464864,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 10 - Technology 4,investment,1631.589561811815,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 2 - Technology 1,CF,0.541208132969034,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 2 - Technology 1,CF,0.50776,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 2 - Technology 1,CF,0.484679999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1338,12 +1338,12 @@ Land-Based Wind - Class 2 - Technology 1,FOM,2.1,%/year,NREL/ATB-https://data.op Land-Based Wind - Class 2 - Technology 1,FOM,1.62,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 2 - Technology 1,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 2 - Technology 1,FOM,2.1,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 2 - Technology 1,investment,1010.1800465163968,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 2 - Technology 1,investment,1114.9082002515315,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 2 - Technology 1,investment,1356.4307170414445,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 2 - Technology 1,investment,1010.1800465163968,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 2 - Technology 1,investment,1114.9082002515315,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 2 - Technology 1,investment,1356.4307170414445,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 2 - Technology 1,investment,882.5531525700844,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 2 - Technology 1,investment,974.0498739323068,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 2 - Technology 1,investment,1185.0582573830277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 2 - Technology 1,investment,882.5531525700844,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 2 - Technology 1,investment,974.0498739323068,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 2 - Technology 1,investment,1185.0582573830277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 3 - Technology 1,CF,0.529014535519125,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 3 - Technology 1,CF,0.496319999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 3 - Technology 1,CF,0.473759999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1356,12 +1356,12 @@ Land-Based Wind - Class 3 - Technology 1,FOM,2.1,%/year,NREL/ATB-https://data.op Land-Based Wind - Class 3 - Technology 1,FOM,1.62,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 3 - Technology 1,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 3 - Technology 1,FOM,2.1,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 3 - Technology 1,investment,1010.1800465163968,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 3 - Technology 1,investment,1114.9082002515315,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 3 - Technology 1,investment,1356.4307170414445,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 3 - Technology 1,investment,1010.1800465163968,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 3 - Technology 1,investment,1114.9082002515315,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 3 - Technology 1,investment,1356.4307170414445,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 3 - Technology 1,investment,882.5531525700844,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 3 - Technology 1,investment,974.0498739323068,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 3 - Technology 1,investment,1185.0582573830277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 3 - Technology 1,investment,882.5531525700844,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 3 - Technology 1,investment,974.0498739323068,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 3 - Technology 1,investment,1185.0582573830277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 5 - Technology 1,CF,0.498061557377049,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 5 - Technology 1,CF,0.46728,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 5 - Technology 1,CF,0.446039999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1374,12 +1374,12 @@ Land-Based Wind - Class 5 - Technology 1,FOM,2.1,%/year,NREL/ATB-https://data.op Land-Based Wind - Class 5 - Technology 1,FOM,1.62,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 5 - Technology 1,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 5 - Technology 1,FOM,2.1,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 5 - Technology 1,investment,1010.1800465163968,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 5 - Technology 1,investment,1114.9082002515315,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 5 - Technology 1,investment,1356.4307170414445,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 5 - Technology 1,investment,1010.1800465163968,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 5 - Technology 1,investment,1114.9082002515315,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 5 - Technology 1,investment,1356.4307170414445,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 5 - Technology 1,investment,882.5531525700844,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 5 - Technology 1,investment,974.0498739323068,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 5 - Technology 1,investment,1185.0582573830277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 5 - Technology 1,investment,882.5531525700844,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 5 - Technology 1,investment,974.0498739323068,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 5 - Technology 1,investment,1185.0582573830277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 6 - Technology 1,CF,0.471798424408014,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 6 - Technology 1,CF,0.44264,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 6 - Technology 1,CF,0.422519999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1392,12 +1392,12 @@ Land-Based Wind - Class 6 - Technology 1,FOM,2.1,%/year,NREL/ATB-https://data.op Land-Based Wind - Class 6 - Technology 1,FOM,1.62,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 6 - Technology 1,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 6 - Technology 1,FOM,2.1,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 6 - Technology 1,investment,1010.1800465163968,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 6 - Technology 1,investment,1114.9082002515315,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 6 - Technology 1,investment,1356.4307170414445,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 6 - Technology 1,investment,1010.1800465163968,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 6 - Technology 1,investment,1114.9082002515315,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 6 - Technology 1,investment,1356.4307170414445,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 6 - Technology 1,investment,882.5531525700844,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 6 - Technology 1,investment,974.0498739323068,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 6 - Technology 1,investment,1185.0582573830277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 6 - Technology 1,investment,882.5531525700844,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 6 - Technology 1,investment,974.0498739323068,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 6 - Technology 1,investment,1185.0582573830277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 7 - Technology 1,CF,0.435217632058287,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 7 - Technology 1,CF,0.40832,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 7 - Technology 1,CF,0.389759999999999,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1410,12 +1410,12 @@ Land-Based Wind - Class 7 - Technology 1,FOM,2.1,%/year,NREL/ATB-https://data.op Land-Based Wind - Class 7 - Technology 1,FOM,1.62,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 7 - Technology 1,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 7 - Technology 1,FOM,2.1,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 7 - Technology 1,investment,1010.1800465163968,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 7 - Technology 1,investment,1114.9082002515315,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 7 - Technology 1,investment,1356.4307170414445,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 7 - Technology 1,investment,1010.1800465163968,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 7 - Technology 1,investment,1114.9082002515315,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 7 - Technology 1,investment,1356.4307170414445,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 7 - Technology 1,investment,882.5531525700844,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 7 - Technology 1,investment,974.0498739323068,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 7 - Technology 1,investment,1185.0582573830277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 7 - Technology 1,investment,882.5531525700844,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 7 - Technology 1,investment,974.0498739323068,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 7 - Technology 1,investment,1185.0582573830277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 8 - Technology 2,CF,0.397295,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 8 - Technology 2,CF,0.36872,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 8 - Technology 2,CF,0.35196,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1428,12 +1428,12 @@ Land-Based Wind - Class 8 - Technology 2,FOM,1.83,%/year,NREL/ATB-https://data.o Land-Based Wind - Class 8 - Technology 2,FOM,1.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 8 - Technology 2,FOM,1.89,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 8 - Technology 2,FOM,1.83,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 8 - Technology 2,investment,1039.4896105871594,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 8 - Technology 2,investment,1219.2559628226406,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 8 - Technology 2,investment,1456.6604307924026,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 8 - Technology 2,investment,1039.4896105871594,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 8 - Technology 2,investment,1219.2559628226406,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 8 - Technology 2,investment,1456.6604307924026,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 8 - Technology 2,investment,908.1597246463292,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 8 - Technology 2,investment,1065.214263031406,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 8 - Technology 2,investment,1272.624874994564,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 8 - Technology 2,investment,908.1597246463292,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 8 - Technology 2,investment,1065.214263031406,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 8 - Technology 2,investment,1272.624874994564,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Land-Based Wind - Class 9 - Technology 3,CF,0.384625,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Land-Based Wind - Class 9 - Technology 3,CF,0.3564,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Land-Based Wind - Class 9 - Technology 3,CF,0.3402,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1446,12 +1446,12 @@ Land-Based Wind - Class 9 - Technology 3,FOM,2.52,%/year,NREL/ATB-https://data.o Land-Based Wind - Class 9 - Technology 3,FOM,1.84,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Land-Based Wind - Class 9 - Technology 3,FOM,2.63,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Land-Based Wind - Class 9 - Technology 3,FOM,2.52,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Land-Based Wind - Class 9 - Technology 3,investment,1134.119948879826,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Land-Based Wind - Class 9 - Technology 3,investment,1219.989213092062,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Land-Based Wind - Class 9 - Technology 3,investment,1432.8763871772703,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Land-Based Wind - Class 9 - Technology 3,investment,1134.119948879826,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Land-Based Wind - Class 9 - Technology 3,investment,1219.989213092062,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Land-Based Wind - Class 9 - Technology 3,investment,1432.8763871772703,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Land-Based Wind - Class 9 - Technology 3,investment,990.834396034833,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Land-Based Wind - Class 9 - Technology 3,investment,1065.8548739196656,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Land-Based Wind - Class 9 - Technology 3,investment,1251.8457250343308,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Land-Based Wind - Class 9 - Technology 3,investment,990.834396034833,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Land-Based Wind - Class 9 - Technology 3,investment,1065.8548739196656,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Land-Based Wind - Class 9 - Technology 3,investment,1251.8457250343308,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 1,CF,0.6035980000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 1,CF,0.6035980000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 1,CF,0.6035980000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1464,12 +1464,12 @@ Large DW - Class 1,FOM,1.82,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 1,FOM,2.89,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 1,FOM,2.19,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 1,FOM,1.82,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 1,investment,1232.2539533785286,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 1,investment,1626.575218459658,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 1,investment,1951.8902621515892,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 1,investment,1232.2539533785286,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 1,investment,1626.575218459658,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 1,investment,1951.8902621515892,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 1,investment,1076.5700778504913,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 1,investment,1421.0725027626488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 1,investment,1705.2870033151783,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 1,investment,1076.5700778504913,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 1,investment,1421.0725027626488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 1,investment,1705.2870033151783,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 10,CF,0.261838,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 10,CF,0.261838,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 10,CF,0.261838,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1482,12 +1482,12 @@ Large DW - Class 10,FOM,1.82,%/year,NREL/ATB-https://data.openei.org/s3_viewer?b Large DW - Class 10,FOM,2.89,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 10,FOM,2.19,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 10,FOM,1.82,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 10,investment,1232.2539533785286,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 10,investment,1626.575218459658,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 10,investment,1951.8902621515892,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 10,investment,1232.2539533785286,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 10,investment,1626.575218459658,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 10,investment,1951.8902621515892,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 10,investment,1076.5700778504913,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 10,investment,1421.0725027626488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 10,investment,1705.2870033151783,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 10,investment,1076.5700778504913,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 10,investment,1421.0725027626488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 10,investment,1705.2870033151783,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 2,CF,0.572181,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 2,CF,0.572181,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 2,CF,0.572181,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1500,12 +1500,12 @@ Large DW - Class 2,FOM,1.82,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 2,FOM,2.89,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 2,FOM,2.19,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 2,FOM,1.82,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 2,investment,1232.2539533785286,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 2,investment,1626.575218459658,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 2,investment,1951.8902621515892,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 2,investment,1232.2539533785286,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 2,investment,1626.575218459658,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 2,investment,1951.8902621515892,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 2,investment,1076.5700778504913,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 2,investment,1421.0725027626488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 2,investment,1705.2870033151783,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 2,investment,1076.5700778504913,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 2,investment,1421.0725027626488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 2,investment,1705.2870033151783,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 3,CF,0.560611,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 3,CF,0.560611,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 3,CF,0.560611,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1518,12 +1518,12 @@ Large DW - Class 3,FOM,1.82,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 3,FOM,2.89,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 3,FOM,2.19,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 3,FOM,1.82,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 3,investment,1232.2539533785286,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 3,investment,1626.575218459658,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 3,investment,1951.8902621515892,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 3,investment,1232.2539533785286,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 3,investment,1626.575218459658,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 3,investment,1951.8902621515892,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 3,investment,1076.5700778504913,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 3,investment,1421.0725027626488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 3,investment,1705.2870033151783,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 3,investment,1076.5700778504913,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 3,investment,1421.0725027626488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 3,investment,1705.2870033151783,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 4,CF,0.548507,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 4,CF,0.548507,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 4,CF,0.548507,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1536,12 +1536,12 @@ Large DW - Class 4,FOM,1.82,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 4,FOM,2.89,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 4,FOM,2.19,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 4,FOM,1.82,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 4,investment,1232.2539533785286,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 4,investment,1626.575218459658,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 4,investment,1951.8902621515892,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 4,investment,1232.2539533785286,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 4,investment,1626.575218459658,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 4,investment,1951.8902621515892,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 4,investment,1076.5700778504913,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 4,investment,1421.0725027626488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 4,investment,1705.2870033151783,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 4,investment,1076.5700778504913,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 4,investment,1421.0725027626488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 4,investment,1705.2870033151783,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 5,CF,0.533199,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 5,CF,0.533199,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 5,CF,0.533199,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1554,12 +1554,12 @@ Large DW - Class 5,FOM,1.82,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 5,FOM,2.89,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 5,FOM,2.19,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 5,FOM,1.82,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 5,investment,1232.2539533785286,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 5,investment,1626.575218459658,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 5,investment,1951.8902621515892,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 5,investment,1232.2539533785286,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 5,investment,1626.575218459658,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 5,investment,1951.8902621515892,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 5,investment,1076.5700778504913,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 5,investment,1421.0725027626488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 5,investment,1705.2870033151783,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 5,investment,1076.5700778504913,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 5,investment,1421.0725027626488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 5,investment,1705.2870033151783,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 6,CF,0.509525,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 6,CF,0.509525,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 6,CF,0.509525,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1572,12 +1572,12 @@ Large DW - Class 6,FOM,1.82,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 6,FOM,2.89,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 6,FOM,2.19,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 6,FOM,1.82,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 6,investment,1232.2539533785286,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 6,investment,1626.575218459658,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 6,investment,1951.8902621515892,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 6,investment,1232.2539533785286,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 6,investment,1626.575218459658,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 6,investment,1951.8902621515892,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 6,investment,1076.5700778504913,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 6,investment,1421.0725027626488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 6,investment,1705.2870033151783,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 6,investment,1076.5700778504913,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 6,investment,1421.0725027626488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 6,investment,1705.2870033151783,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 7,CF,0.474637,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 7,CF,0.474637,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 7,CF,0.474637,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1590,12 +1590,12 @@ Large DW - Class 7,FOM,1.82,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 7,FOM,2.89,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 7,FOM,2.19,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 7,FOM,1.82,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 7,investment,1232.2539533785286,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 7,investment,1626.575218459658,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 7,investment,1951.8902621515892,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 7,investment,1232.2539533785286,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 7,investment,1626.575218459658,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 7,investment,1951.8902621515892,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 7,investment,1076.5700778504913,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 7,investment,1421.0725027626488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 7,investment,1705.2870033151783,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 7,investment,1076.5700778504913,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 7,investment,1421.0725027626488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 7,investment,1705.2870033151783,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 8,CF,0.42898,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 8,CF,0.42898,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 8,CF,0.42898,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1608,12 +1608,12 @@ Large DW - Class 8,FOM,1.82,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 8,FOM,2.89,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 8,FOM,2.19,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 8,FOM,1.82,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 8,investment,1232.2539533785286,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 8,investment,1626.575218459658,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 8,investment,1951.8902621515892,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 8,investment,1232.2539533785286,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 8,investment,1626.575218459658,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 8,investment,1951.8902621515892,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 8,investment,1076.5700778504913,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 8,investment,1421.0725027626488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 8,investment,1705.2870033151783,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 8,investment,1076.5700778504913,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 8,investment,1421.0725027626488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 8,investment,1705.2870033151783,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Large DW - Class 9,CF,0.374957,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Large DW - Class 9,CF,0.374957,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Large DW - Class 9,CF,0.374957,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1626,12 +1626,12 @@ Large DW - Class 9,FOM,1.82,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bu Large DW - Class 9,FOM,2.89,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Large DW - Class 9,FOM,2.19,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Large DW - Class 9,FOM,1.82,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Large DW - Class 9,investment,1232.2539533785286,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Large DW - Class 9,investment,1626.575218459658,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Large DW - Class 9,investment,1951.8902621515892,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Large DW - Class 9,investment,1232.2539533785286,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Large DW - Class 9,investment,1626.575218459658,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Large DW - Class 9,investment,1951.8902621515892,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Large DW - Class 9,investment,1076.5700778504913,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Large DW - Class 9,investment,1421.0725027626488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Large DW - Class 9,investment,1705.2870033151783,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Large DW - Class 9,investment,1076.5700778504913,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Large DW - Class 9,investment,1421.0725027626488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Large DW - Class 9,investment,1705.2870033151783,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Lead-Acid-bicharger,FOM,2.4427,%/year,"Viswanathan_2022, p.28 (p.50)","{'carrier': ['elec', 'lead', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['30% assumed of power components every 10 years']}",2020.0,, Lead-Acid-bicharger,efficiency,0.8832,per unit,"Viswanathan_2022, p.33 (p.55)","{'carrier': ['elec', 'lead', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['AC-AC efficiency at transformer level 0.78^0.5']}",2020.0,, Lead-Acid-bicharger,investment,128853.6139,EUR/MW,"Viswanathan_2022, p.33 (p.55)","{'carrier': ['elec', 'lead', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['Power Equipment']}",2020.0,, @@ -1703,12 +1703,12 @@ Midsize DW - Class 1,FOM,1.77,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 1,FOM,3.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 1,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 1,FOM,1.77,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 1,investment,1141.3752243168622,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 1,investment,1680.3463000616298,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 1,investment,2016.415560073956,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 1,investment,1141.3752243168622,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 1,investment,1680.3463000616298,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 1,investment,2016.415560073956,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 1,investment,997.1730346090177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 1,investment,1468.0501061597608,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 1,investment,1761.660127391713,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 1,investment,997.1730346090177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 1,investment,1468.0501061597608,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 1,investment,1761.660127391713,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 10,CF,0.236829,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 10,CF,0.236829,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 10,CF,0.236829,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1721,12 +1721,12 @@ Midsize DW - Class 10,FOM,1.77,%/year,NREL/ATB-https://data.openei.org/s3_viewer Midsize DW - Class 10,FOM,3.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 10,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 10,FOM,1.77,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 10,investment,1141.3752243168622,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 10,investment,1680.3463000616298,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 10,investment,2016.415560073956,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 10,investment,1141.3752243168622,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 10,investment,1680.3463000616298,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 10,investment,2016.415560073956,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 10,investment,997.1730346090177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 10,investment,1468.0501061597608,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 10,investment,1761.660127391713,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 10,investment,997.1730346090177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 10,investment,1468.0501061597608,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 10,investment,1761.660127391713,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 2,CF,0.550198,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 2,CF,0.550198,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 2,CF,0.550198,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1739,12 +1739,12 @@ Midsize DW - Class 2,FOM,1.77,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 2,FOM,3.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 2,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 2,FOM,1.77,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 2,investment,1141.3752243168622,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 2,investment,1680.3463000616298,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 2,investment,2016.415560073956,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 2,investment,1141.3752243168622,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 2,investment,1680.3463000616298,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 2,investment,2016.415560073956,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 2,investment,997.1730346090177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 2,investment,1468.0501061597608,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 2,investment,1761.660127391713,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 2,investment,997.1730346090177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 2,investment,1468.0501061597608,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 2,investment,1761.660127391713,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 3,CF,0.5380940000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 3,CF,0.5380940000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 3,CF,0.5380940000000001,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1757,12 +1757,12 @@ Midsize DW - Class 3,FOM,1.77,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 3,FOM,3.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 3,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 3,FOM,1.77,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 3,investment,1141.3752243168622,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 3,investment,1680.3463000616298,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 3,investment,2016.415560073956,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 3,investment,1141.3752243168622,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 3,investment,1680.3463000616298,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 3,investment,2016.415560073956,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 3,investment,997.1730346090177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 3,investment,1468.0501061597608,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 3,investment,1761.660127391713,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 3,investment,997.1730346090177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 3,investment,1468.0501061597608,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 3,investment,1761.660127391713,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 4,CF,0.525456,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 4,CF,0.525456,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 4,CF,0.525456,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1775,12 +1775,12 @@ Midsize DW - Class 4,FOM,1.77,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 4,FOM,3.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 4,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 4,FOM,1.77,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 4,investment,1141.3752243168622,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 4,investment,1680.3463000616298,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 4,investment,2016.415560073956,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 4,investment,1141.3752243168622,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 4,investment,1680.3463000616298,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 4,investment,2016.415560073956,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 4,investment,997.1730346090177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 4,investment,1468.0501061597608,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 4,investment,1761.660127391713,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 4,investment,997.1730346090177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 4,investment,1468.0501061597608,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 4,investment,1761.660127391713,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 5,CF,0.509436,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 5,CF,0.509436,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 5,CF,0.509436,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1793,12 +1793,12 @@ Midsize DW - Class 5,FOM,1.77,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 5,FOM,3.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 5,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 5,FOM,1.77,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 5,investment,1141.3752243168622,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 5,investment,1680.3463000616298,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 5,investment,2016.415560073956,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 5,investment,1141.3752243168622,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 5,investment,1680.3463000616298,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 5,investment,2016.415560073956,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 5,investment,997.1730346090177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 5,investment,1468.0501061597608,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 5,investment,1761.660127391713,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 5,investment,997.1730346090177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 5,investment,1468.0501061597608,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 5,investment,1761.660127391713,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 6,CF,0.484872,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 6,CF,0.484872,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 6,CF,0.484872,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1811,12 +1811,12 @@ Midsize DW - Class 6,FOM,1.77,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 6,FOM,3.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 6,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 6,FOM,1.77,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 6,investment,1141.3752243168622,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 6,investment,1680.3463000616298,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 6,investment,2016.415560073956,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 6,investment,1141.3752243168622,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 6,investment,1680.3463000616298,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 6,investment,2016.415560073956,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 6,investment,997.1730346090177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 6,investment,1468.0501061597608,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 6,investment,1761.660127391713,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 6,investment,997.1730346090177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 6,investment,1468.0501061597608,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 6,investment,1761.660127391713,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 7,CF,0.448916,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 7,CF,0.448916,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 7,CF,0.448916,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1829,12 +1829,12 @@ Midsize DW - Class 7,FOM,1.77,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 7,FOM,3.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 7,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 7,FOM,1.77,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 7,investment,1141.3752243168622,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 7,investment,1680.3463000616298,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 7,investment,2016.415560073956,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 7,investment,1141.3752243168622,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 7,investment,1680.3463000616298,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 7,investment,2016.415560073956,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 7,investment,997.1730346090177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 7,investment,1468.0501061597608,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 7,investment,1761.660127391713,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 7,investment,997.1730346090177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 7,investment,1468.0501061597608,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 7,investment,1761.660127391713,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 8,CF,0.402458,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 8,CF,0.402458,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 8,CF,0.402458,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1847,12 +1847,12 @@ Midsize DW - Class 8,FOM,1.77,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 8,FOM,3.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 8,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 8,FOM,1.77,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 8,investment,1141.3752243168622,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 8,investment,1680.3463000616298,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 8,investment,2016.415560073956,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 8,investment,1141.3752243168622,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 8,investment,1680.3463000616298,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 8,investment,2016.415560073956,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 8,investment,997.1730346090177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 8,investment,1468.0501061597608,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 8,investment,1761.660127391713,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 8,investment,997.1730346090177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 8,investment,1468.0501061597608,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 8,investment,1761.660127391713,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Midsize DW - Class 9,CF,0.348079,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Midsize DW - Class 9,CF,0.348079,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Midsize DW - Class 9,CF,0.348079,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1865,78 +1865,78 @@ Midsize DW - Class 9,FOM,1.77,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Midsize DW - Class 9,FOM,3.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Midsize DW - Class 9,FOM,2.12,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Midsize DW - Class 9,FOM,1.77,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Midsize DW - Class 9,investment,1141.3752243168622,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Midsize DW - Class 9,investment,1680.3463000616298,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Midsize DW - Class 9,investment,2016.415560073956,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Midsize DW - Class 9,investment,1141.3752243168622,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Midsize DW - Class 9,investment,1680.3463000616298,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Midsize DW - Class 9,investment,2016.415560073956,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Midsize DW - Class 9,investment,997.1730346090177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Midsize DW - Class 9,investment,1468.0501061597608,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Midsize DW - Class 9,investment,1761.660127391713,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Midsize DW - Class 9,investment,997.1730346090177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Midsize DW - Class 9,investment,1468.0501061597608,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Midsize DW - Class 9,investment,1761.660127391713,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 1-on-1 Combined Cycle (H-Frame),FOM,2.23,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 1-on-1 Combined Cycle (H-Frame),FOM,2.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG 1-on-1 Combined Cycle (H-Frame),FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG 1-on-1 Combined Cycle (H-Frame),FOM,2.23,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 1-on-1 Combined Cycle (H-Frame),FOM,2.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 1-on-1 Combined Cycle (H-Frame),FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 1-on-1 Combined Cycle (H-Frame),VOM,2.09,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 1-on-1 Combined Cycle (H-Frame),VOM,2.13,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 1-on-1 Combined Cycle (H-Frame),VOM,2.18,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 1-on-1 Combined Cycle (H-Frame),VOM,2.09,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 1-on-1 Combined Cycle (H-Frame),VOM,2.13,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 1-on-1 Combined Cycle (H-Frame),VOM,2.18,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 1-on-1 Combined Cycle (H-Frame),investment,1392.943589374882,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 1-on-1 Combined Cycle (H-Frame),investment,1424.1455257768794,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 1-on-1 Combined Cycle (H-Frame),investment,1455.3474621788769,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 1-on-1 Combined Cycle (H-Frame),investment,1392.943589374882,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 1-on-1 Combined Cycle (H-Frame),investment,1424.1455257768794,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 1-on-1 Combined Cycle (H-Frame),investment,1455.3474621788769,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 1-on-1 Combined Cycle (H-Frame),VOM,1.8259478547733685,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 1-on-1 Combined Cycle (H-Frame),VOM,1.8608942251996532,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 1-on-1 Combined Cycle (H-Frame),VOM,1.904577188232509,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 1-on-1 Combined Cycle (H-Frame),VOM,1.8259478547733685,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 1-on-1 Combined Cycle (H-Frame),VOM,1.8608942251996532,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 1-on-1 Combined Cycle (H-Frame),VOM,1.904577188232509,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 1-on-1 Combined Cycle (H-Frame),investment,1216.9580664303264,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 1-on-1 Combined Cycle (H-Frame),investment,1244.2179271183657,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 1-on-1 Combined Cycle (H-Frame),investment,1271.477787806405,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 1-on-1 Combined Cycle (H-Frame),investment,1216.9580664303264,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 1-on-1 Combined Cycle (H-Frame),investment,1244.2179271183657,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 1-on-1 Combined Cycle (H-Frame),investment,1271.477787806405,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.3,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.33,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.3,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.33,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.5,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.89,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.29,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.5,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.89,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.29,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2084.9579645763233,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2307.8289388763046,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2530.699913176286,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2084.9579645763233,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2307.8289388763046,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2530.699913176286,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.0578074122998995,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.398534523956174,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.74799822821902,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.0578074122998995,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.398534523956174,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.74799822821902,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,1821.5428338329123,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2016.2561244617646,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2210.969415090617,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,1821.5428338329123,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2016.2561244617646,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2210.969415090617,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.23,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.3,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.23,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.3,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.54,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.95,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.36,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.54,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.95,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.36,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2103.901997391822,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2334.5734557923024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2565.2449141927827,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2103.901997391822,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2334.5734557923024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2565.2449141927827,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.0927537827261844,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.450954079595601,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.809154376465018,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.0927537827261844,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.450954079595601,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.809154376465018,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,1838.093463536365,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2039.621719337227,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2241.149975138089,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,1838.093463536365,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2039.621719337227,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 1-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2241.149975138089,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame),FOM,2.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (F-Frame),FOM,2.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG 2-on-1 Combined Cycle (F-Frame),FOM,2.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG 2-on-1 Combined Cycle (F-Frame),FOM,2.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 2-on-1 Combined Cycle (F-Frame),FOM,2.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (F-Frame),FOM,2.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (F-Frame),VOM,1.7,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (F-Frame),VOM,1.79,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (F-Frame),VOM,1.87,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (F-Frame),VOM,1.7,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (F-Frame),VOM,1.79,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (F-Frame),VOM,1.87,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (F-Frame),VOM,1.485220743117094,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (F-Frame),VOM,1.5638500765762344,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (F-Frame),VOM,1.6337428174288036,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (F-Frame),VOM,1.485220743117094,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (F-Frame),VOM,1.5638500765762344,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (F-Frame),VOM,1.6337428174288036,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame),discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (F-Frame),discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG 2-on-1 Combined Cycle (F-Frame),discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -1944,12 +1944,12 @@ NG 2-on-1 Combined Cycle (F-Frame),discount rate,0.0535847804878049,per unit,"NR NG 2-on-1 Combined Cycle (F-Frame),discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (F-Frame),discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame),efficiency,0.573,p.u.,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, -NG 2-on-1 Combined Cycle (F-Frame),investment,1141.3222593902035,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (F-Frame),investment,1191.1339221462492,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (F-Frame),investment,1241.057020389445,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (F-Frame),investment,1141.3222593902035,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (F-Frame),investment,1191.1339221462492,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (F-Frame),investment,1241.057020389445,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (F-Frame),investment,997.1267613103523,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (F-Frame),investment,1040.6451817659008,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (F-Frame),investment,1084.2609588667635,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (F-Frame),investment,997.1267613103523,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (F-Frame),investment,1040.6451817659008,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (F-Frame),investment,1084.2609588667635,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame),lifetime,30.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,FOM,2.17,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -1957,12 +1957,12 @@ NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,FOM,2.34,%/year,NREL/ATB-https://data NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,FOM,2.17,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,FOM,2.34,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,3.11,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,3.66,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,4.21,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,3.11,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,3.66,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,4.21,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,2.717080300643625,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,3.197592894005038,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,3.6781054873664507,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,2.717080300643625,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,3.197592894005038,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,VOM,3.6781054873664507,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,capture_rate,0.95,per unit,"NREL, NREL ATB 2024",,,, NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -1971,12 +1971,12 @@ NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,discount rate,0.0535847804878049,per NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,efficiency,0.527,p.u.,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,1634.3128545417617,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,1955.804234969484,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,2277.184179910057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,1634.3128545417617,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,1955.804234969484,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,2277.184179910057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,1427.8325601813733,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,1708.7064819134923,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,1989.4830470002973,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,1427.8325601813733,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,1708.7064819134923,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,investment,1989.4830470002973,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame) 95% CCS,lifetime,30.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,FOM,2.17,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -1984,12 +1984,12 @@ NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,FOM,2.34,%/year,NREL/ATB-https://data NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,FOM,2.17,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,FOM,2.34,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,3.16,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,3.72,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,4.29,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,3.16,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,3.72,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,4.29,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,2.760763263676481,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,3.250012449644465,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,3.74799822821902,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,2.760763263676481,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,3.250012449644465,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,VOM,3.74799822821902,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,capture_rate,0.97,per unit,"NREL, NREL ATB 2024",,,, NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -1998,12 +1998,12 @@ NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,discount rate,0.0535847804878049,per NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,efficiency,0.525,p.u.,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,1648.0194194612106,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,1979.0942517838323,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,2310.2805195936044,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,1648.0194194612106,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,1979.0942517838323,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,2310.2805195936044,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,1439.8074275550478,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,1729.0540207842075,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,2018.397970658682,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,1439.8074275550478,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,1729.0540207842075,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,investment,2018.397970658682,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (F-Frame) 97% CCS,lifetime,30.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, NG 2-on-1 Combined Cycle (H-Frame),FOM,2.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (H-Frame),FOM,2.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -2011,154 +2011,154 @@ NG 2-on-1 Combined Cycle (H-Frame),FOM,2.23,%/year,NREL/ATB-https://data.openei. NG 2-on-1 Combined Cycle (H-Frame),FOM,2.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 2-on-1 Combined Cycle (H-Frame),FOM,2.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (H-Frame),FOM,2.23,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (H-Frame),VOM,1.7,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (H-Frame),VOM,1.78,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (H-Frame),VOM,1.86,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (H-Frame),VOM,1.7,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (H-Frame),VOM,1.78,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (H-Frame),VOM,1.86,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (H-Frame),investment,1141.3222593902035,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (H-Frame),investment,1205.954841937198,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (H-Frame),investment,1270.5874244841923,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (H-Frame),investment,1141.3222593902035,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (H-Frame),investment,1205.954841937198,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (H-Frame),investment,1270.5874244841923,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (H-Frame),VOM,1.485220743117094,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (H-Frame),VOM,1.5551134839696632,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (H-Frame),VOM,1.6250062248222326,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (H-Frame),VOM,1.485220743117094,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (H-Frame),VOM,1.5551134839696632,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (H-Frame),VOM,1.6250062248222326,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (H-Frame),investment,997.1267613103523,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (H-Frame),investment,1053.5936155927193,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (H-Frame),investment,1110.0604698750863,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (H-Frame),investment,997.1267613103523,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (H-Frame),investment,1053.5936155927193,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (H-Frame),investment,1110.0604698750863,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.17,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.23,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.17,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.23,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.11,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.56,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.0,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.11,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.56,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,4.0,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,1634.3128545417617,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,1901.646588214589,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2169.0917573745664,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,1634.3128545417617,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,1901.646588214589,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,2169.0917573745664,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,2.717080300643625,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.1102269679393264,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.4946370426284568,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,2.717080300643625,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.1102269679393264,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,VOM,3.4946370426284568,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,1427.8325601813733,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,1661.3911522906815,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,1895.0471010453043,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,1427.8325601813733,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,1661.3911522906815,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 95% CCS,investment,1895.0471010453043,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.18,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.18,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.24,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,FOM,2.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.16,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.62,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.08,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.16,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.62,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,4.08,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,1648.1308549483604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,1923.376508208837,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2198.622161469314,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,1648.1308549483604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,1923.376508208837,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,2198.622161469314,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,2.760763263676481,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.1626465235787533,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.564529783481026,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,2.760763263676481,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.1626465235787533,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,VOM,3.564529783481026,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,1439.904784200362,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,1680.3756981269946,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,1920.8466120536273,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,1439.904784200362,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,1680.3756981269946,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG 2-on-1 Combined Cycle (H-Frame) 97% CCS,investment,1920.8466120536273,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG Combined Cycle F-Class integrated retrofit 90%-CCS,FOM,7.14,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG Combined Cycle F-Class integrated retrofit 90%-CCS,FOM,6.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG Combined Cycle F-Class integrated retrofit 90%-CCS,FOM,5.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG Combined Cycle F-Class integrated retrofit 90%-CCS,FOM,7.14,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG Combined Cycle F-Class integrated retrofit 90%-CCS,FOM,6.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG Combined Cycle F-Class integrated retrofit 90%-CCS,FOM,5.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,3.67,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,4.01,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,4.35,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,3.67,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,4.01,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,4.35,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,3.206329486611609,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,3.5033736352350275,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,3.8004177838584465,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,3.206329486611609,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,3.5033736352350275,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle F-Class integrated retrofit 90%-CCS,VOM,3.8004177838584465,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG Combined Cycle F-Class integrated retrofit 90%-CCS,capture_rate,0.9,per unit,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, NG Combined Cycle F-Class integrated retrofit 90%-CCS,efficiency,0.536,p.u.,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, -NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,669.6,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,844.1,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,1018.7,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,669.6,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,844.1,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,1018.7,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,585.0022409360037,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,737.4557819206701,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,889.9966888314023,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,585.0022409360037,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,737.4557819206701,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle F-Class integrated retrofit 90%-CCS,investment,889.9966888314023,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG Combined Cycle F-Class integrated retrofit 95%-CCS,FOM,6.98,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG Combined Cycle F-Class integrated retrofit 95%-CCS,FOM,6.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG Combined Cycle F-Class integrated retrofit 95%-CCS,FOM,5.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG Combined Cycle F-Class integrated retrofit 95%-CCS,FOM,6.98,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG Combined Cycle F-Class integrated retrofit 95%-CCS,FOM,6.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG Combined Cycle F-Class integrated retrofit 95%-CCS,FOM,5.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,3.75,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,4.11,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,4.47,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,3.75,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,4.11,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,4.47,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,3.2762222274641783,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,3.59073956130074,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,3.9052568951373003,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,3.2762222274641783,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,3.59073956130074,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle F-Class integrated retrofit 95%-CCS,VOM,3.9052568951373003,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG Combined Cycle F-Class integrated retrofit 95%-CCS,capture_rate,0.95,per unit,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, NG Combined Cycle F-Class integrated retrofit 95%-CCS,efficiency,0.536,p.u.,"NREL, “Cost and performance projections for coal- and natural gas-fired power plants""",,,, -NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,696.0,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,880.0,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,1064.0,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,696.0,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,880.0,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,1064.0,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,608.0668454173515,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,768.8201493782605,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,929.5734533391695,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,608.0668454173515,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,768.8201493782605,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle F-Class integrated retrofit 95%-CCS,investment,929.5734533391695,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG Combined Cycle H-Class integrated retrofit 90%-CCS,FOM,7.69,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG Combined Cycle H-Class integrated retrofit 90%-CCS,FOM,6.64,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG Combined Cycle H-Class integrated retrofit 90%-CCS,FOM,5.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG Combined Cycle H-Class integrated retrofit 90%-CCS,FOM,7.69,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG Combined Cycle H-Class integrated retrofit 90%-CCS,FOM,6.64,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG Combined Cycle H-Class integrated retrofit 90%-CCS,FOM,5.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,3.52,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,3.83,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,4.14,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,3.52,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,3.83,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,4.14,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,583.6,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,734.7,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,885.7,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,583.6,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,734.7,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,885.7,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,3.075280597513042,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,3.3461149683167473,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,3.6169493391204526,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,3.075280597513042,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,3.3461149683167473,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle H-Class integrated retrofit 90%-CCS,VOM,3.6169493391204526,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,509.86754451949184,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,641.8774588047818,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,773.800007164006,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,509.86754451949184,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,641.8774588047818,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle H-Class integrated retrofit 90%-CCS,investment,773.800007164006,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG Combined Cycle H-Class integrated retrofit 95%-CCS,FOM,7.52,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG Combined Cycle H-Class integrated retrofit 95%-CCS,FOM,6.49,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG Combined Cycle H-Class integrated retrofit 95%-CCS,FOM,5.82,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative NG Combined Cycle H-Class integrated retrofit 95%-CCS,FOM,7.52,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG Combined Cycle H-Class integrated retrofit 95%-CCS,FOM,6.49,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG Combined Cycle H-Class integrated retrofit 95%-CCS,FOM,5.82,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,3.6,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,3.92,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,4.25,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,3.6,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,3.92,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,4.25,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,606.5,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,765.9,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,925.4,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,606.5,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,765.9,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,925.4,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,3.1451733383656113,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,3.4247443017758874,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,3.713051857792735,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,3.1451733383656113,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,3.4247443017758874,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle H-Class integrated retrofit 95%-CCS,VOM,3.713051857792735,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,529.8743415885398,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,669.1356277372837,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,808.4842798120934,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,529.8743415885398,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,669.1356277372837,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Combined Cycle H-Class integrated retrofit 95%-CCS,investment,808.4842798120934,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative NG Fuel Cell,FOM,2.4,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG Fuel Cell,FOM,2.36,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG Fuel Cell,FOM,2.4,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG Fuel Cell,FOM,2.36,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Fuel Cell,VOM,6.46,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Fuel Cell,VOM,7.35,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Fuel Cell,VOM,6.46,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Fuel Cell,VOM,7.35,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Fuel Cell,investment,1492.4554793998236,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Fuel Cell,investment,1701.062711344606,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Fuel Cell,investment,1492.4554793998236,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Fuel Cell,investment,1701.062711344606,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Fuel Cell,VOM,5.643838823844957,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Fuel Cell,VOM,6.421395565829789,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Fuel Cell,VOM,5.643838823844957,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Fuel Cell,VOM,6.421395565829789,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Fuel Cell,investment,1303.8975506961087,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Fuel Cell,investment,1486.1491907247146,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Fuel Cell,investment,1303.8975506961087,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Fuel Cell,investment,1486.1491907247146,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NG Fuel Cell 98% CCS,FOM,2.4,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced NG Fuel Cell 98% CCS,FOM,2.37,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate NG Fuel Cell 98% CCS,FOM,2.4,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced NG Fuel Cell 98% CCS,FOM,2.37,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Fuel Cell 98% CCS,VOM,7.12,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Fuel Cell 98% CCS,VOM,8.05,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Fuel Cell 98% CCS,VOM,7.12,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Fuel Cell 98% CCS,VOM,8.05,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -NG Fuel Cell 98% CCS,investment,2075.820254630024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -NG Fuel Cell 98% CCS,investment,2398.983167364997,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -NG Fuel Cell 98% CCS,investment,2075.820254630024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -NG Fuel Cell 98% CCS,investment,2398.983167364997,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Fuel Cell 98% CCS,VOM,6.220453935878653,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Fuel Cell 98% CCS,VOM,7.03295704828977,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Fuel Cell 98% CCS,VOM,6.220453935878653,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Fuel Cell 98% CCS,VOM,7.03295704828977,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +NG Fuel Cell 98% CCS,investment,1813.5595889171293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +NG Fuel Cell 98% CCS,investment,2095.8938603289653,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +NG Fuel Cell 98% CCS,investment,1813.5595889171293,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +NG Fuel Cell 98% CCS,investment,2095.8938603289653,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate NH3 (l) storage tank incl. liquefaction,FOM,2.0,%/year,"Guesstimate, based on H2 (l) storage tank.",,2010.0,, NH3 (l) storage tank incl. liquefaction,investment,166.8201,EUR/MWh_NH3,"Calculated based on Morgan E. 2013: doi:10.7275/11KT-3F59 , Fig. 55, Fig 58.","Based on estimated for a double-wall liquid ammonia tank (~ambient pressure, -33°C), inner tank from stainless steel, outer tank from concrete including installations for liquefaction/condensation, boil-off gas recovery and safety installations; the necessary installations make only a small fraction of the total cost. The total cost are driven by material and working time on the tanks. While the costs do not scale strictly linearly, we here assume they do (good approximation c.f. ref. Fig 55.) and take the costs for a 9 kt NH3 (l) tank = 8 M$2010, which is smaller 4-5x smaller than the largest deployed tanks today. @@ -2171,11 +2171,11 @@ NH3 (l) transport ship,investment,81164200.0,EUR,"Cihlar et al 2020 based on IEA NH3 (l) transport ship,lifetime,20.0,years,"Guess estimated based on H2 (l) tanker, but more mature technology",,2019.0,, Natural gas steam reforming,FOM,0.05,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Natural gas steam reforming,efficiency,0.787,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Natural gas steam reforming,investment,180.0632,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Natural gas steam reforming,investment,242.75887320940691,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Natural gas steam reforming,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Natural gas steam reforming CC,FOM,0.05,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Natural gas steam reforming CC,efficiency,0.695,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Natural gas steam reforming CC,investment,323.8999,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Natural gas steam reforming CC,investment,436.6777280424164,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Natural gas steam reforming CC,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Ni-Zn-bicharger,FOM,2.1198,%/year,"Viswanathan_2022, p.51-52 in section 4.4.2","{'carrier': ['elec', 'nizn', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['Guesstimate 30% assumed of power components every 10 years ']}",2020.0,, Ni-Zn-bicharger,efficiency,0.9,per unit,"Viswanathan_2022, p.59 (p.81)","{'carrier': ['elec', 'nizn', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['((0.75-0.87)/2)^0.5 mean value of range efficiency is not RTE but single way AC-store conversion']}",2020.0,, @@ -2196,24 +2196,24 @@ Nuclear - Small,FOM,2.71,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucke Nuclear - Small,FOM,4.9,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Nuclear - Small,FOM,2.78,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Nuclear - Small,FOM,2.71,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Nuclear - Small,VOM,2.2,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Nuclear - Small,VOM,2.6,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Nuclear - Small,VOM,2.8,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Nuclear - Small,VOM,2.2,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Nuclear - Small,VOM,2.6,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Nuclear - Small,VOM,2.8,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Nuclear - Small,fuel,10.0062,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Nuclear - Small,fuel,11.016,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Nuclear - Small,fuel,12.1176,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Nuclear - Small,fuel,10.0062,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Nuclear - Small,fuel,11.016,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Nuclear - Small,fuel,12.1176,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Nuclear - Small,investment,2406.277601050836,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Nuclear - Small,investment,4884.568243939496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Nuclear - Small,investment,7972.787671781175,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Nuclear - Small,investment,2406.277601050836,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Nuclear - Small,investment,4884.568243939496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Nuclear - Small,investment,7972.787671781175,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Nuclear - Small,VOM,1.9220503734456513,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Nuclear - Small,VOM,2.271514077708497,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Nuclear - Small,VOM,2.4462459298399195,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Nuclear - Small,VOM,1.9220503734456513,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Nuclear - Small,VOM,2.271514077708497,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Nuclear - Small,VOM,2.4462459298399195,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Nuclear - Small,fuel,8.742009293987216,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Nuclear - Small,fuel,9.62423041539877,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Nuclear - Small,fuel,10.586653456938647,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Nuclear - Small,fuel,8.742009293987216,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Nuclear - Small,fuel,9.62423041539877,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Nuclear - Small,fuel,10.586653456938647,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Nuclear - Small,investment,2102.2667098698475,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Nuclear - Small,investment,4267.448280629398,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Nuclear - Small,investment,6965.499782704496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Nuclear - Small,investment,2102.2667098698475,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Nuclear - Small,investment,4267.448280629398,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Nuclear - Small,investment,6965.499782704496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative OCGT,FOM,1.8023,%/year,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",52 OCGT - Natural gas: Fixed O&M,2015.0,, OCGT,VOM,4.762,EUR/MWh,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",52 OCGT - Natural gas: Variable O&M,2015.0,, OCGT,efficiency,0.43,per unit,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","52 OCGT - Natural gas: Electricity efficiency, annual average",2015.0,, @@ -2231,12 +2231,12 @@ Offshore Wind - Class 1,FOM,2.16,%/year,NREL/ATB-https://data.openei.org/s3_view Offshore Wind - Class 1,FOM,2.49,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 1,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 1,FOM,2.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 1,investment,2559.9516152941696,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 1,investment,3087.59817371129,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 1,investment,3750.0838044308034,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 1,investment,2559.9516152941696,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 1,investment,3087.59817371129,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 1,investment,3750.0838044308034,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 1,investment,2236.5254355358893,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 1,investment,2697.508737650862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 1,investment,3276.295443981234,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 1,investment,2236.5254355358893,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 1,investment,2697.508737650862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 1,investment,3276.295443981234,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 10,CF,0.5251,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 10,CF,0.4953,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 10,CF,0.4734,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2249,12 +2249,12 @@ Offshore Wind - Class 10,FOM,1.04,%/year,NREL/ATB-https://data.openei.org/s3_vie Offshore Wind - Class 10,FOM,2.02,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 10,FOM,1.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 10,FOM,1.04,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 10,investment,2635.172926720409,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 10,investment,4039.161644014973,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 10,investment,6304.837673138107,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 10,investment,2635.172926720409,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 10,investment,4039.161644014973,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 10,investment,6304.837673138107,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 10,investment,2302.2432308621965,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 10,investment,3528.850975584695,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 10,investment,5508.2798200769585,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 10,investment,2302.2432308621965,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 10,investment,3528.850975584695,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 10,investment,5508.2798200769585,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 11,CF,0.5223,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 11,CF,0.4927,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 11,CF,0.4709,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2267,12 +2267,12 @@ Offshore Wind - Class 11,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_vie Offshore Wind - Class 11,FOM,1.98,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 11,FOM,1.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 11,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 11,investment,2716.4804865283863,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 11,investment,4163.78893258637,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 11,investment,6499.371892672134,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 11,investment,2716.4804865283863,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 11,investment,4163.78893258637,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 11,investment,6499.371892672134,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 11,investment,2373.2783334498677,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 11,investment,3637.7327603756826,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 11,investment,5678.236442487566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 11,investment,2373.2783334498677,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 11,investment,3637.7327603756826,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 11,investment,5678.236442487566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 12,CF,0.5121,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 12,CF,0.4831,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 12,CF,0.4617,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2285,12 +2285,12 @@ Offshore Wind - Class 12,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_vie Offshore Wind - Class 12,FOM,2.0,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 12,FOM,1.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 12,FOM,1.03,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 12,investment,2829.057123042142,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 12,investment,4336.344872820436,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 12,investment,6768.719094195102,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 12,investment,2829.057123042142,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 12,investment,4336.344872820436,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 12,investment,6768.719094195102,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 12,investment,2471.6319544737403,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 12,investment,3788.48785554257,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 12,investment,5913.554119430185,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 12,investment,2471.6319544737403,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 12,investment,3788.48785554257,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 12,investment,5913.554119430185,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 13,CF,0.403,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 13,CF,0.3801,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 13,CF,0.3633,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2303,12 +2303,12 @@ Offshore Wind - Class 13,FOM,0.88,%/year,NREL/ATB-https://data.openei.org/s3_vie Offshore Wind - Class 13,FOM,1.71,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 13,FOM,1.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 13,FOM,0.88,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 13,investment,3151.804346776431,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 13,investment,4831.048015362057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 13,investment,7540.91474021447,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 13,investment,3151.804346776431,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 13,investment,4831.048015362057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 13,investment,7540.91474021447,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 13,investment,2753.6030553405753,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 13,investment,4220.689837300234,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 13,investment,6588.189996614108,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 13,investment,2753.6030553405753,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 13,investment,4220.689837300234,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 13,investment,6588.189996614108,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 14,CF,0.3082,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 14,CF,0.2907,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 14,CF,0.2779,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2321,12 +2321,12 @@ Offshore Wind - Class 14,FOM,0.83,%/year,NREL/ATB-https://data.openei.org/s3_vie Offshore Wind - Class 14,FOM,1.61,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 14,FOM,1.15,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 14,FOM,0.83,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 14,investment,3424.954123113536,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 14,investment,5249.72870922142,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 14,investment,8194.444840489447,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 14,investment,3424.954123113536,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 14,investment,5249.72870922142,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 14,investment,8194.444840489447,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 14,investment,2992.2428869839064,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 14,investment,4586.474102748813,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 14,investment,7159.1526208375135,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 14,investment,2992.2428869839064,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 14,investment,4586.474102748813,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 14,investment,7159.1526208375135,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 2,CF,0.5104,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 2,CF,0.4815,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 2,CF,0.4601,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2339,12 +2339,12 @@ Offshore Wind - Class 2,FOM,2.22,%/year,NREL/ATB-https://data.openei.org/s3_view Offshore Wind - Class 2,FOM,2.55,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 2,FOM,2.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 2,FOM,2.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 2,investment,2488.655832074944,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 2,investment,3001.607298103593,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 2,investment,3645.642491688456,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 2,investment,2488.655832074944,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 2,investment,3001.607298103593,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 2,investment,3645.642491688456,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 2,investment,2174.237214280611,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 2,investment,2622.3820128441835,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 2,investment,3185.0493239086964,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 2,investment,2174.237214280611,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 2,investment,2622.3820128441835,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 2,investment,3185.0493239086964,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 4,CF,0.5176,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 4,CF,0.4883,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 4,CF,0.4666,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2357,12 +2357,12 @@ Offshore Wind - Class 4,FOM,1.98,%/year,NREL/ATB-https://data.openei.org/s3_view Offshore Wind - Class 4,FOM,2.28,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 4,FOM,2.07,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 4,FOM,1.98,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 4,investment,2784.2013083830475,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 4,investment,3358.0694730253986,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 4,investment,4078.588329101687,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 4,investment,2784.2013083830475,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 4,investment,3358.0694730253986,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 4,investment,4078.588329101687,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 4,investment,2432.4432566025034,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 4,investment,2933.808493038595,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 4,investment,3563.296464127715,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 4,investment,2432.4432566025034,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 4,investment,2933.808493038595,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 4,investment,3563.296464127715,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 5,CF,0.5048,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 5,CF,0.4762,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 5,CF,0.4551,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2375,12 +2375,12 @@ Offshore Wind - Class 5,FOM,1.91,%/year,NREL/ATB-https://data.openei.org/s3_view Offshore Wind - Class 5,FOM,2.19,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 5,FOM,1.99,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 5,FOM,1.91,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 5,investment,2928.782857191869,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 5,investment,3532.4515316851357,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 5,investment,4290.3864688988015,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 5,investment,2928.782857191869,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 5,investment,3532.4515316851357,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 5,investment,4290.3864688988015,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 5,investment,2558.758265639479,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 5,investment,3086.1589934791264,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 5,investment,3748.3358703514136,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 5,investment,2558.758265639479,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 5,investment,3086.1589934791264,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 5,investment,3748.3358703514136,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 6,CF,0.3951,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 6,CF,0.3727,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 6,CF,0.3562,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2393,12 +2393,12 @@ Offshore Wind - Class 6,FOM,1.96,%/year,NREL/ATB-https://data.openei.org/s3_view Offshore Wind - Class 6,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 6,FOM,2.05,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 6,FOM,1.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 6,investment,2825.4629813917627,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 6,investment,3407.835662590264,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 6,investment,4139.0326161671055,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 6,investment,2825.4629813917627,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 6,investment,3407.835662590264,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 6,investment,4139.0326161671055,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 6,investment,2468.491899336773,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 6,investment,2977.287185419557,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 6,investment,3616.1041752762344,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 6,investment,2468.491899336773,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 6,investment,2977.287185419557,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 6,investment,3616.1041752762344,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 7,CF,0.3024,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 7,CF,0.2852,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 7,CF,0.2726,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2411,12 +2411,12 @@ Offshore Wind - Class 7,FOM,1.86,%/year,NREL/ATB-https://data.openei.org/s3_view Offshore Wind - Class 7,FOM,2.14,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 7,FOM,1.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 7,FOM,1.86,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 7,investment,2987.6867344821508,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 7,investment,3603.496308158218,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 7,investment,4376.675026977078,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 7,investment,2987.6867344821508,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 7,investment,3603.496308158218,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 7,investment,4376.675026977078,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 7,investment,2610.220183522744,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 7,investment,3148.2279203661496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 7,investment,3823.7226682052496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 7,investment,2610.220183522744,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 7,investment,3148.2279203661496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 7,investment,3823.7226682052496,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 8,CF,0.5207,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 8,CF,0.4912,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 8,CF,0.4694,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2429,12 +2429,12 @@ Offshore Wind - Class 8,FOM,1.11,%/year,NREL/ATB-https://data.openei.org/s3_view Offshore Wind - Class 8,FOM,2.15,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 8,FOM,1.54,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 8,FOM,1.11,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 8,investment,2407.2283123291018,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 8,investment,3689.7706750423663,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 8,investment,5759.463763274649,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 8,investment,2407.2283123291018,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 8,investment,3689.7706750423663,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 8,investment,5759.463763274649,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 8,investment,2103.097307582316,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 8,investment,3223.602319951815,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 8,investment,5031.80885320397,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 8,investment,2103.097307582316,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 8,investment,3223.602319951815,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 8,investment,5031.80885320397,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Offshore Wind - Class 9,CF,0.5241,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Offshore Wind - Class 9,CF,0.4944,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Offshore Wind - Class 9,CF,0.4725,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2447,12 +2447,12 @@ Offshore Wind - Class 9,FOM,1.08,%/year,NREL/ATB-https://data.openei.org/s3_view Offshore Wind - Class 9,FOM,2.08,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Offshore Wind - Class 9,FOM,1.49,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Offshore Wind - Class 9,FOM,1.08,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Offshore Wind - Class 9,investment,2561.2621942456512,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Offshore Wind - Class 9,investment,3925.8720108649786,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Offshore Wind - Class 9,investment,6128.000648762892,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Offshore Wind - Class 9,investment,2561.2621942456512,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Offshore Wind - Class 9,investment,3925.8720108649786,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Offshore Wind - Class 9,investment,6128.000648762892,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Offshore Wind - Class 9,investment,2237.6704349736738,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Offshore Wind - Class 9,investment,3429.8744384467554,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Offshore Wind - Class 9,investment,5353.784516104504,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Offshore Wind - Class 9,investment,2237.6704349736738,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Offshore Wind - Class 9,investment,3429.8744384467554,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Offshore Wind - Class 9,investment,5353.784516104504,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PEM electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PEM electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PEM electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative @@ -2460,12 +2460,12 @@ PEM electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenar PEM electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PEM electrolyzer,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PEM electrolyzer,efficiency,0.73,p.u.,ICCT IRA e-fuels assumptions ,,,, -PEM electrolyzer,investment,1309.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PEM electrolyzer,investment,1309.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PEM electrolyzer,investment,1122.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PEM electrolyzer,investment,1122.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PEM electrolyzer,investment,384.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PEM electrolyzer,investment,384.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PEM electrolyzer,investment,1143.6199722001625,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PEM electrolyzer,investment,1143.6199722001625,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PEM electrolyzer,investment,980.2456904572821,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PEM electrolyzer,investment,980.2456904572821,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PEM electrolyzer,investment,335.48515609233186,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PEM electrolyzer,investment,335.48515609233186,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PEM electrolyzer,lifetime,30.0,years,ICCT IRA e-fuels assumptions ,,,, PHS,FOM,0.7,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PHS,FOM,0.62,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -2473,12 +2473,12 @@ PHS,FOM,0.62,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data- PHS,FOM,0.7,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PHS,FOM,0.62,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PHS,FOM,0.62,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PHS,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PHS,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PHS,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PHS,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PHS,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PHS,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PHS,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PHS,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PHS,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PHS,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PHS,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PHS,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PHS,discount rate,0.0481958813505439,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PHS,discount rate,0.0481958813505439,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PHS,discount rate,0.0481958813505439,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2486,12 +2486,12 @@ PHS,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of s PHS,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PHS,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PHS,efficiency,0.75,per unit,DIW DataDoc http://hdl.handle.net/10419/80348, from old pypsa cost assumptions,2015.0,, -PHS,investment,2865.9897396293513,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PHS,investment,3224.2384570830204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PHS,investment,3224.2384570830204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PHS,investment,2865.9897396293513,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PHS,investment,3224.2384570830204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PHS,investment,3224.2384570830204,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PHS,investment,2503.8984769754543,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PHS,investment,2816.8857865973864,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PHS,investment,2816.8857865973864,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PHS,investment,2503.8984769754543,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PHS,investment,2816.8857865973864,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PHS,investment,2816.8857865973864,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PHS,lifetime,80.0,years,IEA2010, from old pypsa cost assumptions,2015.0,, PV+Storage - Class 1,CF,0.389609019508651,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 1,CF,0.3706689120891035,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -2505,12 +2505,12 @@ PV+Storage - Class 1,FOM,3.8,%/year,NREL/ATB-https://data.openei.org/s3_viewer?b PV+Storage - Class 1,FOM,4.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 1,FOM,4.05,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 1,FOM,3.8,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 1,investment,887.4065814722364,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 1,investment,1153.9136111114174,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 1,investment,1636.2795581701564,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 1,investment,887.4065814722364,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 1,investment,1153.9136111114174,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 1,investment,1636.2795581701564,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 1,investment,775.2909778712913,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 1,investment,1008.1273123457817,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 1,investment,1429.5507890192882,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 1,investment,775.2909778712913,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 1,investment,1008.1273123457817,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 1,investment,1429.5507890192882,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 10,CF,0.25004168896826656,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 10,CF,0.24373817706815865,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 10,CF,0.22993619878698873,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2523,12 +2523,12 @@ PV+Storage - Class 10,FOM,3.8,%/year,NREL/ATB-https://data.openei.org/s3_viewer? PV+Storage - Class 10,FOM,4.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 10,FOM,4.05,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 10,FOM,3.8,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 10,investment,887.4065814722364,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 10,investment,1153.9136111114174,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 10,investment,1636.2795581701564,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 10,investment,887.4065814722364,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 10,investment,1153.9136111114174,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 10,investment,1636.2795581701564,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 10,investment,775.2909778712913,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 10,investment,1008.1273123457817,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 10,investment,1429.5507890192882,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 10,investment,775.2909778712913,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 10,investment,1008.1273123457817,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 10,investment,1429.5507890192882,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 2,CF,0.3773685021684776,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 2,CF,0.35863243870759,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 2,CF,0.34046894190039917,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2541,12 +2541,12 @@ PV+Storage - Class 2,FOM,3.8,%/year,NREL/ATB-https://data.openei.org/s3_viewer?b PV+Storage - Class 2,FOM,4.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 2,FOM,4.05,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 2,FOM,3.8,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 2,investment,887.4065814722364,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 2,investment,1153.9136111114174,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 2,investment,1636.2795581701564,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 2,investment,887.4065814722364,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 2,investment,1153.9136111114174,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 2,investment,1636.2795581701564,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 2,investment,775.2909778712913,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 2,investment,1008.1273123457817,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 2,investment,1429.5507890192882,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 2,investment,775.2909778712913,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 2,investment,1008.1273123457817,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 2,investment,1429.5507890192882,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 3,CF,0.3600398408176434,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 3,CF,0.34412888892056986,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 3,CF,0.32621512274498154,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2559,12 +2559,12 @@ PV+Storage - Class 3,FOM,3.8,%/year,NREL/ATB-https://data.openei.org/s3_viewer?b PV+Storage - Class 3,FOM,4.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 3,FOM,4.05,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 3,FOM,3.8,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 3,investment,887.4065814722364,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 3,investment,1153.9136111114174,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 3,investment,1636.2795581701564,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 3,investment,887.4065814722364,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 3,investment,1153.9136111114174,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 3,investment,1636.2795581701564,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 3,investment,775.2909778712913,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 3,investment,1008.1273123457817,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 3,investment,1429.5507890192882,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 3,investment,775.2909778712913,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 3,investment,1008.1273123457817,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 3,investment,1429.5507890192882,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 4,CF,0.3434420283983233,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 4,CF,0.32978357722922286,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 4,CF,0.31223703634815564,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2577,12 +2577,12 @@ PV+Storage - Class 4,FOM,3.8,%/year,NREL/ATB-https://data.openei.org/s3_viewer?b PV+Storage - Class 4,FOM,4.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 4,FOM,4.05,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 4,FOM,3.8,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 4,investment,887.4065814722364,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 4,investment,1153.9136111114174,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 4,investment,1636.2795581701564,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 4,investment,887.4065814722364,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 4,investment,1153.9136111114174,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 4,investment,1636.2795581701564,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 4,investment,775.2909778712913,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 4,investment,1008.1273123457817,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 4,investment,1429.5507890192882,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 4,investment,775.2909778712913,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 4,investment,1008.1273123457817,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 4,investment,1429.5507890192882,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 5,CF,0.326921040499277,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 5,CF,0.3148762955347873,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 5,CF,0.2978286955244422,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2595,12 +2595,12 @@ PV+Storage - Class 5,FOM,3.8,%/year,NREL/ATB-https://data.openei.org/s3_viewer?b PV+Storage - Class 5,FOM,4.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 5,FOM,4.05,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 5,FOM,3.8,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 5,investment,887.4065814722364,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 5,investment,1153.9136111114174,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 5,investment,1636.2795581701564,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 5,investment,887.4065814722364,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 5,investment,1153.9136111114174,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 5,investment,1636.2795581701564,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 5,investment,775.2909778712913,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 5,investment,1008.1273123457817,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 5,investment,1429.5507890192882,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 5,investment,775.2909778712913,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 5,investment,1008.1273123457817,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 5,investment,1429.5507890192882,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 6,CF,0.3106502269620825,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 6,CF,0.3001924335898397,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 6,CF,0.283632266390766,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2613,12 +2613,12 @@ PV+Storage - Class 6,FOM,3.8,%/year,NREL/ATB-https://data.openei.org/s3_viewer?b PV+Storage - Class 6,FOM,4.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 6,FOM,4.05,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 6,FOM,3.8,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 6,investment,887.4065814722364,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 6,investment,1153.9136111114174,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 6,investment,1636.2795581701564,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 6,investment,887.4065814722364,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 6,investment,1153.9136111114174,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 6,investment,1636.2795581701564,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 6,investment,775.2909778712913,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 6,investment,1008.1273123457817,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 6,investment,1429.5507890192882,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 6,investment,775.2909778712913,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 6,investment,1008.1273123457817,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 6,investment,1429.5507890192882,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 7,CF,0.2953399665497729,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 7,CF,0.2862833018541765,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 7,CF,0.2703152850075578,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2631,12 +2631,12 @@ PV+Storage - Class 7,FOM,3.8,%/year,NREL/ATB-https://data.openei.org/s3_viewer?b PV+Storage - Class 7,FOM,4.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 7,FOM,4.05,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 7,FOM,3.8,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 7,investment,887.4065814722364,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 7,investment,1153.9136111114174,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 7,investment,1636.2795581701564,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 7,investment,887.4065814722364,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 7,investment,1153.9136111114174,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 7,investment,1636.2795581701564,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 7,investment,775.2909778712913,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 7,investment,1008.1273123457817,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 7,investment,1429.5507890192882,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 7,investment,775.2909778712913,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 7,investment,1008.1273123457817,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 7,investment,1429.5507890192882,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 8,CF,0.28448958237377947,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 8,CF,0.27579802278267646,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 8,CF,0.2605567359488021,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2649,12 +2649,12 @@ PV+Storage - Class 8,FOM,3.8,%/year,NREL/ATB-https://data.openei.org/s3_viewer?b PV+Storage - Class 8,FOM,4.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 8,FOM,4.05,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 8,FOM,3.8,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 8,investment,887.4065814722364,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 8,investment,1153.9136111114174,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 8,investment,1636.2795581701564,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 8,investment,887.4065814722364,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 8,investment,1153.9136111114174,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 8,investment,1636.2795581701564,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 8,investment,775.2909778712913,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 8,investment,1008.1273123457817,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 8,investment,1429.5507890192882,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 8,investment,775.2909778712913,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 8,investment,1008.1273123457817,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 8,investment,1429.5507890192882,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative PV+Storage - Class 9,CF,0.2713419725835152,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced PV+Storage - Class 9,CF,0.2635200718765501,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate PV+Storage - Class 9,CF,0.24890140545017353,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -2667,336 +2667,336 @@ PV+Storage - Class 9,FOM,3.8,%/year,NREL/ATB-https://data.openei.org/s3_viewer?b PV+Storage - Class 9,FOM,4.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced PV+Storage - Class 9,FOM,4.05,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate PV+Storage - Class 9,FOM,3.8,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -PV+Storage - Class 9,investment,887.4065814722364,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -PV+Storage - Class 9,investment,1153.9136111114174,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -PV+Storage - Class 9,investment,1636.2795581701564,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -PV+Storage - Class 9,investment,887.4065814722364,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -PV+Storage - Class 9,investment,1153.9136111114174,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -PV+Storage - Class 9,investment,1636.2795581701564,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +PV+Storage - Class 9,investment,775.2909778712913,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +PV+Storage - Class 9,investment,1008.1273123457817,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +PV+Storage - Class 9,investment,1429.5507890192882,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +PV+Storage - Class 9,investment,775.2909778712913,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +PV+Storage - Class 9,investment,1008.1273123457817,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +PV+Storage - Class 9,investment,1429.5507890192882,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 10,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 10,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 10,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 10,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 10,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 10,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 10,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 10,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 10,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 10,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 10,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 10,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 10,investment,4006.060901704014,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 10,investment,4506.818514417017,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 10,investment,4506.818514417017,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 10,investment,4006.060901704014,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 10,investment,4506.818514417017,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 10,investment,4506.818514417017,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 10,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 10,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 10,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 10,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 10,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 10,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 10,investment,3499.9322055301013,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 10,investment,3937.4237312213645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 10,investment,3937.4237312213645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 10,investment,3499.9322055301013,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 10,investment,3937.4237312213645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 10,investment,3937.4237312213645,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 11,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 11,FOM,0.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 11,FOM,0.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 11,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 11,FOM,0.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 11,FOM,0.44,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 11,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 11,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 11,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 11,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 11,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 11,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 11,investment,4065.490758848822,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 11,investment,4573.677103704925,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 11,investment,4573.677103704925,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 11,investment,4065.490758848822,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 11,investment,4573.677103704925,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 11,investment,4573.677103704925,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 11,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 11,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 11,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 11,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 11,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 11,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 11,investment,3551.853650584192,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 11,investment,3995.835356907216,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 11,investment,3995.835356907216,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 11,investment,3551.853650584192,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 11,investment,3995.835356907216,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 11,investment,3995.835356907216,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 12,FOM,0.49,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 12,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 12,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 12,FOM,0.49,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 12,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 12,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 12,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 12,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 12,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 12,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 12,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 12,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 12,investment,4118.88297395718,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 12,investment,4633.743345701827,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 12,investment,4633.743345701827,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 12,investment,4118.88297395718,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 12,investment,4633.743345701827,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 12,investment,4633.743345701827,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 12,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 12,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 12,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 12,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 12,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 12,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 12,investment,3598.5002537606056,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 12,investment,4048.3127854806808,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 12,investment,4048.3127854806808,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 12,investment,3598.5002537606056,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 12,investment,4048.3127854806808,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 12,investment,4048.3127854806808,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 13,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 13,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 13,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 13,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 13,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 13,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 13,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 13,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 13,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 13,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 13,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 13,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 13,investment,4167.960881656503,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 13,investment,4688.955991863566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 13,investment,4688.955991863566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 13,investment,4167.960881656503,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 13,investment,4688.955991863566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 13,investment,4688.955991863566,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 13,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 13,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 13,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 13,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 13,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 13,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 13,investment,3641.3776223157943,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 13,investment,4096.549825105269,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 13,investment,4096.549825105269,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 13,investment,3641.3776223157943,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 13,investment,4096.549825105269,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 13,investment,4096.549825105269,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 14,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 14,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 14,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 14,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 14,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 14,FOM,0.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 14,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 14,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 14,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 14,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 14,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 14,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 14,investment,4214.15433248977,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 14,investment,4740.923624050991,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 14,investment,4740.923624050991,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 14,investment,4214.15433248977,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 14,investment,4740.923624050991,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 14,investment,4740.923624050991,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 14,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 14,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 14,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 14,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 14,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 14,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 14,investment,3681.7349584179874,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 14,investment,4141.951828220235,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 14,investment,4141.951828220235,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 14,investment,3681.7349584179874,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 14,investment,4141.951828220235,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 14,investment,4141.951828220235,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 15,FOM,0.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 15,FOM,0.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 15,FOM,0.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 15,FOM,0.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 15,FOM,0.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 15,FOM,0.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 15,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 15,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 15,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 15,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 15,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 15,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 15,investment,4258.451763537991,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 15,investment,4790.75823398024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 15,investment,4790.75823398024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 15,investment,4258.451763537991,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 15,investment,4790.75823398024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 15,investment,4790.75823398024,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 15,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 15,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 15,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 15,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 15,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 15,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 15,investment,3720.435819276585,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 15,investment,4185.490296686159,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 15,investment,4185.490296686159,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 15,investment,3720.435819276585,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 15,investment,4185.490296686159,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 15,investment,4185.490296686159,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 2,FOM,0.63,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 2,FOM,0.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 2,FOM,0.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 2,FOM,0.63,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 2,FOM,0.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 2,FOM,0.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 2,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 2,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 2,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 2,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 2,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 2,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 2,investment,3195.65086821374,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 2,investment,3595.107226740458,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 2,investment,3595.107226740458,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 2,investment,3195.65086821374,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 2,investment,3595.107226740458,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 2,investment,3595.107226740458,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 2,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 2,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 2,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 2,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 2,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 2,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 2,investment,2791.909974841881,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 2,investment,3140.898721697117,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 2,investment,3140.898721697117,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 2,investment,2791.909974841881,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 2,investment,3140.898721697117,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 2,investment,3140.898721697117,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 3,FOM,0.6,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 3,FOM,0.53,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 3,FOM,0.53,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 3,FOM,0.6,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 3,FOM,0.53,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 3,FOM,0.53,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 3,investment,3372.4497842453384,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 3,investment,3794.0060072760057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 3,investment,3794.0060072760057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 3,investment,3372.4497842453384,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 3,investment,3794.0060072760057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 3,investment,3794.0060072760057,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 3,investment,2946.3719851070264,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 3,investment,3314.668483245405,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 3,investment,3314.668483245405,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 3,investment,2946.3719851070264,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 3,investment,3314.668483245405,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 3,investment,3314.668483245405,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 4,FOM,0.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 4,FOM,0.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 4,FOM,0.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 4,FOM,0.57,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 4,FOM,0.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 4,FOM,0.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 4,investment,3507.208415107455,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 4,investment,3945.609466995887,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 4,investment,3945.609466995887,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 4,investment,3507.208415107455,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 4,investment,3945.609466995887,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 4,investment,3945.609466995887,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 4,investment,3064.1051109131886,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 4,investment,3447.118249777337,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 4,investment,3447.118249777337,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 4,investment,3064.1051109131886,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 4,investment,3447.118249777337,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 4,investment,3447.118249777337,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 5,FOM,0.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 5,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 5,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 5,FOM,0.56,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 5,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 5,FOM,0.5,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 5,investment,3615.238225362584,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 5,investment,4067.1430035329063,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 5,investment,4067.1430035329063,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 5,investment,3615.238225362584,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 5,investment,4067.1430035329063,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 5,investment,4067.1430035329063,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 5,investment,3158.4863550696127,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 5,investment,3553.2971494533135,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 5,investment,3553.2971494533135,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 5,investment,3158.4863550696127,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 5,investment,3553.2971494533135,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 5,investment,3553.2971494533135,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 6,FOM,0.54,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 6,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 6,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 6,FOM,0.54,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 6,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 6,FOM,0.48,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 6,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 6,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 6,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 6,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 6,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 6,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 6,investment,3710.254570622873,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 6,investment,4174.036391950732,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 6,investment,4174.036391950732,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 6,investment,3710.254570622873,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 6,investment,4174.036391950732,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 6,investment,4174.036391950732,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 6,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 6,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 6,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 6,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 6,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 6,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 6,investment,3241.4982650200577,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 6,investment,3646.685548147565,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 6,investment,3646.685548147565,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 6,investment,3241.4982650200577,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 6,investment,3646.685548147565,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 6,investment,3646.685548147565,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 7,FOM,0.53,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 7,FOM,0.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 7,FOM,0.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 7,FOM,0.53,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 7,FOM,0.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 7,FOM,0.47,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 7,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 7,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 7,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 7,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 7,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 7,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 7,investment,3795.849861187808,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 7,investment,4270.331093836284,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 7,investment,4270.331093836284,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 7,investment,3795.849861187808,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 7,investment,4270.331093836284,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 7,investment,4270.331093836284,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 7,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 7,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 7,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 7,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 7,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 7,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 7,investment,3316.27938329075,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 7,investment,3730.8143062020936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 7,investment,3730.8143062020936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 7,investment,3316.27938329075,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 7,investment,3730.8143062020936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 7,investment,3730.8143062020936,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 8,FOM,0.52,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 8,FOM,0.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 8,FOM,0.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 8,FOM,0.52,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 8,FOM,0.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 8,FOM,0.46,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 8,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 8,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 8,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 8,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 8,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 8,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 8,investment,3873.3053872175096,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 8,investment,4357.468560619698,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 8,investment,4357.468560619698,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 8,investment,3873.3053872175096,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 8,investment,4357.468560619698,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 8,investment,4357.468560619698,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 8,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 8,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 8,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 8,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 8,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 8,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 8,investment,3383.949120895667,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 8,investment,3806.942761007625,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 8,investment,3806.942761007625,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 8,investment,3383.949120895667,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 8,investment,3806.942761007625,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 8,investment,3806.942761007625,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower - National Class 9,FOM,0.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower - National Class 9,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower - National Class 9,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower - National Class 9,FOM,0.51,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower - National Class 9,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower - National Class 9,FOM,0.45,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 9,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 9,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 9,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 9,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 9,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 9,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower - National Class 9,investment,3940.8209590388096,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower - National Class 9,investment,4433.423578918661,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower - National Class 9,investment,4433.423578918661,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower - National Class 9,investment,3940.8209590388096,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower - National Class 9,investment,4433.423578918661,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower - National Class 9,investment,4433.423578918661,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 9,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 9,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 9,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 9,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 9,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 9,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower - National Class 9,investment,3442.934725455906,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower - National Class 9,investment,3873.301566137895,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower - National Class 9,investment,3873.301566137895,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower - National Class 9,investment,3442.934725455906,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower - National Class 9,investment,3873.301566137895,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower - National Class 9,investment,3873.301566137895,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower One New Reservoir - National Class 1,FOM,1.23,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower One New Reservoir - National Class 1,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower One New Reservoir - National Class 1,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower One New Reservoir - National Class 1,FOM,1.23,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower One New Reservoir - National Class 1,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower One New Reservoir - National Class 1,FOM,1.09,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1636.4924350614654,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1841.0539894441488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1841.0539894441488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1636.4924350614654,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1841.0539894441488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1841.0539894441488,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 1,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1429.7367708867603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1608.4538672476056,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1608.4538672476056,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1429.7367708867603,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1608.4538672476056,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 1,investment,1608.4538672476056,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower One New Reservoir - National Class 3,FOM,0.98,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower One New Reservoir - National Class 3,FOM,0.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower One New Reservoir - National Class 3,FOM,0.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower One New Reservoir - National Class 3,FOM,0.98,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower One New Reservoir - National Class 3,FOM,0.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower One New Reservoir - National Class 3,FOM,0.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2064.9347029946134,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2323.0515408689403,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2323.0515408689403,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2064.9347029946134,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2323.0515408689403,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2323.0515408689403,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 3,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 3,investment,1804.0493259234916,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2029.5554916639283,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2029.5554916639283,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 3,investment,1804.0493259234916,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2029.5554916639283,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 3,investment,2029.5554916639283,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower One New Reservoir - National Class 4,FOM,0.85,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower One New Reservoir - National Class 4,FOM,0.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower One New Reservoir - National Class 4,FOM,0.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower One New Reservoir - National Class 4,FOM,0.85,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower One New Reservoir - National Class 4,FOM,0.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower One New Reservoir - National Class 4,FOM,0.76,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2366.4499120202177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2662.256151022745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2662.256151022745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2366.4499120202177,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2662.256151022745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2662.256151022745,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 4,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2067.470880517676,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2325.9047405823862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2325.9047405823862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2067.470880517676,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2325.9047405823862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 4,investment,2325.9047405823862,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped Storage Hydropower One New Reservoir - National Class 5,FOM,0.66,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Pumped Storage Hydropower One New Reservoir - National Class 5,FOM,0.58,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Pumped Storage Hydropower One New Reservoir - National Class 5,FOM,0.58,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Pumped Storage Hydropower One New Reservoir - National Class 5,FOM,0.66,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Pumped Storage Hydropower One New Reservoir - National Class 5,FOM,0.58,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Pumped Storage Hydropower One New Reservoir - National Class 5,FOM,0.58,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.58,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3074.700898749907,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3459.038511093646,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3459.038511093646,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3074.700898749907,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3459.038511093646,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3459.038511093646,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 5,VOM,0.5067223711811262,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 5,investment,2686.240913943608,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3022.0210281865598,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3022.0210281865598,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Pumped Storage Hydropower One New Reservoir - National Class 5,investment,2686.240913943608,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3022.0210281865598,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Pumped Storage Hydropower One New Reservoir - National Class 5,investment,3022.0210281865598,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Pumped-Heat-charger,FOM,0.366,%/year,"Viswanathan_2022, NULL","{'carrier': ['elec', 'phes'], 'technology_type': ['charger'], 'type': ['thermal'], 'note': ['Guesstimate, 50% on charger']}",2020.0,, Pumped-Heat-charger,efficiency,0.99,per unit,"Viswanathan_2022, NULL","{'carrier': ['elec', 'phes'], 'technology_type': ['charger'], 'type': ['thermal'], 'note': ['Charger']}",2020.0,, Pumped-Heat-charger,investment,761782.6727,EUR/MW,"Georgiou_2018, Figure 9 of reference roughly 80% of capital cost are power related 47%/80% of costs are required for liquefaction (charging)","{'carrier': ['elec', 'phes'], 'technology_type': ['charger'], 'type': ['thermal'], 'note': ['Power Equipment Charge']}",2020.0,, @@ -3021,24 +3021,24 @@ Residential Battery Storage - 5 kW - 12.5 kWh,FOM,2.41,%/year,NREL/ATB-https://d Residential Battery Storage - 5 kW - 12.5 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential Battery Storage - 5 kW - 12.5 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential Battery Storage - 5 kW - 12.5 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential Battery Storage - 5 kW - 12.5 kWh,investment,1319.6833397265448,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential Battery Storage - 5 kW - 12.5 kWh,investment,2232.146603969219,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential Battery Storage - 5 kW - 12.5 kWh,investment,3159.560577463271,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential Battery Storage - 5 kW - 12.5 kWh,investment,1319.6833397265448,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential Battery Storage - 5 kW - 12.5 kWh,investment,2232.146603969219,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential Battery Storage - 5 kW - 12.5 kWh,investment,3159.560577463271,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential Battery Storage - 5 kW - 12.5 kWh,investment,1152.9535708870044,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential Battery Storage - 5 kW - 12.5 kWh,investment,1950.1355517020363,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential Battery Storage - 5 kW - 12.5 kWh,investment,2760.379358107926,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential Battery Storage - 5 kW - 12.5 kWh,investment,1152.9535708870044,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential Battery Storage - 5 kW - 12.5 kWh,investment,1950.1355517020363,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential Battery Storage - 5 kW - 12.5 kWh,investment,2760.379358107926,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential Battery Storage - 5 kW - 20 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential Battery Storage - 5 kW - 20 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential Battery Storage - 5 kW - 20 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Residential Battery Storage - 5 kW - 20 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential Battery Storage - 5 kW - 20 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential Battery Storage - 5 kW - 20 kWh,FOM,2.41,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential Battery Storage - 5 kW - 20 kWh,investment,1638.6824920245783,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential Battery Storage - 5 kW - 20 kWh,investment,2676.375424452385,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential Battery Storage - 5 kW - 20 kWh,investment,3923.3022384392425,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential Battery Storage - 5 kW - 20 kWh,investment,1638.6824920245783,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential Battery Storage - 5 kW - 20 kWh,investment,2676.375424452385,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential Battery Storage - 5 kW - 20 kWh,investment,3923.3022384392425,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential Battery Storage - 5 kW - 20 kWh,investment,1431.6501344339506,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential Battery Storage - 5 kW - 20 kWh,investment,2338.240174567941,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential Battery Storage - 5 kW - 20 kWh,investment,3427.62933296923,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential Battery Storage - 5 kW - 20 kWh,investment,1431.6501344339506,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential Battery Storage - 5 kW - 20 kWh,investment,2338.240174567941,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential Battery Storage - 5 kW - 20 kWh,investment,3427.62933296923,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 1,CF,0.49395000000000006,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 1,CF,0.49395000000000006,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 1,CF,0.49395000000000006,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3051,12 +3051,12 @@ Residential DW - Class 1,FOM,1.42,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential DW - Class 1,FOM,2.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 1,FOM,1.84,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 1,FOM,1.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 1,investment,1209.412446006358,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 1,investment,1935.0599136101723,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 1,investment,2515.577887693224,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 1,investment,1209.412446006358,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 1,investment,1935.0599136101723,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 1,investment,2515.577887693224,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 1,investment,1056.6143834074269,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 1,investment,1690.5830134518824,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 1,investment,2197.7579174874472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 1,investment,1056.6143834074269,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 1,investment,1690.5830134518824,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 1,investment,2197.7579174874472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 10,CF,0.196957,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 10,CF,0.196957,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 10,CF,0.196957,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3069,12 +3069,12 @@ Residential DW - Class 10,FOM,1.42,%/year,NREL/ATB-https://data.openei.org/s3_vi Residential DW - Class 10,FOM,2.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 10,FOM,1.84,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 10,FOM,1.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 10,investment,1209.412446006358,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 10,investment,1935.0599136101723,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 10,investment,2515.577887693224,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 10,investment,1209.412446006358,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 10,investment,1935.0599136101723,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 10,investment,2515.577887693224,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 10,investment,1056.6143834074269,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 10,investment,1690.5830134518824,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 10,investment,2197.7579174874472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 10,investment,1056.6143834074269,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 10,investment,1690.5830134518824,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 10,investment,2197.7579174874472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 2,CF,0.462355,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 2,CF,0.462355,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 2,CF,0.462355,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3087,12 +3087,12 @@ Residential DW - Class 2,FOM,1.42,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential DW - Class 2,FOM,2.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 2,FOM,1.84,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 2,FOM,1.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 2,investment,1209.412446006358,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 2,investment,1935.0599136101723,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 2,investment,2515.577887693224,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 2,investment,1209.412446006358,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 2,investment,1935.0599136101723,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 2,investment,2515.577887693224,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 2,investment,1056.6143834074269,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 2,investment,1690.5830134518824,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 2,investment,2197.7579174874472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 2,investment,1056.6143834074269,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 2,investment,1690.5830134518824,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 2,investment,2197.7579174874472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 3,CF,0.45185300000000006,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 3,CF,0.45185300000000006,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 3,CF,0.45185300000000006,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3105,12 +3105,12 @@ Residential DW - Class 3,FOM,1.42,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential DW - Class 3,FOM,2.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 3,FOM,1.84,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 3,FOM,1.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 3,investment,1209.412446006358,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 3,investment,1935.0599136101723,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 3,investment,2515.577887693224,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 3,investment,1209.412446006358,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 3,investment,1935.0599136101723,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 3,investment,2515.577887693224,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 3,investment,1056.6143834074269,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 3,investment,1690.5830134518824,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 3,investment,2197.7579174874472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 3,investment,1056.6143834074269,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 3,investment,1690.5830134518824,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 3,investment,2197.7579174874472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 4,CF,0.440728,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 4,CF,0.440728,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 4,CF,0.440728,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3123,12 +3123,12 @@ Residential DW - Class 4,FOM,1.42,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential DW - Class 4,FOM,2.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 4,FOM,1.84,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 4,FOM,1.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 4,investment,1209.412446006358,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 4,investment,1935.0599136101723,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 4,investment,2515.577887693224,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 4,investment,1209.412446006358,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 4,investment,1935.0599136101723,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 4,investment,2515.577887693224,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 4,investment,1056.6143834074269,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 4,investment,1690.5830134518824,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 4,investment,2197.7579174874472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 4,investment,1056.6143834074269,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 4,investment,1690.5830134518824,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 4,investment,2197.7579174874472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 5,CF,0.426488,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 5,CF,0.426488,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 5,CF,0.426488,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3141,12 +3141,12 @@ Residential DW - Class 5,FOM,1.42,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential DW - Class 5,FOM,2.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 5,FOM,1.84,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 5,FOM,1.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 5,investment,1209.412446006358,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 5,investment,1935.0599136101723,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 5,investment,2515.577887693224,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 5,investment,1209.412446006358,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 5,investment,1935.0599136101723,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 5,investment,2515.577887693224,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 5,investment,1056.6143834074269,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 5,investment,1690.5830134518824,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 5,investment,2197.7579174874472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 5,investment,1056.6143834074269,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 5,investment,1690.5830134518824,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 5,investment,2197.7579174874472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 6,CF,0.404505,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 6,CF,0.404505,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 6,CF,0.404505,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3159,12 +3159,12 @@ Residential DW - Class 6,FOM,1.42,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential DW - Class 6,FOM,2.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 6,FOM,1.84,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 6,FOM,1.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 6,investment,1209.412446006358,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 6,investment,1935.0599136101723,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 6,investment,2515.577887693224,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 6,investment,1209.412446006358,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 6,investment,1935.0599136101723,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 6,investment,2515.577887693224,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 6,investment,1056.6143834074269,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 6,investment,1690.5830134518824,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 6,investment,2197.7579174874472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 6,investment,1056.6143834074269,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 6,investment,1690.5830134518824,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 6,investment,2197.7579174874472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 7,CF,0.372376,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 7,CF,0.372376,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 7,CF,0.372376,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3177,12 +3177,12 @@ Residential DW - Class 7,FOM,1.42,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential DW - Class 7,FOM,2.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 7,FOM,1.84,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 7,FOM,1.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 7,investment,1209.412446006358,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 7,investment,1935.0599136101723,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 7,investment,2515.577887693224,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 7,investment,1209.412446006358,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 7,investment,1935.0599136101723,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 7,investment,2515.577887693224,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 7,investment,1056.6143834074269,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 7,investment,1690.5830134518824,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 7,investment,2197.7579174874472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 7,investment,1056.6143834074269,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 7,investment,1690.5830134518824,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 7,investment,2197.7579174874472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 8,CF,0.331525,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 8,CF,0.331525,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 8,CF,0.331525,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3195,12 +3195,12 @@ Residential DW - Class 8,FOM,1.42,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential DW - Class 8,FOM,2.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 8,FOM,1.84,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 8,FOM,1.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 8,investment,1209.412446006358,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 8,investment,1935.0599136101723,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 8,investment,2515.577887693224,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 8,investment,1209.412446006358,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 8,investment,1935.0599136101723,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 8,investment,2515.577887693224,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 8,investment,1056.6143834074269,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 8,investment,1690.5830134518824,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 8,investment,2197.7579174874472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 8,investment,1056.6143834074269,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 8,investment,1690.5830134518824,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 8,investment,2197.7579174874472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential DW - Class 9,CF,0.285334,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential DW - Class 9,CF,0.285334,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential DW - Class 9,CF,0.285334,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3213,12 +3213,12 @@ Residential DW - Class 9,FOM,1.42,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential DW - Class 9,FOM,2.95,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential DW - Class 9,FOM,1.84,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential DW - Class 9,FOM,1.42,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential DW - Class 9,investment,1209.412446006358,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential DW - Class 9,investment,1935.0599136101723,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential DW - Class 9,investment,2515.577887693224,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential DW - Class 9,investment,1209.412446006358,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential DW - Class 9,investment,1935.0599136101723,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential DW - Class 9,investment,2515.577887693224,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential DW - Class 9,investment,1056.6143834074269,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential DW - Class 9,investment,1690.5830134518824,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential DW - Class 9,investment,2197.7579174874472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential DW - Class 9,investment,1056.6143834074269,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential DW - Class 9,investment,1690.5830134518824,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential DW - Class 9,investment,2197.7579174874472,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 1,CF,0.19262941265204728,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 1,CF,0.19262941265204728,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 1,CF,0.18778017406004235,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3231,12 +3231,12 @@ Residential PV - Class 1,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_view Residential PV - Class 1,FOM,1.34,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 1,FOM,1.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 1,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 1,investment,942.288785597594,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 1,investment,1208.073423882336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 1,investment,1702.885175115879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 1,investment,942.288785597594,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 1,investment,1208.073423882336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 1,investment,1702.885175115879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 1,investment,823.239323750684,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 1,investment,1055.4445343285502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 1,investment,1487.7414030756993,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 1,investment,823.239323750684,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 1,investment,1055.4445343285502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 1,investment,1487.7414030756993,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 10,CF,0.12483975330012692,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 10,CF,0.12483975330012692,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 10,CF,0.12169704658060394,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3249,12 +3249,12 @@ Residential PV - Class 10,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_vie Residential PV - Class 10,FOM,1.34,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 10,FOM,1.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 10,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 10,investment,942.288785597594,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 10,investment,1208.073423882336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 10,investment,1702.885175115879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 10,investment,942.288785597594,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 10,investment,1208.073423882336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 10,investment,1702.885175115879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 10,investment,823.239323750684,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 10,investment,1055.4445343285502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 10,investment,1487.7414030756993,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 10,investment,823.239323750684,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 10,investment,1055.4445343285502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 10,investment,1487.7414030756993,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 2,CF,0.1896493378001759,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 2,CF,0.1896493378001759,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 2,CF,0.1848751193921595,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3267,12 +3267,12 @@ Residential PV - Class 2,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_view Residential PV - Class 2,FOM,1.34,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 2,FOM,1.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 2,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 2,investment,942.288785597594,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 2,investment,1208.073423882336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 2,investment,1702.885175115879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 2,investment,942.288785597594,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 2,investment,1208.073423882336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 2,investment,1702.885175115879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 2,investment,823.239323750684,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 2,investment,1055.4445343285502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 2,investment,1487.7414030756993,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 2,investment,823.239323750684,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 2,investment,1055.4445343285502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 2,investment,1487.7414030756993,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 3,CF,0.17692612853862053,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 3,CF,0.17692612853862053,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 3,CF,0.17247220325986126,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3285,12 +3285,12 @@ Residential PV - Class 3,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_view Residential PV - Class 3,FOM,1.34,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 3,FOM,1.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 3,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 3,investment,942.288785597594,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 3,investment,1208.073423882336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 3,investment,1702.885175115879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 3,investment,942.288785597594,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 3,investment,1208.073423882336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 3,investment,1702.885175115879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 3,investment,823.239323750684,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 3,investment,1055.4445343285502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 3,investment,1487.7414030756993,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 3,investment,823.239323750684,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 3,investment,1055.4445343285502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 3,investment,1487.7414030756993,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 4,CF,0.16719068008616828,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 4,CF,0.16719068008616828,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 4,CF,0.16298183426695853,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3303,12 +3303,12 @@ Residential PV - Class 4,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_view Residential PV - Class 4,FOM,1.34,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 4,FOM,1.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 4,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 4,investment,942.288785597594,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 4,investment,1208.073423882336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 4,investment,1702.885175115879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 4,investment,942.288785597594,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 4,investment,1208.073423882336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 4,investment,1702.885175115879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 4,investment,823.239323750684,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 4,investment,1055.4445343285502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 4,investment,1487.7414030756993,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 4,investment,823.239323750684,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 4,investment,1055.4445343285502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 4,investment,1487.7414030756993,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 5,CF,0.15835652646896928,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 5,CF,0.15835652646896928,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 5,CF,0.15437007097976382,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3321,12 +3321,12 @@ Residential PV - Class 5,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_view Residential PV - Class 5,FOM,1.34,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 5,FOM,1.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 5,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 5,investment,942.288785597594,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 5,investment,1208.073423882336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 5,investment,1702.885175115879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 5,investment,942.288785597594,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 5,investment,1208.073423882336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 5,investment,1702.885175115879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 5,investment,823.239323750684,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 5,investment,1055.4445343285502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 5,investment,1487.7414030756993,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 5,investment,823.239323750684,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 5,investment,1055.4445343285502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 5,investment,1487.7414030756993,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 6,CF,0.15639145748147906,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 6,CF,0.15639145748147906,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 6,CF,0.15245447049367689,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3339,12 +3339,12 @@ Residential PV - Class 6,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_view Residential PV - Class 6,FOM,1.34,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 6,FOM,1.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 6,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 6,investment,942.288785597594,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 6,investment,1208.073423882336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 6,investment,1702.885175115879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 6,investment,942.288785597594,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 6,investment,1208.073423882336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 6,investment,1702.885175115879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 6,investment,823.239323750684,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 6,investment,1055.4445343285502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 6,investment,1487.7414030756993,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 6,investment,823.239323750684,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 6,investment,1055.4445343285502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 6,investment,1487.7414030756993,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 7,CF,0.1494966780048899,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 7,CF,0.1494966780048899,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 7,CF,0.1457332596858643,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3357,12 +3357,12 @@ Residential PV - Class 7,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_view Residential PV - Class 7,FOM,1.34,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 7,FOM,1.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 7,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 7,investment,942.288785597594,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 7,investment,1208.073423882336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 7,investment,1702.885175115879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 7,investment,942.288785597594,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 7,investment,1208.073423882336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 7,investment,1702.885175115879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 7,investment,823.239323750684,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 7,investment,1055.4445343285502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 7,investment,1487.7414030756993,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 7,investment,823.239323750684,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 7,investment,1055.4445343285502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 7,investment,1487.7414030756993,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 8,CF,0.1424107632833385,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 8,CF,0.1424107632833385,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 8,CF,0.1388257252576146,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3375,12 +3375,12 @@ Residential PV - Class 8,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_view Residential PV - Class 8,FOM,1.34,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 8,FOM,1.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 8,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 8,investment,942.288785597594,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 8,investment,1208.073423882336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 8,investment,1702.885175115879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 8,investment,942.288785597594,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 8,investment,1208.073423882336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 8,investment,1702.885175115879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 8,investment,823.239323750684,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 8,investment,1055.4445343285502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 8,investment,1487.7414030756993,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 8,investment,823.239323750684,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 8,investment,1055.4445343285502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 8,investment,1487.7414030756993,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Residential PV - Class 9,CF,0.13674203686793523,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Residential PV - Class 9,CF,0.13674203686793523,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Residential PV - Class 9,CF,0.1332997029418742,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3393,12 +3393,12 @@ Residential PV - Class 9,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_view Residential PV - Class 9,FOM,1.34,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Residential PV - Class 9,FOM,1.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Residential PV - Class 9,FOM,1.2,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Residential PV - Class 9,investment,942.288785597594,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Residential PV - Class 9,investment,1208.073423882336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Residential PV - Class 9,investment,1702.885175115879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Residential PV - Class 9,investment,942.288785597594,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Residential PV - Class 9,investment,1208.073423882336,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Residential PV - Class 9,investment,1702.885175115879,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Residential PV - Class 9,investment,823.239323750684,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Residential PV - Class 9,investment,1055.4445343285502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Residential PV - Class 9,investment,1487.7414030756993,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Residential PV - Class 9,investment,823.239323750684,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Residential PV - Class 9,investment,1055.4445343285502,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Residential PV - Class 9,investment,1487.7414030756993,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative SMR,FOM,5.0,%/year,Danish Energy Agency,"Technology data for renewable fuels, in pdf on table 3 p.311",2015.0,, SMR,efficiency,0.76,per unit (in LHV),"IEA Global average levelised cost of hydrogen production by energy source and technology, 2019 and 2050 (2020), https://www.iea.org/data-and-statistics/charts/global-average-levelised-cost-of-hydrogen-production-by-energy-source-and-technology-2019-and-2050",,,, SMR,investment,522201.0492,EUR/MW_CH4,Danish Energy Agency,"Technology data for renewable fuels, in pdf on table 3 p.311",2015.0,, @@ -3415,12 +3415,12 @@ SOEC,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and finan SOEC,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced SOEC,FOM,0.04,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced SOEC,efficiency,0.9,p.u.,ICCT IRA e-fuels assumptions ,,,, -SOEC,investment,1446.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -SOEC,investment,1446.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -SOEC,investment,1240.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -SOEC,investment,1240.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -SOEC,investment,676.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -SOEC,investment,676.0,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +SOEC,investment,1263.3112909101872,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +SOEC,investment,1263.3112909101872,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +SOEC,investment,1083.3374832148215,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +SOEC,investment,1083.3374832148215,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +SOEC,investment,590.5936602042092,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +SOEC,investment,590.5936602042092,USD/kW,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced SOEC,lifetime,30.0,years,ICCT IRA e-fuels assumptions ,,,, Sand-charger,FOM,1.075,%/year,"Viswanathan_2022, NULL","{'carrier': ['elec', 'sand'], 'technology_type': ['charger'], 'type': ['thermal'], 'note': ['Guesstimate, 50% on charger']}",2020.0,, Sand-charger,efficiency,0.99,per unit,"Viswanathan_2022, p.107 (p.129)","{'carrier': ['elec', 'sand'], 'technology_type': ['charger'], 'type': ['thermal'], 'note': ['RTE assume 99% for charge and other for discharge']}",2020.0,, @@ -3435,7 +3435,7 @@ Sand-store,investment,6700.8517,EUR/MWh,"Viswanathan_2022, p.100 (p.122)","{'car Sand-store,lifetime,35.0,years,"Viswanathan_2022, p.107 (p.129)","{'carrier': ['sand'], 'technology_type': ['store'], 'type': ['thermal'], 'note': ['NULL']}",2020.0,, Solid biomass steam reforming,FOM,0.05,%/year,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Solid biomass steam reforming,efficiency,0.712,p.u.,"JRC, 01_JRC-EU-TIMES Full model ",,,, -Solid biomass steam reforming,investment,590.7702,EUR/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, +Solid biomass steam reforming,investment,796.4750872147151,USD/kW,"JRC, 01_JRC-EU-TIMES Full model ",,2010.0,, Solid biomass steam reforming,lifetime,20.0,years,"JRC, 01_JRC-EU-TIMES Full model ",,,, Steam methane reforming,FOM,3.0,%/year,"International Energy Agency (2015): Technology Roadmap Hydrogen and Fuel Cells , table 15.",Large scale SMR facility (150-300 MW).,2015.0,, Steam methane reforming,investment,497454.611,EUR/MW_H2,"International Energy Agency (2015): Technology Roadmap Hydrogen and Fuel Cells , table 15.",Large scale SMR facility (150-300 MW). Currency conversion 1.17 USD = 1 EUR.,2015.0,, @@ -3462,12 +3462,12 @@ Utility PV - Class 1,FOM,1.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Utility PV - Class 1,FOM,2.02,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 1,FOM,1.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 1,FOM,1.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 1,investment,562.568749666391,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 1,investment,682.8963556917138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 1,investment,895.3211436190419,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 1,investment,562.568749666391,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 1,investment,682.8963556917138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 1,investment,895.3211436190419,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 1,investment,491.4933979023363,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 1,investment,596.6187252190604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 1,investment,782.205608384894,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 1,investment,491.4933979023363,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 1,investment,596.6187252190604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 1,investment,782.205608384894,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 10,CF,0.2362485855199907,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 10,CF,0.2299450736198828,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 10,CF,0.21614309533871287,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3480,12 +3480,12 @@ Utility PV - Class 10,FOM,1.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer Utility PV - Class 10,FOM,2.02,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 10,FOM,1.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 10,FOM,1.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 10,investment,562.568749666391,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 10,investment,682.8963556917138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 10,investment,895.3211436190419,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 10,investment,562.568749666391,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 10,investment,682.8963556917138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 10,investment,895.3211436190419,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 10,investment,491.4933979023363,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 10,investment,596.6187252190604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 10,investment,782.205608384894,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 10,investment,491.4933979023363,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 10,investment,596.6187252190604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 10,investment,782.205608384894,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 2,CF,0.3635753987202017,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 2,CF,0.34483933525931415,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 2,CF,0.32667583845212333,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3498,12 +3498,12 @@ Utility PV - Class 2,FOM,1.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Utility PV - Class 2,FOM,2.02,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 2,FOM,1.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 2,FOM,1.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 2,investment,562.568749666391,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 2,investment,682.8963556917138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 2,investment,895.3211436190419,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 2,investment,562.568749666391,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 2,investment,682.8963556917138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 2,investment,895.3211436190419,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 2,investment,491.4933979023363,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 2,investment,596.6187252190604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 2,investment,782.205608384894,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 2,investment,491.4933979023363,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 2,investment,596.6187252190604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 2,investment,782.205608384894,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 3,CF,0.34624673736936756,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 3,CF,0.33033578547229403,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 3,CF,0.3124220192967057,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3516,12 +3516,12 @@ Utility PV - Class 3,FOM,1.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Utility PV - Class 3,FOM,2.02,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 3,FOM,1.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 3,FOM,1.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 3,investment,562.568749666391,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 3,investment,682.8963556917138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 3,investment,895.3211436190419,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 3,investment,562.568749666391,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 3,investment,682.8963556917138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 3,investment,895.3211436190419,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 3,investment,491.4933979023363,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 3,investment,596.6187252190604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 3,investment,782.205608384894,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 3,investment,491.4933979023363,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 3,investment,596.6187252190604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 3,investment,782.205608384894,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 4,CF,0.32964892495004744,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 4,CF,0.315990473780947,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 4,CF,0.2984439328998798,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3534,12 +3534,12 @@ Utility PV - Class 4,FOM,1.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Utility PV - Class 4,FOM,2.02,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 4,FOM,1.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 4,FOM,1.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 4,investment,562.568749666391,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 4,investment,682.8963556917138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 4,investment,895.3211436190419,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 4,investment,562.568749666391,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 4,investment,682.8963556917138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 4,investment,895.3211436190419,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 4,investment,491.4933979023363,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 4,investment,596.6187252190604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 4,investment,782.205608384894,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 4,investment,491.4933979023363,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 4,investment,596.6187252190604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 4,investment,782.205608384894,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 6,CF,0.29685712351380666,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 6,CF,0.2863993301415639,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 6,CF,0.26983916294249016,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3552,12 +3552,12 @@ Utility PV - Class 6,FOM,1.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Utility PV - Class 6,FOM,2.02,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 6,FOM,1.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 6,FOM,1.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 6,investment,562.568749666391,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 6,investment,682.8963556917138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 6,investment,895.3211436190419,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 6,investment,562.568749666391,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 6,investment,682.8963556917138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 6,investment,895.3211436190419,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 6,investment,491.4933979023363,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 6,investment,596.6187252190604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 6,investment,782.205608384894,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 6,investment,491.4933979023363,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 6,investment,596.6187252190604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 6,investment,782.205608384894,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 7,CF,0.28154686310149707,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 7,CF,0.27249019840590066,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 7,CF,0.25652218155928197,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3570,12 +3570,12 @@ Utility PV - Class 7,FOM,1.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Utility PV - Class 7,FOM,2.02,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 7,FOM,1.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 7,FOM,1.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 7,investment,562.568749666391,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 7,investment,682.8963556917138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 7,investment,895.3211436190419,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 7,investment,562.568749666391,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 7,investment,682.8963556917138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 7,investment,895.3211436190419,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 7,investment,491.4933979023363,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 7,investment,596.6187252190604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 7,investment,782.205608384894,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 7,investment,491.4933979023363,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 7,investment,596.6187252190604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 7,investment,782.205608384894,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 8,CF,0.27069647892550364,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 8,CF,0.2620049193344006,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 8,CF,0.24676363250052624,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3588,12 +3588,12 @@ Utility PV - Class 8,FOM,1.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Utility PV - Class 8,FOM,2.02,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 8,FOM,1.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 8,FOM,1.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 8,investment,562.568749666391,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 8,investment,682.8963556917138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 8,investment,895.3211436190419,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 8,investment,562.568749666391,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 8,investment,682.8963556917138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 8,investment,895.3211436190419,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 8,investment,491.4933979023363,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 8,investment,596.6187252190604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 8,investment,782.205608384894,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 8,investment,491.4933979023363,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 8,investment,596.6187252190604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 8,investment,782.205608384894,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility PV - Class 9,CF,0.2575488691352394,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility PV - Class 9,CF,0.24972696842827424,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility PV - Class 9,CF,0.23510830200189767,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3606,60 +3606,60 @@ Utility PV - Class 9,FOM,1.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer? Utility PV - Class 9,FOM,2.02,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility PV - Class 9,FOM,1.87,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility PV - Class 9,FOM,1.68,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility PV - Class 9,investment,562.568749666391,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility PV - Class 9,investment,682.8963556917138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility PV - Class 9,investment,895.3211436190419,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility PV - Class 9,investment,562.568749666391,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility PV - Class 9,investment,682.8963556917138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility PV - Class 9,investment,895.3211436190419,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility PV - Class 9,investment,491.4933979023363,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility PV - Class 9,investment,596.6187252190604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility PV - Class 9,investment,782.205608384894,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility PV - Class 9,investment,491.4933979023363,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility PV - Class 9,investment,596.6187252190604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility PV - Class 9,investment,782.205608384894,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility-Scale Battery Storage - 10Hr,FOM,2.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility-Scale Battery Storage - 10Hr,FOM,2.29,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility-Scale Battery Storage - 10Hr,FOM,2.34,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Utility-Scale Battery Storage - 10Hr,FOM,2.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility-Scale Battery Storage - 10Hr,FOM,2.29,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility-Scale Battery Storage - 10Hr,FOM,2.34,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility-Scale Battery Storage - 10Hr,investment,1565.2395334491666,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility-Scale Battery Storage - 10Hr,investment,2013.667582769996,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility-Scale Battery Storage - 10Hr,investment,3256.097011239588,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility-Scale Battery Storage - 10Hr,investment,1565.2395334491666,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility-Scale Battery Storage - 10Hr,investment,2013.667582769996,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility-Scale Battery Storage - 10Hr,investment,3256.097011239588,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility-Scale Battery Storage - 10Hr,investment,1367.4860135444853,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility-Scale Battery Storage - 10Hr,investment,1759.259331572033,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility-Scale Battery Storage - 10Hr,investment,2844.719307467418,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility-Scale Battery Storage - 10Hr,investment,1367.4860135444853,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility-Scale Battery Storage - 10Hr,investment,1759.259331572033,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility-Scale Battery Storage - 10Hr,investment,2844.719307467418,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility-Scale Battery Storage - 2Hr,FOM,1.91,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility-Scale Battery Storage - 2Hr,FOM,2.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility-Scale Battery Storage - 2Hr,FOM,2.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Utility-Scale Battery Storage - 2Hr,FOM,1.91,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility-Scale Battery Storage - 2Hr,FOM,2.06,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility-Scale Battery Storage - 2Hr,FOM,2.16,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility-Scale Battery Storage - 2Hr,investment,494.271219947937,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility-Scale Battery Storage - 2Hr,investment,709.8064551090512,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility-Scale Battery Storage - 2Hr,investment,976.0471731141064,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility-Scale Battery Storage - 2Hr,investment,494.271219947937,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility-Scale Battery Storage - 2Hr,investment,709.8064551090512,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility-Scale Battery Storage - 2Hr,investment,976.0471731141064,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility-Scale Battery Storage - 2Hr,investment,431.82462858380455,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility-Scale Battery Storage - 2Hr,investment,620.1289827802208,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility-Scale Battery Storage - 2Hr,investment,852.7326516293365,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility-Scale Battery Storage - 2Hr,investment,431.82462858380455,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility-Scale Battery Storage - 2Hr,investment,620.1289827802208,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility-Scale Battery Storage - 2Hr,investment,852.7326516293365,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility-Scale Battery Storage - 4Hr,FOM,2.08,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility-Scale Battery Storage - 4Hr,FOM,2.17,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility-Scale Battery Storage - 4Hr,FOM,2.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Utility-Scale Battery Storage - 4Hr,FOM,2.08,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility-Scale Battery Storage - 4Hr,FOM,2.17,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility-Scale Battery Storage - 4Hr,FOM,2.25,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility-Scale Battery Storage - 4Hr,investment,762.0132983232445,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility-Scale Battery Storage - 4Hr,investment,1035.7717370242874,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility-Scale Battery Storage - 4Hr,investment,1546.0596326454768,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility-Scale Battery Storage - 4Hr,investment,762.0132983232445,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility-Scale Battery Storage - 4Hr,investment,1035.7717370242874,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility-Scale Battery Storage - 4Hr,investment,1546.0596326454768,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility-Scale Battery Storage - 4Hr,investment,665.7399748239748,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility-Scale Battery Storage - 4Hr,investment,904.9115699781738,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility-Scale Battery Storage - 4Hr,investment,1350.7293155888567,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility-Scale Battery Storage - 4Hr,investment,665.7399748239748,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility-Scale Battery Storage - 4Hr,investment,904.9115699781738,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility-Scale Battery Storage - 4Hr,investment,1350.7293155888567,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Utility-Scale Battery Storage - 8Hr,FOM,2.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced Utility-Scale Battery Storage - 8Hr,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate Utility-Scale Battery Storage - 8Hr,FOM,2.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative Utility-Scale Battery Storage - 8Hr,FOM,2.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced Utility-Scale Battery Storage - 8Hr,FOM,2.26,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate Utility-Scale Battery Storage - 8Hr,FOM,2.32,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -Utility-Scale Battery Storage - 8Hr,investment,1297.497455073859,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -Utility-Scale Battery Storage - 8Hr,investment,1687.7023008547596,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -Utility-Scale Battery Storage - 8Hr,investment,2686.0845517082175,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -Utility-Scale Battery Storage - 8Hr,investment,1297.497455073859,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -Utility-Scale Battery Storage - 8Hr,investment,1687.7023008547596,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -Utility-Scale Battery Storage - 8Hr,investment,2686.0845517082175,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +Utility-Scale Battery Storage - 8Hr,investment,1133.570667304315,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +Utility-Scale Battery Storage - 8Hr,investment,1474.4767443740798,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +Utility-Scale Battery Storage - 8Hr,investment,2346.7226435078974,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +Utility-Scale Battery Storage - 8Hr,investment,1133.570667304315,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +Utility-Scale Battery Storage - 8Hr,investment,1474.4767443740798,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +Utility-Scale Battery Storage - 8Hr,investment,2346.7226435078974,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative Vanadium-Redox-Flow-bicharger,FOM,2.4395,%/year,"Viswanathan_2022, p.28 (p.50)","{'carrier': ['elec', 'vanadium', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['30% assumed of power components every 10 years']}",2020.0,, Vanadium-Redox-Flow-bicharger,efficiency,0.8062,per unit,"Viswanathan_2022, p.42 (p.64)","{'carrier': ['elec', 'vanadium', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['AC-AC efficiency at transformer level 0.65^0.5']}",2020.0,, Vanadium-Redox-Flow-bicharger,investment,129023.0526,EUR/MW,"Viswanathan_2022, p.42 (p.64)","{'carrier': ['elec', 'vanadium', 'elec'], 'technology_type': ['bicharger'], 'type': ['electrochemical'], 'note': ['Power Equipment']}",2020.0,, @@ -3706,12 +3706,12 @@ battery storage,FOM,2.29,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucke battery storage,FOM,2.17,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced battery storage,FOM,2.23,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate battery storage,FOM,2.29,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -battery storage,investment,1029.7553766985518,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -battery storage,investment,1361.7370189395238,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -battery storage,investment,2116.072092176847,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -battery storage,investment,1029.7553766985518,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -battery storage,investment,1361.7370189395238,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -battery storage,investment,2116.072092176847,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +battery storage,investment,899.6553210641449,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +battery storage,investment,1189.694157176127,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +battery storage,investment,1848.725979548377,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +battery storage,investment,899.6553210641449,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +battery storage,investment,1189.694157176127,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +battery storage,investment,1848.725979548377,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative battery storage,lifetime,30.0,years,"Danish Energy Agency, inputs/technology_data_catalogue_for_energy_storage.xlsx",: Technical lifetime,2015.0,, biochar pyrolysis,FOM,3.4,%/year,"Danish Energy Agency, inputs/data_sheets_for_renewable_fuels.xlsx","105 Slow pyrolysis, Straw: Fixed O&M",2020.0,, biochar pyrolysis,VOM,823.497,EUR/MWh_biochar,"Danish Energy Agency, inputs/data_sheets_for_renewable_fuels.xlsx","105 Slow pyrolysis, Straw: Variable O&M",2020.0,, @@ -3756,12 +3756,12 @@ biomass,FOM,3.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-d biomass,FOM,3.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced biomass,FOM,3.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate biomass,FOM,3.96,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -biomass,VOM,5.246639999999999,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -biomass,VOM,5.246639999999999,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -biomass,VOM,5.246639999999999,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -biomass,VOM,5.246639999999999,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -biomass,VOM,5.246639999999999,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -biomass,VOM,5.246639999999999,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +biomass,VOM,4.583775623334041,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +biomass,VOM,4.583775623334041,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +biomass,VOM,4.583775623334041,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +biomass,VOM,4.583775623334041,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +biomass,VOM,4.583775623334041,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +biomass,VOM,4.583775623334041,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative biomass,discount rate,0.0548163560987116,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced biomass,discount rate,0.0548163560987116,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate biomass,discount rate,0.0548163560987116,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3769,18 +3769,18 @@ biomass,discount rate,0.0471698161746512,per unit,"NREL, NREL ATB 2024",Meaning biomass,discount rate,0.0471698161746512,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate biomass,discount rate,0.0471698161746512,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative biomass,efficiency,0.468,per unit,DIW DataDoc http://hdl.handle.net/10419/80348, from old pypsa cost assumptions,2015.0,, -biomass,fuel,73.57007249999998,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -biomass,fuel,73.57007249999998,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -biomass,fuel,73.57007249999998,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -biomass,fuel,73.57007249999998,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -biomass,fuel,73.57007249999998,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -biomass,fuel,73.57007249999998,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -biomass,investment,4135.457972325422,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -biomass,investment,4135.457972325422,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -biomass,investment,4135.457972325422,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -biomass,investment,4135.457972325422,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -biomass,investment,4135.457972325422,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -biomass,investment,4135.457972325422,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +biomass,fuel,64.27517514684027,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +biomass,fuel,64.27517514684027,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +biomass,fuel,64.27517514684027,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +biomass,fuel,64.27517514684027,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +biomass,fuel,64.27517514684027,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +biomass,fuel,64.27517514684027,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +biomass,investment,3612.981154580397,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +biomass,investment,3612.981154580397,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +biomass,investment,3612.981154580397,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +biomass,investment,3612.981154580397,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +biomass,investment,3612.981154580397,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +biomass,investment,3612.981154580397,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative biomass,lifetime,30.0,years,ECF2010 in DIW DataDoc http://hdl.handle.net/10419/80348, from old pypsa cost assumptions,2015.0,, biomass CHP,FOM,3.5368,%/year,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","09c Straw, Large, 40 degree: Fixed O&M",2015.0,, biomass CHP,VOM,2.222,EUR/MWh_e,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","09c Straw, Large, 40 degree: Variable O&M ",2015.0,, @@ -3946,12 +3946,12 @@ coal,FOM,2.19,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data coal,FOM,2.18,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced coal,FOM,2.18,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate coal,FOM,2.19,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -coal,VOM,8.15,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -coal,VOM,8.34,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -coal,VOM,8.52,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -coal,VOM,8.15,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -coal,VOM,8.34,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -coal,VOM,8.52,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +coal,VOM,7.120322974355481,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +coal,VOM,7.2863182338803325,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +coal,VOM,7.443576900798613,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +coal,VOM,7.120322974355481,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +coal,VOM,7.2863182338803325,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +coal,VOM,7.443576900798613,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative coal,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced coal,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate coal,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -3959,13 +3959,13 @@ coal,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of coal,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate coal,discount rate,0.0535847804878049,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative coal,efficiency,0.356,p.u.,"Lazard's levelized cost of energy analysis - version 16.0 (2023): https://www.lazard.com/media/typdgxmm/lazards-lcoeplus-april-2023.pdf , pg. 49 (Levelized Cost of Energy - Key Assumptions), accessed: 2023-12-14.","Calculated based on average of listed range, i.e. 1 / ((8.75+12) MMbtu/MWh_th /2 / (3.4095 MMbtu/MWh_th)), rounded up.",2023.0,, -coal,fuel,8.12,USD/MWh_th,"EIA, https://www.eia.gov/coal/annual/",46.97 USD/short ton of bituminous coal with energy content = 19.73 million BTU/short ton,2023.0,, -coal,investment,3350.3716189524553,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -coal,investment,3268.3358215122153,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -coal,investment,3186.176476184264,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -coal,investment,3350.3716189524553,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -coal,investment,3268.3358215122153,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -coal,investment,3186.176476184264,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +coal,fuel,6.887488540325987,USD/MWh_th,"EIA, https://www.eia.gov/coal/annual/",46.97 USD/short ton of bituminous coal with energy content = 19.73 million BTU/short ton,2023.0,, +coal,investment,2927.0831915405806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +coal,investment,2855.411857401524,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +coal,investment,2783.632584506234,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +coal,investment,2927.0831915405806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +coal,investment,2855.411857401524,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +coal,investment,2783.632584506234,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative coal,lifetime,40.0,years,"Lazard's levelized cost of energy analysis - version 16.0 (2023): https://www.lazard.com/media/typdgxmm/lazards-lcoeplus-april-2023.pdf , pg. 49 (Levelized Cost of Energy - Key Assumptions), accessed: 2023-12-14.",,2023.0,, csp-tower,CF,0.666,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced csp-tower,CF,0.666,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -3979,24 +3979,24 @@ csp-tower,FOM,0.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi csp-tower,FOM,1.27,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced csp-tower,FOM,1.17,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate csp-tower,FOM,0.94,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -csp-tower,VOM,2.91,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -csp-tower,VOM,3.0,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -csp-tower,VOM,3.95766,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -csp-tower,VOM,2.91,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -csp-tower,VOM,3.0,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -csp-tower,VOM,3.95766,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +csp-tower,VOM,2.5423484485122025,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +csp-tower,VOM,2.6209777819713427,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +csp-tower,VOM,3.4576463095322345,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +csp-tower,VOM,2.5423484485122025,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +csp-tower,VOM,2.6209777819713427,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +csp-tower,VOM,3.4576463095322345,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative csp-tower,discount rate,0.0525782457084354,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced csp-tower,discount rate,0.0525782457084354,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate csp-tower,discount rate,0.0525782457084354,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative csp-tower,discount rate,0.0416031281240576,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced csp-tower,discount rate,0.0416031281240576,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate csp-tower,discount rate,0.0416031281240576,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -csp-tower,investment,3150.4413251673172,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -csp-tower,investment,4455.096594371452,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -csp-tower,investment,7912.019603207439,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -csp-tower,investment,3150.4413251673172,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -csp-tower,investment,4455.096594371452,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -csp-tower,investment,7912.019603207439,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +csp-tower,investment,2752.4122388892974,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +csp-tower,investment,3892.23639679459,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +csp-tower,investment,6912.409196842806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +csp-tower,investment,2752.4122388892974,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +csp-tower,investment,3892.23639679459,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +csp-tower,investment,6912.409196842806,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative csp-tower,lifetime,30.0,years,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),-,2020.0,, csp-tower TES,FOM,1.4,%/year,see solar-tower.,-,2020.0,, csp-tower TES,investment,13.32,EUR/kWh_th,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,"Based on NREL’s SAM (v2021.12.2) numbers for a CSP power plant, 2020 numbers. CAPEX degression (=learning) taken from ATB database (“moderate”) scenario. Costs include the TES incl. EPC cost for the default installation size (104 MWe plant, 2.791 MW_th TES). Total costs (69390776.7 USD) are divided by TES size to obtain EUR/kW_th. Exchange rate: 1.16 USD to 1 EUR.",2020.0,, @@ -4062,12 +4062,12 @@ direct air capture,compression-heat-output,0.2,MWh/tCO2,"Danish Energy Agency, i direct air capture,electricity-input,0.24,MWh_el/t_CO2,ICCT IRA e-fuels assumptions ,,,, direct air capture,heat-input,1.17,MWh_th/t_CO2,ICCT IRA e-fuels assumptions ,,,, direct air capture,heat-output,0.75,MWh/tCO2,"Danish Energy Agency, inputs/technology_data_for_carbon_capture_transport_storage.xlsx",403.a Direct air capture,2020.0,, -direct air capture,investment,12398844.91,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -direct air capture,investment,12398844.91,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -direct air capture,investment,19180739.93,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -direct air capture,investment,19180739.93,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -direct air capture,investment,7103597.31,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -direct air capture,investment,7103597.31,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +direct air capture,investment,10832365.677072823,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +direct air capture,investment,10832365.677072823,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +direct air capture,investment,16757431.066100188,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +direct air capture,investment,16757431.066100188,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +direct air capture,investment,6206123.573860465,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +direct air capture,investment,6206123.573860465,USD/t_CO2/h,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced direct air capture,lifetime,20.0,years,"Danish Energy Agency, inputs/technology_data_for_carbon_capture_transport_storage.xlsx",403.a Direct air capture,2020.0,, direct air capture,years,30.0,years,ICCT IRA e-fuels assumptions ,,,, direct firing gas,FOM,1.0303,%/year,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",312.a Direct firing Natural Gas: Fixed O&M,2019.0,, @@ -4148,7 +4148,7 @@ fuel cell,investment,846.5773,EUR/kW_e,"Danish Energy Agency, inputs/technology_ fuel cell,lifetime,10.0,years,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",12 LT-PEMFC CHP: Technical lifetime,2015.0,, fuelwood,fuel,11.9967,EUR/MWhth,"JRC ENSPRESO ca avg for MINBIOWOO (FuelwoodRW), ENS_BaU_GFTM",,2010.0,, gas,CO2 intensity,0.198,tCO2/MWh_th,Stoichiometric calculation with 50 GJ/t CH4,,,, -gas,fuel,14.05,USD/MWh_th,World Bank https://www.worldbank.org/en/research/commodity-markets,,2010.0,, +gas,fuel,16.199297879801314,USD/MWh_th,World Bank https://www.worldbank.org/en/research/commodity-markets,,2010.0,, gas boiler steam,FOM,3.74,%/year,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",311.1c Steam boiler Gas: Fixed O&M,2019.0,, gas boiler steam,VOM,1.007,EUR/MWh,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx",311.1c Steam boiler Gas: Variable O&M,2019.0,, gas boiler steam,efficiency,0.94,per unit,"Danish Energy Agency, inputs/technology_data_for_industrial_process_heat.xlsx","311.1c Steam boiler Gas: Total efficiency, net, annual average",2019.0,, @@ -4180,12 +4180,12 @@ geothermal,discount rate,0.0400999293962161,per unit,"NREL, NREL ATB 2024",Meani geothermal,discount rate,0.0400999293962161,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative geothermal,district heat surcharge,25.0,%,Frey et al. 2022: Techno-Economic Assessment of Geothermal Resources in the Variscan Basement of the Northern Upper Rhine Graben,"If capital cost of electric generation from EGS is 100%, district heating adds additional 25%. Costs incurred by piping.",2020.0,, geothermal,district heat-input,0.8,MWh_thdh/MWh_th,"Aghahosseini, Breyer 2020: From hot rock to useful energy: A global estimate of enhanced geothermal systems potential, https://www.sciencedirect.com/science/article/pii/S0306261920312551; Breede et al. 2015: Overcoming challenges in the classification of deep geothermal potential, https://eprints.gla.ac.uk/169585/","Heat-input, District Heat-output. This is an assessment of typical heat losses when heat is transmitted from the EGS plant to the DH network, This is a rough estimate, depends on local conditions",2020.0,, -geothermal,investment,4871.195050146992,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -geothermal,investment,5735.334425532337,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -geothermal,investment,6288.328801161732,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -geothermal,investment,4871.195050146992,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -geothermal,investment,5735.334425532337,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -geothermal,investment,6288.328801161732,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +geothermal,investment,4255.764666028015,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +geothermal,investment,5010.728033831877,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +geothermal,investment,5493.856691191796,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +geothermal,investment,4255.764666028015,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +geothermal,investment,5010.728033831877,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +geothermal,investment,5493.856691191796,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative geothermal,lifetime,30.0,years,"Aghahosseini, Breyer 2020: From hot rock to useful energy: A global estimate of enhanced geothermal systems potential, https://www.sciencedirect.com/science/article/pii/S0306261920312551",,2020.0,, helmeth,FOM,3.0,%/year,no source, from old pypsa cost assumptions,2015.0,, helmeth,efficiency,0.8,per unit,HELMETH press release, from old pypsa cost assumptions,2015.0,, @@ -4216,19 +4216,19 @@ hydro,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of hydro,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate hydro,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative hydro,efficiency,0.9,per unit,DIW DataDoc http://hdl.handle.net/10419/80348, from old pypsa cost assumptions,2015.0,, -hydro,investment,2800.6424250469768,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -hydro,investment,3241.3364440395458,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -hydro,investment,3111.4700906166145,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -hydro,investment,2800.6424250469768,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -hydro,investment,3241.3364440395458,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -hydro,investment,3111.4700906166145,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +hydro,investment,2446.8071904314893,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +hydro,investment,2831.823601240549,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +hydro,investment,2718.3646589248356,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +hydro,investment,2446.8071904314893,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +hydro,investment,2831.823601240549,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +hydro,investment,2718.3646589248356,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative hydro,lifetime,80.0,years,IEA2010, from old pypsa cost assumptions,2015.0,, hydrogen storage compressor,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,,2022.0,, hydrogen storage compressor,compression-electricity-input,0.05,MWh_el/MWh_H2,"Based on Stöckl et al (2021): https://doi.org/10.48550/arXiv.2005.03464, table SI.4.",1.707 kWh/kg.,,, -hydrogen storage compressor,investment,2.28,USD/kWh_H2,ICCT IRA e-fuels assumptions ,,2022.0,, +hydrogen storage compressor,investment,1.9919431142982202,USD/kWh_H2,ICCT IRA e-fuels assumptions ,,2022.0,, hydrogen storage compressor,lifetime,30.0,years,ICCT IRA e-fuels assumptions ,,,, hydrogen storage tank type 1,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,,2022.0,, -hydrogen storage tank type 1,investment,16.87,USD/kWh_H2,ICCT IRA e-fuels assumptions ,,2022.0,, +hydrogen storage tank type 1,investment,14.738631727285517,USD/kWh_H2,ICCT IRA e-fuels assumptions ,,2022.0,, hydrogen storage tank type 1,lifetime,30.0,years,ICCT IRA e-fuels assumptions ,,,, hydrogen storage tank type 1,min_fill_level,6.0,%,"Based on Stöckl et al (2021): https://doi.org/10.48550/arXiv.2005.03464, table SI.9.",,,, hydrogen storage tank type 1 including compressor,FOM,1.9048,%/year,"Danish Energy Agency, inputs/technology_data_catalogue_for_energy_storage.xlsx",151a Hydrogen Storage - Tanks: Fixed O&M,2015.0,, @@ -4309,12 +4309,12 @@ nuclear,FOM,2.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-d nuclear,FOM,4.43,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced nuclear,FOM,3.49,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate nuclear,FOM,2.22,%/year,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -nuclear,VOM,1.9,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -nuclear,VOM,2.8,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -nuclear,VOM,3.4,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -nuclear,VOM,1.9,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -nuclear,VOM,2.8,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -nuclear,VOM,3.4,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +nuclear,VOM,1.6599525952485168,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +nuclear,VOM,2.4462459298399195,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +nuclear,VOM,2.970441486234188,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +nuclear,VOM,1.6599525952485168,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +nuclear,VOM,2.4462459298399195,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +nuclear,VOM,2.970441486234188,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative nuclear,discount rate,0.056463198329135,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced nuclear,discount rate,0.056463198329135,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate nuclear,discount rate,0.056463198329135,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative @@ -4322,18 +4322,18 @@ nuclear,discount rate,0.0471844359305569,per unit,"NREL, NREL ATB 2024",Meaning nuclear,discount rate,0.0471844359305569,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate nuclear,discount rate,0.0471844359305569,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative nuclear,efficiency,0.326,p.u.,"Lazard's levelized cost of energy analysis - version 16.0 (2023): https://www.lazard.com/media/typdgxmm/lazards-lcoeplus-april-2023.pdf , pg. 49 (Levelized Cost of Energy - Key Assumptions), accessed: 2023-12-14.","Based on heat rate of 10.45 MMBtu/MWh_e and 3.4095 MMBtu/MWh_th, i.e. 1/(10.45/3.4095) = 0.3260.",2023.0,, -nuclear,fuel,9.13239,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -nuclear,fuel,10.18209,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -nuclear,fuel,11.33676,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -nuclear,fuel,9.13239,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -nuclear,fuel,10.18209,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -nuclear,fuel,11.33676,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -nuclear,investment,2842.5500204535756,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -nuclear,investment,5012.475561422719,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -nuclear,investment,9197.49272729507,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -nuclear,investment,2842.5500204535756,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -nuclear,investment,5012.475561422719,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -nuclear,investment,9197.49272729507,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +nuclear,fuel,7.978597095432423,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +nuclear,fuel,8.895677221344195,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +nuclear,fuel,9.904465359847146,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +nuclear,fuel,7.978597095432423,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +nuclear,fuel,8.895677221344195,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +nuclear,fuel,9.904465359847146,USD/MWh,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +nuclear,investment,2483.4201492503357,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +nuclear,investment,4379.195693054426,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +nuclear,investment,8035.474696027795,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +nuclear,investment,2483.4201492503357,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +nuclear,investment,4379.195693054426,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +nuclear,investment,8035.474696027795,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative nuclear,lifetime,40.0,years,"Lazard's levelized cost of energy analysis - version 16.0 (2023): https://www.lazard.com/media/typdgxmm/lazards-lcoeplus-april-2023.pdf , pg. 49 (Levelized Cost of Energy - Key Assumptions), accessed: 2023-12-14.",,2023.0,, offwind,CF,0.515,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced offwind,CF,0.4858,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate @@ -4353,12 +4353,12 @@ offwind,discount rate,0.0515168802203552,per unit,"NREL, NREL ATB 2024",Meaning offwind,discount rate,0.0401070465062936,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced offwind,discount rate,0.0401070465062936,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate offwind,discount rate,0.0401070465062936,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -offwind,investment,2596.595495907305,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -offwind,investment,3131.7949847930554,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -offwind,investment,3803.7637701200447,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -offwind,investment,2596.595495907305,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -offwind,investment,3131.7949847930554,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -offwind,investment,3803.7637701200447,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +offwind,investment,2268.539701179969,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +offwind,investment,2736.121690943959,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +offwind,investment,3323.1934431173954,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +offwind,investment,2268.539701179969,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +offwind,investment,2736.121690943959,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +offwind,investment,3323.1934431173954,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative offwind,lifetime,30.0,years,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",21 Offshore turbines: Technical lifetime [years],2020.0,, offwind-ac-connection-submarine,investment,2841.3251,EUR/MW/km,DEA https://ens.dk/en/our-services/projections-and-models/technology-data, from old pypsa cost assumptions,2015.0,, offwind-ac-connection-underground,investment,1420.1334,EUR/MW/km,DEA https://ens.dk/en/our-services/projections-and-models/technology-data, from old pypsa cost assumptions,2015.0,, @@ -4376,7 +4376,7 @@ oil,CO2 intensity,0.2571,tCO2/MWh_th,Stoichiometric calculation with 44 GJ/t die oil,FOM,2.4095,%/year,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",50 Diesel engine farm: Fixed O&M,2015.0,, oil,VOM,6.3493,EUR/MWh,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",50 Diesel engine farm: Variable O&M,2015.0,, oil,efficiency,0.35,per unit,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx","50 Diesel engine farm: Electricity efficiency, annual average",2015.0,, -oil,fuel,44.22,USD/MWh_th,World Bank https://www.worldbank.org/en/research/commodity-markets,,2010.0,, +oil,fuel,50.984551761196734,USD/MWh_th,World Bank https://www.worldbank.org/en/research/commodity-markets,,2010.0,, oil,investment,355.5625,EUR/kW,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",50 Diesel engine farm: Specific investment,2015.0,, oil,lifetime,25.0,years,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",50 Diesel engine farm: Technical lifetime,2015.0,, onwind,CF,0.514945,per unit,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced @@ -4397,12 +4397,12 @@ onwind,discount rate,0.0556378005825331,per unit,"NREL, NREL ATB 2024",Meaning o onwind,discount rate,0.0365777183152598,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced onwind,discount rate,0.0365777183152598,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate onwind,discount rate,0.0365777183152598,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -onwind,investment,1010.1800465163968,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -onwind,investment,1114.9082002515315,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -onwind,investment,1356.4307170414445,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -onwind,investment,1010.1800465163968,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -onwind,investment,1114.9082002515315,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -onwind,investment,1356.4307170414445,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +onwind,investment,882.5531525700844,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +onwind,investment,974.0498739323068,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +onwind,investment,1185.0582573830277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +onwind,investment,882.5531525700844,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +onwind,investment,974.0498739323068,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +onwind,investment,1185.0582573830277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative onwind,lifetime,30.0,years,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",20 Onshore turbines: Technical lifetime,2015.0,, organic rankine cycle,FOM,2.0,%/year,"Aghahosseini, Breyer 2020: From hot rock to useful energy: A global estimate of enhanced geothermal systems potential, https://www.sciencedirect.com/science/article/pii/S0306261920312551","Both for flash, binary and ORC plants. See Supplemental Material for details",2020.0,, organic rankine cycle,electricity-input,0.12,MWh_el/MWh_th,"Aghahosseini, Breyer 2020: From hot rock to useful energy: A global estimate of enhanced geothermal systems potential, https://www.sciencedirect.com/science/article/pii/S0306261920312551; Breede et al. 2015: Overcoming challenges in the classification of deep geothermal potential, https://eprints.gla.ac.uk/169585/","Heat-input, Electricity-output. This is a rough estimate, depends on input temperature, implies ~150 C.",2020.0,, @@ -4427,12 +4427,12 @@ ror,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of s ror,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate ror,discount rate,0.0383600809886244,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative ror,efficiency,0.9,per unit,DIW DataDoc http://hdl.handle.net/10419/80348, from old pypsa cost assumptions,2015.0,, -ror,investment,9005.486475065536,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -ror,investment,9234.349311015783,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -ror,investment,9281.186356512577,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -ror,investment,9005.486475065536,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -ror,investment,9234.349311015783,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -ror,investment,9281.186356512577,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +ror,investment,7867.726655663398,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +ror,investment,8067.674791711581,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +ror,investment,8108.594410251673,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +ror,investment,7867.726655663398,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +ror,investment,8067.674791711581,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +ror,investment,8108.594410251673,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative ror,lifetime,80.0,years,IEA2010, from old pypsa cost assumptions,2015.0,, seawater RO desalination,electricity-input,0.003,MWHh_el/t_H2O,"Caldera et al. (2016): Local cost of seawater RO desalination based on solar PV and windenergy: A global estimate. (https://doi.org/10.1016/j.desal.2016.02.004), Fig. 4.",Desalination using SWRO. Assume medium salinity of 35 Practical Salinity Units (PSUs) = 35 kg/m^3.,,, seawater desalination,FOM,4.0,%/year,"Caldera et al 2016: Local cost of seawater RO desalination based on solar PV and windenergy: A global estimate. (https://doi.org/10.1016/j.desal.2016.02.004), Table 1.",,2015.0,, @@ -4463,12 +4463,12 @@ solar-rooftop,discount rate,0.0461583242514692,per unit,"NREL, NREL ATB 2024",Me solar-rooftop,discount rate,0.0364480268090299,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced solar-rooftop,discount rate,0.0364480268090299,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate solar-rooftop,discount rate,0.0364480268090299,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -solar-rooftop,investment,773.8962637917009,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -solar-rooftop,investment,929.2122343748616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -solar-rooftop,investment,1239.359469701182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -solar-rooftop,investment,773.8962637917009,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -solar-rooftop,investment,929.2122343748616,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -solar-rooftop,investment,1239.359469701182,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +solar-rooftop,investment,676.1216376495604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +solar-rooftop,investment,811.8148736774867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +solar-rooftop,investment,1082.7778779875277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +solar-rooftop,investment,676.1216376495604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +solar-rooftop,investment,811.8148736774867,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +solar-rooftop,investment,1082.7778779875277,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative solar-rooftop,lifetime,40.0,years,Calculated. See 'further description'.,Mixed investment costs based on average of 50% 'solar-rooftop commercial' and 50% 'solar-rooftop residential',2020.0,, solar-rooftop commercial,FOM,1.812,%/year,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",22 Rooftop PV commercial: Fixed O&M [2020-EUR/MW_e/y],2020.0,, solar-rooftop commercial,investment,413.9018,EUR/kW_e,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",22 Rooftop PV commercial: Nominal investment [2020-MEUR/MW_e],2020.0,, @@ -4494,12 +4494,12 @@ solar-utility,discount rate,0.0507126462365808,per unit,"NREL, NREL ATB 2024",Me solar-utility,discount rate,0.0342774493840203,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced solar-utility,discount rate,0.0342774493840203,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate solar-utility,discount rate,0.0342774493840203,per unit,"NREL, NREL ATB 2024",Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative -solar-utility,investment,562.568749666391,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced -solar-utility,investment,682.8963556917138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate -solar-utility,investment,895.3211436190419,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative -solar-utility,investment,562.568749666391,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced -solar-utility,investment,682.8963556917138,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate -solar-utility,investment,895.3211436190419,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative +solar-utility,investment,491.4933979023363,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Advanced +solar-utility,investment,596.6187252190604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate +solar-utility,investment,782.205608384894,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Conservative +solar-utility,investment,491.4933979023363,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Advanced +solar-utility,investment,596.6187252190604,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate +solar-utility,investment,782.205608384894,USD/kW,NREL/ATB-https://data.openei.org/s3_viewer?bucket=oedi-data-lake&prefix=ATB%2Felectricity%2Fcsv%2F2022%2F,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative solar-utility,lifetime,40.0,years,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",22 Utility-scale PV: Technical lifetime [years],2020.0,, solar-utility single-axis tracking,FOM,2.5531,%/year,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",22 Utility-scale PV tracker: Fixed O&M [2020-EUR/MW_e/y],2020.0,, solar-utility single-axis tracking,investment,352.5127,EUR/kW_e,"Danish Energy Agency, inputs/technology_data_for_el_and_dh.xlsx",22 Utility-scale PV tracker: Nominal investment [2020-MEUR/MW_e],2020.0,, diff --git a/scripts/_helpers.py b/scripts/_helpers.py index 74b48d61..400a1352 100644 --- a/scripts/_helpers.py +++ b/scripts/_helpers.py @@ -196,6 +196,43 @@ def make_accessable(*ios): return snakemake +def prepare_inflation_rate(fn: str, currency_to_use: str = "eur") -> pd.Series: + """ + The function reads-in annual the inflation rates from Eurostat + https://ec.europa.eu/eurostat/api/dissemination/sdmx/2.1/dataflow/ESTAT/prc_hicp_aind/1.0?references=descendants&detail=referencepartial&format=sdmx_2.1_generic&compressed=true + + Parameters + ---------- + fn: str + file name for the Eurostat inflation rates + currency_to_use: str + currency to select for the inflation rate + + Returns + ------- + pandas.Series + inflation rates series + """ + + if currency_to_use.casefold() == "usd": + row_to_use = "United States" + else: + row_to_use = "European Union - 27 countries (from 2020)" + + inflation_rate_series = pd.read_excel( + fn, sheet_name="Sheet 1", index_col=0, header=[8], engine="calamine" + ) + inflation_rate_series = (inflation_rate_series.loc[row_to_use].dropna()).loc[ + "2001":: + ] + inflation_rate_series.rename( + index=lambda inflation_rate_val: int(inflation_rate_val), inplace=True + ) + inflation_rate_series = inflation_rate_series.astype(float) + inflation_rate_series /= 100.0 + return inflation_rate_series + + def adjust_for_inflation( inflation_rate: pd.Series, costs: pd.DataFrame, diff --git a/scripts/compile_cost_assumptions.py b/scripts/compile_cost_assumptions.py index 72c62a20..b9c7f150 100644 --- a/scripts/compile_cost_assumptions.py +++ b/scripts/compile_cost_assumptions.py @@ -38,6 +38,7 @@ configure_logging, get_relative_fn, mock_snakemake, + prepare_inflation_rate, ) from currency_converter import ECB_URL, CurrencyConverter from scipy import interpolate @@ -3889,36 +3890,6 @@ def add_energy_storage_database( return pd.concat([cost_dataframe, df]), tech_names -def prepare_inflation_rate(fn: str) -> pd.Series: - """ - The function reads-in annual the inflation rates from Eurostat - https://ec.europa.eu/eurostat/api/dissemination/sdmx/2.1/dataflow/ESTAT/prc_hicp_aind/1.0?references=descendants&detail=referencepartial&format=sdmx_2.1_generic&compressed=true - - Parameters - ---------- - fn - file name for the Eurostat inflation rates - - Returns - ------- - pandas.Series - inflation rates series - """ - - inflation_rate = pd.read_excel( - fn, sheet_name="Sheet 1", index_col=0, header=[8], engine="calamine" - ) - inflation_rate = ( - inflation_rate.loc["European Union - 27 countries (from 2020)"].dropna() - ).loc["2001"::] - inflation_rate.rename(index=lambda x: int(x), inplace=True) - inflation_rate = inflation_rate.astype(float) - - inflation_rate /= 100 - - return inflation_rate - - # %% ************************************************************************* # ---------- MAIN ------------------------------------------------------------ if __name__ == "__main__": diff --git a/scripts/compile_cost_assumptions_usa.py b/scripts/compile_cost_assumptions_usa.py index 0c3a9d70..4028906b 100644 --- a/scripts/compile_cost_assumptions_usa.py +++ b/scripts/compile_cost_assumptions_usa.py @@ -14,8 +14,12 @@ import numpy as np import pandas as pd -from _helpers import adjust_for_inflation, configure_logging, mock_snakemake -from compile_cost_assumptions import prepare_inflation_rate +from _helpers import ( + adjust_for_inflation, + configure_logging, + mock_snakemake, + prepare_inflation_rate, +) logger = logging.getLogger(__name__) @@ -298,36 +302,25 @@ def replace_value_name( def pre_process_manual_input_usa( manual_input_usa_file_path: str, - inflation_rate_file_path: str, list_of_years: list, - eur_year: int, year: int, - n_digits: int, ) -> pd.DataFrame: """ The function reads and modifies the manual_input_usa.csv file. Namely, it: - reads the input file - renames the column "further_description" to "further description" - - prepares a dataframe with the inflation rate per year in European Union - starting from manual_input_usa.csv, it estimates the parameters for each technology for all the requested years - it selects the values for a given year - - it adjusts the cost estimates to the inflation rate - queries the necessary rows of the existing cost dataframe Parameters ---------- manual_input_usa_file_path : str manual_input_usa.csv file path - inflation_rate_file_path : str - inflation rate file path list_of_years : list years for which a cost assumption is provided - eur_year : int - year for european output year : int year from list_of_years - n_digits : int - number of significant digits Returns ------- @@ -345,29 +338,32 @@ def pre_process_manual_input_usa( columns={"further_description": "further description"} ) - # Read the inflation rate - inflation_rate_series = prepare_inflation_rate(inflation_rate_file_path) - # Create cost estimates for all years list_dataframe_row = [] for tech in manual_input_usa_file_df["technology"].unique(): - c0 = manual_input_usa_file_df[manual_input_usa_file_df["technology"] == tech] - for param in c0["parameter"].unique(): - c = manual_input_usa_file_df.query( + technology_filtered_df = manual_input_usa_file_df[ + manual_input_usa_file_df["technology"] == tech + ] + for param in technology_filtered_df["parameter"].unique(): + technology_parameter_filtered_df = manual_input_usa_file_df.query( "technology == @tech and parameter == @param" ) # Consider differences among scenarios - scenarios = c["scenario"].dropna().unique() + scenarios = technology_parameter_filtered_df["scenario"].dropna().unique() for scenario in scenarios: - scenario_value = c[c["scenario"] == scenario][ - "value" - ].values # Extract values for each scenario + scenario_value = technology_parameter_filtered_df[ + technology_parameter_filtered_df["scenario"] == scenario + ]["value"].values # Extract values for each scenario if scenario_value.size > 0: - scenario_years = c[c["scenario"] == scenario]["year"].values - scenario_values = c[c["scenario"] == scenario]["value"].values + scenario_years = technology_parameter_filtered_df[ + technology_parameter_filtered_df["scenario"] == scenario + ]["year"].values + scenario_values = technology_parameter_filtered_df[ + technology_parameter_filtered_df["scenario"] == scenario + ]["value"].values interpolated_values = np.interp( list_of_years, scenario_years, scenario_values @@ -384,38 +380,22 @@ def pre_process_manual_input_usa( s_copy["technology"] = tech s_copy["scenario"] = scenario try: - s_copy["currency_year"] = int(c["currency_year"].values[0]) + s_copy["currency_year"] = int( + technology_parameter_filtered_df["currency_year"].values[0] + ) except ValueError: s_copy["currency_year"] = np.nan # Add the other columns in the data file for col in ["unit", "source", "further description"]: - s_copy[col] = c[col].unique()[0] + s_copy[col] = technology_parameter_filtered_df[col].unique()[0] # Add a separate row for each `financial_case` - for financial_case in c["financial_case"].unique(): + for financial_case in technology_parameter_filtered_df[ + "financial_case" + ].unique(): s_copy["financial_case"] = financial_case list_dataframe_row.append(s_copy.copy()) - if len(scenarios) == 0: - s = pd.Series( - index=list_of_years, - data=[scenario_value] * len(list_of_years), - name=param, - ) - s["parameter"] = param - s["technology"] = tech - s["scenario"] = "" - try: - s["currency_year"] = int(c["currency_year"].values[0]) - except ValueError: - s["currency_year"] = np.nan - for col in ["unit", "source", "further description"]: - s[col] = c[col].unique()[0] - - # Add a separate row for each `financial_case` - for financial_case in c["financial_case"].unique(): - s["financial_case"] = financial_case - list_dataframe_row.append(s.copy()) manual_input_usa_file_df = pd.DataFrame(list_dataframe_row).reset_index(drop=True) # Filter the information for a given year @@ -460,27 +440,7 @@ def pre_process_manual_input_usa( # Cast the value column to float manual_input_usa_file_df["value"] = manual_input_usa_file_df["value"].astype(float) - # Correct the cost assumptions to the inflation rate - mask = manual_input_usa_file_df["unit"].str.startswith("EUR", na=False) - - inflation_adjusted_manual_input_usa_file_df = manual_input_usa_file_df.copy() - inflation_adjusted_manual_input_usa_file_df.loc[mask, "value"] = ( - adjust_for_inflation( - inflation_rate_series, - manual_input_usa_file_df.loc[mask], - manual_input_usa_file_df.loc[mask, "technology"].unique(), - eur_year, - "value", - usa_costs_flag=True, - )["value"] - ) - - # Round the results - inflation_adjusted_manual_input_usa_file_df.loc[:, "value"] = round( - inflation_adjusted_manual_input_usa_file_df["value"].astype(float), n_digits - ) - - return inflation_adjusted_manual_input_usa_file_df + return manual_input_usa_file_df def modify_cost_input_file( @@ -781,6 +741,8 @@ def pre_process_atb_input_file( NREL/ATB file path nrel_source: str link to the NREL/ATB source files. This information shall be used to populate the source column + nrel_further_description: str + text that details the further description field for the NREL/ATB sources year: int year for the cost assumption list_columns_to_keep: list @@ -904,6 +866,7 @@ def pre_process_atb_input_file( # ATB currency year dates back to 2018 for ATB2020 and to 2022 for ATB2024 atb_input_df["currency_year"] = atb_input_df["currency_year"] - 2 + # Cast currency_year from int to float atb_input_df["currency_year"] = atb_input_df["currency_year"].astype(float) @@ -990,7 +953,7 @@ def duplicate_fuel_cost(input_file_path: str, list_of_years: list) -> pd.DataFra input_file_discount_rate = snakemake.input.nrel_atb_input_discount_rate input_file_fuel_costs = snakemake.input.nrel_atb_input_fuel_costs input_file_manual_input_usa = snakemake.input.nrel_atb_manual_input_usa - input_file_eur_inflation_rate = snakemake.input.eur_inflation_rate + input_file_inflation_rate = snakemake.input.inflation_rate cost_file_list = snakemake.input.cost_files_to_modify nrel_atb_columns_to_keep = snakemake.config["nrel_atb"]["nrel_atb_columns_to_keep"] nrel_atb_core_metric_parameter_to_keep = snakemake.config["nrel_atb"][ @@ -1048,11 +1011,8 @@ def duplicate_fuel_cost(input_file_path: str, list_of_years: list) -> pd.DataFra manual_input_usa_df = pre_process_manual_input_usa( input_file_manual_input_usa, - input_file_eur_inflation_rate, year_list, - eur_reference_year, year_val, - num_digits, ) cost_df = pre_process_cost_input_file( @@ -1144,13 +1104,32 @@ def duplicate_fuel_cost(input_file_path: str, list_of_years: list) -> pd.DataFra by=["technology", "parameter"] ).reset_index(drop=True) + # Correct for inflation for technology-parameter pairs having units that contain USD + inflation_rate_series_usd = prepare_inflation_rate( + input_file_inflation_rate, "USD" + ) + mask_usd = ( + updated_cost_df["unit"].str.casefold().str.startswith("usd", na=False) + ) + inflation_adjusted_updated_cost_df = updated_cost_df.copy() + inflation_adjusted_updated_cost_df.loc[mask_usd, "value"] = ( + adjust_for_inflation( + inflation_rate_series_usd, + inflation_adjusted_updated_cost_df.loc[mask_usd], + inflation_adjusted_updated_cost_df.loc[mask_usd, "technology"].unique(), + eur_reference_year, + "value", + usa_costs_flag=True, + )["value"] + ) + # output the modified cost dataframe output_cost_path_list = [ path for path in snakemake.output if str(year_val) in path ] if len(output_cost_path_list) == 1: output_cost_path = output_cost_path_list[0] - updated_cost_df.to_csv(output_cost_path, index=False) + inflation_adjusted_updated_cost_df.to_csv(output_cost_path, index=False) logger.info( f"The cost assumptions file for the US has been compiled for year {year_val}" ) diff --git a/test/conftest.py b/test/conftest.py index 783dfeba..320c5368 100644 --- a/test/conftest.py +++ b/test/conftest.py @@ -322,7 +322,7 @@ def mock_inflation_data(tmpdir): 2003: [2.5], 2004: [1.8], } - index = ["European Union - 27 countries (from 2020)"] + index = ["European Union - 27 countries (from 2020)", "United States"] inflation_rate_output_path = pathlib.Path(tmpdir, "inflation_rate.xlsx") inflation_rate_dataframe = pd.DataFrame(data, index=index) inflation_rate_dataframe.to_excel( diff --git a/test/test_compile_cost_assumptions.py b/test/test_compile_cost_assumptions.py index 8e9ff4b0..919f9671 100644 --- a/test/test_compile_cost_assumptions.py +++ b/test/test_compile_cost_assumptions.py @@ -26,7 +26,6 @@ get_data_from_DEA, get_excel_sheets, get_sheet_location, - prepare_inflation_rate, set_round_trip_efficiency, set_specify_assumptions, ) @@ -34,7 +33,7 @@ path_cwd = pathlib.Path.cwd() snakemake_input_dictionary = { - "inflation_rate": "inputs/prc_hicp_aind__custom_9928419_spreadsheet.xlsx", + "inflation_rate": "inputs/Eurostat_inflation_rate.xlsx", "pypsa_costs": "inputs/costs_PyPSA.csv", "fraunhofer_costs": "inputs/Fraunhofer_ISE_costs.csv", "fraunhofer_energy_prices": "inputs/Fraunhofer_ISE_energy_prices.csv", @@ -565,20 +564,6 @@ def test_geometric_series(nom_val, den_val, n_terms, start_val, expected_val): ) -def test_prepare_inflation_rate(mock_inflation_data): - """ - The test verifies what is returned by prepare_inflation_rate. - """ - output_series = prepare_inflation_rate(mock_inflation_data).round(decimals=3) - reference_output_series = pd.Series( - [0.02, 0.015, 0.025, 0.018], - index=[2001, 2002, 2003, 2004], - name="European Union - 27 countries (from 2020)", - ) - comparison_series = output_series.compare(reference_output_series) - assert comparison_series.size == 0 - - def test_add_gas_storage(config): """ The test verifies what is returned by add_gas_storage. diff --git a/test/test_compile_cost_assumptions_usa.py b/test/test_compile_cost_assumptions_usa.py index da5a26a3..d9544252 100644 --- a/test/test_compile_cost_assumptions_usa.py +++ b/test/test_compile_cost_assumptions_usa.py @@ -398,17 +398,11 @@ def test_pre_process_manual_input_usa(config, year, expected): manual_input_usa_file_path = pathlib.Path( path_cwd, "inputs", "US", "manual_input_usa.csv" ) - inflation_rate_file_path = pathlib.Path( - path_cwd, "inputs", "prc_hicp_aind__custom_9928419_spreadsheet.xlsx" - ) year = 2020 output_dataframe = pre_process_manual_input_usa( manual_input_usa_file_path, - inflation_rate_file_path, list_of_years, - config["eur_year"], year, - config["ndigits"], ) assert output_dataframe.shape == expected diff --git a/test/test_helpers.py b/test/test_helpers.py new file mode 100644 index 00000000..789dfa0c --- /dev/null +++ b/test/test_helpers.py @@ -0,0 +1,54 @@ +# SPDX-FileCopyrightText: Contributors to technology-data +# +# SPDX-License-Identifier: GPL-3.0-only + +# coding: utf-8 + +import pathlib +import sys + +import numpy as np +import pytest + +sys.path.append("./scripts") + +from _helpers import prepare_inflation_rate + +path_cwd = pathlib.Path.cwd() + + +@pytest.mark.parametrize( + "currency_to_use, expected_series_name, expected_index, expected_values", + [ + ( + "eur", + "European Union - 27 countries (from 2020)", + [2017, 2022, 2023], + [0.016, 0.092, 0.064], + ), + ("usd", "United States", [2017, 2022, 2023], [0.018, 0.087, 0.03]), + ( + "EuR", + "European Union - 27 countries (from 2020)", + [2017, 2022, 2023], + [0.016, 0.092, 0.064], + ), + ("USD", "United States", [2017, 2022, 2023], [0.018, 0.087, 0.03]), + ], +) +def test_prepare_inflation_rate( + currency_to_use, expected_series_name, expected_index, expected_values +): + """ + The test verifies what is returned by prepare_inflation_rate. + """ + inflation_rate_input_file_path = pathlib.Path( + path_cwd, "inputs", "Eurostat_inflation_rates.xlsx" + ) + output_series = prepare_inflation_rate( + inflation_rate_input_file_path, currency_to_use + ).round(decimals=3) + assert np.array_equal( + output_series.loc[expected_index].values, np.array(expected_values) + ) + assert output_series.name == expected_series_name